BRIEF DESCRIPTION of the PROJECT M/S. Sakthi Mining
Total Page:16
File Type:pdf, Size:1020Kb
BRIEF DESCRIPTION OF THE PROJECT M/s. Sakthi Mining Company has an existing mine for extraction of limestone to an extent of 2.98.0 Ha at S.F. Nos. 76/2, 77/13 & 77/14 of Kodur Agraharam Village, Paramathi-Velur Taluk, Namakkal District, Tamil Nadu. The first mining lease for this area was granted for twenty years in G.O. Ms. No.176 dated 16.04.1991 for a period of five years. The lease deed was executed on 16.09.1991. The lease will expire on 15.09.1996. SALIENT FEATURES OF THE PROJECT SITE ARE AS FOLLOWS: Description Details Name of the owner M/s. Sakthi Mining Company Address for correspondence 202-Sengodan Palayam, O. Rajapalayam Post, Tiruchengode– 637 209, Namakkal District. Project Name Kodur Agraharam Limestone Mine Mine G.O No G.O. Ms. No.176 dated 16.04.1991 Mining Lease Area 2.98.0 ha Location of Mine S.F. Nos. 76/2, 77/13 & 77/14 of Kodur Agraharam Village, Paramathi-Velur Taluk, Namakkal District, Tamil Nadu Topo sheet number 58 I/4 Production capacity 7366 Tonnes/Year (36832 T for five year) Method of mining Open Cast fully mechanized method Drilling/Blasting Controlled Blasting and drilling No. of working days 300 days Water demand/Source 2.5 KLD Sourced - nearby Bore wells Sources of water Water will be supplied from bore wells of the nearby area Man power 18 Nos Nearest Town/City Taluk Headquarters Paramathi- 9.8 km (S) District Headquarters Namakkal - 17 km (E) Nearest Roadways Velagoundanpatti Road – 1.6 km (E) Vasanthapuram Road - 2.8 km (S) Omalur – Sankari - Paramathi Road - 3.9 Km (W) Kanniyakumari – Varanasi (NH 44) – 8.9 km (SSE) Nearest railway station Namakkal – 19 km (E) Nearest airport Salem Airport – 58 km (NE) Top Soil/Overburden in case The wastes (40%) are generated during the mining of Limestone/ Blue Metal. period is 24554 Tonnes shall be proposed to Dump in the non-mineral bearing area of North and Eastern side of the lease area. Land Use/ Land Ownership Patta Land – 2.98.0 ha Sl. Present Area (Ha.) No. Description 01. Mining (Quarry) 0.32.0 02. Waste dump 0.08.0 03. Office-Infrastructure - 04. Mineral Stack/ - Processing Yard 05. Sub-grade Mineral - stacks 06. Mine Roads 0.12.0 07. Area under Plantation 0.03.0 08. Unutilized Area 2.43.0 TOTAL 2.98.0 Infrastructures Site office, First Aid Room, Toilets, etc Climate Condition Maximum Temperature - 400c Minimum Temperature - 250c Average Amount of Rainfall - 400 mm/annum Project Cost 29,78,000/- Nearby Mines Few quarries are present .