UNLIMITED SNOW For all imaginable snow & ice leisure experiences

Unlimited Snow Nieuwe Gracht 11, 2011 NB Haarlem, Netherlands +31 (0)20 4714640 / +31 (0)88 snowbiz [email protected] www.snow.biz © UNNLIMTEED SNOW UNLLIMMIITEED SNNOWW 2 Table of Contents

Introduction...... 4

Company Profi le...... 5 Profi le...... 6 Project overview...... 7 Track record...... 8

Service and Approach...... 12 Project Organization...... 13 The Process...... 14

Technology and Support...... 18 Sub-consultants...... 19 Energy Strategy & Machine Room...... 20 Snow-making...... 21 Construction...... 22 Envelope...... 23 Attraction...... 24 Operation...... 25

UNLLIMMIITEED SNNOWW 3 About US

Unlimited Snow is a leisure development company specialized in Snow & Ice environments. It provides state of the art solutions for all conceivable snow & ice leisure concepts with its creations. It is known for its innovative and original concepts and reliable engineering. Its “snow-how” builds on the experience gained from many realized projects as well as continuous research and development. Services range from realization of turnkey projects to specialized advice and customized products. Close collaboration stimulates developers to employ their skills while strategic planning, concept development and project management ensure that all projects are kept on track. Even with the most daring assignments.

Unlimited Snow has proven to be a trustworthy partner for the development of snow and ice amusement parks. It’s highly experienced team is capable of handling all design, technological and commercial aspects of projects to be conceived. The process remains under control from the fi rst sketch till the start of a successful operation. And even beyond. US’ expertise ensures that budgets are maintained and that the highest quality in terms of fi nish, environmental safety and fi nal experience is achieved.

Our belief is that integration of the most innovative technology and high quality, durable realization are key to the creation of next generation snow and ice indoor amusement parks. With ultimately customized turnkey solutions, US realizes the most attractive, unique and profi table projects for any location or target group.

KEES ALBERS CEO, Unlimited Snow

UNLLIMMIITEED SNNOWW 4 THE SNOW & ICE DEVELOPMENT COMPANY Company Profi le Company Profi le

WHO WE ARE

Unlimited Snow (also referred to as US) was founded in 1995 under the guidance of Kees Albers, who already had an impressive career as a ski-instructor, freestyle ski competitor and coach at the Olympic Winter Games. In the early nineties, Kees and his predecessor were involved in the development and snow making of the fi rst ever modern indoor snowdome. Later, Unlimited Snow became the fi rst ‘one stop shop’ in providing virtually all imaginable services for permanent indoor snow & ice experiences, from concepts to turnkey development and additional entertainment.

Unlimited Snow takes care of every step towards completion of every turnkey project, and fulfi ls its customer’s needs smoothly and reliably, sharing information and reporting all progress in a punctual manner. Handover and training is integrated as a “natural” process, tailored to the customer’s vision and philosophy. Unlimited Snow takes pride in creating the most successful project for you location.

1. As a turnkey solution provider, Unlimited Snow provides the following service: 2. As a partner of your business:

• Feasibility studies & Business plans Unlimited Snow fosters strategic relationships by investing in a variety of projects in ice & snow • Budget analysis domes, rides & attractions, technology and research & development. Proven expertise in strategic • Strategic & master planning planning and experience design helps US’ partners craft, execute and expand their vision and stems • Concept development & architectural and creative design from a core belief in helping passionate people to achieve their goals. • Project consulting & project management • Engineering & technical installations • Fixed & mobile Snow making machines 3. Franchises: • Fixed & mobile Ice making machines Unlimited Snow’s core focus is developing original, fully immersive snow & ice entertainment • Ice rinks & Ice climbing experiences that are scalable, repeatable and catered to regional markets anywhere in the world. • Rides & attractions Unlimited Snow is open to collaboration with other enterprises in long-term franchises, bringing • Specialist equipment & systems indoor snow and ice experience to a new level of commercial branding and merchandizing. These • Theming & special effects franchises include exciting and immersive experiences that are modular, scalable, and feasible. • Lighting systems • Audio & Video systems • Prefab & Instant structures • Operational support & management • Operations • Merchandising & promotion • Additional leisure facilities & franchise • The Experience Ticket online reservation and visual queuing system ystem • Tape My Day® camera system

UUNLLIMMITTEED SSNNOWW 6 Project Overview

Over the decades, Unlimited Snow has executed design and construction as general contractor for several indoor snow & ice facilities, as well as snow productions for many events worldwide. The budget managed in each project has varied from a few thousand euros to 200 million. Projects at different continents have enabled Unlimited Snow to be the most experienced partner in international collaborations, which has generated a lot of trust, goodwill and support all around the world.

PREVIOUS PROJECTS

PENDING PROJECTS

UUNLLIMMITTEED SSNNOWW 7 Track Record

SNOW MAKING EQUIPMENT CONCEPT DESIGN CONSULTANCY

Shaab Park, Kuwait Ski Park, Guangzhou, China Snow dome, Kuwait mobile snow making machine concept design consultancy

Empa and avalanche institute Zurich, Switzerland Arctic World, Almere, Netherlands Freestyle ski park, Moscow, Russia snow making installation concept design consultancy

Snow City, Jurong, Singapore Ski Park, Wuxi, China Xscape, Milton Keynes, United Kingdom polar snow making installation concept design, schematic & detailed design business plan study

International Antarctic Centre, Christchurch, New Zealand Grand Alps Snow Dome, Irving, Texas, USA Ski Dome, Cardiff , United Kingdom polar snow making installation concept design consultancy

Event company, South Africa Silver Dome - Dune Park, Viavari, Letvia Snow World, Hydrabad, India mobile snow making machine concept design consultancy, layouts and design

Ocean Park, Kong, China Snow Mountain, Houston, Texas, USA Snowland, Mexico City, Mexico snow making installation masterplan consultancy

Snow & Ice , Wuhan, China Ski Dubai, Dubai, UAE concept design and consultancy Snow maintenance and consultancy

SNOW MAKING Kernwasser Wunderland, Kalkar, Germany Snowbase, Terneuzen, Netherlands concept design snow and technical management and consultancy SkiDôme, Rucphen, Netherlands snow making, sponsoring, ski instruction-coordination Mall of Arabia, Cairo, Egypt Ski Egypt, Cairo, Egypt concept design snow and technical management and consultancy Snow World, Zoetermeer, Netherlands snow making, equipment supply, sponsoring, ski school Snow Dome Thialf, Heerenveen, Netherlands Snowland, Gramado, Brazil management, marketing management concept design and consultancy consultancy

Montana Snow Center, Westerhoven, Netherlands Snow Dome, Chengdu, China cryogenic snow making installation masterplan TURNKEY PROJECT Snow Village , Biddinghuizen, Netherlands Winterland, Shanghai, China polar snow making installation, equipment supply masterplan, concept design, general calculations, ongoing Snow Village, Jeddah, Mall of Arabia, Saudi Arabia

Snow Fun Park, Wittenburg, Germany Snow Park, Muscat, Palm Mall, Oman polar snow making half pipe

Winter , Waalwijk, Netherlands snow theming winter opening attraction park

UUNLLIMMITTEED SSNNOWW 8 WINTERLAND I SHANGHAI, CHINA

Client: KOP Properties

Finished stages: - Feasibility studies & Business plans Description: and visitors with year-round access to the largest indoor Olympic- - Budget analysis Winterland Shanghai will be located in Lingang City, with a site area grade winter sports facility, winter sport competitions, ice sculpture - Strategic & master planning of approximately 107,000 square metres. Located close to the site shows, exciting retail, and food and beverage establishments. The - Concept development & architectural and creative design of the Shanghai Haichang Polar Ocean Park and just within minutes development will also feature a ski-in ski-out resort, an indoor - Project consulting & project management from the Shanghai Disney Resort, Winterland Shanghai will boast a waterpark, an outdoor waterpark, an ice hotel and several theatres (Other stages are in progress) gross fl oor area of approximately 213,000 sqm, providing residents showcasing a wide variety of theatrical shows, concerts and multi- dimensional cinematic displays. Planned opening time: 2020

UNLLIMMIITEED SNNOWW 9 SNOW PARK I PALM MALL, MUSCAT

Description:

The Snow Park represents a world fi rst new generation real snow & ice amusement The warm zone includes the reception, rental area, the dressing rooms and park. Visitors are “beamed” into an Alpine winter landscape with realistic the merchandising shop as well as a separate Ice Bar and Alpine café. The mountain sceneries, Alpine chalet facades, snowy rockwork, F&B terraces with cold zone is divided over 2 levels and comprises numerous snow & ice fun themed furniture, huts, trees, snowfall and sound & light effects. Mall visitors can rides and attractions for the whole family to enjoy. already get a taste of the excitement from behind the mall windows, providing them a view at the Snow Park.

Client: Al Jarwani Group

Scope: - Feasibility study - Consultancy - Project management - Master planning - Schematic & concept design - Design development - Tender documents - Technical design - Specialist equipment & systems - Theming & special effects - Lighting systems - Audio Visual systems - Content production - Construction, production and fabrication - Installations attraction - Testing & programming - Pre opening & training - Operational support & management - Operations - Merchandising & promotion - Character design - Merchandising design - Engineering - Attractions - 50% joint adventure and franchise - Machine room (HVAC/snow-ice equipment) - The Experience Ticket online reservation and visual queuing system - Tape My Day® camera system

Planned opening time: 2018

UNLLIMMIITEED SNNOWW 10 SNOW VILLAGE ARABIAN CENTRES, RIYADH

Description: A new Snow Village to be built for Saudi Arabia, as part of a new mall development in Riyadh. The Snow Village aims for a new generation of winter themed indoor real snow and ice amusement parks. Covering approximately 5,000 square metres. There will be 15 snow and ice fun rides and attractions for children and families, which has an indoor temperature above zero to allow free snow play. The visitors will be virtually brought into a fantastic Alpine and snowy mountain landscape with huts, trees, snowfall, sound and light effects as well as Polar bear animatronics. Rides and attractions include an explorer snow circuit with snowmobiles, a snow carousel, bumper cars and alpine curling on ice, an ice-carving igloo, etc.

Client: Arabian Centres

Scope: - Feasibility study - Consultancy - Master planning - Schematic & concept design - Design development - Technical design - Construction, production and fabrication - Character design - Merchandising design - Engineering - Theming - Attractions - Machine room - Project management UNLLIMMIITEED SNNOWW 11 YOUR PARTNER TO SUCCESS FROM A WHOLE NEW PERSPECTIVE Service and Approach

UNLLIMMIITEED SNNOWW 12 Project Organization

Unlimited Snow’s core team will work in collaboration with the UNLIMITED SNOW All four departments and sub-consultants are accredited feasibility customer to lead a design process that works within the budget and companies, operations management fi rms and/or fabrication/specialty timeline. We will rely heavily on the customers feedback and factor shops. In order to ensure that Unlimited Snow’s vision is met, its project in the time needed for this in our design process. Key members of team is based on the specifi c skill sets unique to the needs of creating the customer’s team will be involved in the development process by immersive snow & ice environments. The Unlimited Snow Project Team means of conference call updates, design & budget meetings and comprises seasoned storytellers and audio & fi lm producers. Unlimited milestone reviews. Snow Project team staff will continue to oversee the project, and will Unlimited Snow has established a reputation by working under always take part in creative development, production management extreme conditions and tight schedules, and collaborating with and strategic planning for the duration of each design phase. external consultants to drive the production forward, respecting its STAFF - PROJECT TEAM deadlines.

BUDGET MONITORING BUDGET CALCULATIONS

PROJECT MANAGEMENT

PRODUCTION PRODUCTION PRODUCTION COORDINATION DEVELOPMENT PROJECT PLANNING ADMINISTRATION

TECHNICAL CREATIVE PRODUCTION OPERATIONS

UUNLLIMMITTEED SSNNOWW 13 The Process MEDIA DEVELOPMENT

MASTER PLANNING SCHEMATIC DESIGN APPROVAL PROGRAM

DESIGN DREEAAMERRSS DEVELOPMENT DESSIGNERRS DESIGN BRIEF

PROJECT DEVELOPMENT ORDERING LONG TECHNICAL DESIGN LEAD ITEMS DETAILED DESIGN

PROJECT INITIATION TENDER STAARRT

PROJECT COMPLETION DELIVER CONTRACT FINNIISSHH DOCUMENTS

CONSTRUCTION PRODUCTION PROJECT FINISHING FABRICATION

INSTALLATION GRAND OPENING ATTRACTION COOLING EQUIPMENT

OOPPEERRAATTORS PRE OPENING CONNTTRRAACCTOORRS TRAINING TESTING

OPERATIONS PROGRAMMING HAND OVER TO TO OVER HAND

UUNLLIMMITTEED SSNNOWW 14 A Creative Process

Unlimited Snow is experienced in creating all snow & ice related entertainment facilities, being the expert in the market to bring natural snow & ice experience into a well-planned indoor space. Starting from feasibility studies and provisional masterplans in the initial stage to the fi nal result, US’ collaborative creative minds continue to look for the best solutions possible to realize the clients` dream. In this creative process, 3D representations and other forms of design documents are used to inspire other parties invited in the process. US’ architects, theme designers, engineers and sub- consultants work together in diff erent stages to make the most creative design possible, while at the same time tackle possible problems even before they rise.

UUNLLIMMITTEED SSNNOWW 15 The Process - From Idea to Reality

PRE-FEASIBILITY, MASTER PLANNING & CONCEPT DESIGN & DEVELOPMENT

The primary goal of phase one is to develop the overall concept and to start envisioning the experience for each of the attractions. A written narrative is created outlining the experience from entry to exit. A master plan is developed to organize the program while artwork is created to help the customer and the team envision the look and feel of the project. In order to already assess progress in later construction, it is critical that a pre-feasibility study is performed and a facility impact report generated.

FEASIBILITY & BUSINESS PLAN

During the second phase a detailed feasibility study and a concept business plan will be delivered. Unlimited Snow tends to work with preferred and respected consultants for feasibility studies and business plans, so that the customer gains deeper insight into the revenues, budget plans, market analysis, fi nancial projections and the consequences of program mix confi gurations evolving from the Concept Design Phase that have been designed to meet the target numbers.

SCHEMATIC DESIGN

During the Schematic Design, the big ideas generated during the previous phase are translated into preliminary drawings showing sizing and general specifi cations, which can be shared with architects, engineers and other vendors. Essential infrastructural requirements such as power and water are provisionally defi ned. A much more detailed development package will be provided in the next phase of work. The above documents are compiled within a “Schematic Show Package” and an “Architectural Design Package” consisting of facility layout plans for attractions, initial technical show systems designs (lighting, audio, control, etc.), elevations/drawings for all themed facades, etc. The mix of story-driven environments, themed facades and off -the-shelf attractions must be integrated into the facility. It is during this phase that a Facility Design Architect will join the team to ensure a smooth integration.

DESIGN DEVELOPMENT, TENDER DOCUMENTS & TENDER APPRAISAL

During Design Development, the Schematic Show Package, Tender documents & Tender Appraisal from the previous phase is drilled down to add and specify further details. Unlimited Snow develops the design packages for attractions by working with the architect’s records, while the facilities are developed. Included in the design package is intent for graphics and signage, media pre-production treatment and scaled drawings & descriptions of all project elements to help communicate the design intent with manufacturers and specialty vendors. UNLLIMMIITEED SNNOWW 16 The Process - From Idea to Reality

CONSTRUCTION, PRODUCTION & FABRICATION

While the facilities are being constructed, the attractions and exhibit pieces begin fabrication. During the Production and Fabrication Phase, the media (both video and audio) are developed while the environment, attractions and theming are manufactured. Unlimited Snow works with composers and media producers, to create the specialty media (if needed) for the project and will provide oversight of the build of the attractions, scenery, theming, props, and eff ects. Partial pre-testing will be performed at all individually functional elements.

INSTALLATION & PROGRAMMING

The project comes together during the Installation and Programming Phase. Unlimited Snow manages the installations of all elements such as: the ice & snow installations, attractions, theming, scenery, props and eff ects and leads the programming of lights, audio and video elements. Comprehensive tests are being performed on all parts of the system, preferably in their coherence and under low temperatures and realistic humidity.For a Snow Theme Park, it will be essential to allow enough time for the temperature to drop to the target temperature, especially when diff erential temperatures (inside versus outside) are signifi cant.

TRAINING/HANDOVER/OPENING

Unlimited Snow strongly believes in a thorough training of and handover to the operational staff . A proper handover is key to the success and longevity of the project and its specialized hardware. Unlimited Snow will work directly with the customers’ staff to help train them in the proper way to operate and maintain all components of the system in a safe and effi cient way. Hands-on training in the most realistic manner also provides input for the formal handover, that will be offi cially scheduled before the opening and transfer of all property (following the corresponding articles in the contract).

S S S S S S S S S S S S S 01 02 03 04 05 06 07A 07 08 09 10 11 12

4400 1500 2200 3300 2200 2200 1800

9400+ 9400+ LIGHT 9000+ 8950+ TOP

7400+ FW 10 FW 10 FW 10 FW 10 7250+ 7000+ FW 09 FW 11 6750+ FW 01 FW 01 FW 01 FW 01 FW 01 6400+ 6200+ 5950+

FW 02 FW 02 FW 02 FW 02 FW 02 5225+ FW 05 FW 05 FW 06 FW 06 FW 06 FW 06 FW 06 FW 04 FW 04 FW 07 FW 08 FW 08 FW 08 FW 08 FD 03 FD 03 FD 03 FD 03 FD 03 FD 03 FW 12 FW 12 FW 12 FW 12 4900+ FW 03 FW 03 4800+ 4800+ 4850+ FD 01 FW 14 FW 14 FW 14 4500+ 4600+ FW 13 FW 13 FW 13 FW 13 FW 13 4500+ 4300+ 4300+ 4400+ FW 01 FW 01 FW 01 4100+ 4000+ 3820+ 3900+ 3900+ 3600+ 3625+

3300+ 15° 4200+ 18°

3600+

32.21 32.20 32.04 32.04 32.13 32.13 32.13 32.43 32.43 32.43 32.43 FD 02 32.16 32.17 32.18 32.17 32.17 32.17 32.17 32.17 32.17 32.18 32.17 32.16 51 50 42 FD 04 42 FD 05 60 59 58 54 54 54 53 48 47 46 45 44 43 41 40 39 38 37 36 1220+ 32.13 32.13 32.14 32.13 32.15 34 33 32 31 600+ 35 TOP 0

2711 1682 6318 1675 4365 1960 6887 1113 5810 2190 8000 1808 6192 3363 4637 692 7308 8000 5210 4402 3598 6182 1818

8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

UUNLLIMMITTEED SSNNOWW 17 ESSENCE FOR QUALITY PROJECTS Technology and Support Sub-consultants

Snow and ice indoor theme parks are complex projects that require close integration of architects, construction engineers, MEP specialists, theme & media designers, and a whole range of contractors and other professionals. Unlimited snow is the most experienced as well as effi cient party to take lead in such projects as a turnkey solution provider. As part of its overall design and development process, Unlimited Snow anticipates working with and managing the following sub-consultants.

GIEBROS Giebros Technics Projects B.V. situated in the Netherlands, operates all over Europe and outside Europe, has specifi c knowledge and a considerable experience in relation to design, engineer, assemble, produce, install and maintain mechanical installations in all types of facilities. Giebros Technics realized over 400 “Prefab Machine Room Installations” in snow and ice facilities, water parks, etc.

ARUP Worldwide, Arup is one of the most well-known and authoritative engineering fi rms, with 70 years of experience. Having hundreds of engineers based in Amsterdam, they take care of interdisciplinary projects in aspects including structural engineering, building physics and construction. Their services are delivered locally through 34 offi ces on all continents, including 9 offi ces in Greater China. Unlimited Snow has been collaborating with Arup in several successful projects, bringing technical innovation to a new level.

WT PARTNERSHIP WT Partnership is an award winning international practice of property, project and cost management consultants in building construction, infrastructure and management of facilities. WT Partnership provide consultancy services on a wide range of commissions for public and private sector clients worldwide, drawing on the resources of over 1,250 staff operating from offi ces throughout the United Kingdom, Europe, South East , Central America, Australia and the Pacifi c.

UUNLLIMMITTEED SSNNOWW 19 Energy Strategy & Machine Room

Snow and ice projects such as ice rinks, leisure ice, snow domes, snow play and additional mixed use facilities are quite complex and require very specifi c technical installations. - ENERGY SAVING For signifi cant energy savings or for reducing the use of energy from the grid to an absolute minimum Giebros Technics facilitates a full integration of all components of the installation leading to a minimum energy consumption under operational circumstances. Apart from limiting operational costs - COST REDUCTION it is also of environmental importance to achieve a considerable reduction of CO2 emissions. In case this is commercially viable energy power plants are applied with the presently most effi cient and state of the art combination of heat and power (HCP) and solar energy in an energetic, ecological as - DURABILITY well as fi nancial sense. Because of its specifi c know how and applied superior materials making the machine room installations last for at least 20 years, Giebros Technics has built an outstanding reputation among its sports and leisure projects clients during the past 30 years. A total of 472 projects have so far been realised in the Netherlands and abroad.

Psychrometric Chart Location: SHANGHAI, CHN Frequency: 1st January to 31st December Weekday Times: 00:00-24:00 Hrs Weekday Times: 00:00-24:00 Hrs Barometric Pressure 101.36kPa © Weather Tool

UUNLLIMMITTEED SSNNOWW 20 Snow-making

Unlimited Snow is the only one stop shop in the world to manage and build systems for next generation indoor snow parks. With US’ advanced snow making technology the authentic snow amusement experience can be realized in virtually any location and climate. The team has previously taken part in the snow making process of many snow domes and outdoor events in Europe and all around the world. Whenever in need, US makes real snow to accomplish missions previously regarded as impossible.

NO H2 2 O A/C

VACUUM H2O 0-24˚c

H2 O

VACUUM SNOW TECHNOLOGY CRYOGENIC SNOW TECHNOLOGY SNOW SHOWER TECHNOL- • Suitable for any temperature. • Suitable for any temperature. OGY • Large capacity snow making. • Faster snow-making production. • Suitable for any temperature. • Real snow fall.

0˚c -4˚c 2O H A/C

H2 H2 O Cooling O

ICE FLAKE TECHNOLOGY INNER-COOLED SPRAY TECHNOL- AIR-COOLED SPRAY TECHNOL- • Suitable for any temperature. OGY OGY • Applicable for almost any event. • Suitable from zero to below freezing temperature. • Below freezing temperature required. • Especially for indoor ski slopes and snow play areas. • Applicable for indoor and outdoor events.

UUNLLIMMITTEED SSNNOWW 21 Construction

What defi nes a snow project’s performance can depend on the smallest ice indoors. US has gained thorough experience in insulation, indoor climate - RELIABILITY details. Reliability is a key concern, so US engineers and integrated control, damp-proofi ng, and decision making in response to engineering design teams evaluate and consider all materials and components of a challenges such as also making structures transportable and lightweight. - INTEGRATION construction. US projects are required to operate at low running cost without This results in the creation of the most reliable structures, working in perfect affecting quality and durability. Unlimited Snow pursues excellence in high- harmony with snow, ice and visitors. performance building systems that are most suitable for managing snow and - DETAILS

UNLLIMMIITEED SNNOWW 22 Envelope

The design of the envelope of the snow park shall consider the STRUCTURAL MOVEMENTS WATER TIGHTNESS AND DRAINAGE following specifi c requirements: The thermal performance of the enclosure must be excellent The external cladding should be developed to provide a fully to prevent the transmission of the warm exterior into the ski weather tight enclosure. In particular, the 3-dimensional • Thermal insulation enclosure. Detailed studies will be required to understand the analysis of the slope will in- form the refi nement of the shape • Condensation risk assessment internal conditions throughout the volume of the internal enclosure. and the positioning of gutters for the collection of rainwater. • Air tightness As the design develops particular attention must be applied to the • Structural movements design of all interfaces and structural movement joints where local • Water tightness and drainage reduced performance may occur. Review of any penetrations (for example to support access and maintenance equipment) should be carried out to mitigate the risk of cold bridges trough the facade.

THERMAL INSULATION The thermal performance of the enclosure must be excellent to prevent the transmission of the warm exterior into the ski enclosure. Detailed studies will be required to understand the internal conditions throughout the volume of the internal enclosure. As the design develops particular attention must be applied to the design of all interfaces and structural movement joints where local reduced performance may occur. Review of any penetrations (for example to support access and maintenance equipment) should be carried out to mitigate the risk of cold bridges trough the facade.

CONDENSATION RISK Vapor permeability of each element the roof envelope shall be designed and specifi ed to avoid condensation occurring on cold surfaces or inside the weather barrier. This requires thermal modelling of the typical roof build up in diff erent climate condition to verify that the position of the vapor barriers is eff ective throughout the year. Thermal bridges and penetrations also need careful detailing and modelling.

AIR TIGHTNESS The air tightness of the enclosure will be critical to the success of the project from an energy standpoint. Air leakage is likely at a number of locations such as: between cladding sheets, at interfaces with the perimeter of the building, at interfaces with the adjacent structures and at any movement joints. Testing of certain arrangements should be considered as the design develops. Due to the large change in height of the covered ski tunnel internal air movements and the stack eff ect are likely to aff ect the actual leakage through the external skin. We would recommend that the project specifi cation requires detailed testing of the contractor’s proposed jointing arrangement to justify its air tightness performance.

UNLLIMMIITEED SNNOWW 23 Attraction

US is the leading developer to produce innovative and unique attractions in a snow and ice environment. US’ attraction development team and related sub-consultants have researched and produced a wide range of INNOVATIVE - CUSTOMIZED - DURABLE IN LOW TEMPERA- attraction systems, never experienced before. These systems include: electrical indoor snowmobiles, snow TURE diggers, laser gun ice bumper cars, adventure games over snow, special snowball games, simulators, reservation & ticketing systems and many more. Unlimited Snow also collaborates with the new generation track & trace video system - TapeMyDay - automatically fi lms, edits, and distributes a personalised guest video covering the entire visit in theme parks, introducing an opportunity for additional revenue. Unlimited Snow has developed more than 50 different types of snow and ice attractions, below are some examples.

UUNLLIMMITTEED SSNNOWW 24 Operation

- WOW FACTOR The success of theme parks heavily depends on the post- prepares operational plans and training schemes most suitable for construction phase and its later steps. Operational knowledge, each specifi c turnkey project. also to be found in related industries, is crucial. Important projects Once operational, Unlimited Snow persists on providing immersive - GUEST FRIENDLY benefi t from advice and support of top operators and franchisees experience with every detail of guest requirement and safety hazard knowing about snow and ice. considered. Guest experience and consumers’ satisfaction remain - GUARANTEED SAFETY Unlimited Snow has an entire team of specialized operators and key issues that should be monitored and taken care of with priority. managers who are experienced in running snow domes, ski resorts, It requires the best expertise to “bring Disneyland into the snow - IMMERSIVE EXPERI- indoor ski domes and theme parks. Together with the group of dome”. US can do it. ENCE theme designers, engineers, trainers, and other staff members, US

UNLLIMMIITEED SNNOWW 25

Unlimited Snow Nieuwe Gracht 11, 2011 NB Haarlem, Netherlands +31 (0)20 4714640 / +31 (0)88 snowbiz [email protected] www.snow.biz

NO PART OF THIS DOCUMENT MAY BE REPRODUCED, COPIED OR TRANSFERRED TO OTHERS IN ANY FORM WITHOUT THE EXPLICIT WRITTEN AUTHORIZATION OF UNLIMITED SNOW. OBVIOUS OMISSIONS OR CLEAR MISTAKES CANNOT BE USED AGAINST UNLIMITED SNOW. IN CASE OF ANY CONFLICTS, DUTCH LAW AND JURISPRUDENCE WILL APPLY.