Operation and Maintenance of Gravel Roads a Literature Study Hossein Alzubaidi

Total Page:16

File Type:pdf, Size:1020Kb

Operation and Maintenance of Gravel Roads a Literature Study Hossein Alzubaidi Operation and maintenance of gravel roads A literature study Hossein Alzubaidi VTI meddelande 852A • 1999 VTI meddelande 852A • 1999 Operation and maintenance of gravel roads A literature study Hossein Alzubaidi Cover: Heikki Heiniö, Finland Publisher: Publication: VTI meddelande 852A Published: Project code: 1999 60519 S-581 95 Linköping Sweden Project: Efficient production methods in the operation and maintenance of gravel roads Author: Sponsor: Hossein Alzubaidi Swedish National Road Administration (SNRA) Title: Operation and maintenance of gravel roads – A Literature Atudy Abstract Gravel roads form a large percentage of the road network in Sweden. The public road network under the jurisdiction of the Swedish National Road Administration has a total length of some 98,000 kilometres. About 22,000 km of this network consist of gravel roads. In addition, there are about 74,000 kilometres of private road and 210,000 kilometres of forest roads. The report describes the present position in the operation and maintenance of gravel roads. It presents a comprehensive literature survey of current and recent national and international research. It deals only with summer maintenance and focuses primarily on roads surfaced with aggregate. The following areas are treated in the report: 1-Definitions and terms regarding the operation and maintenance of gravel roads. 2-General description of the Swedish road network. 3-Major factors causing deterioration of gravel roads. 4-Technical requirements for Swedish gravel roads. 5-Factors, which influence the operation and maintenance of gravel roads. 6-Operation and maintenance methods. 7-Condition assessment of gravel roads. 8-Planning and evaluation of operation and maintenance measures. ISSN: Language: No. of pages: 0347-6049 English 231 + Appendixes Foreword This study of the literature forms the first part of a PhD project "Efficient production methods in the operation and maintenance of gravel roads". The project is carried out in the Centre for Research and Education in the Operation and Maintenance of Infrastructure (CDU), with financial assistance from the Swedish National Road Administration (SNRA), Management of State Roads. The project is carried out at the Swedish National Road and Transport Research Institute (VTI). My principal supervisor and examiner is Professor Rolf Magnusson, Royal Institute of Technology (KTH). Project manager at VTI is Lars Bäckman, and the SNRA representative is Ulf Påhlsson. A combined steering and reference group has been formed for the project, comprising the following members: Gunnar Svensson SNRA, Production Göran Andersson SNRA, Region Mälardalen (VMN) Hans Cedermark CDU Ingvar Sikh SNRA, Production Jan Nordqvist SNRA, Region North (VN) Jan-Åke Karlsson SNRA, Region South-east (VSÖ) Johan Hansen SNRA, Highway Division Karin Högström SNRA, Highway Division Kent Enkell VTI, Operation and Maintenance (DU) Lars Bäckman VTI, Highway Engineering (VB) Rolf Magnusson KTH, Highway Engineering Ulf Isacsson KTH, Highway Engineering Ulf Påhlsson SNRA, Highway Division I wish to express my sincere thanks to my supervisor, the project manager, the members of the steering and reference group, the sponsor and all who have provided assistance during the performance of this work. Linköping, May 1999 Hossein Alzubaidi VTI meddelande 852A Contents i Contents Summary vi! ! 1 Introduction 1 1.1 "#$%&'()*+!! 1 1.2 ,-.!#/0 2 1.3 1/0/2#2/(*3 2 1.4 4*5('0#2/(*!3.#'$- 3 2 Definitions 4 2.1 67.'#2/(*!#*+!0#/*2.*#*$. 4 2.2 8#/*2.*#*$.!!!!4 2.3 67.'#2/(* 7 2.4 92#:/;/3#2/(*!#*+!32'.*&2-.*/*&!!!!7 2.5 </55.'.*2!2=7.3!(5!'(#+ 8 2.6 ,-.!32')$2)'.!(5!2-.!'(#+ 9 2.7 ,=7.3!(5!>.#'/*&!$()'3. 10 3 General description of the Swedish road network 12 3.1 ?+0/*/32'#2/@.!$;#33/5/$#2/(*!(5!9>.+/3-!'(#+3!A%0B 13 3.2 "'.#%+(>*!:=!2=7.!(5!>.#'/*&!$()'3.!A%0B 13 3.3 "'.#%+(>*!:=!2=7.!(5!>.#'/*&!$()'3.!/*!+/55.'.*2!$()*2/.3 14 3.4 1.*&2-!(5!&'#@.;!'(#+3!/*!+/55.'.*2!$()*2/.3 15 3.5 "'.#%+(>*!(5!2=7.!(5!>.#'/*&!$()'3.!:[email protected]/$;.!0/;.#&. 17 3.6 "'.#%+(>*!:=!??<,!(*!+/55.'.*2!2=7.3!(5!>.#'/*&!$()'3.!/*!CDDE 18 3.7 "'.#%+(>*!(5!'(#+!>/+2-!:=!+/55.'.*2!2=7.3!(5!>.#'/*&!$()'3.!/*!CDDE 19 3.8 "'.#%+(>*!:=!37..+!;/0/2!:=!+/55.'.*2!2=7.3 (5!>.#'/*&!$()'3. /*!CDDE 20 3.9 1.*&2-3!#*+!7'(7('2/(*3!(5!7#@.+!#*+!)*7#@.+!'(#+3 21 3.10 9>.+/3-!&'#@.;!'(#+!*.2>('%!/*!CDDE 22 3.11 8#/*2.*#*$.!$(32 23 4 Deterioration of gravel roads 24 4.1 ,-.!$#)3.3!(5!+.2.'/('#2/(* 25 4.1.1 ,'#55/$ 25 4.1.2 F'.$/7/2#2/(*!#*+!$;/0#2. 26 4.1.3 G'#+/*& 26 4.2 </32'.33.3!(5!&'#@.;!'(#+3 26 4.2.1 4*$(''.$2!3-#7. 26 4.2.1.1 9-#7.!(5!'(#+!(*!32'#/&-2!3.$2/(*3 26 4.2.1.2 9-#7.!(5!'(#+!2-'()&-!$)'@.3 29 4.2.2 4*3)55/$/.*2!+'#/*#&. 30 VTI meddelande 852A Contents ii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echnical requirements for Swedish gravel roads 44 5.1 ,.$-*/$#;!'.J)/'.0.*23!5('!2-.!$(*32')$2/(*!(5!*.>!&'#@.;!'(#+3! /*!9>.+.* 45 5.1.1 I.J)/'.0.*23!/*!H-#72.'!C!(5!I6?<!DL 45 5.1.1.1 I.J)/'.0.*23!$(*$.'*/*&!3.'@/$.!;/5. 45 5.1.1.2 I.J)/'.0.*23!$(*$.'*/*&!7.'0/22.+!2'#55/$ 45 5.1.1.3 I.J)/'.0.*23!$(*$.'*/*&!7.'0/33/:;.!3)'5#$.!)*.@.**.33!/*!2-.! ;(*&/2)+/*#;!+/'.$2/(* 46 5.1.1.4 I.J)/'.0.*23!$(*$.'*/*&!$'(335#;; 46 5.1.1.5 I.J)/'.0.*23!$(*$.'*/*&!7.'0/33/:;.!5'(32!-.#@. 47 5.1.2 I.J)/'.0.*23!/*!H-#72.'!M!(5!I6?<!DL 47 5.1.3 I.J)/'.0.*23!/*!H-#72.'!N!(5!I6?<!DL 48 5.1.3.1 I.J)/'.0.*23!5('!&'#@.;!>.#'/*&!$()'3. 48 5.1.3.2 I.J)/'.0.*23!5('!:#3.!$()'3. 49 5.1.3.3 I.J)/'.0.*23!5('!2-.!3):O:#3. 51 5.1.3.4 I.J)/'.0.*23!5('!7'(2.$2/(*!$()'3. 52 5.2 ,.$-*/$#;!'.J)/'.0.*23!5('!2-.!(7.'#2/(*!#*+!0#/*2.*#*$.!(5! 9>.+/3-!&'#@.;!'(#+3 53 5.2.1 I.J)/'.0.*23!5('!2-.!2-'..!32#*+#'+!$;#33.3 53 5.2.1.1 92#*+#'+!H;#33!?!A??<,2PCQNB 53 5.2.1.2 92#*+#'+!H;#33!"!ANRS!??<,2!SCQLB 53 5.2.1.3 92#*+#'+!H;#33!H!A??<,2TNRB 53 5.2.2 62-.'!'.J)/'.0.*23!5('!0#*#&.0.*2!#*+!0#/*2.*#*$. 54 5.2.2.1 9)'5#$.!.@.**.33!#*+!:/*+/*&!#:/;/2= 54 5.2.2.2 ,'#5/$%#:/;/2=!#*+!$(*2/*)/2= 54 VTI meddelande 852A Contents iii 5.2.2.3 H'(335#;; 54 5.2.2.4 1.#32!#$$.72#:;.!$(*+/2/(*!$;#33!!!!!54 5.2.2.5 <'#/*#&. 55 5.2.2.6 9;(7.3 55 5.2.2.7! K'/$2/(* 55 5.2.2.8 U)#;/2=!(5!>.#'/*&!$()'3. 55 5.2.2.9 K'..+(0!5'(0!(:32#$;.3 55 5.2.2.10 </@.'3/(*!(5!2'#55/$ 55 5.2.2.11 97.$/#;!$(*+/2/(*3 56 6 Factors which influence the operation and maintenance of gravel roads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peration and maintenance methods 75 7.1 <)32!$(*2'(; 76 7.1.1 </55.'.*2!'.#3(*3!5('!+)32!$(*2'(; 77 7.1.2 </55.'.*2!2=7.3!(5!+)32!$(*2'(; 78 7.1.3 </55.'.*2!2=7.3!(5!+)32!$(*2'(;!#&.*2 79 7.1.3.1 W#2.' 80 7.1.3.2 4*('&#*/$!3#;23 80 7.1.3.3 Y(*O:/2)0/*()3!('&#*/$!$-.0/$#;3 96 7.1.3.4 "/2)0/*()3!!0#2.'/#;3 106 7.1.3.5 H;#=! 121 7.1.3.6 6/;!#3!+)32!$(*2'(;!#&.*2 122 7.1.4 H(323!(5!+)32!$(*2'(;!)3/*&!3#;2[!;/&*(3);7-(*#2.3!#*+!:/2)0.*! .0);3/(* 123 VTI meddelande 852A Contents iv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ondition assessment of gravel roads 154 8.1 ?33.330.*2!(5!2-.!$(*+/2/(*!(5!&'#@.;!'(#+3!/*!9>.+.* 155 8.1.1 9):^.$2/@.!#33.330.*2 155 8.1.1.1 9>.+/3-!I(#+!4*32/2)2.[!CDML 155 8.1.1.2 ?*+'.*!#*+!K'#*33(*!_!`,Z[!CDEa 155 8.1.1.3 407'(@.0.*2!#*+!0#/*2.*#*$.!(5!&'#@.;!'(#+3[!bKcGb!3$#;.
Recommended publications
  • Environmental Guidelines for Access Roads and Water Crossings
    Environmental Guidelines For Access Roads and Water Crossings Cette publication est également disponible en français. Ministry of Natural Resources Ontario Lyn McLeod Minister ©1990, Queen's Printer for Ontario Printed in Ontario, Canada Single copies of this publication are available for $5.25 from the address noted below. Current publications of the Ontario Ministry of Natural Resources, and price lists, are obtainable through the Ministry of Natural Resources Public Information Centre, Room 1640, Whitney Block, 99 Wellesley St. West, Toronto, Ontario M7A IW3 (personal shopping and mail orders). Telephone inquiries about ministry programs and services should be directed to the Public Information Centres: Fisheries/Fishing Licence Sales (416) 965-7883 Wildlife/Hunting Licence Sales 965-4251 Provincial Parks 965-3081 Forestry/Lands 965-9751 Aerial Photographs 965-1123 Maps 965-6511 Minerals 965-1348 Cheques or money orders should be made payable to the Treasurer of Ontario, and payment must accompany order. Other government publications are available from Publications Ontario, Main Floor, 880 Bay St., Toronto. For mail orders write MGS Publications Services Section, 5th Floor, 880 Bay St., Toronto, Ontario M7A IN8. Cover Photo - The Brightsand River bridge, built by Canadian Pacific Forest Products Limited near Thunder Bay, illustrates the use of good design and construction practices to minimize environmental changes. This paper contains recycled materials Contents 1 1.0 Preface .....................................2 2.0 Introduction
    [Show full text]
  • Essex Windsor Regional Transportation Master Plan
    ESSEX-WINDSOR REGIONAL TRANSPORTATION MASTER PLAN Technical Report IBI Group With October, 2005 Paradigm Transportation Solutions Essex-Windsor Regional Transportation Master Plan MAJOR STUDY FINDINGS & EXECUTIVE SUMMARY PART 1: MAJOR STUDY FINDINGS Official Plan policies of both the County of Essex and the City of Windsor acknowledge that comprehensive regional transportation policies and implementation strategies are needed to effectively address regional transportation needs now through to 2021. This is needed because during this time period, the City and County combined are expected to grow by about 92,000 more residents and 53,000 jobs. The location and form of this growth will have a significant impact on the capability of the existing transportation system, and specifically the major roadway system, to serve the added travel needs. Coupled with this is the overall background growth in trip-making throughout the Essex-Windsor region, and the amount of cross-border traffic moving through the region. This is why the regional transportation plan has taken a very integrated transportation/land use planning approach, with as much emphasis on demand-side issues such as trip-making characteristics and travel mode choice, as on the more traditional supply-side alternatives dealing with major roadway widenings and extensions. The transportation planning approach used in this study emphasizes the integration of land use and transportation planning in Essex-Windsor region. Continued regional growth will put pressure on strategic parts of the transportation system, reducing its ability to move people and goods safely and efficiently in these parts of the region. Other transportation system needs will continue to grow in response to growth in international cross-border traffic, and are addressed more specifically in the Lets Get Windsor-Essex Moving initiatives, the Detroit River International Crossing Study and the Windsor Gateway Report prepared for the City of Windsor by Sam Schwartz Engineering PLLC and released in January 2005.
    [Show full text]
  • Payandan Shareholders
    PAYANDAN PAYANDAN 1. Company Background Creative Path to Growth Payandan Shareholders PAYANDAN Payandan’s shares belong to Mostazafan Foundation of Islamic Revolution. • Mostazafan Foundation owns 49% • Sina Energy Development Company owns 51% Mostazafan Foundation of Islamic Revolution Sina Energy Development Company PAYANDAN Mostazafan Foundation of Islamic Revolution PAYANDAN SEDCO Sina Financial Paya Saman Pars (Oil & Gas) & Investment Co (Road & Building) Sina Food Industries Iran Housing Group Saba Paya Sanat Sina (Power & Electricity) (Tire, Tiles, Glasswork, Textile, Etc) Ferdos Pars Sina ICT Group (Agriculture) Parsian Tourism Kaveh Pars & Transport Group (Mining) Alavi Foundation Alavi Civil (Charitable) Engineering Group Sina Energy Development Holding Company PAYANDAN SEDCO as one of subsidiaries of The Mostazafan Foundation of Islamic Revolution is considered one of pioneer holding companies in area of oil & gas which aims on huge projects in whole chains of oil and gas. Payandan (Oil & Gas General Contractor) North Drilling (Offshore Drilling) Pedex (Onshore Drilling) Behran (Oil Refinery Co) Dr Bagheri SEDCO Managing Director Coke Waste Water Refining Co Payandan in Numbers PAYANDAN +40 1974 Years ESTABLISHED +1400 +4000 EMPLOYEES CONTRACTOR +200,000,000 $ ANNUAL TURNOVER 75 COMPLETED PROJECTS Company Background PAYANDAN • 48” Zanjan-Mianeh Pipeline • 56” Saveh-Loushan • South Pars – SP No. 14 Pipeline (190KM) • South Pars – SP No. 13 • 56" Dezfoul- Kouhdasht Pipeline (160KM) 1974 1996 2003 2005 2007 2009 2011 2013 2015 2017 • Nargesi Gas • F & G Lavan • 56” Asaluyeh Gathering & • South Pars – SP Pipeline Injection No. 17 & 18 • 30” Iran- Payandan is • South Pars – SP No. 22,23,24 Armenia established (oil and • 48” Iraq Pipeline Naftkhane- Pipeline gas contractor) Baghdad (63KM) (113KM) • 56” Naeen-Tehran Gas Pipeline (133KM) • Parsian Gas Refinery • 56” Loushan-Rasht Gas Pipeline (81KM) • Pars Petrochemical Port • Arak Shazand Refinery • Kangan Gas Compressor Station • South Pars – SP No.
    [Show full text]
  • Marcaccio and Chow-Fraser Final
    Ministry of Transportation Provincial Highways Management Division Highway Infrastructure Innovations Funding Program Mapping invasive Phragmites australis in highway corridors using provincial orthophoto databases in Ontario Final Report, HIIFP Project #2015-15 i Technical Report Documentation Page Publications Mapping invasive Phragmites australis in highway corridors using Title provincial orthophoto databases in Ontario Authors James V. Marcaccio and Patricia Chow-Fraser Department of Biology, McMaster University Originating West Region , Ontario Ministry of Transportation Office Report Number 2015-15 ISBN Number To be added by MTO after completion Publication October 2018 Date Revision Date N/A Ministry Executive Director’s Office Contact Provincial Highways Management Division Ontario Ministry of Transportation 301 St. Paul Street, St. Catharines, Ontario, Canada L2R 7R3 Tel: (905) 704-3998; [email protected] Abstract We mapped the distribution of invasive Phragmites australis (European common reed) in MTO-operated roadways of southern Ontario using airphotos from a provincial database, the Southwestern Ontario Orthophotography Project (SWOOP), which covers all highways from Windsor east to Norfolk/Niagara and north to Tobermory. We mapped all available SWOOP images acquired in 2006, 2010 and 2015. In addition, we delineated invasive Phragmites along MTO-operated roadways within the footprint of the Southcentral Ontario Orthphotography Project (SCOOP acquired in 2013) and the Central Ontario Orthophotography Project (COOP acquired in 2016); the mapping excludes the Greater Toronto Area but includes Prince Edward county, roads through the city of Barrie, and north to Parry Sound. Based on available orthophotos for SWOOP only, total areal cover of invasive Phragmites expanded an order of magnitude between 2006 and 2010 (26.8 to 259.7 ha, respectively); between 2010 and 2015, there was only an increase of 7.2% (278.4 ha), presumably because of ongoing herbicide treatments that began on selected roads beginning in 2012.
    [Show full text]
  • The Buildingsmart Canada BIM Strategy
    CSCE Annual Conference Growing with youth – Croître avec les jeunes Laval (Greater Montreal) June 12 - 15, 2019 A MACHINE-LEARNING SOLUTION FOR QUANTIFYING THE IMPACT OF CLIMATE CHANGE ON ROADS Piryonesi, S. M.1,2 and El-Diraby, T. E. 1 1 University of Toronto, Canada 2 [email protected] Abstract: Modeling pavement performance is a must for road asset management. In the age of climate change, pavement performance models need to be able to quantify the impact of climate change on roads. This paper provides a practical decision-support tool for predicting the condition of asphalt roads in the short and long term under a changing climate. Users have the option of running a predictive model under different values of climate stressors. The prediction of deterioration is performed via machine learning. More than a thousand examples of road sections from the Long-Term Pavement Performance (LTPP) database were used in the process of model training. The models can predict future values of pavement condition index (PCI) with an accuracy above 80%. The results were implemented in a web-based platform, which includes a map with an interactive dashboard. Users can query any road, input its data, and get relevant predictions about its deterioration in two, three, five and six years. To show the effectiveness of the solution two sets of examples were presented: two individual roads in Ontario and British Columbia and a group of 44 roads in Ontario. The condition of the latter was predicted under a hypothetical climate change scenario. The results suggested that the roads in Ontario will experience a more relaxed deterioration under this climate change scenario.
    [Show full text]
  • 1949 December Engineers News
    ... OPERATING .E·NGINEERS LO·CAL 3 STATIONARY ENGINEERS ··LOCAl· 39 SAN FRANCISCO, CALIF. DECEMB.ER 15, '~<!14~ :A Strong Program fo_r Jobs~ Green Green\ to DEVELOP STATE'S . , s NEEDS, RESOURCES, GOVERN,OR IS TOLD AFL Building T"?ades Department and the Associated G-en­ Rolise California into action on projects vitally needed in eral Contractors of America have filed a request with NLRB .its new, post-war status, and at the same time produce jobs asking blanket exemption from Taft-Hartley labor law elec­ badly needed to keep its inflated population gainfully em­ tion requirements on the grounds that elections in this indus.., ployed, Governor Warren was advised by a strong confer~ try ar~ impractical, costly, 90 per c:ent AFL supporting thus ence of business, labor and civic leaders in the state's capital · far, and wholly unnecessary.. on December 7, 8. ~R,J~w 8 ~~~m(!d Thus th~re was climaxed. t wo Public works, coristruction,e civic - AFL President. rg ·. Washington. 'un~~ ~ "~ ~ years of costly red tape caused .bY :r_:1eeds, private building needs, and 15,000 Arrive in William Green (left) pins flower V a. ·' on Leonard G1•een (no relation), r!lr the ill-begott en Taft-Harney law other projects that are or may b~ ·assistant general secretary N a­ f'tt-rnst.::.t·n. ~A~~:i'tftl~_ r .),;})0 a I!Jl!U ~ ~~~ni!J~~s and a growing protest against it ~ lagging for one r eason dr another l.ional Union of Operative Hea-ting, A S ·cant Each nth Domestic, Ventilating Engineers TO.
    [Show full text]
  • An Energy Model for Sustainable Decision-Making in Road Construction Projects
    AN ENERGY MODEL FOR SUSTAINABLE DECISION-MAKING IN ROAD CONSTRUCTION PROJECTS Jan Krantz, Weizhuo Lu, Tim Johansson & Thomas Olofsson Luleå University of Technology, Sweden. ABSTRACT: Road construction operations often require considerable amounts of energy in the form of fossil fuels, thus generating substantial greenhouse gas (GHG) emissions. While fuel efficiency of the heavy construction equipment is extensively studied, limited attention is given to how the construction process can be planned in order to reduce energy use and GHG-emissions. In this study a conceptual model is proposed for the assessment of energy use and GHG-emission on-site at road construction projects. The model is applied to a road construction project to evaluate production alternatives in the early planning stages of the project. As a result the most favorable alternative in terms of energy use and GHG-emissions could be selected during the construction phase. This demonstrates the model’s ability to quantify environmental effects and energy use of different production alternatives. KEYWORDS: Earthworks; Energy estimation; Greenhouse gas emissions. 1. INTRODUCTION AND BACKGROUND Road construction generally requires extensive earthworks operations such as excavations, hauling, and depositing of materials as well as crushing of rock. These operations require large and energy intensive equipment and thus generate considerable amounts of greenhouse gas (GHG) emissions (Apif M, Phil 2013). (Stripple 2001) estimated that the amount of fuel needed to construct a road is about 5% of the total fuel consumption of all traffic, of 5 000 vehicles per day, using the road during its expected lifetime of 40 years. Energy efficiency, as a measure for mitigating GHG-emissions, has become one of the most important centers of attention for the Swedish Transport Administration (STA).
    [Show full text]
  • Cover Technical Guides Convert.Indd
    If there are sharp curves in the road where vehicles can maintain a high speed, invert In sharp curved the the camber of the road (see also fi gure 43). This will reduce the risks of slipping camber of on the vehicles. Inverting the camber is gradually built up over a 20m section before entering outer side needs to into the curve. be inverted Figure 45: Example of inverting the camber in a sharp curve 7.4 Graveling In the past graveling of roads was considered an effective and cost-effective option Gravel surfaces for surfacing low-volume rural roads. Recent research however shows that gravel have many roads have serious limitations in many situations. Very often gravel surfaces are not limitations appropriate, affordable or sustainable for rural roads. There are for example serious problems related to the maintenance and sustainability of gravel surfaces (or ordinary earth roads). Although the initial construction costs of gravel roads are low, the maintenance costs are very high. The suitability of graveling roads depends on a range of factors. These include for example the road gradient, rainfall, material quality, haul distance and maintenance regime. Gravel should NOT be used if any of the following conditions, or a combination of them applies: Gravel quality is poor; Situations Compaction & thickness cannot be assured ; where gravel is not suitable as Haul distances are longer than 10km; surface option Rainfall is very high – Gravel loss is related to rainfall; There are dry season dust problems; Technical Guidelines for Supervisors Technical Traffi c levels are high, i.e. more than 200 vehicle equivalents per day; 49 Road gradients are more than 6% (with < 1,000mm rain per year) or more than 4% (with 1,000 – 2,000mm rain per year); If rainfall is more than 2,000mm/year; Adequate maintenance cannot be provided; Sub-grade is weak or soaked; Gravel deposits are limited or environmentally sensitive.
    [Show full text]
  • Hamilton Cycling Committee Agenda Package
    City of Hamilton HAMILTON CYCLING COMMITTEE AGENDA Meeting #: Meeting#-xx-xxxx Date: May 5, 2021 Time: 5:45 p.m. Location: Due to the COVID-19 and the Closure of City Hall All electronic meetings can be viewed at: City’s YouTube Channel: https://www.youtube.com/user/InsideCityofHa milton Rachel Johnson, Project Manager - Sustainable Mobility (905) 546-2424 ext. 1473 Pages 1. APPROVAL OF AGENDA (Added Items, if applicable, will be noted with *) 2. DECLARATIONS OF INTEREST 3. APPROVAL OF MINUTES OF PREVIOUS MEETING 3.1. HCyC Meeting Minutes, dated April 7, 2021 3 4. COMMUNICATIONS 4.1. Correspondence from the Hamilton Police Services Board respecting the 7 Feasibility of Launching Project529 (to reduce bike theft) in the City of Hamilton 5. CONSENT ITEMS 6. STAFF PRESENTATIONS 6.1. Victoria Avenue Cycle Track - Conceputal Design 6.2. Commerical e-Scooters Operations Pilot 9 Page 2 of 28 7. DISCUSSION ITEMS 7.1. Planning and Project Updates 23 7.2. Bike Month 2021 Update 8. MOTIONS 8.1. Bike Lane Asphalt 8.2. Keddy Access Trail Artwork 9. NOTICES OF MOTION 9.1. Approval of the All Advisory Committee Meeting Date 27 10. GENERAL INFORMATION / OTHER BUSINESS 11. ADJOURNMENT Page 3 of 27 HAMILTON CYCLING COMMITTEE (HCyC) MINUTES Wednesday, April 7, 2021 5:45 p.m. Virtual Meeting Present: Chair: Chris Ritsma Vice-Chair: William Oates Members: Sharon Gibbons, Yaejin Kim, Ann McKay, Jessica Merolli, Cora Muis, Gary Rogerson, Kevin Vander Meulen, and Christine Yachouh Absent with Regrets: Jeff Axisa, Kate Berry, Joachim Brouwer, Roman Caruk, Jane Jamnik, Councillor Esther Pauls, Cathy Sutherland, and Councillor Terry Whitehead Also Present: Trevor Jenkins, Project Manager, Sustainable Mobility Peter Topalovic, Program Manager, Sustainable Mobility (a) APPROVAL OF AGENDA Staff advised of the following addition to the agenda: 7.
    [Show full text]
  • Trade Catalogs in Degolyer Library
    TRADE CATALOGS IN DEGOLYER LIBRARY 1. AGRICULTURE. A. Buch's Sons Co. ILLUSTRATED CATALOGUE AND PRICE LIST. LAND ROLLERS, LAWN ROLLERS, CORN SHELLERS, WHEELBARROWS, CORN MARKERS, STRAW AND FEED CUTTERS, STEEL AND CAST TROUGHS FOR STOCK, CELLAR GRATES, AND A FULL LINE OF SMALL IMPLEMENTS. (Elizabethtown PA, 1903). 64pp. 2. AGRICULTURE. A. W. Coates & Co. CENTENNIAL DESCRIPTIVE CIRCULAR OF THE COATES LOCK-LEVER HAY AND GRAIN RAKE. (Alliance OH, 1876). 3. AGRICULTURE. Abeneque Machine Works. GAS & GASOLENE ENGINES. TRACTION ENGINES, WOOD SAWING OUTFITS, PUMPING PLANTS, PNEUMATIC WATER SYSTEMS, HAY PRESSES, HAY HOISTS, GRINDERS, ENSILAGE CUTTERS, SAW MILLS, THRESHING MACHINES, GENERAL FARM MACHINERY. (Westminster Station VT, 1908)., 24pp. 4. AGRICULTURE. Albion Mfg. Co. Gale Sulky Harrow Mfg. Co. GALE SULKY HARROW CULTIVATOR & SEEDER. (Detroit & Albion MI, [1882]). 5. AGRICULTURE. American Harrow Company. AMERICAN. THE MAKING AND SELLING OF AMERICAN MANURE SPREADERS. (Detroit MI, 1907). 6. AGRICULTURE. American Seeding Machine Co. Empire Drill Co. AMERICAN SEEDING MACHINE CO. ALMANAC AND HOUSEHOLD ENCYCLOPEDIA. (Springfield OH, 1905). 7. AGRICULTURE. Avery Company Manufacturers. AVERY TRACTORS, PLOWS, SEPARATORS, AND STEAM ENGINES. (Peoria IL, 1916). 8. AGRICULTURE. Avery Power Machinery Co. AVERY STEEL THRESHERS. BETTER AND SIMPLER. (Peoria IL, circa 1930). 9. AGRICULTURE. B - L - K Milker Company. B - L - K MILKER. (Little Falls NY, circa 1930, 8pp.. 1O. AGRICULTURE. Bateman Bros. Inc. CATALOGUE No. 28. FARM IMPLEMENTS AND SUPPLIES. (Philadelphia PA, 1928); 171pp. 11. AGRICULTURE. Bateman Manufacturing Company. IRON AGE FARM, GARDEN AND ORCHARD IMPLEMENTS. HOME, FARM AND MARKET GARDENING WITH MODERN TOOLS. (Grenloch NJ, 1918). 12. AGRICULTURE. [Bees]. A.I.Root Company. ROOT QUALITY BEE SUPPLIES.
    [Show full text]
  • Appendix C-11: CHERS: Part 2 of 6
    City of Hamilton and Metrolinx Hamilton Light Rail Transit (LRT) Environmental Project Report (EPR) Addendum APPENDIX C: TECHNICAL SUPPORTING DOCUMENTS APPENDIX C-11: CULTURAL HERITAGE EVALUATION REPORT PART 2/6 Cultural Heritage Evaluation Report, 658-660 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 658-660 King, Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, 662 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 662 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report 949 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report Recommendations 949 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, 951-953 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 951-953 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, 1125-1127 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 1125-1127 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, 1173 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 1173 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report 658-660 King Street East. Hamilton, Ontario Cultural Heritage Evaluation Report 658-660 King Street East, Hamilton, Ontario Prepared by AECOM for Metrolinx March 6, 2017 Report prepared by AECOM RPT-2017-03-06-CHER658-660KingStE-60507521.docx Cultural Heritage Evaluation Report 658-660 King Street East. Hamilton, Ontario Authors Report Prepared By: Michael Greguol, MA Cultural Heritage Specialist Emily Game, B.A. Heritage Researcher Report Reviewed By: Fern Mackenzie, M.A., CAHP Senior Architectural Historian Revision History Revision # Date Revised By: Revision Description 0 02/15/2017 C. Latimer Draft to Metrolinx 1 03/6/2017 M.
    [Show full text]
  • Appendix C-11: CHERS: Part 1 of 6
    City of Hamilton and Metrolinx Hamilton Light Rail Transit (LRT) Environmental Project Report (EPR) Addendum APPENDIX C: TECHNICAL SUPPORTING DOCUMENTS APPENDIX C-11: CULTURAL HERITAGE EVALUATION REPORT PART 1/6 Cultural Heritage Evaluation Report, 2 West Avenue North, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 2 West Avenue, North, Hamilton, Ontario Cultural Heritage Evaluation Report, 160 Bond Street South, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 160 Bond Street, South, Hamilton, Ontario Cultural Heritage Evaluation Report, 426-428 King Street West, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 426-428 King Street West, Hamilton, Ontario Cultural Heritage Evaluation Report, 561-563 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 561-563 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, 652-654 King Street East and 1 Grant, Avenue, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 652-654 King, Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 1 Grant Avenue, Hamilton, Ontario Metrolinx Interim Heritage Committee – Statement of Cultural Heritage Value, 1 Grant Avenue, Hamilton, Ontario Cultural Heritage Evaluation Report, 656 King Street East, Hamilton, Ontario Cultural Heritage Evaluation Report, Recommendations 656 King Street, East, Hamilton, Ontario Metrolinx Interim Heritage Committee – Statement of Cultural Heritage Value, 656 King Street, East, Hamilton, Ontario Cultural Heritage Evaluation Report 2 West Avenue North, Hamilton, Ontario Prepared by AECOM for Metrolinx March 13, 2017 Cultural Heritage Evaluation Report 2 West Avenue North, Hamilton, Ontario Authors Report Prepared By: Michael Greguol Cultural Heritage Specialist Emily Game, B.A. Heritage Researcher Report Reviewed By: Fern Mackenzie, M.A., CAHP Senior Architectural Historian Revision History Revision # Date Revised By: Revision Description 0 02/10/2017 C.
    [Show full text]