7. Recommended Projects

Total Page:16

File Type:pdf, Size:1020Kb

7. Recommended Projects 7. RECOMMENDED PROJECTS 7.1 Overview Section 5 of this Infrastructure Master Plan describes each of the water supply systems within the Umgeni Water area of operation, discusses the constraints identified within each one, and makes recommendations on the water supply infrastructure that is required to alleviate these constraints. Figure 7.1 illustrates the systems and subsystems that each of the recommended projects belongs to, and should also be read in conjunction with Figure 5.1. This Section links directly to Section 5, and describes each of the recommended infrastructure projects of significance in more detail. In particular, projects currently being implemented, or are close to implementation, are discussed. A summary of the areas that will be supplied by these proposed projects are shown in Figure 7.2. The projects per WSA are summarised in Figure 7.3, Figure 7.4, Figure 7.5, Figure 7.6 and Figure 7.7. Also included in this Section, are descriptions of new infrastructure projects that have been identified to expand the area of supply. These projects are often planned to be linked into existing supply infrastructure and their future demands could impact on the existing infrastructure. These potential impacts are discussed in Section 5. It is important to note that the implementation of these projects is influenced, and driven, by a host of factors besides purely technical requirements. These factors include financial constraints, corporate strategy, politics and local government priorities, to mention but a few. All these factors carry their own weight in the decision making process and cannot be ignored. Hence the actual implementation and timing thereof, could well vary from what is mentioned for these projects. Finally, all planned new wastewater works (WWW) or proposed upgrades to WWW that Umgeni Water is responsible for are included at the end of this section. These proposals should be read in conjunction with Section 6. As previously mentioned in Section 6, Umgeni Water has recently taken over the operation of all the WWW within the Umgungundlovu District Municipality. Umgeni Water is assessing the nature of infrastructure development and or rehabilitation required at these works. This assessment is currently taking place and therefore there are no definitive plans to report on at this stage. However, the Darvill WWW is in the process of being upgraded and the detailed design for the upgrade of Mpophomeni WWW has been completed and these two WWW are therefore discussed in detail. 383 Figure 7.1 Recommended projects per system. 384 Figure 7.2 Areas that are anticipated to be supplied by Umgeni Water’s proposed projects. Figure 7.3 Proposed projects within Umgungundlovu WSA and the areas anticipated to be supplied. 385 Figure 7.4 Proposed projects within eThekwini WSA and the areas anticipated to be supplied. Figure 7.5 Proposed projects within Harry Gwala WSA and the areas anticipated to be supplied. 386 Figure 7.6 Proposed projects within Ugu WSA and the areas anticipated to be supplied. Figure 7.7 Proposed projects within iLembe WSA and the areas anticipated to be supplied. 387 7.2 uMkhomazi System 7.2.1 uMkhomazi Water Project Planning No. 114.0 Project No. UI0530 Project Status Detailed Feasibility Project Description After the final planned commissioning of Phase 2B of the Mooi-Mgeni Transfer Scheme (MMTS-2) in 2016, the water resources available in the Mooi and Mgeni catchments, to augment the Mgeni System, will be fully utilised (Section 4.4.4). The MMTS-2 will increase the safe assured yield of the Mgeni System to 394 million m3/annum. Over recent years, eThekwini Municipality has put considerable effort into optimising the operation of its distribution systems that are served by the Lower Mgeni System. Amongst other things, this has led to them implementing new infrastructure in order to undertake a significant load shifting exercise. eThekwini Municipality’s Western Aqueduct project, which is expected to be fully commissioned in mid-2018, will represent the most significant of these load-shifting operations. The intention is for those areas currently being served under pumping from the Lower Mgeni System (viz. from Durban Heights WTP) to be transferred onto the Upper Mgeni System, and served under gravity from Midmar WTP via the Western Aqueduct (WA). This will result in the full utilisation of the Upper Mgeni resource by 2018. After the implementation of MMTS-2, further water resource developments within the Mooi-Mgeni system are not considered to be beneficial. Further augmentation of the Mgeni System will then be required. Water resource development on the uMkhomazi River has been identified as the next likely major project to secure long-term water resources for eThekwini’s Western Aquaduct supply zone. During the late 1990’s, the then DWAF (now DWS) and Umgeni Water jointly commissioned a pre-feasibility study to investigate various options for developing the uMkhomazi River’s water resources, such that they could be utilised to augment those of the Mgeni River System. A two-phased scheme was proposed, and the overall project area is shown in Figure 7.8. Phase 1 of the proposed uMkhomazi Water Project (uMWP-1) will involve the construction of Smithfield Dam, located along the central reaches of the uMkhomazi River midway between Lundy’s Hill Bridge and Deepdale. Smithfield Dam will be the primary impoundment, whilst for Phase 2, a second dam (Impendle Dam) will be constructed upstream of the Smithfield site (just downstream of the uMkhomazi River/Nzinga River confluence). Phase 2 would only be implemented once the yield of Phase 1 (Smithfield Dam) has been fully utilised. 388 Figure 7.8 uMkhomazi Water Project. It is proposed that raw water from Smithfield Dam be transferred between the uMkhomazi and Mgeni catchments via a tunnel through the catchment divide. Water will be delivered into a balancing dam located in the Mlazi River catchment near Baynesfield. Water will then be treated at a new regional WTP to be constructed in the vicinity. Potable water will then be delivered under gravity, via a large diameter potable water pipeline into the ’57 pipeline downstream of Umlaas Road Reservoir. Key information on this project is summarised in Table 7.1. Table 7.1 Project description: uMkhomazi Water Project. Project Water Resource Components (to be developed by DWS): Components . Smithfield Dam – having a storage capacity 251 million m3 (31% of MAR), earth core rockfill dam. A Transfer Tunnel – 3.5 m bored diameter (3.0 m lined diameter), concrete-lined (where necessary), overall length of 32 km. Balancing Dam – located at the outlet portal of the tunnel in the vicinity of Baynesfield Estate. 3km of 3 000mm Raw Water Pipeline. Potable Water Supply Components (to be developed by Umgeni Water): . Water Treatment Plant (WTP) – to be located near Baynesfield Estate with an initial capacity of 500 Mℓ/day and allowance for another module to increase capacity to 625 Mℓ/day. 170 Mℓ potable water storage reservoir at WTP. Bulk Potable Water Pipelines –2 820mm diameter (15.1km) and 2 540mm diameter (4.6km) gravity mains from the WTP to ’57 pipeline. Capacity 625 Mℓ/day Institutional Arrangements DWS will plan, develop and own the water resource and raw water infrastructure up to the WTP. The operation and management component of this infrastructure will be decided at the time of commissioning. Umgeni Water will plan, build, own, operate and maintain all water supply infrastructure from (and including) the WTP. Umgeni Water will purchase raw water from DWS as per a revised raw water agreement and sell potable water from this system to eThekwini, the Msunduzi and Umgungundlovu municipalities, as per the existing bulk water supply agreements. Beneficiaries The scheme will primarily serve the eThekwini Municipal area and to a lesser extent portions of Umgungundlovu District Municipality. Implementation The project is divided into three components: Module 1: Technical Feasibility Study: Raw Water (Appointment by Department of Water and Sanitation). The study was completed in 2015; Module 2: Environmental Impact Assessment (Joint appointment by Department of Water Affairs and Umgeni Water). Targeted submission date is June 2016; Module 3: Technical Feasibility Study: Potable Water (Appointment of PSP by Umgeni Water). The study was completed in 2015. 390 The project needs to be implemented by 2018 in order to achieve a 99% level of assurance of supply to the Mgeni System. However, the earliest possible commissioning of this scheme is 2024. The estimated cost of the entire project (of both the water resource and water supply infrastructure for both phases) is in the order of R 18 billion at 2015 prices. This is made up of R 13.5 billion for the raw water component to be implemented by DWS and R 4.5 billion (Excl. VAT) for the potable component to be implemented by Umgeni Water. 391 7.2.2 eMzimkhulu Bulk Water Supply Scheme Planning No. 162.6 Project No. Project Status Detailed Feasibility Project Description The Harry Gwala District Municipality (formally Sisonke District Municipality) is in the process of entering into a Regional Schemes Agreement with Umgeni Water, whereby Umgeni Water will plan and implement selected regional schemes. The eMzimkhulu Bulk Water Supply Scheme was selected by the municipality as one of its priority interventions. The purpose of this study is to identify any feasible bulk water supply options that could: • in particular, provide an alternative, more reliable, source of potable water for the stand- alone rural water supply schemes which rely, to a large extent, on protected springs, boreholes or run-of-river abstraction, and that continue to present operational and financial challenges for the municipality; and • in general, provide an adequate supply of potable water to meet the growing needs of the area.
Recommended publications
  • Descendants of William Park and Mary Martin
    Park Family History The following pages have a highly speculative attempt to reconstruct the history of the family of William Park, of Bath, Belfast and Quebec, who died in Bath, Somerset, England in 1844. It is known that his daughter Matilda married Richard Vause in Bath in January 1852, and that Matilda's sister married Frederick Hawkins on the same day, and that his wife was Mary Martin, daughter of John Martin, a merchant of Belfast, Antrim, Ireland. Most of the other information is based on circumstantial evidence and “connecting the dots”. Recently several people have helped by giving new dots to connect, but fresh evidence may show that they could be connected in entirely different way, so please do not add this information to your family tree yet. I've been helped a great deal by ShaunJ of the Rootschat website, who found some of the dots. I have compiled this family tree as a research tool only, as a working hypothesis to see where other family members might fit in. I will send this to some other family members who may be interested. If you have any more information on this family, please let me have it. If you would like me to pass on anything else I may find, please let me know. Please note the date on these documents. I am continuing my research and so the information here may be out of date and superseded within a few days, so please get in touch with me for the latest information. Stephen Hayes PO Box 7648 Pretoria 0001 South Africa E-mail: [email protected] Web: http://hayesgreene.wordpress.com http://hayesgreene.wikispaces.com Mon 26 September 2011 Family Group Record- 15 Page 1 of 3 Husband William PARK-2231 Born Place Abt 1780 Died-2 Place 23 May 1844Bath, Somerset, England Married Place Husband's father James PARK MRIN: 514 Husband's mother Elizabeth Wife Mary MARTIN-2223 Born-4 Place Abt 1784Belfast, Ulster, Ireland Died Place 19 Aug 1851Bath, Somerset, England Wife's father 5 John MARTIN-221 MRIN: 9 Wife's mother Children List each child in order of birth.
    [Show full text]
  • Between Empire and Revolution : a Life of Sidney Bunting, 1873-1936
    BETWEEN EMPIRE AND REVOLUTION: A LIFE OF SIDNEY BUNTING, 1873–1936 Empires in Perspective Series Editors: Emmanuel K. Akyeampong Tony Ballantyne Duncan Bell Francisco Bethencourt Durba Ghosh Forthcoming Titles A Wider Patriotism: Alfred Milner and the British Empire J. Lee Th ompson Missionary Education and Empire in Late Colonial India, 1860–1920 Hayden J. A. Bellenoit Transoceanic Radical: William Duane, National Identity and Empire, 1760–1835 Nigel Little Ireland and Empire, 1692–1770 Charles Ivar McGrath Natural Science and the Origins of the British Empire Sarah Irving Empire of Political Th ought: Indigenous Australians and the Language of Colonial Government Bruce Buchan www.pickeringchatto.com/empires.htm BETWEEN EMPIRE AND REVOLUTION: A LIFE OF SIDNEY BUNTING, 1873–1936 BY Allison Drew london PICKERING & CHATTO 2007 Published by Pickering & Chatto (Publishers) Limited 21 Bloomsbury Way, London WC1A 2TH 2252 Ridge Road, Brookfi eld, Vermont 05036-9704, USA www.pickeringchatto.com All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise without prior permission of the publisher. © Pickering & Chatto (Publishers) Limited 2007 © Allison Drew 2007 british library cataloguing in publication data Drew, Allison Between empire and revolution : a life of Sidney Bunting, 1873–1936. – (Empires in per- spective) 1. Bunting, Sidney Percival, 1873–1936 2. Social reformers – South Africa – Biography 3. Communists – South Africa – Biography 4. Lawyers – South Africa – Biography 5. South Africa – Politics and government – 1909–1948 6. South Africa – Politics and government – 1836–1909 7. South Africa – Social conditions I.
    [Show full text]
  • Provincial Road Network Provincial Road Network CLASS, SURFACE P, Concrete L, Blacktop G, Blacktop On-Line Roads !
    O D238 3 4 L0 Mkhize 3 6 Mahlutshini!. 4 Bhungane H 1 5 4 71 9 O 81 161 1 Enhlanganisweni H 1 6 OL0 L0 99 Treverton Treverton 0 7 7 Thibane 1 165 Mooi River Town L L 7 1 9 O 6 7 O Col Prep P 4 4 1 L0 Local Authority 2 1 P1 8 4 0 6 4-1 L 1 L 3 KwaMankonjane 7 8 0 O 44 Clinic R103 4 !.O P L OL016 12 L Weston 2 3 O 5 D 0 1 L 1 9 Mooi 6 1 - Agriculture R622 5 7 8 15 7 5 P !. 4 9 River P O L1 6 O 76 Col 4 L L 1 6 01 A I 01 9 1 1 68 3 0 8 4 0 6 P Kajee P 1 L O L 610 O O 8 F Fundukhuphuke O L 4 0 6 Mankonjane 1 F 6 6 95 5 Adult O 3 - 4 1 R L 8 0 0 16 1 A Education 2 L 1 P M O 3 O P s L01 3 n 622 1 9 !. a 1 1 m L sh P Bruntville u 2 Bruntville P B 3 Mount 6 163 1 Victoria P 489 0 Carshalton 3 L Mpofanyana 1 1 69 96 0 9 O 2 1 0 1 P 6 L Highover G Bruntville 4 1 Estates Provincial 0 L CHC O Ncibidwane Lakhanyilanga D Mts 21 4 Mount he 8 za 9 1 na KZN223 6 West P 4 L ulu Zamukwazi Hlatik O L0 83 16 !.30 KwaMkhize 4 Gezwayo JS 7 4 40 O OL0 L 12 L01 1629 D 625 Insonge 43 183 P 413 D 2 75 7 8 - - 1 KZNDMA22 1 P KZN221 Robin LP 11 D P 1 6 KZN222 7 94 f 162 92 o 27 lo rk a K a n a w id ib KZN224 c N Rosetta Local 0 69 5 Authority 4 D Satellite Clinic 2 4 9 5 1 6 L KZN225 53 N 1 3 P 104 Sibonokuhle P -4 34 Rosetta D !.
    [Show full text]
  • Umngeni Resilience Project Annexes
    ANNEXES I. Vulnerability Analysis: Preliminary Prioritisation of Vulnerable Communities for Climate Change Adaptation in the uMgungundlovu District Municipality. II. Stakeholder Consultations Annex II.1 Organisations consulted during the project development period. Annex II.2: Attendance register for meeting to plan Inception Workshop. Annex II.3: Attendance register for Inception Workshop. Annex II.4: Attendance register for workshop to plan field visit itinerary. Annex II.5: Field visit itinerary to identify project interventions sites. Annex II.6: Attendance register for technical agriculture workshop. Annex II.7: Attendance register for built environment and ecological infrastructure workshop. Annex II.8: Attendance register for technical EWS workshop. Annex II.9: List of meetings from 18-22 November 2013. Annex II.10: List of meetings from 6-10 January 2014. Annex II.11: List of meetings from 27-29 January 2014. Annex II.12: List of meetings from 17-18 March 2014. Annex II.12.1: Attendance register from Management Committee meeting. Annex II.12.2: Attendance register from Disaster Management Forum meeting. Annex II.12.3: Attendance register from fire component meeting. Annex II.13: Attendance register from UMDM/DAEA meeting. Annex II.14: Attendance register from DAEA meeting. Annex II.15: Attendance register CoGTA meeting. Annex II.16: Attendance register from Msunduzi Local Municipality meeting. III. Maps of the demonstration sites for the Adaptation Fund project. Figure III.1: Ward 8 of Vulindlela showing position of households and traditional communities (2011). Figure III.2: Ward 8 of Swayimane showing position of households and traditional communities (2011). Figure III.3: Ward 5 of Nhlazuka showing position of households and traditional communities (2011).
    [Show full text]
  • Southern Drakensberg & Midlands Tourist Map – Accommodation
    To Warden/JHB To Warden R57 FREE STATE To Bethlehem N5 Platberg 46km Nature Reserve Kestel To Newcastle To Glencoe ..De Beers Pass 1:8 To Dundee . Biggarsberg .. 24km 31km Swinburne R19 Montrose R602 31km R74 Van Reenen Wasbank Golden Gate N11 R712 . .. Van Reenens Reserve R57 .. Pass 1:16 9km Driefontein 21km . R602 .. .. Besters To Clarens To Reitz . Middledale Pass 18km T The Lost Valley FREE T Sterkfontein STATE Dam R103 N3 25km . .. D45 Nambiti .. KWAZULU-NATAL Game Reserve Oliviershoek Qedusize Dam To Tugela Ferry Pass 1:12 D44 R74 17km R616 N11 LESOTHO R600 Woodstock Dam 35km Spioenkop Dam Nature Reserve 32km Southern Drakensberg &R74 Midlands Tourist Map – Accommodation/Reservations 036 468 1241 24km Tugela River R103 22km 24 African Loom 25 Steve Bull Gallery 26 Winterton Country 27 Drakensberg Cave Lodge 28 Antbear Drakensberg Lodge Lodge @ Rose Cottage SimmiesR74 082 804 3774 Driel Dam 6 14km River Exit 207 loukrans Open 7am –7pmDrakensberg Ballooning B 7 days a week including public036 468holidays 1241 Winterton Simmies Ok shop 036 488 1828 no 26 t re 11km Pig and Plough 036 488 1542 R74 co For all of your daily requirements m 31km 20 Jo Photo & Print 074 894 4515 m 22km Butcherye | Bakery | Fresh Produce | Groceries | Ice 23 Chris’s Biltong & Braai 072 288 2437 N3 30 n km d e Winterton Museum d ATMs Spoil yourself. Stay in a “Luxury Cave” in the Drakensberg Mountains.R7 The4 cave Relax in the Drakensberg. Intimate, romantic and artisticly styled, the thatched is beautifully private and makes for the perfect honeymoon experience or accommodation overlooks the Bushmans River Valley and Giants Castle.
    [Show full text]
  • Marketing Constraints Faced by Communal Farmers in Kw Azulu-Na Tal, South Africa: a Case Study of Transaction Costs Maliem Pierr
    MARKETING CONSTRAINTS FACED BY COMMUNAL FARMERS IN KW AZULU-NA TAL, SOUTH AFRICA: A CASE STUDY OF TRANSACTION COSTS By MALIEM PIERRE MA TUNGUL SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY (AGRICULTURAL ECONOMICS) IN THE SCHOOL OF AGRICULTURAL SCIENCES AND AGRIBUSINESS F ACUL TY OF SCIENCE AND AGRICULTURE UNIVERSITY OF NATAL PIETERMARITZBURG 2002 The financial assistance received from the NRF Agricultural Policy Research U nit and TOTAL South Africa towards this research is hereby acknowledged. Opinions expressed and conclusions arrived at, are those of the author and not necessarily to be attributed to the sponsors. I hereby certify that, unless specifically indicated to the contrary in the text, this dissertation is the result of my own original work. Maliem Pierre Matungul A Mamie Ursule et Jesse Tavun, je dedie ce travail. ABSTRACT Farmers engaged in small-scale agriculture in Africa generally have limited access to factors of production, credit and information. Empirical studies throughout the African continent have shown the extent to which high transaction costs constrain or prevent access to information and markets, especially for small-scale farmers. Despite these constraints, farmers in two communal areas of KwaZulu-Natal (Impendle and Swayimana) have managed to produce food for both own consumption and marketing. This study draws heavily on the New Institutional Economics, and particularly Transaction Cost Economics, which have demonstrated the important role of transaction costs in constraining economic activity, and of institutions developed to lower these costs. Transaction costs are the costs of exchange, including costs of information, negotiation, monitoring, coordination and enforcement of contracts.
    [Show full text]
  • Greater Mpofana Bulk Water Supply Scheme
    GREATER MPOFANA BULK WATER SUPPLY SCHEME IMPLEMENTATION READINESS REPORT OCTOBER 2016 PREPARED BY Umgeni Water Telephone N° : 033 341 1203 Fax N° : 033 341 1218 Email Address : [email protected] P O Box 3235 Pietermaritzburg, 3200 310 Burger Street Pietermaritzburg, 3201 EXECUTIVE SUMMARY Context This project involves a potable bulk water supply scheme located in the Midlands area of the KwaZulu-Natal province. It is referred to as the Greater Mpofana Bulk Water Supply Scheme (GMBWSS). The Greater Mpofana Region (described in this report as the area from Mooi River to Lidgetton) does not have a reliable water supply. Much of the area relies on boreholes and run of river abstraction. With increasing demands, the future supply is not considered sustainable. Phase 1 of the project is currently under construction and will provide a sustainable bulk water supply to the towns of Mooiriver, Rosetta and Nottingham Road. Phase 2 of the project is in the final feasibility stage and will provide a sustainable bulk water supply to the towns of Lidgetton and Lions River including the rural hinterland surrounding the abovementioned towns in KwaZulu Natal. The Scheme will provide bulk water supply to large areas within the uMgungundlovu WSA boundary and will include the rural areas of Bruntville, Lidgetton, Lions River and Msinga. The scheme will also supply economic activities in the areas of Mooiriver, Nottingham Road and Rosetta and will reinforce the supply to these towns. This Implementation Readiness Report (IRS) for the GMBWSS is a prerequisite for RBIG funding so that potable water is made available to both the developing and backlog areas of Mooi River and Rosetta in the Mpofana Local Municipality and Nottingham Road, Mount West, Balgowan and Lidgetton in the uMngeni Local Municipality.
    [Show full text]
  • Msunduzi Co-Operative Development Strategy
    MSUNDUZI MUNICIPALITY __________________________________________ CO-OPERATIVE DEVELOPMENT STRATEGY Final Development Strategy Issue Date: September 2017 Revision No.: 02 Project No.: 14511 Date: September 2017 Document Title: Final Co-operative Development Strategy Author: Leon Katambwe Revision Number: 02 Checked by: Kavi Soni Approved by: Kavi Soni Signature: For: SiVEST SA (PTY) LTD MSUNDUZI MUNICIPALITY CO-OPERATIVE DEVELOPMENT STRATEGY TABLE OF CONTENTS 2. INTRODUCTION ........................................................................................................................... 1 2.1. BACKGROUND ....................................................................................................................... 1 2.2. OVERALL OBJECTIVE OF THE STUDY .................................................................................................. 2 2.3. SCOPE OF THE STUDY .................................................................................................................... 2 2.4. URBAN-ECON’S APPROACH: THE THEORY OF CHANGE OR OUTCOMES APPROACH .................. 3 2.5. METHODOLOGY ........................................................................................................................... 5 2.6. ACTION STEPS ............................................................................................................................. 6 2.7. REPORT OUTLINE .......................................................................................................................... 8 3. CO-OPERATIVE
    [Show full text]
  • DISTRICT ECONOMIC PROFILES Umgungundlovu District 2021
    Office of the Head of Department 270 Jabu Ndlovu Street, Pietermaritzburg, 3201 Tel: +27 (33) 264 2515, Fax: 033 264 2680 Private Bag X 9152 Pietermaritzburg, 3200 www.kznded.gov.za DISTRICT ECONOMIC PROFILES UMgungundlovu District 2021 1 GEOGRAPHICAL LOCATION UMgungundlovu DM (DC 22) Population: 1,149,439 2 Area Size: 9, 602.2 Km Located in the centre most part of KZN and houses the midlands area, the district is home to the KZN Legislature and Provincial Capital Pietermaritzburg. The district is comprised of the following seven local municipalities: . Impendle; . Mkhambathini; . Mpofana; . Msunduzi; . Richmond; . uMngeni; and . uMshwathi. The district offers distinguished education facilities and is a retirement hub for senior citizens. It also offers excellent sporting, commercial and health facilities. It is an important industrial, timber, dairy and agricultural hub. It is dissected by the N3 between Gauteng and Durban. DISTRICT SPATIAL FEATURES The Msunduzi Municipality houses the administrative and legislative centre of the provincial government in KwaZulu-Natal as well as performing an important commercial and industrial function in the economy of the district. Urban centres outside of Pietermaritzburg include Howick located in uMngeni Municipality, Mooi River located in Mpofana Municipality, Impendle village in Impendle Municipality, New Hanover-Wartburg-Hamburg in uMshwathi, Camperdown located in Mkhambathini Municipality and Richmond-Ndaleni located in the Richmond Municipality. The municipalities in the district include large areas of land owned by the Ingonyama Trust Board and occupied by traditional communities. There are number of identified nodes in these traditional areas as well as extensive areas of informal settlement and limited agriculture: a large proportion of the regional population is located in traditional areas.
    [Show full text]
  • The Lower Umkhomazi Bulk Water Supply Scheme – Sediment Impact Opinion
    NM Environmental December 2017 Report for: NM Environmental PO Box 63, Caversham Glen, Pinetown, 3616, SOUTH AFRICA Report by: ASP Technology (Pty) Ltd PO Box 12793, Die Boord, 7613, Stellenbosch, SOUTH AFRICA Table of Contents 1. Introduction ................................................................................................................................... 1 2. Hydrodynamic Modelling of the Non-Cohesive Sediment Loads .............................................. 2 3. Total Sediment Loads in the uMkhomazi River .......................................................................... 3 4. Comparison of Sediment Loads for Current and Future Scenarios ........................................... 4 5. The Release of Sediment Back Into the uMkhomazi River ......................................................... 6 6. Consideration of the South KwaZulu-Natal Coastal Sediment Erosion..................................... 8 6.1 Interpretation of Previous Studies on the KZN Coastal Sediment Erosion ............................. 8 6.2 uMkhomazi River Sand Yield Reductions in Context of the Coastal Sediment Erosion .......... 9 6.3 Shoreline Variability and Long-Term Stability ....................................................................... 11 6.3.1 INTERPRETATION OF AERIAL PHOTOGRAPHY .............................................................. 11 6.3.2 INTERPRETATION OF COASTAL TOPOGRAPHIC SURVEYS ............................................. 16 7. Conclusions and Recommendations .........................................................................................
    [Show full text]
  • Measuring Service Quality Delivery at Impendle Local Municipality in Kwazulu-Natal
    Measuring Service Quality Delivery at Impendle Local Municipality in KwaZulu-Natal By Vusumuzi David Mkhwanazi Student Number: 210538747 This dissertation is submitted in partial fulfilment of the requirements for the degree of Master of Commerce (Marketing) College of Law and Management Studies School of Management, Information Technology and Governance Supervisor: Dr Sanjay Soni July 2019 DECLARATION I, Vusumuzi David Mkhwanazi (student number 210538747), declare that: i. The research reported in this dissertation, except where otherwise indicated, is my original research. ii. This dissertation has not been submitted for any degree or examination at any other tertiary institution. iii. This dissertation does not contain other persons’ data, tables, figures and any other information, unless specifically acknowledged as being sources from other persons. iv. This dissertation does not contain other persons’ writing, unless specifically acknowledged as being sources from other authors. Where other written sources have been quoted then: a) Their words have been paraphrased but the general information attributed to them has been referenced; b) Where their exact words have been utilised, their writing has been placed inside quotation marks and referenced. v. This dissertation does not contain text, graphics or tables copied and pasted from the internet, unless specifically acknowledged, and the source being detailed in the dissertation and in the References section. Signature: Date: ii ACKNOWLEDGEMENTS The researcher wants to thank the following persons for their assistance and support during the course of this study. I would like to thank my family for the support they have given me during the course of this dissertation; without their encouragement, I could not have accomplished this.
    [Show full text]
  • Impendle Nature Reserve
    IMPENDLE NATURE RESERVE KwaZulu-Natal South Africa Protected Area Management Plan: Public Participation Report 2012 Prepared by Ezemvelo KwaZulu-Natal Wildlife Protected Area Management Planning Unit TABLE OF CONTENTS 1) STAKEHOLDER CONSULTATION PROCESS 2 1.1 The context of stakeholder consultation 2 1.2 Approach and objectives of the consultation process 2 1.3 Consultation process 4 2) KEY FINDINGS OF THE STAKEHOLDER CONSULTATION PROCESS 6 3) COMMENTS RECEIVED DURING REVIEW OF THE DRAFT MANAGEMENT PLAN 7 REFERENCES APPENDIX A LIST OF STAKEHOLDERS WHO HAVE PARTICPATED IN OR BEEN INVITED TO PARTICIPATE IN THE PREPARATION OF THE PROTECTED AREA MANAGEMENT PLAN FOR IMPENDLE NATURE RESERVE APPENDIX B MINUTES OF ADDITIONAL MEETINGS AND DISCUSSIONS HELD ON 4TH SEPTEMBER 2012 APPENDIX C SCANS OF THE ADVERTISEMENTS FOR THE PUBLIC MEETING AND PUBLIC REVIEW OF THE DRAFT MANAGEMENT PLAN APPENDIX D BACKGROUND INFORMATION DOCUMENT CIRCULATED PRIOR TO THE PUBLIC STAKEHOLDER WORKSHOP APPENDIX E COPIES OF STANDARD INVITATIONS SENT TO KNOWN STAKEHOLDERS FOR THE PUBLIC STAKEHOLDER WORKSHOP APPENDIX F MINUTES OF THE PUBLIC STAKEHOLDER WORKSHOP IMPENDLE NATURE RESE RVE PROTECTED AREA MANAG EMENT PLAN – P U B L I C PA R TICIPATION REPORT 1 1) STAKEHOLDER CONSULTATION PROCESS The Impendle Nature Reserve en route to the Southern Drakensberg is situated approximately 15 km south from the town of Impendle in KZN with the main R617 road to Underberg passing through the reserve. It falls within the Ingwe Local Municipality and the Sisonke District Municipality and Impendle Local Municipality abuts the reserve along its northern border. Despite these boundaries the reserve is closer to the Impendle Local Municipality and the access to the reserve falls within this municipal area.
    [Show full text]