LIST OF APPROVED WORKS FROM MAY.- 2010 TO MAY-2013

BOARD/VC&MD/Jt.MD/CE&GM(TECH)/CE(N) ( All figures in Rs. Lacs) Administrative Approval Award of Work Sr. Node/ File No Name of work Original Revised Contract Remark No. Division Authourity C.A No. Agency % Qouted DSR/CSR Authority Amount Amount Amount Grant-in-Aid work for Construction of Internal CSR 2008-09 Pathways at Ram Mandir pada at Asudgaon 1 5233 EE(PNL-I) 9.19 Jt..MD. Village, Asudgaon Grampanchayat , Tal. . Grant-in-Aid work for the construction of CSR 2008-09 & DSR Internal Pathway at Vitthawadi, Chinchpada 2008-09. 2 5234 EE(PNL-I) 4.65 Jt..MD. village under Vadghar Grampanchayat , Tal. Panvel GIA work for the construction of Pathway CSR 2008-09. from Gadhi river bridge to Muslim Mohalla at 3 5235 Vadghar village under Vadghar EE(PNL-I) 7.37 Jt.MD. Grampanchayat , Tal. Panvel. GIA work for pitching to Vadghar-Chinchpada CSR 2008-09. 4 5236 Creek Bund under Vadghar Grampanchayat , EE(PNL-I) 21.1 Jt.MD. Tal. Panvel. GIA (Grant-In-Aid) works under Nhava Grampanchayat , Tal. Panvel, for 1) Construction of Storm water Drains at CSR 2008-09. 9.04 Jt.MD. Jt.MD. Nhava village under GIA Scheme. 2) Construction of Storm water drains at CSR 2008-09. Motha Pada in Nhava Khadi under 2.03 Jt.MD. Jt.MD. Grampanchayat Nhava Village under GIA Scheme. CSR 2008-09. 5 5237 3) Construction of Storm water drains at EEB&U-II)) Uttar Pada in Nhava Khadi under 2.97 Jt.MD. Jt.MD. Grampanchayat Nhava Village under GIA Scheme. 4) Construction of Compound wall & Filling CSR 2008-09. for Burrial Ground at Nhava village under GIA 9.51 Jt.MD. Jt.MD. Scheme. 5) Construction of Compound wall & raising CSR 2008-09. of play ground level at Nhava village under 8.90 Jt.MD. GIA Scheme. GIA (Grant-In-Aid) works in Belpada Village under Grampanchayat Gavan, Tal. Panvel, Dist. Raigad. 1) Construction of concrete pathway from CSR 2008-09. school to temple at Belpada under GIA 8.09 Jt.MD. 8.08 Jt.MD. Scheme at Node. 6 5238 EEB&U-II)) 2) Construction of Pucty (Platform) for CSR 2008-09. fishermen at Belpada under GIA Scheme at 3.21 Jt.MD. 2.84 Jt.MD. Ulwe Node. 3) Construction of W. B. M. road from CSR 2008-09. Crematorium to Creek at Belpada under GIA 4.93 Jt.MD. 4.96 Jt.MD. Scheme at Ulwe Node. Various works in Vahal Grampanchayat under GIA at Ulwe Node for 1) Replacement of damaged doors and CSR 2008-09. windows for school building at Vahal village 7 5239 Vahal Grampanchayat, Tal. Panvel, Dist. EEB&U-II)) 2.40 Jt.MD. Raigad. 2) Providing brick drain at Vahal village Vahal CSR 2008-09. Grampanchayat, Tal. Panvel, Dist. Raigad. 2.66 Jt.MD. Providing & Laying Sewer lines in Sector-27 M/s J.M.Mhatre CSR 2006-07 & 5187 under 12.5% Scheme at Dronagiri, Navi 2008-09 & DSR 8 ------EE(DRON-II) 4.95 4.73 VC&MD 09/CIDCO/EE(Dron-II)/2009-10 (-)16.5% 3.95 VC&MD old file . 2008-09, MJP DSR 2008-09 Providing & laying sewer lines in Sector 15 M/s Girish Enterprises CSR 2008-09, DSR 9 5181 under 12.5% Scheme at Dronagiri, Navi EE (Dron.-II) 207.57 245.09 VC&MD 08/CIDCO/EE(Dron-II)/2009-10. (-)15.97% 2008-09, MJP DSR 205.95 VC&MD Mumbai. 2008-09 Construction of Bridge over 80.0m wide CSR 2008-09, DSR 10 5240 channel on 30.0m wide road at Sector 50 at EE() 210.51 277.17 VC&MD 2008-09 & Nerul (Part B). Approved Rates Acoustical treatment and green room, lobby, M/s. Sanjiv Yajnik & PWD DSR 2008-09 & interior work for Auditorium in Agri-Koli Associates Market Rates. 11 5241 EE(Nerul) 106.73 99.47 VC&MD 09/CIDCO/SE(D)/EE(NL)/2009-10. (-) 6.80% 99.47 VC&MD Sanskruti Bhavan in Sector 24 at Nerul.

Construction of Road, Pathways, Parking with Misc. Civil Works along with Area Levelling, 04/CIDCO/CE&GM(T)/SE(D)/2006 12 5242 Reclamation, Amphitheatre and Water Supply EE(CP-II) Extension of Time Limit -07. works within Central Park in Sector-23 at Kharghar Node, . Construction of S. W. Drain in Sector 4 at M/s. Shree CSR 2008-09 & DSR 5176 Nerul 05/CIDCO/SE(Design)/EE(NL)/ Venkateshwara 2008-09 13 ------ol EE(Nerul) 324.27 VC&MD (-) 24.71% 244.14 VC&MD d file 2009-10. Infrastructure Pvt. Ltd

Modification of storm water drains and M/s. S.N.Naik CSR 2008-09 & construction of footpath along 20m wide road &Brothers Approved Rates 14 5243 EE(KLM-I) 47.26 60.60 VC&MD 01/CIDCO/EE(-KLM-I)/ 2010-11 (-) 2.71% 62.28 VC&MD between Sector-8 and 11 at Kalamboli, Navi Mumbai Execution of various GIA works at Owe Gram PWD DSR 2008-09, Panchayat, Kharghar, Tal. - Panvel, Dist. - MJP 2008-09 & Rate 15 5244 Raigad. EE(KHR-II) 41.50 VC&MD Analysis based on Market Rates.

P/L installation, commissioning & operating for 6 months fully computerized automated 16 5245 irrigation system with related civil work for EE(CP-II) 01/CIDCO/EE(C.P.)/2008-09. Extension of Time Limit Central Park in Sector-23 at Kharghar, Navi Mumbai. Manufacturing, Supplying and Fixing Glossy type Interlocking paver blocks in Sector-23 of Q.No. 01/CIDCO/EE(CP-II)/2008- 17 5246 EE(CP-II) Extension of Time Limit Central Park at Kharghar, Navi Mumbai. (Part- 09. I) Manufacturing, Supplying and Fixing Glossy type Interlocking paver blocks in Sector-23 of Q.No. 01/CIDCO/EE(CP-II)/2008- 18 5247 EE(CP-II) Extension of Time Limit Central Park at Kharghar, Navi Mumbai. (Part- 09. II) Construction of Entrance Building, Toilet blocks, Food plaza, Nursery Office Building 02/CIDCO/SE(KHR- 19 5248 EE(CP-II) Extension of Time Limit and Dias in Central Park in Sector-23 at II)/EE(C.P.)/2007-08. Kharghar, Navi Mumbai. GIA for the construction of internal storm CSR 2008-09 & water drain at Khalche Owale village, under Approved rates. 20 5249 EE(PNL-I) 10.12 Jt.MD. 10.12 Owale Gram Panchayat, Tal. - Panvel, Dist. - Raigad. Providing and laying Bituminous Concrete for M/s. Ajwani CSR 2008-09 03/CIDCO/SE(NT)/EE(GHN)/2010- 21 5250 balance portion of Palm Beach Marg at EE (GHN-I) 45.61 43.82 VC&MD Infrastructure Pvt. Ltd. (-) 1.35% 43.23 VC&MD 11. Ghansoli, Navi Mumbai. 5193 Construction of S. W. Drains for 36m wide M/s. J.M.Mhatre CSR 2008-09, DSR 22 ------old road from MSEB Compound wall and EE(DRON-I) 506.59 565.77 VC&MD 10/CIDCO/EE(DRON-I)/2009-10 (-)26.52% 2008-09 & MJP DSR 415.73 VC&MD file peripheral of Sector-9 at Dronagiri. 2008-09. GIA for the construction of internal pathway DSR 2009-10. at Adivasi wadi, Shilpada raod, Aganwadi 23 5251 road, Chinchpada Village, under Vadghar EE(PNL-I) 6.55 Jt.MD Gram Panchayat, Tal. - Panvel, Dist. - Raigad.

Providing and laying balance 700 mm dia. D. I. M/s. Prashant MJP 2009-10, MJP K-9 feeder main from Vahal transmission 04/CIDCO/SE(ENV)/EE(ENV- Mahagaokar 2008-09 & PWD DSR 24 5252 EE(ENV-I) 255.90 234.68 VC&MD (+)4.9% 246.18 VC&MD main up to ESR/GSR plot Sector-8, at I)/2010-11 2009-10. , Navi Mumbai. Construction of Pathways along with S. W. CSR 2008-09. 25 5253 Drains for Gavhan village, under GIA Scheme, EE(B&U-II) 27.51 Jt.MD. at Ulwe Node, Navi Mumbai. GIA works under Gavhan Grampanchayat for Shivaji Nagar village at Ulwe Node, Navi Mumbai 1) Construction of approach road to toilet CSR 2008-09. 26 5254 along with brick drain for Shivaji Nagar village EE(B&U-II) 4.40 Jt.MD. under GIA Scheme at Ulwe. 2) Reconstruction of compound wall CSR 2008-09. pertaining to Shivaji Nagar village under GIA 3.70 Jt.MD. Scheme at Ulwe. Environment clearance for various works at M/s. Enviro Forest Spot quotations 27 5255 Kamothe, Navi Mumbai. EE(KMT-II) 23.50 VC&MD. Consultancy Services collected from 23.50 VC&MD. Consultants. Construction of S. W. drain from Shri. Gokul CSR 2008-09 & Patil’s house to Holding Pond in Roadpali Approved Rates 28 5256 village under Gram Panchayat Roadpali in EE(KLM-I) 9.62 VC&MD. Kalamboli Node, Tal. Panvel, Dist. Raigad.

Grant-In-Aid for Construction of Internal S. W. CSR 2009-10 & Drains at Kundevahal village under Gram Approved Rates. 29 5257 Panchayat Kundevahal, Tal. Panvel, Dist. EE(PNL-I) 10.61 Jt,MD. Jt.MD. Raigad.

Grant-In-Aid for Construction of Internal DSR 2009-10. Pathway at Adiwasiwadi & Construction of S. W. Drain from Shri. Amrut Hira Mhatre’s 30 5258 EE(PNL-I) 6.74 Jt.MD. Jt.MD. house to Sanjay Bhoir’s house at Kundevahal village under Gram Panchayat Kundevahal, Tal. Panvel, Dist. Raigad. Repairs to Existing pipe culvert & Pathway at CSR 2007-08 & DSR 31 5259 Kundegaon village under GIA Scheme at 2009-10 Dronagiri. Integrated Development of Infrastructural Board M/s Thakur CSR 2008-09, Board Works in Sector-18 at Ulwe, Navi Mumbai. BR No. 10311 infraprojects Pvt. Ltd. MPWD DSR 2008-09 BR No. 01/CIDCO/SE(Ulwe)/EE(B&U- & MJP DSR 2008- 10447 32 5260 EE(B&U-II) 2041.58 (-)1.7% 1911.31 ------II)/2010-11 09.Rate Analysis ------30.1 1.06.2010 1.2010 &Approved Rates

Providing and laying 1500mm dia. MS gravity Board M/s. Koya & Co. CSR 2009-10 . Board main along NH-4 from Kalamboli Junction to BR No. 10309 Construction Pvt. Ltd. BR No. 01/CIDCO/SE(Env)/EE(Env- 33 5261 MBR Sector-26 at Kharghar. EE(ENV-II) 3547.32 (+)23.9% 4395.13 10450 ------1.06.2 II)/2010-11 010 ------3 0.11.2010 Integrated Development of Physical Board M/s Thakur CSR 2008-09 & MJP Board 5152 infrastructure works under 12.5% Scheme in BR No. 10218 infraprojects Pvt. Ltd. 2008-09. BRNo. 10310 34 ------Navade at Kalamboli, Navi Mumbai. EE(KLM-II) 894.82 01/CIDCO/EE(KLM-III)/2009-10. (-)7.5% 783.59 old file ------23.11.20 ------01.0 09 6.2010 Development of Roads (Up to 1st stage of M/s Thakur CSR 2008-09 & MJP Asphalting) under 12.5% Scheme in Sector- 02/CIDCO/SE(Ulwe)/EE(B&U- infraprojects Pvt. Ltd. 2008-09. 35 5262 EE(B&U-II) 205.43 VC&MD. (-)32.32% 139.03 CE&GM(T) 10B around Shivajinagar at Ulwe, Navi II)/2010-11 Mumbai. Construction of balance carriage way of 30m M/s. P.P.Kharpatil CSR 2008-09. 36 5263 wide road from Amra Marg to Sector-19 at EE(B&U-I) 151.92 VC&MD. 03/CIDCO/EE(B&U-I)/2010-11 Const. Pvt, Ltd. (-)34.178 100 ACE(I&NT) Ulwe Node. Construction of 30m Wide D. P. Road from Board CSR 2008-09. Holding pond to Carshed in Vasai-Virar Sub BR No. 10312 37 5264 EE(V/V) 868.82 Region ------01.06.20 10 Development of one carriageway of 24.00m M/s.L.T.Patil & Sons CSR 2008-09. 03/CIDCO/SE(Ulwe)/EE(B&U- 38 5265 wide road in Sector-16A at Ulwe, Navi EE(B&U-II) 77.73 VC&MD. (+) 4.9% 81.54 ACE(I&NT) II)/2010-11 Mumbai. Providing consultancy services for repairs to M/s. Structwel Spot quotations 39 5266 GSRs, MBRs & Pump Houses in Panvel & SE(Env-III) 11.06 VC&MD. Desigerners & collected from 11.06 VC&MD. Kalamboli Nodes Consultants Pvt. Ltd. Consultants. GIA work for Construction of PCC SW drain CSR 2008-09 & from Muslim Mohalla to Boudhawada & RCC Approved Rate. 40 5267 culvert for road crossing at Village Vadghar, EE(Pnl-I) 4.36 Jt.MD. under Vadghar Grampanchayat, Tal. Panvel.

Improvement of Crematorium at Navghar CSR 2008-09 & DSR Village under GIA Scheme by Navghar Gram 2008-09 & 41 5268 EE(Dron-I) 7.95 Jt.MD. Panchayat at Dronagiri Tal. , Dist. Raigad. Approved Rates.

Extension of six months for the work of M & P approval for the extension of of Gardens at Kalamboli, Panvel (E) & Panvel time limit for the above-referred (W) Nodes work from 01/10/2009 to 42 5269 Horticulture 176.09 VC&MD 31/03/2010 on the same rate, terms & condition.

Repairs to Bund for Roadpali - Boudhwadi Shri P.S.Gaikwad & CSR 2008-09. 43 5270 village under the Gram Panchayat Roadpali at EE(KLM-I) 6.47 Jt.MD. Shri M.K.Gaikwad Kalamboli. Development of balance carriageway in M/s. P.P.Kharpatil CSR 2008-09, MJP EE(KHR-HSG- 04/CIDCO/SE(KHR- 44 5271 Sector-11, 14, 15, 18, 19 & 20 at Kharghar 567.62 VC&MD. Const. Pvt. Ltd. (-)29.53% 2008-09 & 400.00 VC&MD I) I)/EE(KHR.HSG-I)/2010-11 Approved Rates. 5166 Construction of approach road to plot No. 16, M/s. V .B Bhoir CSR and DSR 2008- 45 ------17 and School plot in Sector-22 in Nerul (W). EE(NeruI) 08/CIDCO/SE(D)/EE(NL)/09-10. Construction (-)20.00% 09. 48.47 VC&MD old file Providing & Laying Sewer lines at Nagar-I & MJP/PWD/DSR Nagar-II of Waluj Mahanagar, Dist. 2008-09 of 46 5272 EE (AUR) 569.07 VC&MD. Aurangabad. Aurangabad region.

Asphalting of WBM roads in G. C. of Nagar-IV, MJP/PWD/DSR CIDCO, Waluj Mahanagar, Dist. Aurangabad. 2008-09 of 47 5273 EE (AUR) 289.05 VC&MD. Aurangabad region.

Providing, Supplying, L/L, D. I. water supply lines in growth centre, Nagar-IV, CIDCO, 48 5274 EE (AUR) 83.86 VC&MD. Waluj Mahanagar, Dist. Aurangabad

Balance area reclamation with Murum in M/s. S.N.Naik & CSR 2008-09. 49 5275 EE(B&U) 153.49 VC&MD 04/CIDCO/EE(B&U-I)/2010-11 (+)28.50% 197.24 VC&MD Sector-6 at Ulwe Node, Navi Mumbai. Brothers Environment clearance for the work of a) M/s. International Spot quotations Widening and up-gradation of Taloja Link Infrastruct. Projects & collected from Road leading to Taloja Industrial Estate at 15.00 + Labs. Consultants 50 5276 EE(KLM-I) VC&MD. 2.5%% VC&MD. MIDC. b) Construction of H. P. in Sector-21 at Service Tax Kalamboli as per the High Court order dated 28/07/2008 at Kalamboli Node Environment clearance for the work of M/s. Project Spot quotations ‘Construction of Culvert/Bridge across central Consultant collected from 8.50 + 51 5277 channel for connecting Sector-20&22 in KRC EE(KLM-I) VC&MD. 3.40% Consultants. Service Tax as per the High Court order dated 28/07/2008 at Kalamboli Node. GIA for repairs to road from Chandrakant CSR 2009-10 & Rate Bhoir’s house to Uttam Keni’s house at Analysis. 52 5278 Digodpada, Chinchpada village, under EE(PNL-I) 2.92 Jt.MD. Vadghar Gram Panchayat, Tal. - Panvel, Dist. - Raigad. Construction of six seated toilet blocks at CSR 2006-07. Kaladhonda village at Chanje Group Gram 53 5279 Panchayat at Dronagiri Tal. Uran, Dist. Raigad, EE(Dron-II) 2.2 Jt.MD. under Grant-In-Aid Scheme. Repairs to Elevated Storage Reservoirs (ESRs) M/s. Mahindra DSR 2008-09, at Sector-6E, Kalamboli and Sector-5A, New Realtors & Infrast. Pvt. Approved Rate and 5184 03/CIDCO/SE(ENV)/EE(ENV- 54 ------Panvel (E). EE(Env-III) 77.71 105.76 Vc&MD. Ltd. (+) 13% Rate Analysis given 85.66 III)/2009-10. old file by Consultant.

Construction of Roads in Sector-19 near M/s. Sai Construction CSR 2008-09. 55 5280 village in Ulwe Node, Navi EE(B&U-I) 144.54 VC&MD. 05/CIDCO/EE(B&U-I)/2010-11 (+)4.9% 151.62 CE&GM(T) Mumbai. GIA for the construction of concrete pathway CSR 2008-09. at Hanumanpada, Asudgaon village under 56 5281 EE(PNL-I) 1.5 Jt.MD. Gram Panchayat Asudgaon, Tal. Panvel

GIA work for construction of pathway at CSR 2009-10. 57 5282 Khalchi Ali in Kundevahal village, under EE(PNL-I) 9.58 Jt.MD. Kundevahal Gram Panchayat, Tal. Panvel. GIA work for construction of toilet block at CSR 2009-10. Shilpada, Naman Nagar, Chinchpad village, 58 5283 EE(PNL) 8.53 Jt.MD. under Vadghar Gram Panchayat, Tal. Panvel.

Development of Power Supply Network and Board M/s. IVRCL Ltd. DSR 2011-12 Board Infrastructure Distribution Network & BR No. BR No. Construction of 33/11 KV & 11/0.4 KV HT 102331 10674 59 5284 EE(Elect) 10970.00 12/CIDCO/EE(Elect-I)/2011-12 (+)8.5% 6097.73 substations & allied work in Sector-25 to 45 at Kharghar Node. Phase-I. ------11.06.20 ------14.07. 10 2012 Balance Development of Peripheral Road & Board M/s. Thakur Board 5177 B.R No. B.R No. Cross Drainage Works on 45m wide Road (Jal 08/CIDCO/SE(KHR-I)/EE(KHR- Infraprojects Pvt. Ltd. 60 ------old EE(Khr-II) 1835.71 10240 (-) 34% 1099.37 10329 Marg) from Sector 16 to 34 at Kharghar, Navi II)/2009-10. file ------. ------. Mumbai. 05.01.2010 11.06.2010 Providing & Laying 100mm dia. G. I. water CSR 2008-09 & MJP 61 5285 supply pipeline for Boudhwadi of Roadpali EE(KLM-I) 5.86 Jt.MD. DSR 2008-09. village at Kalamboli (GIA work). GIA for Repairs of road from Bus stop on CSR 2009-10 & DSR Panvel-Belapur road to Varche Owale village 2009-10 & Rate 62 5286 EE(PNL-I) 4.24 Jt.MD. under Owale Grampanchayat, Tal. Panvel. Analysis.

Grant-In-Aid Work for CSR 2009-10 & Renovation/improvement to pond at Approved Rates. 63 5287 Talewadi, Chinchpada Village, under Vadghar EE(PNL-I) 9.88 Jt.MD. Grampanchayat, Tal. Panvel. Grant-In-Aid for 1) Construction of conventional wood pyre, steel structure and other misc. works in 64 5288 crematorium at Dungi village. EE(PNL) 7.27 VC&MD. 64 5288 2) Construction of compound wall for EE(PNL) 7.27 VC&MD. Crematorium at Dungi Village, under Pargaon Grampanchayat, Tal. Panvel.

Construction & commissioning of one ESR, 2.0 M/s. Gleg Engineers DSR 2008-09, MJP 5212 MLD capacity along with allied works at the 04/CIDCO/SE(Env)/EE(Env- Pvt. Ltd. 2008-09, CSR 2007- 65 ------old EE(Env-III) 154.26 351.94 VC&MD. (+) 49% 351.94 VC&MD. file risk & cost of defaulting contractor in Sector- III)/2009-10 08, CSR 2008-09 & 11 at Kharghar. Approved Rates. Providing and laying 1000mm, 1500mm dia. Board M/S. S.N.Thakkar Board M.S. pipe line for rising/gravity main from B.R No. 19/CIDCO/SE(ENV)/EE(ENV- Const. Pvt. Ltd. B.R No. 1963.35 10330 (+)23.04% 2415.7 10330 MBR in Sector 26 to HSR in Sector 30 at I)/2009-10 ------. ------. Kharghar, Navi Mumbai 66 4992 EE(Env-I) 11.06.2010 11.06.2010 Construction, Commissioning & testing of 30 Board M/S. S.N.Thakkar Board ML capacity HSR in Sector-30 at Kharghar. B.R No. 12/CIDCO/SE(ENV)/EE(ENV- Const. Pvt. Ltd. B.R No. 2126.46 3471.24 10192 (+)35.01 2126.46 I)/2008-09 10045 ------. ------. 25.08.2009 28.01.2009 Asphalting of Internal Roods (Stage-II) in M/s.K.N.Gharat & Co. CSR 2008-09, 67 5289 Sector-17 & 18 of Phase-II area under 12.5% EE(KMT-I) 83.63 VC&MD. 01/CIDCO/EE(KMT-I)/2010-11 (-)22.32% Approved Rates & 64.96 CE&GM(T) Scheme at Kamothe, Navi Mumbai. Rate Analysis Construction of one Toilet Block of six seated CSR 2009-10. at Bouddhavadi, Kopar village, under Gavan 68 5290 EE(B&U-II) 3.75 Jt.MD. Grampanchayat at Ulwe Node.

GIA work for construction of Toilet Block (2 CSR 2009-10 & 69 5291 units) at village Waghiwali, under Waghiwali EE(PNL-I) 5.91 Jt.MD. Approved Rates. Grampanchayat, Tal. Panvel. Construction of RCC Box type Channel near M/s. Safire Const. CSR 2008-09, 70 5292 Bokadvira village in Sector 41 at Dronagiri EE(Dron-II) 213.84 VC&MD. 01/CIDCO/EE(Dron-II)/2010-11 (-)16.70% Approved Rates. 178.13 CE&GM(T)

Reclamation in Sectors 44 & 62 under 12.5% M/s. J.M.Mhatre Foreclosure of contract & scheme at Dronagiri. Board cancellation of contract invited 2522 B.R No. 9093 02,03,04,05,06,07/CIDCO/EE(DRO for PAP's as per B.Rno.8882 dtd. 71 ------old EE(Dron-II) 214.34 (-)22.00% 167.18 VC&MD. ------. file N.-II)/2009-10 29.11.2003 subject to no 17.08.2004 claims by contractor

Fixing of odd/even date parking sign boards M/s. Western Fibrolite Approved rates 72 5293 EE(Khr-II) 4.60 VC&MD 4.6 VC&MD. at Kharghar. GIA work for construction of pathway from CSR 2009-10 Electric D. P. to Shiv Temple at village 73 5294 EE(PNL-I) 2.90 Jt.MD Kundevahal, under Kundevahal Grampanchayat, Tal. Panvel GIA work for Renovation of crematorium at CSR 2008-09 & CSR 74 5295 Bhangarpada village, under Dapoli EE(PNL-I) 7.82 Jt.MD 2009-10 Grampanchayat, Tal. Panvel. Development of roads (Upto 1st stage of CSR 2009-10. 75 5296 Asphalting) under 12.5% Scheme in Sector-8 EE(B&U-II) 362.01 VC&MD at Ulwe, Navi Mumbai. GIA work for the construction of Internal CSR 2009-10 & Storm water drain from A. P. Bhoir Vidyalaya Approved Rates. 76 5297 to Sadashiv Daur’s house at Dapoli village, EE(PNL-I) 18.36 Jt.MD under Dapoli Grampanchayat, Tal. Panvel.

Providing & Laying 800mm dia. M. S. pipeline M/s. J.M.Mhatre Infra. MJP DSR 2009-10, to relocate the part portion of existing Pvt. Ltd & CSR 2008-09 & 77 5298 EE(ENV-I) 227.36 279.66 VC&MD 05/CIDCO/EE(Env-I)/2010-11 (+)23% & 279.66 VC&MD Hetawane feederline in Sector 23, Panchnand Approved Rates. Nagar, Taloja,Navi Mumbai. Provding & laying RCC 600mm NP3 class pipes CSR 2008-09. 78 5299 at west side of Navghar village at Dronagiri EE(Dron-I) 1.54 Jt.MD under GIA Scheme. GIA work for the construction of bund at CSR 2009-10 79 5300 Waghivali village, under Waghivali EE(PNL-I) 2.01 Jt.MD Grampanchayat, Tal. Panvel. Area reclamation in Sector-21, 22, 27, 28 & 29 Board M/s. J .M. Mhatre Infra CSR 2008-09 Board 5179 of Taloja – Panchanand Nagar, Phase-II of B.R No. Pvt. Ltd & (+) 28.60% 1089.25 B.R No. 80 ------old Nodal area at Kalamboli, Navi Mumbai. EE(KLM-III) 1694.02 2178.51 10229 02/CIDCO/EE(KLM-III)/2009-10 M/s. P. D. Earthmovers, ------(+) ------10370 file ------05.01.2 28.60% 1089.25 ------06.08. 010 2010 Reclamation of 12.5% Scheme near village M/s. P. D. Bhagat & 5076 Bhendkhal in Sector-10 at Dronagiri. (Part – I 05, 06 & 07/CIDCO/EE(DRON- Bros. M/s. M. K. Patil & 81 ------old EE(DRON-I) 249.80 VC&MD At par Fore-Closure of Contract file to III) I)/2009-10 M/s. Jagdish Thakur & Co. Construction of Dam across Balganga River for Water Supply to CIDCO areas in Navi 48834 .00 Board Board Rs. 217.57 crores towards B.R No. B.R No. Mumbai 92405.00 Rehabilitation and Re- 82 5301 EE(ENV-HET) 10374 10562 ------Approval ------21 ------settlement Scheme in respect of to Rehabilitation package prepared by KIDC 757.00 06.08.2010 08.09.2011 Balganga Dam project.”

Integrated Infrastructure Development of Board M/s. J .M. Mhatre Infra CSR 2009-10 Roads, Footpath, Storm Water Drain, Water B.R No. Pvt. Ltd 83 5302 Supply, Sewerage, Street Lighting work etc. EE(PNL-II) 4581.34 10364 01/CIDCO/EE(PNL-II)/2010-11 (-)1.55% 4175.12 VC&MD. for Karanjade under 12.5% Scheme at Panvel. ------06.08.2010 Repair & Rehabilitation of various Structures M/s. Mahendra in Fire Station Complex in Sector 19 at New Realtors & Revised Administrative approval 84 5303 EE(PNL-I) 104.79 200.12 VC&MD 05/CIDCO/EE (PNL-I)/2009-10. (+)17% 122.6 VC&MD. Panvel (East). Infrastructure Pvt. Ltd & Approval of 2nd Excess Saving

GIA work for the construction of concrete CSR 2009-10. pathway from Ashok Mistri’s house to 85 5304 Varmata Temple at Talewadi, Chinchpada EE(PNL-I) 5.95 Jt.MD village, under Vadghar Grampanchayat, Tal. Panvel. Development of NIFT Campus on Plot No. 15 Board M/s. Unity Infra (2nd Phase) & Plot No. 20 in Sector 4 at B.R No. 01/CIDCO/SE(KHR-II)/EE(KHR- Projects Ltd 86 5305 EE(Khr-II) 11799.39 10383 (-) 0.21% 10338.55 Kharghar, Navi Mumbai. ------IV)/2009-10 16.08.2010 Proposed Bhoomiputra Bhavan at Ulwe Node, Board Navi Mumbai. B.R No. 87 5306 EE(Nerul) 2791.21 10385 ------16.08.2010 GIA work for construction of Strom Water CSR 2009-10, DSR Drain and Culvert from Gaondevi Mandir to 2009-10 & Rate 88 5307 Katkarwadi at Village Kundevahal, under EE(PNL-I) 14.22 Jt.MD Analysis Kundevahal Grampanchayat, Tal. Panvel.

Providing & Laying Internal sewer line & D. I. M/s. Godavari DSR 2008-09, CSR

water supply line in Sector-15 & balance W/s Construction 2008-09 & MJP DSR CE&GM 89 5308 EE(GHN-I) 92.18 VC&MD 01/CIDCO/SE(NT)/EE(GHN)/2010- At par 92.18 line in Sector-11 at Ghansoli, Navi Mumbai. 2008-09. (Tech) 11. Operation & maintenance of 150MLD M/s. SMC MJP DSR 2009-10, capacity Water Treatment Plant & Raw water 03/CIDCO/SE(ENV)/EE(ENV- Infrastructure Pvt. Ltd. Approved Rates & 90 5309 EE(ENV-HET) 186.31 227.76 VC&MD (+)24.92% 207.76 VC&MD. pumping plant at Jite, Tal. Pen, Dist. Raigad. HET)/2010-11 Rate Analysis

GIA work for construction of Grampanchayat CSR 2008-09. 91 5310 office, Anganwadi & Samaj Mandir at Pargaon EE(PNL-I) 25.97 Jt.MD village under Pargaon Grampanchayat, Tal. Panvel. GIA work for construction of Toilet Blocks (2 CSR 2009-10. 92 5311 Units of 6 Seats) at Dungi village, under EE(PNL-I) 5.46 Jt.MD Pargaon Grampanchayat, Tal. Panvel. GIA work for pitching to Kopar village Creek CSR 2009-10 93 5312 Bund, under Vadghar Grampanchayat, Tal. EE(PNL-I) 56.98 Jt.MD Panvel. Balganga Water Supply Project, Navi Mumbai – Approval in principle, for taking up various Board B.R No. infrastructure works under Balganga Water 94 5313 EE(ENV-HET) 33500.00 10382 Supply Project and to accord administrative ------approval to the Block Cost Estimates of these 16.08.2010 works. GIA work for construction of internal CSR 2009-10 95 5314 pathways at Varche Owale Village, under EE(PNL-I) 4.75 Jt.MD Owale Grampanchayat, Tal. Panvel.

GIA work for construction of concrete CSR 2009-10 pathway from Prakash Keni’s house to 96 5315 Chandrakant Patil’s house at Village EE(PNL-I) 3.27 Jt.MD Chinchpada, under Vadghar Grampanchayat, Tal. Panvel. GIA work for construction of Dhobi Ghat at CSR 2009-10 97 5316 Bhangarpada village, under Dapoli EE(PNL-I) 5.50 Jt.MD Grampanchayat, Tal. Panvel. GIA work for construction of platform for CSR 2009-10. cultural activity & renovation work for 98 5317 Primary school at village Kundevahal, under EE(PNL-I) 2.88 Jt.MD Kundevahal Grampanchayat, Tal. Panvel.

GIA work for construction of Internal CSR 2009-10. 99 5318 pathways at Khalche Owale Village, under EE(PNL-I) 5.84 Jt.MD Owale Grampanchayat, Tal. Panvel. GIA work for construction of S. W. drains at CSR 2009-10. 100 5319 Varche Owale Village, under Owale EE(PNL-I) 11.42 Jt.MD Grampanchayat, Tal. Panvel. GIA work for the construction of concrete CSR 2009-10. pathway from Railway Culvert to Katkariwadi 101 5320 crematorium at village Kundevahal, under EE(PNL-I) 5.17 Jt.MD Kundevahal Grampanchayat, Tal. Panvel.

GIA works at Bhangarpada village, under CSR 2009-10 & Dapoli Grampanchayat, Tal. Panvel Approved rates

1)Development of channel from National 102 5321 highway to Bhangarpada village & EE(PNL-I) 13.06 Jt.MD 2)Construction of pathway & Retaining wall from Ashok Katekar’s house to Panvel-Patnoli road at Bhangarpada village.

Development of balance carriageway in M/s. P. P. Kharpatil CSR 2008-09, MJP 5271 EE(KHR- 04/CIDCO/SE(KHR-I)/EE(KHR- 103 ------old Sector- 11,14,15,18,19,& 20 at Kharghar, Navi 567.62 VC&MD Consts. Pvt. Ltd. (-)29.53% 2008-09 & 400 VC&MD. file Mumbai. HSG-I) HSG-I)/2010-11. Approved Rates. GIA work for repairs to damage pathway in CSR 2009-10 104 5322 Bhendkhal village under Bhendkhal EE(Dron-I) 2.64 Jt.MD Grampanchayat at Dronagiri node. GIA work for construction of UCR Drain at CSR 2008-09. Dhutum village near National Highway NH-4B 105 5323 EE(Dron-I) 9.50 Jt.MD under Dhutum Grampanchayat at Dronagiri node. Construction of lift shaft, supply, installation M/S.Kalpana Struct CSR 2008-09 & PWD 5229 and commissioning of passenger lift in North Con Pvt. Ltd. DSR 2009-10, 106 ------old EE(D-II) 74.93 107.84 VC&MD. 01/CIDCO/EE(D-II)/2010-11. (+)43.92% 107.84 VC&MD. file wing of CIDCO Bhavan, CBD, Belapur, Navi Approved Rates & Mumbai. Market Enquiry. Const. of ROB at CH - 18167m across No order , only file keeping in 107 5324 proposed Nerul/Belapur-Uran Railway Line at EE(NUR-I) Dronagiri node. storage unit. Providing additional Raw water VT pump M/s. Allied PWD DSR 2009-10, 108 5325 motor set & accessories in Sector - 11 & 26 EE(Elect) 49.69 52.17 VC&MD. Electromech Pvt. Ltd. (+)5% Approved Rates & 52.17 CE&GM(Tech) MBR at Kharghar Market Rates. GIA work for providing water supply line for 109 5326 village Kopar under Vadghar Grampanchayat, EE(PNL-I) 18.91 Jt.MD. Tal. Panvel. Construction of Fire station on Plot No. 1 in M/s. Govardhani CSR 2007-08 & PWD Board B.R No. Sector-19A at Ulwe Node, Navi Mumbai. 10/CIDCO/SE(Ulwe)/EE(B&U- Const. Co. DSR 2008-09. 110 5327 EE(B&U-I) 512.48 639.86 VC&MD. (+)25% 639.86 10493 I)/2010-11 ------07.03.2011 GIA work for construction of Toilet Blocks at Mhaskar Ali, Varche Owale village under 111 5328 EE(PNL-I) 5.46 Jt.MD. Owale Grampanchayat, Tal. Panvel. (2 Units of 6 Seats) GIA work for repairs to School at Chinchpada 112 5329 village under Vadghar Grampanchayat, Tal. EE(PNL-I) 7.06 Jt.MD. Panvel. Asphalting of W.B.M. roads in Growth Centre M/s. Aadinath MJP/PWD/DSR 5273 of Nagar-IV, CIDCO, Waluj Mahanagar, Dist. 05/CIDCO/SE(NT)/EE(AUR)/2010- Construction 2008-09 of 113 ------old EE(AUR) 216.07 VC&MD (-) 25.25% 216.07 VC&MD file Aurangabad. 11 Aurangabad region.

Construction of 33KV Electric Sub-Station at M/s. Bhairavnath CSR 2009-10 114 5330 EE(B&U-II) 100.99 108.06 VC&MD 01/CIDCO/EE(B&U-III)/2010-11 (+) 7.00% 108.06 VC&MD. Sector 23, Ulwe. Construction Co. Development of one carriageway of 24.00m M/s. L. T. Patil & Sons. CSR 2008-09 5265 03/CIDCO/SE(Ulwe)/EE(B&U- 115 ------old wide road in Sector-16A at Ulwe, Navi EE(B&U-II) 77.73 VC&MD (+) 4.90% 81.54 ACE(I&NT) II)/2010-11 file Mumbai. GIA work for construction of Anganwadi at CSR 2009-10 116 5331 Katkarwadi, Kundevahal village under EE(PNL-I) 6.78 Jt.MD. Kundevahal Grampanchayat, Tal. Panvel. Repairs to wooden flap-gates near Dighode & CSR 2008-09. Chirle village including stone masonry at 117 5332 EE(Dron-I) 2.89 Jt.MD. Belondekhar area, Dronagiri, under GIA Scheme. Providing and laying 800mm dia. M. S. M/s. J. M. Mhatre Infra MJP DSR 2009-10, 5298 pipeline to relocate the part portion of Pvt. Ltd. CSR 2008-09 & 118 ------old existing Hetawane feeder line in Sector-23, EE(Env-I) 227.36 279.66 VC&MD 05/CIDCO/EE(ENV-I)/2010-11 (+) 23.00% Approved Rates 279.66 VC&MD file Panchnand Nagar, Taloja, Navi Mumbai.

Providing consultancy services and Detail M/s. Structwel Engineering for Repairs to Elevated Storage Designers & 119 5333 Reservoirs (ESRs) at Sector-6E, Kalamboli and EE(ENV-III) 7.00 VC&MD. Consultants Pvt. Ltd. 7.00 VC&MD Sector-5A, New Panvel (E).

Consultancy for development of sustainable M/s. Teri Board model for wetland preservation at 37.9 + B.R No. 4959 24.38 + 7.5% of 120 ------old Khandeshwar Lake, Panvel in Navi Mumbai. EE(PNL) 37.90 VC&MD. Service 10398 Service Tax Project Cost file (The Energy and Resources Institute : TERI) Tax ------14.09.2010 Providing and laying polymer based Geo CSR 2008-09 & 121 5334 Membrane for pond lining to lakes in Golf EE(GC) 128.73 VC&MD. Market Rate. Course area at Kharghar, Navi Mumbai. Construction of 11m wide Bye-Pass road from Board the Board do and hereby accord the hotel Anandi to Uran City at Dronagiri, Navi B.R No. proposal for taking up the project of execution of proposed Uran Bye-pass Mumbai 10409 ------road with 2 lanes from Hotel Anandi to Bori at Uran with following terms and 29.09.2010 conditions : i) Funding of project by 122 5335 EE(Dron-I) CIDCO ii) Appointment of consultant for obtaining environmental, construction and forest clearances iii) Appointment of consultant for design of the proposed road. Retrieval & Relaying of Water Supply Pipeline M/s. Sukhmani Const. falling under Navi Mumbai Special Economic Pvt. Ltd. 123 4911 EE(Env-Het) 294 287.37 VC&MD. 15/CIDCO/EE(ENV-Het)/2007-08 (+) 37% 264.39 VC&MD. Zone (NMSEZ) area at Kalamboli.

5289 Asphalting of Internal Roads (Stage-II) in M/s. K.N.Gharat & Co. CSR 2008-09, 124 ------old Sector-17&18 of Phase-II area under 12.5% EE(KMT-I) 83.63 VC&MD. 01/CIDCO/EE(KMT-I)/2010-11 (-)22.32% Approved Rates & 64.96 ACE(II) file Scheme at Kamothe. Rate Analysis Operation and maintenance of 150 MLD M/s. SMC MJP DSR 2009-10, 5309 03/CIDCO/SE(ENV.)/EE(ENV- 125 ------old capacity Water Treatment plant and Raw EE(ENV-Het) 227.76 VC&MD. Infrastructures Private Approved Rates & 207.76 VC&MD. HET)/2010-11 file Water pumping plant at Jite. Limited Rate Analysis GIA work for construction of S. W. Drain from Govardhan Mhatre’s house to Crematorium 126 5336 EE(PNL-I) 14.5 Jt.MD. at Khalche Owale under Owale Grampanchayat, Tal. Panvel Repairs to various roads in Dronagiri, Navi M/s. P.P.Kharpatil CSR 2009-10. 127 5337 EE(Dron-I) 67.9 VC&MD. 03/CIDCO/EE(Dron-I)/2010-11 (-)16% 57.03 CE&GM(T) Mumbai. Const. Pvt. Ltd. Providing , Supplying, Lowering & Laying D. I. M/s. A. G. Mapari MJP/PWD/DSR 5274 water supply lines in Growth Center, Nagar- 2008-09 of 128 ------old EE(AUR) 83.86 97.93 VC&MD. 07/CIDCO/EE(AUR)/2010-11 (+) 16.77% 97.93 VC&MD. file IV, Waluj Mahanagar, Dist. Aurangabad region. Aurangabad. Construction of Compound walls to PWD/DSR 2009-10 129 5338 playgrounds in Sector-4,8,11 & 12 at EE (KHR-II) 72.56 VC&MD. & Rate Analysis Kharghar, Navi Mumbai. Balance development of roads, footpath and M/s. P. E. S. W. drains in Sector 10 at Kopra Village 07/CIDCO/SE(KHR-I)/EE(KHR- Infrastructure 130 5339 EE (KHR-II) (-)29.29% 651.42 VC&MD. Termination of Contract under 12.5% Scheme in Khaghar, Navi II)/2009-10 Developers Pvt. Ltd Mumbai. 5275 Balance area reclamation with Murum in M/s. S. N. Naik & Bros. CSR 2008-09. 131 ------old Sector-6 at Ulwe Node, Navi Mumbai. EE (B&U-I) 153.49 197.24 VC&MD 04/CIDCO/EE(B&U-I)/2010-11 (+) 28.50% 197.24 VC&MD. file Construction of 24m wide approach road to M/s. P. P. Kharpatil VC&MD. Has accorded approval Board Panje village at Dronagiri, Navi Mumbai. (Ist Board Constructions Ptv. Ltd to revision in budget provision B.R No. 4804 stage-Road & SWD) B.R No. 9703 amounting to Rs. 500 lacs in 132 ------old EE(Dron-I) 3184.00 1305.57 02/CIDCO/EE(DRON-I)/2010-11 At par 1305.57 10421 ------place of nominal provision of Rs. file ------26.09.2007 08.10.2010 5.0 lacs in the year 2010-11 on 05/07/2010. GIA works at village Waghivali under CSR 2009-10 & Waghivali Grampanchayat, Tal. Panvel for - Approved Rates. 133 5340 EE(PNL-I) 5.99 Jt.MD 1)Repairs to School Building & 2)Construction of Toilet Block (1 unit) for School. GIA works for Construction of Anganwadi at CSR 2009-10 134 5341 Dungi village under Pargaon Grampanchayat, EE(PNL-I) 6.78 Jt.MD Tal. Panvel.

Training of Existing S. W. Channel from Golf M/s. Girish Enterprises CSR 2008-09, MJP Course to Taloja Creek at Kharghar-Part I 04/CIDCO/SE(KHR-I)/EE(KHR- 2008-09 & 135 5342 EE(KHR-I) 219.00 181.40 VC&MD. (-)17.17% 181.40 VC&MD. ( From Chainage 286m to Chainage 900m). II)/2010-11 PWD/DSR 2009-10.

Repairs to Old Administrative Building (A&B M/s. M.G.Construction CSR 2008-09 & CE&GM(Tec 136 5343 wing) in Sector-1 at Vashi, Navi Mumbai. (2nd EE(Airoli) 49.16 60.05 01/CIDCO/EE(Airoli)/2010-11 (+)18.60% Approved Rates. 58.3 VC&MD. h)/VC&MD. Call) GIA works for Construction of Toilet Blocks (3 CSR 2009-10 & units) at Ramdaswadi, Chinchecha Mal & ‘D’ Approved Rates. 137 5344 EE(PNL-I) 8.19 Jt.MD. point at Chinchpada village under Vadghar Grampanchayat, Tal. Panvel. GIA works for Construction of Toilet Blocks (2 CSR 2009-10 & units) at Vitthalwadi, Chinchpada village Approved Rates 138 5345 EE(PNL-I) 5.73 Jt.MD. under Vadghar Grampanchayat, Tal. Panvel. GIA works for Construction of Toilet Block (1 CSR 2009-10 & units) at Katkarwadi, Asudgaon village under Approved Rates 139 5346 EE(PNL-I) 2.86 Jt.MD. Asudgaon Grampanchayat, Tal. Panvel.

Construction of pathways in Dongri Village CSR 2008-09 140 5347 under GIA Scheme at Dronagiri, Tal. Uran. EE(Dron-II) 4.71 Jt.MD. Basic services to urban poor(BSUP) under Board approve to request the Government JNNURM by CIDCO in NMMC’s area. B.R No. of for deputation of 141 5348 SE(KHR-III) 10419 one Dy. Collector and two Naib ------Tehsildars to CIDCO for survey and 08.10.2010 identification of beneficiaries under this BSUP Scheme.” Rental Housing Projects at Village Kon and accord approval to inform CIDCO’s Village , Tal. Panvel, Dist. Raigad. Board consent to MMRDA about the B.R No. offsite infrastructure development 142 5349 EE(Env-II) 10420 work to Rental Housing Schemes ------and accordingly MMRDA may 08.10.2011 decide about issuing of NOC to the developers for obtaining environment clearance.” Designing, Providing, Constructing, Erecting, Testing & Commissioning of 70 MLD capacity High Tech Sewage Treatment Plant (STP) Board B.R No. including O&M for 5 years in Sector-16, 06/CIDCO/SE(ENV)/CE&GM(T)/08 Approval for Inspection of 143 5350 EE(ENV-I) 10423 Kharghar, Navi Mumbai on Contractor’s own ------09. Decanters at Shanghai, China Design with Cyclic Activated Sludge/SBR 08.10.2012 Technology.

Resurfacing to existing Asphalted internal PWD/DSR 2008-09 Roads at LIG/MIG Housing Scheme at Nagar-I, of Aurangabad 144 5351 EE (PNL-I) 50.68 Jt.MD. CIDCO, Waluj Mahanagar, New Aurangabad. region.

Development of Roads (Upto 1st stage of CSR 2009-10. 5296 06/CIDCO/SE(Ulwe)/EE(B&U- 145 ------old Asphalting) under 12.5% Scheme in Sector-8 EE(B&U-II) (-)37.37% 226.72 VC&MD file at Ulwe, Navi Mumbai. II)/2010-11 Extension of Bridge CD-10 on 32m wide M/s. Govardhani CSR 2009-10, 01/CIDCO/SE(KHR)/EE(KHR- 146 5352 Pandav Marg across the 45m wide Diversion EE(KHR-I) 372.09 477.50 VC&MD Const. Co. (+)28.33% PWD/DSR 2009-10 477.50 VC&MD I)/2010-11 Channel at Kharghar. & Approved Rates. Consultancy Services for Design of Bridge on M/s. M. S. Phiske & quotation received 6.55 18 m wide Road from Nagar-II to Nagar-IV, Associates from Consultant. including 147 5353 EE(AUR) 6.55 VC&MD VC&MD CIDCO , Waluj Mahanagar, New Aurangabad. Service charge Conversion of 33 KV HT overhead line to M/s Leena powertech Contractor rates 148 5354 underground cable from Exhibition Centre EE(E/M) 22.00 VC&MD Engineers Pvt. Ltd Lumsum approved by 22.00 VC&MD end to Vashi Village, Sector-30A, Vashi. EE(E/M).

Carrying out structural rehabilitation and CSR 2009-10, 149 5355 external painting works for Raigad Bhavan in EE(NM) 117.18 VC&MD Approved Rates & Sector-11 at CBD, Belapur. Rate Analysis. Providing and laying balance 700 mm dia. D. I. M/s Prashant MJP 2009-10, MJP 5252 K-7 feeder main from Vahal transmission 04/CIDCO/SE(ENV)/EE(ENV- Mahagaokar 2008-09 & PWD DSR 150 ------old EE(ENV-I) 234.68 246.18 VC&MD (+)4.90% 246.18 VC&MD file main up to ESR/GSR Plot Sector-8 at I)/2009-10 2009-10. Kamothe, Navi Mumbai. GIA work for the construction of Internal CSR 2009-10 & Storm water Drain at Vitthalwadi, Chinchpada Approved Rates. 151 5356 EE(PNL-I) 11.95 Jt.MD 11.95 Jt.MD village under Vadghar Grampanchayat, Tal. Panvel. GIA work for the construction of Storm water CSR 2009-10 & Drain from Laxman Gaikwad House to River at Approved Rates. 152 5357 Village Kiundevahal under Kundevahal EE(PNL-I) 15.60 Jt.MD 15.60 Jt.MD Grampanchayat, Tal. Panvel. GIA work for the construction of Samaj CSR 2009-10 153 5358 Mandir at Kundevahal Village under EE(PNL) 11.64 Jt.MD Kundevahal Grampanchayat, Tal. Panvel. GIA work for the construction of Internal CSR 2009-10 & Storm Water Drains at Shrirampada, Approved Rates. 154 5359 EE(GHN-I) 13.69 Jt.MD 13.69 Jt.MD Asudgaon Village under Asudgaon Grampanchayat, Tal. Panvel. Integrated Development around Mass CSR 2009-10. 155 5360 Housing Scheme in Sector-19A, Ulwe, Navi EE(B&U-III) 240.13 VC&MD Mumbai. GIA works at Dapoli Village under Dapoli CSR 2009-10. Grampanchayat, Tal. Panvel. 156 5361 1) Repairs to pathway from Jitekar’s house EE(PNL-I) 2.60 Jt.MD 2.60 Jt.MD to Hanuman Temple. 2) Construction of RCC Box Culverts. GIA work for Construction of Toilet Blocks (3 CSR 2009-10. 157 5362 units) at Dapoli village under Dapoli EE(PNL-I) 8.19 Jt.MD 8.19 Jt.MD Grampanchayat, Tal. Panvel. GIA work for Repairs to Crematorium at CSR 2009-10. 158 5363 Pagote Village, under Grampanchayat Pagote, EE(Dron-I) 7.22 Jt.MD Tal. Uran at Dronagiri, Raigad. Various GIA works at Village Jawale under CSR 2009-10. Vahal Grampanchayat, Tal. Panvel. 1) Construction of compound wall & 159 5364 pavement development for Crematorium. EE(B&U-II) 12.95 Jt.MD 12.95 Jt.MD 2) Construction of balance concrete pavement. 3) Repairs to primary School Building. Providing Power Supply to Sewage Treatment M/s A.S. Electric PWD (Elect) DSR 160 5365 Plant, Sector-12, Kalamboli. EE(Elect-s) 109.63 99.76 VC&MD CIDCO/EE(Elect-s)/2010-11/85 Corporation (-)9.00% 2009-10 and 99.76 CE&GM(Tech) Approved Rates GIA work for Construction of S. W. Drain from CSR 2009-10. 161 5366 Hanuman Mandir to Creek at Belpada village, EE(B&U-II) 5.21 Jt.MD under Gavan Grampanchayat, Tal. Panvel in Ulwe Node. Construction of ESR of conical shape M/s. AAKAR INFRRAA supported on RCC shaft of 2.00 ML capacity in 07/CIDCO/SE(ENV)/EE(ENV- 162 5367 EE(ENV-III) VC&MD 2nd Extention in time Limit Sector-18 at Kharghar at the risk and cost of I)/2007-08 the defaulting contractor. Box Culvert Across Sion-Panvel Expressway MCC/Thane DSR 163 5368 for Storm Water Disposal at Kalamboli. EE(KLM-I) 431.44 VC&MD 2008-09 and Rate PWD Deposit Work Analysis Construction of Box Culvert across 20m wide m/s Ajwani Infra. Pvt. CSR 2008-09 and 164 5369 channel for 24m wide approach road to Golf EE(GC) 74.56 VC&MD 02/CIDCO/EE(GC)/2010-11 Ltd (-)5.85% PWD/DSR 2008-09. 70.19 CE&GM(Tech) Course, Sector-22, Kharghar. Construction of Box Culvert across 35m wide M/s Saffire CSR 2009-10 & Rate 07/CIDCO/SE(Ulwe)/EE(B&U- 165 5370 channel along 30m wide road in Sector-17/18 EE(B&U-II) 187.17 VC&MD Construction (-)12.90% Analysis 163.03 CE&GM(Tech) at Ulwe Node, Navi Mumbai. II)/2007-08 Appointment of Independent Financial SE(KHR- M/s Darashaw & Co. quotation received Advisor for the Project of “Development of III)&BSUP Pvt .Ltd from Consultant. 01/CIDCO/SE(KHR- Appointment of Independent 166 5371 Slum Rehabilitation Scheme on PPP basis for incharge VC&MD 2.97 VC&MD III)/BSUP/2010-11 Financial Advisor BSUP Project under JNNURM in NMMC Area.”

Manufacturing, Supplying and fixing Glossy M/s. M. T. Enterprises. 5247 type Interlocking Paver blocks in Sector-23 of 167 ------old EE(CP-II) 01/CIDCO/EE(CP-II)/2008-09. VC&MD 2nd Extension of Time Limit file Central Park at Kharghar, Navi Mumbai. (Part- II) Construction of Balance Carriage way up to CSR 2009-10, DSR 1st Stage of 30m wide road & Balance sewer 2009-10, MJP 2008- 168 5372 EE(B&U-I) 441.66 VC&MD 11/CIDCO/EE(B&U-I)/2010-2011 line along 30m wide road in Sector-22,23,2&3 09 & Rate Analysis. at Ulwe Node, Navi Mumbai. Construction of Sulabh Toilet Block near ST M/s Sulabh CSR 2008-09. Bus Depot at Charphata, Uran under Chanje international Social 169 5373 EE(Dron-II) 30.49 Jt.MD Jt.MD Group Grampanchayat, Tal. Uran at Services organisation Dronagiri. YEAR 2011 Operation, Maintenance & Repairs to PSC/MS M/s. R.K.Patil PWD – DSR, MJP, pipeline of dia. 1500/1200mm from CSR/2009-10, Hetawane Dam to Panvel Creek Bridge approved rates & 170 5374 EE(Env-Het) 175.08 VC&MD. 04/CIDCO/SE(ENV-HET)/2010-11 (+) 4.5% 182.96 CE&GM(T) (Retibunder), Navi Mumbai including rate analysis operation of intake structure, break pressure including levy tank & MBR at Vahal. charges. Change in the name of firm M/s. Swastik M/s. Swastik Infralogics to M/s. Swastik Infra-Logic (I) Pvt. Infralogics to M/s. 171 5375 Ltd. EE(CP-II) Swastik Infra Logics(I) VC&MD. Pvt. Ltd. Change in name of the agency Construction of 20m wide Road in sector 16 M/s. Ajwani CSR-2009-10 & under 12.5 % scheme around Shelghar village 08/CIDCO/SE(Ulwe)/EE(B&U- Infrastructure Pvt. Ltd. Approved rates. 172 5376 EE(B&U-II) 67.35 VC&MD. (-)5% 63.98 CE&GM(T) at Ulwe Node II)/2010-11

Upgradation of Peripheral roads to concrete Board Board pavement in K WC at Kalamboli. B.R No. B.R No. 173 5377 EE(KLM-II) 5522.09 8123.19 10308 05/CIDCO/EE(KLM-I)/2010-11 10449 ------01.06.2010 30.11.2010 Manufacturing, providing, laying, jointing, M/s. Koya & Co. 5261 Board Board testing and commissioning 1500mm dia. MS B.R No. Construction Pvt. Ltd. B.R No. 01/CIDCO/SE(ENV)/EE(ENV- 174 gravity main pipe line from Kalamboli Juction EE(ENV-II) 3547.32 10309 (+)23.9% 4395.13 10450 ------ol II)/2010-11. to MBR in Sector-26, Kharghar along Sion ------d file Panvel Express way 4395.13 01.06.2010 30.11.2010 Integrated Development of Infrastructural Board M/s. Thakur Board 5260 B.R No. B.R No. Works in Sector-18 at Ulwe, Navi Mumbai. 01/CIDCO/SE(Ulwe)/EE(B&U- Infraprojects Pvt. Ltd. 175 ------old EE(B&U-II) 1944.36 1911.31 10311 (-)1.70% 1911.31 10447 file ------II)/2010-11 ------01.06.2010 30.11.2010 Providing power Supply infrastructure Board development in Ulwe Node by CIDCO on B.R No. 176 5378 EE(Elect) 8500.00 10442 behalf of the MSEDCL. ------30.11.2010 Construction of 7m wide road along channel M/s. Zenith Const. Co. CSR 2009-10 & in between Sector 21 & 24 at Kamothe, Navi Approved Rates 177 5379 EE(KMT-II) 64.16 VC&MD. 01/CIDCO/EE(KMT-II)/2010-11 (-)14.66% 54.75 ACE(II) Mumbai.

Reclamation of Nodal area Plots No. 279 to M/s. Govardhani CSR-2009-10 11/CIDCO/SE(KHR)/EE(KHR- 178 5380 281 in Sector-10 at Kharghar, Navi Mumbai. EE(KHR-II) 91.19 106.69 VC&MD. Construction Co. (+) 17.00% 106.69 VC&MD. II)/2010-11 Construction of Entrance Building, Toilet M/s. Klassic 5248 blocks, Food plaza, Nursery Office Building 02/CIDCO/SE(KHR- Constructions Pvt. Ltd. 179 ------old EE(CP-II) VC&MD. 2nd Extension in Time Limit file and Dias in the Central Park in Sector-23 at II)/EE(C.P.)/2007-08. Kharghar, Navi Mumbai. Construction of Crematorium for Shelghar CSR 2009-10 village at Burial ground complex at Village 180 5381 EE(B&U-II) 5.54 Jt.MD. Shelghar in Ulwe Node under Gavan Grampanchayat, Tal. Panvel,. GIA for repairs to existing water supply line CSR 2009-10 181 5382 for village Waghivali under Waghivali EE(PNL-I) 4.61 Jt.MD. Grampanchayat, Tal. Panvel. Construction of Internal Roads/Pathways CSR 2009-11 182 5383 under GIA Scheme at Karanjade village under EE(PNL-II) 22.68 Jt.MD. Karanjade Grampanchayat, Tal. Panvel.

GIA for repairs to road from Tanaji Bhoir CSR 2009-10 and house to Crematorium & from Dhanaji Bhoir Rate Analysis 183 5384 house to Mohan Bhoir house at Kundevahal EE(PNL-I) 27.08 VC&MD. village, Tal. Panvel. Construction of Public Toilet Block in Sector-1 M/s. SISSO CSR 2008-09 With the condition that the at Dronagiri. toilet blocks will be maintained by M/s. SISSO for thirty years 184 5385 EE(Dron-I) 27.65 VC&MD. from the date of commencement without charging any cost to CIDCO. Feature Construction, Drainage, Fine Shaping M/s. Continental for Greens, Tesss, Fairways, Bunkers, Roughs Fairways 185 5386 EE(GC) 02/CIDCO/EE(GC)/2008-09. Extension in Time Limit and Lakes etc. for Golf Course at Kharghar, Navi Mumbai. Providing, Laying, Installing and M/s. Irrigation Commissioning the computerized irrigation Products International nd 186 5387 system for Golf Course at Kharghar, Navi EE(GC) VC&MD. : 04/CIDCO/EE(GC)/2008-09 Pvt. Ltd 2 Extension in Time Limit Mumbai.

5330 Construction of 33 KV Electric Substation M/s. Bhairavnath CSR 2009=10 & 187 ------old (Civil Work) at Sector-23, Ulwe. EE(B&U-III) 101.58 108.06 VC&MD. 01/CIDCO/EE(B&U-III)/2010-11. Construction Co. (+) 7.00% Approved Rates 108.06 VC&MD. file Construction of 36m wide road and S.W. Board M/s.P.P.Kharpatil Board Drain along BPCL Compound Wall at B.R No. Const. Pvt. Ltd. B.R No. 188 5388 EE(Dron-I) 1546.09 1100.01 10441 04/CIDCO/EE(Dron-I)/2010-11 (-)28.85% 1100.01 10549 Dronagiri. ------30.11.2010 08.09.2011 Providing & laying sewer lines at Growth Board M/s. Lalit Costructions, Board 5272 B.R No. B.R No. Centre of Nagar-I & II, CIDCO, Waluj 04/CIDCO/SE(NT)/EE(AUR)/2010- Mumbai 189 ------old EE(AUR-I) 680.82 10460 (+) 19.64% 680.82 10460 Mahanagar, Aurangabad. file ------11. ------10.01.2011 10.01.2011 GIA for repairs to road from Chinchpada Bus stop to Ashok Bhopi’s house, Motha pada at 190 5389 Chinchpada village under Vadghar EE(PNL-I) 6.70 Jt.MD. Grampanchayat, Tal. Panvel.

Providing & Laying balance links of water M/s. Kishan MJP DSR 2009-10, supply network in Sectors – 7,13,19,27,30,34 Construction MIDC DSR 2008-09 191 5390 EE(ENV-I) 53.68 63.34 VC&MD. 08/CIDCO/EE(ENV-I)/2010-11 (+) 18.00% 63.34 VC&MD. & 35 at Kharghar, Navi Mumbai & CSR 2008-09.

Integrated Infrastructure Development of Board M/s.J.M.Mhatre Infra Board 5302 Roads, Footpath, Storm Water Drains, Water B.R No. Pvt. Ltd. B.R No. 192 ------old Supply, Sewerage, etc. for 12.5% scheme in EE(P&L-II) 4581.34 10364 01/CIDCO/EE(PNL-II)/2010-11 (-) 1.55% 4175.12 10364 file Sector-1 to 6 at Karanjade, Panvel. ------06.08.2010 06.08.2010 Construction of 33KV Electric Substation in CSR-2009-10,MJP Sec.-23, Central Park at Kharghar. Navi DSR 2009-10, Rate 193 5391 Mumbai. EE(CP-II) 93.70 VC&MD. Analysis and Approved Rates. Augmentation of Existing Water Supply Lines M/s. Lalit MJP DSR 2009-10, in Sector 3 & 18 at Kharghar, Navi Mumbai. Constructions MIDC DSR 2008-09 194 5392 EE(ENV-I) 37.67 44.45 VC&MD. 07/CIDCO/EE(ENV-I)/2010-11. (+) 18.00% 44.45 VC&MD. & CSR 2008-09.

GIA for construction of S. W. Drain from CSR 2009-10 & Vasant Shetye House to S. W. Drain near Approved rate 195 5393 Ashok Shetye House in Roadpali Village under EE(KLM-I) 4.37 Jt.MD. Grampanchayat Roadpali at Kalamboli, Tal. Panvel. Supply of fire vehicles along with chassis & M/s.Devi Fire Services Market Enquiry and accessories for services of CIDCO, Navi Rate Analysis and 196 5394 SE(Elect) 413.45 463.06 VC&MD. 17/CIDCO/EE(Elect-II)/2011-12 (+)12% 413.45 VC&MD. Mumbai. quotation received from various Reclamation around Village Bokadvira in C. A. No. 04 awarded to agencies. 4971 Sector 41 under 12.5% Scheme at Dronagiri 04/CIDCO/EE(Dron-II)/2008-09. M/s. N. G. Bhoir & M/s. 197 ------old EE(Dron-II) 291.98 05, 06 & 07/CIDCO/EE(Dron- P. D. Earthmovers Fore-Closure of Contract file II)/2008-09 C. A. No. 05, 06 & 07 awarded to 18 Groups of PAPs CRZ & Forest clearance for construction of M/s. Fine Envirotech quotation received 198 5395 proposed Uran Bye Pass Road at Dronagiri, EE(Dron-I) 24.25 VC&MD. Engineers from Consultant 24.25 incusive of all taxes Navi Mumbai. Providing and Laying water supply line from MJP DSR 2010 -11 199 5396 Hetawane main to Ganeshpuri village, Ulwe, EE(B&U-I) 20.18 Jt.MD. Tal. Panvel. 5246 Manufacturing, supplying and fixing glossy M/s. Dream Pavers & Q. No. : 01/CIDCO/EE(CP- 200 ------old type interlocking paver blocks in Central Park EE(CP-II) VC&MD. Tiles nd II)/2008-09. (Part-I) 2 Extension in Time Limit file at Sector-23, Kharghar, Navi Mumbai. Structural Audit to buildings constructed M/s. Structwel the quotation 23.62 inclusive of service tax 201 5397 under Mass Housing Scheme in Sector 46,48 EE(Nerul) 23.62 VC&MD. Designers & received from @10.30% & 48A at Nerul, Navi Mumbai. Consultants Pvt. Ltd. Consultants GIA for construction of Toilet Blocks (3 units) CSR 2009-10 & at Boudhawadi, Vadghar village under Approved rate 202 5398 EE(PNL-I) 8.19 Jt.MD. Vadghar Grampanchayat, Tal. Panvel.

Strengthening of existing gravity main M/s. Nagarjuna 1500mm dia. by laying additional 1500mm Construction Co. Ltd. dia. M. S. pipe line parallel to existing gravity 203 5399 main @ Ch. 1/056 from Chirner to Bhom EE(ENV-HET) 04/CIDCO/EE(ENV-HET)/2008-09. VC&MD. 2nd Extension in Time Limit 3/636 & Ch. 6/705 at Kanthavali at Ch. 6/860 Dighode under Hetawane Water supply Scheme. Providing and laying Sewerage Lines in M/s. Das Offshore approval for the 2nd extension in Sectors 2,3,5,19,20,21 & 23 under 12.5% Engg. Pvt. Ltd time limit for the above-referred 5127 Scheme at Ulwe Node, Navi Mumbai. work awarded to M/s. Das 14/CIDCO/ACE(I)/SE(BUD)/EE(B& 204 ------old EE(B&U-I) Offshore Engg. Pvt. Ltd., upto & U)/2006-07. file including 31/03/2011 with freezing of indices as on 31/03/2010. Integrated Infrastructure Development of M/s. R. B. Deshmukh Extension of Time Limit Roads, Footpath, S. W. Drain, Water Supply, upto and including 205 5400 Sewerage etc. of Trans-Railway Area at New EE(PNL-I) 10/CIDCO/EE(PNL)/2007-08. 30/06/2011 with same term & Panvel. condition of contract. Construction of village road from Gavhan M/s. Thakkur Infra CSR-2009-10 & DSR- phata to Gavhan; improvement of vertical 09/CIDCO/SE(Ulwe)/EE(B&U- Projects Pvt. LTd. 2009-10 206 5401 EE(B&U-II) 35.11 VC&MD. (-)14.20% 30.12 SE(Ulwe) profile of road as well as repairs to the road. II)/2010-11

GIA for construction of concrete pathway at CSR 2009-10. various locations from Hanuman Mandir at 207 5402 Belpada village under Gavhan EE(B&U-II) 5.47 Jt.MD. Grampanchayat at Ulwe Node. GIA for construction of concrete pathway at Gavan Gram CSR 2009-10. various locations at Shelghar village under Panchayat 208 5403 EE(B&U-II) 13.53 Jt.MD. 13.53 Jt.MD. Gavhan Grampanchayat at Ulwe Node.

Extension of existing parking area infront of M/s. Zenith 05/CIDCO/SE(Ulwe)/EE(B&U- 209 5404 CIDCO Bhavan at CBD-Belapur, Navi Mumbai. EE(B&U-II) Construction Co. Extension of Time Limit II)/2009-10. GIA for providing water supply line, balance CSR 2009-10, DSR pathway and approach road at Gaondevi 2010-11 & MJP 210 5405 Temple for Village Vahal, under Vahal EE(B&U-I) 30.44 Jt.MD. 2009-10 Grampanchayat at Ulwe Node. Construction of prayer hall & office at burial M/s. A. E. Infraproject CSR-2009-10 and ground plot for Christian Cemeteries Trust, Pvt. Ltd. Approved rates 211 5406 EE(KLM-I) 40.13 45.95 VC&MD. 01/CIDCO/EE(KLM-I)/2011-2012 (+) 14.50% 45.95 VC&MD. Plot No. C-2 in Sector 12 at Kalamboli.

Construction of CIDCO Exhibition Center M/s. IVRCL 2nd Extension in Time Limit including civil, interior and site development Infrastructures & upto and including 5171 work at plot no. 1A, 15, 29 & 30 in Sector 30- Projects Ltd. 31/12/2011 without application 01/CIDCO/CE&GM(T)/ACE(I&NT)/ 212 ------old A at Vashi, Navi Mumbai EE(Vashi-I) of penal Clause of GCC and also 2008-09 file as per the original terms & conditions of contract.

an Independent Technical Experts Construction of Dam across Balganga River KIDC of Govt. of Committee comprising of Shri S. R. for water supply to CIDCO areas in Navi Maharashtra Tambe, Retd. Secretary, PWD; Shri Mumbai. S. G. Pingale, ex-CE&GM(Tech.) of CIDCO & Shri R. G. Kulkarni, Retd. Secretary, Irrigation Deptt., GoM, Board Board be appointed to study the revised B.R No. B.R No. Administrative proposal submitted 213 5407 EE(ENV-HET) 488.34 495.45 10197 10492 by KIDC including reason for ------increase and justification thereof 25.08.2009 07.03.2011 and to recommend the further course for according revised administrative Approval in respect of construction of Dam across Bal Ganga River for water supply to CIDCO area in Navi Mumbai.” Modification of S. W. Drains & construction of M/s. Venkateshwara CSR-2009-10 02/CIDCO/SE(P&K)/EE(KLM- 214 5408 footpaths along roads in Sector-3E & 4E at EE(KLM-I) 378.67 VC&MD. Infrastructure Pvt. Ltd. (-)12.2% 332.47 VC&MD. I)/2011-12 Kalamboli. Apprisal note to the Board for buildings Board constructed under Demand Registration B.R No. 215 5409 ACE(I&NT) 10495 Survey (DRS) 1987 scheme. ------07.03.2011 Construction of Fire Station on Plot No. 1, M/s. Govardhani Board 5327 B.R No. Sector-19A in Ulwe. 10/CIDCO/SE(Ulwe)/EE(B&U- Const. CO. 216 ------old EE(B&U-I) 512.48 639.86 VC&MD. (+)25% 639.86 10493 file I)/2010-11 ------07.03.2011 Grant-In-Aid for providing, supplying & laying MJP DSR 2010-11 & water supply line for Targhar Village, under PWD-DSR 2010-11, 217 5410 EE(Ulwe-I) 9.76 Jt.MD. Targhar Grampanchayat at Ulwe Node. CSR 2009-10 & Approved Rate. Comprehensive operation & maintenance of M/s. Bharuch Enviro Board 599.26 CIDCO’s municipal solid waste processing and Infrastructure Ltd B.R No. 9236 12/CIDCO/SE(ENV)/EE(ENV- for a 218 5411 disposal facility at Chal near Taloja MIDC, as EE(ENV-I) 1703.55 VC&MD. I)/2010-11 period of per MSW (Management & Handling) Rules ------31.05.20 two years 2000. 05 Construction of Christian Burial Ground on M/s. Shakti PWD DSR 2009-10, EE (KHR- 08/CIDCO/SE(KHR-I)/EE(KHR- 219 5412 Plot No. 14 in Sector-14 at Kharghar, Navi 53.89 VC&MD. (+) 14.50% CSR 2009-10 & 53.89 VC&MD. HSG-I) HSG-I)/2010-11. Constructions Mumbai. Approved Rates Grant-In-Aid for providing & laying 50mm dia. MJP DSR 2010-11 & G. I. water supply pipe line for Adivasi Houses PWD-DSR 2010-11. 220 5413 & Balance 100mm dia. G. I. water supply pipe EE(KLM-I) 2.31 Jt.MD. line for Boudhwadi of Roadpali Village at Kalamboli.

5225 Construction of School Building for Raigad Zila M/s. Thakur DSR 2008-09 & CSR 221 ------old Parishad in Sector-23 at Vahal village, Ulwe, EE(Ulwe-I) 220.19 244.72 VC&MD. 02/CIDCO/EE(B&U-I)/2010-11 Infraprojects Pvt. Ltd (+) 14.79% 2008-09 244.72 VC&MD. file Navi Mumbai. Grant-In-Aid for providing water supply line DSR 2010-11 & CSR 222 5414 for village Pargoan under Pargoan EE(PNL-I) 15.76 Jt.MD. 2009-10 Grampanchayat, Tal. Panvel. Grant-In-Aid for construction of S. W. Drains DSR 2010-11, CSR and Pathways along with G. I. water supply 2009-10 & Rate 223 5415 EE(B&U-II) 18.21 Jt.MD. line for Shivaji Nagar village under Gavhan Analysis. Grampanchayat, Tal. Panvel. Development of Garden in Sector-16 at New CSR 2009-10 & 224 5416 Horticulture 44.62 VC&MD. Panvel (E) near Gadhi River. Approved Rates Proposed Mass Housing Scheme in Sector-36 Board M/s. B.G.Shirke Const. Board at Kharghar. B.R No. Technology Pvt. Ltd. B.R No. 225 5417 SE(KHR) 42652.17 10498 Lumpsum 39633.28 10561 ------07.03.20 11 ------08.09.2 011 Proposed affordable (EWS/LIG) Mass Housing Board Scheme under BSUP-JNNURM in various lands SE(KHR-III) & B.R No. 226 5418 with CIDCO, Navi Mumbai. BSUP 90633.65 10499 in-Charge ------07.03.20 11 Training of Existing S. W. Channel from Golf M/s. Girish Enterprises (-) 17.17% CSR 2008-09, MJP 5342 Course to Taloja Creek at Kharghar-Part I 04/CIDCO/SE(KHR-I)/EE(KHR- 2008-09 & 227 ------ol EE (KHR-II) 219.00 181.40 VC&MD. 181.40 VC&MD. d file ( From Chainage 286m to Chainage 900m). II)/2010-11. PWD/DSR 2009-10

Grant-In-Aid for providing, supplying & laying MJP DSR 2010-11 & water supply line for Kombadbhuje Village, PWD-DSR 2010-11, 228 5419 EE (Ulwe-I) 9.97 Jt.MD. under Targhar Grampanchayat at Ulwe Node. CSR 2009-10 & Approved Rate. Construction of balance carriage way upto Ist M/s. Girish Enterprises CSR 2009-10, DSR 5372 stage of 30m wide road and balance sewer 2009-10, MJP 2008- 229 ------old EE (B&U-I) 11/CIDCO/EE(B&U-I)/2010-2011 (-) 38.00% 09 & Rate Analysis. 273.83 VC&MD. file line along 30m wide road in sectors 22,23,2 & 3 at Ulwe Node. Grant-In-Aid for construction of balance RCC MJP DSR 2009-10 & Pipe Drain & Balance Concrete Pathways for PWD-DSR 2009-10, 230 5420 EE(B&U-I) 20.98 Jt.MD. Bamandongari village, under Vahal CSR 2009-10. Grampanchayat at Ulwe Node. Grant-In-Aid for construction of Internal PWD-DSR 2010-11 Storm water drains at Boudhapada, Vadghar & Approved Rates. 231 5421 EE (PNL-I) 6.69 Jt.MD. village under Vadghar Grampanchayat, Tal. Panvel. Resurfacing of internal roads under BUDP CSR 2009-10 232 5422 scheme in sector-12 at Kharghar, Navi EE(KHR-II) 60.59 VC&MD. Mumbai. Construction of 5ML capacity MBR on Plot M/s. J. M. Mhatre Infra CSR 2009-10, DSR No. 1 Sector-8 Kamothe, Navi Mumbai. Pvt. Ltd. 2009-10, MJP DSR 14/CIDCO/SE(ENV)/EE(ENV- 233 5423 EE(ENV-I) 460.08 VC&MD. (-) 7.35% 2009-10, Rate 426.26 VC&MD. I)/2010-2011 Analysis &. Approved Rate. Grant-In-Aid for repairs to vadghar village PWD-DSR 2010-11 234 5424 road at Vadghar village under Vadghar EE(PNL-I) 7.15 Jt.MD. & Rate Analysis Grampanchayat, Tal. Panvel. Grant-In-Aid for construction of Anganwadi at PWD-DSR 2010-11. Boudhawadi, Vadghar village under Vadghar 235 5425 EE(PNL-I) 7.06 Jt.MD. Grampanchayat, Tal. Panvel.

Grant-In-Aid for repairs to road from Panvel- PWD-DSR 2010-11 Uran highway (NH-4B) to Jai Mata temple on & Rate Analysis. 236 5426 hill near Adiwasi vadi at Kolhi village, under EE(PNL-I) 15.51 Jt.MD. Pargaon Grampanchayat, Tal. Panvel.

Extension of Bridge CD-7 on 35m wide Owe M/s. Thakur CSR 2009-10, 01/CIDCO/SE(KHR)/EE(KHR- 237 5427 Marg, across the 26m wide Channel at EE(KHR-I) 290.40 VC&MD. (-) 9.00 % PWD/DSR 2009-10 264.26 VC&MD. I)/2011-12. Infraprojects Pvt. Ltd. Kharghar, Navi Mumbai. & MJP 2009-10 Renovation of conference hall at 2nd floor, Market Rate 238 5428 CIDCO Bhavan, CBD-Belapur, Navi Mumbai. EE(NM) 80.33 VC&MD. prepared by Consultant Dismantling of 0.65 ML capacity ESR in PWD DSR 2009-10 & 239 5429 EE(ENV-III) 19.04 VC&MD. Sector-2E at Kalamboli, Navi Mumbai. Rate Analysis Construction of Crematorium at Vahal village M/s. Thakur CSR 2008-09, at Ulwe Node, Navi Mumbai. Electrical DSR 2009- CE&GM(Tech 240 5430 EE(B&U-I) 53.37 VC&MD. Infraprojects Pvt. Ltd. (-) 8.34 % 10 & Approved ) Rates Grant-In-Aid for construction of path ways M/s. J.M.Mhatre Infra. CSR 2009-10, PWD- along with S. W. drains at Kopar village, under 01/CIDCO/SE(Ulwe)/EE(B&U- Pvt. Ltd DSR 2010-11 CE&GM(Tech 241 5431 EE(B&U-II) 58.35 Jt.MD. (-)23.55% 44.61 Gavhan Grampanchayat, Tal. Panvel. II)/2011-12 .)

Fencing to open plots in Sector-13 to 21 at M/s. Safire CSR 2008-09, MIDC EE (KHR- 02/CIDCO/SE(KHR-I)/EE(KHR- 242 5432 Kharghar, Navi Mumbai. 97.42 VC&MD. Constructions (-) 15.40% SR 2008-09 & Rate 97.42 VC&MD. HSG-I) HSG-I)/2010-2011 Analysis Grant-In-Aid for construction of Samaj Mandir CSR 2008-09 and Gram Panchayat Office at Funde Village 243 5433 EE(Dron-II) 16.19 Jt.MD. Under Grampanchayat Funde at Dronagiri Node. Grant-In–Aid for construction of Storm CSR 2009-10, MJP DSR 2009-10, 244 5434 Water/ Sewer lines for Karanjade Village, EE(PNL-II) 38.09 Jt.MD. under Grampanchayat Karanjade at Panvel. approved rate & rate analysis. Constructing & commissioning of Sewerage PWD DSR 2009-10, Pump House (SPH) including allied works and MJP 2009-10, DSR O&M for three years, in Sector-6 at Elect. 2009-10, CSR 245 5435 Kalamboli. EE(KLM-I) 301.60 VC&MD. 2009-10 & 2008-09, Rate analysis and Market enquiry.

Construction of Crematorium at Sector-19B CSR 2009-10 & 246 5436 near Bamandongri village in Ulwe Node. EE(B&U-I) 40.40 Jt.MD. Approved Rates

Grant-In–Aid for construction of Internal PWD/DSR 2010-11 247 5437 Pathways at Kundevahal village, under EE(PNL=I) 7.47 Jt.MD. Kundevahal Grampanchayat at Panvel. Comprehensive operation and maintenance M/s. R. K. Patil negotiate Rate analysis 248 5438 EE(W/S)-I 82.47 VC&MD. 82.47 VC&MD. of MSW at village Vahal. basis Area leveling by rock cutting in sector-18 in M/s.Thankur CSR 2009-10 02/CIDCO/SE(Ulwe)/EE(Ulwe- 249 5439 Ulwe Node. EE(B&U-II) 548.59 VC&MD. Infraprojects Pvt. Ltd. (-)18.2% 440.93 VC&MD. II)/2011=12 Grant-In–Aid for improvement of internal PWD/DSR 2009-10 roads in Navghar village, at Dronagiri under & CSR 2009-10 250 5440 EE(Dron-I) 7.05 Jt.MD. Grampanchayat Navghar, Tal. Uran, Raigad.

Construction of Additional 6.0 ML capacity M/s. Girish Enterprises Extension in Time Limit upto pure water sump & pump house at Water and including 09/11/2011 on the 251 5441 EE(Env-Het) 01/CIDCO/EE(Env.-Het.)/2009-10 treatment plant, Jite, Tal. Pen, Dist. Raigad. same terms & conditions of contract. Urgently extending the 11KV power supply M/s. Vishwa Electricals PWD DSR 2009-10 & feeder from 33/11KV substation in sector-19 approved rates. 252 5442 to release the power supply to plot owners in EE(Elect) 03/CIDCO/EE(Elect.)/2011-2012. (-) 45.45% 48.38 VC&MD. sector-25 to 45, Kharghar, Navi Mumbai. (Stage-II). Change of site Grant-In–Aid for construction of Anganwadi PWD/DSR 2010-11 253 5443 at Bambavi village, under Kundevahal EE(PNL-I) 7.06 Jt.MD. Grampanchayat, Tal. Panvel. GIA for various works in Pendhar village CSR 2009-10 & 254 5444 under Grampanchayat Pendhar at Kalamboli EE (KLM-III) 42.65 Jt.MD. Approved Rate. Node, Navi Mumbai. Construction of 50m wide channel in sector-6 M/s.Thankur CSR 2009-10 & DSR 03/CIDCO/SE(Ulwe)/EE(Ulwe- 255 5445 at Ulwe Node. EE(B&U-I) 367.24 VC&MD. Infraprojects Pvt. Ltd. (-)29.80% 2009-10 257.8 VC&MD. I)2011-12

Grant-In–Aid for reconstruction of CSR 2009-10. 256 5446 crematorium at Belpada village, under EE(B&U-II) 5.47 Jt.MD. Gavhan Grampanchayat, Tal. Panvel at Ulwe Node. Premonsoon works in Kalamboli, New Panvel PWD/DSR 2010-11, 257 5447 & Kamothe Node. SE(P&K) 239.53 VC&MD. MJP 2010-11 & Approved Rates Construction/Upgradation of 36m wide road M/s. P.P.Kharpatil CSR 2009-10 & Rate 258 5448 (One carriageway) leading to coastal road EE(Dron-I) 446.88 VC&MD. 01/CIDCO/EE(dron-I)/2011-12 Const. Pvt. Ltd. (-)32.86% Analysis 300.00 VC&MD. Dronagiri, Navi Mumbai. (Ist stage) Formation of Committee for Prequalification 259 5449 of agencies for Electrical works. SE(Elect) Order Cancelled

Providing Solar-Energy System in CIDCO Market rates on Bhavan premises, CBD- Belapur, Navi block rate basis 260 5450 Mumbai. EE(Elect) 299.79 VC&MD. submitted by Autonic Energy Systems Pvt. Ltd.. Proposed repairs to Bldg No. B/13 M/s. Hetal Enterprises DSR 2010-11, CSR Dyaneshwar Mauli O. H. Tank and also B, C Qtn. No. 28/CIDCO/EE(NL)/2011- 2009-10& Rate 261 5451 EE (NL) 17.43 ACE(I&NT) “AT PAR” 17.43 ACE(I&NT) and D type flats in Sector 46, 48 and 48A at 2012. Analysis. Nerul. Grant-In–Aid for providing G. I. Water Supply CSR 2009-10. Lines for Madhlapada Village under 262 5452 EE(B&U-I) 3.40 Jt.MD. Grampanchayat Nhava at Ulwe Node, Navi Mumbai. Urgent repairs to peripheral 38m and 30m PWD DSR 2010-11 263 5453 wide roads by filling pot holes with WBM EE(KLM-II) 24.76 VC&MD. The work is carried out at the layers in KWC area at Kalamboli. Risk & Cost of M/s. ACC Ltd. Renovation & Interior works of Kille Gaothan M/s. N. B. Sutar CSR 2009-10, 02/CIDCO/SE(HQ)/EE(NM)/2011- 264 5454 Guest House, CBD-Belapur, Navi Mumbai. EE(NM) 67.24 VC&MD. (-) 8.33% Approved Rates & 61.64 CE&GM(T) 2012 Rate Analysis. Grant-In-Aid for repairs to crematorium, CSR 2009-10, DSR construction of footpath, compound wall, 2009-10 and rate toilet blocks & approach road to crematorium analysis 265 5455 EE(KLM-II) 40.26 Jt.MD. from low laying area at Majkur village under Grampanchayat Taloje Majkur at Kalamboli Node. Consultancy Services for preparation of M/s. Abhay quotation received Detailed Design, Estimate & Technical Consultants Pvt. Ltd. from Consultants Parameters for the work of “Constructing Qtn. No. 68/CIDCO/EE(B&U- 266 5456 EE(B&U-I) 14.39 VC&MD. 60MLD Capacity of Seweage Pump House I)/2010-11 (SPH) in Sector-22 at Ulwe Node, Navi Mumbai.”

Repairs to road from Gavhan phata to Jawale 03/CIDCO/SE(Ulwe)/EE(Ulwe- M/s. R.K.Patil CSR 2009-10 & DSR 267 5457 EE(U-II) 29.81 32.50 VC&MD. (+)9% 32.50 VC&MD. village at Ulwe Node. II)/2011-12 2009-10 Construction of S.W drains at Vahal Village in 04/CIDCO/SE(Ulwe)/EE(Ulwe- M/s. K.N.Gharat & Co. CSR 2009-10 & DSR 268 5458 EE(B&U=I) 24.07 VC&MD. (+)4.95% 25.26 SE(Ulwe) Sector- 23 in Ulwe Node. II)/2011-12 2010-11. Maintenance & Protection of Gardens at on DSR P&G Panvel (W) Node. Mumbai 2008-09, 269 5459 Horticulture 6.11 6.91 VC&MD. M/s Sanjay Enterprises (+)13% DSR 2009-10 & 6.91 VC&MD. Govt. Approved labour rates. Maintenance & Protection of Gardens at DSR P&G Mumbai Panvel (E) Node. 2008-09, DSR 2009- 270 5460 Horticulture 67.06 75.78 VC&MD. (+)13% 10 & Govt. 75.78 VC&MD. Approved labour rates. Maintenance & Protection of Gardens at DSR P&G Mumbai Kalamboli Node. 2008-09, DSR 2009- 271 5461 Horticulture 51.55 58.26 VC&MD. (+)13% 10 & Govt. 58.26 VC&MD. Approved labour rates. GIA work for construction of concrete PWD DSR 2010-11. 272 5462 pathway in Roadpali Village under Gram EE(KLM-I) 8.89 Jt.MD. panchayat Roadpali at Kalamboli. GIA work for Repairs to Road from Koper CSR 2009-10 & Rate Phata to Koper Village, under Vadghar Gram Analysis under the Grant-In–Aid panchayat Tal. Panvel. 273 5463 EE(PNL-I) 11.81 JT.MD. Scheme with a condition to confirm that no expenditure has been incurred by Z.P in past for the subject work. Construction of Police Station in Sector- 7 at M/s. R.K.Patil CSR 2010-11, PWD 01/CIDCO/SE(P&K)/EE(KMT)/201 274 5464 Kamothe. EE(KMT) 194.49 208.11 VC&MD. (+)7% DSR 2010-11 & 208.11 VC&MD. 1-12 Approved rates GIA works for Construction of 4 seated public Approval with the conditions :-1. toilet at Boudhawadi in Taloja village at Conformations of the requirement Kharghar under Gram Panchayat Taloje of toilet block taking into account 275 5465 Panchnand. EE(KHR-II) 4.16 Jt.MD. the population of the village. 2. Gram Panchayat shall take responsibility of post completion operation and maintenance Board Designing, planning and Construction of B.R No. commercial complex building at sect-19A, 10548 276 5466 Ulwe, Navi Mumbai. EE(Ulwe-III) 2999.01 ------08.09.20 11 Reinstatement of MGL Trenches in different with remarks that, the quality of sectors of Kharghar, Navi Mumbai. work has to be maintained and 277 5467 (Deposit Work) EE(KHR-II) 157.58 VC&MD. separate agency should be appointed for checking the quality of work. Supply, Operation & Maintenance of Robotic The VC&MD has also accorded an ONLINE desilting system to be used for approval to take up cleaning of pure water sump at Jite on trial basis for 278 5468 desilting of various reservoirs of CIDCO area. EE(Env-Het) 284.12 VC&MD. 11.52 VC&MD. Rs. 11.52 lakhs alongwith award of work to M/s Aryan Pumps Pvt. Ltd for Rs. 11.52 lakhs. Board Establishment of Turf nursery, Grassing & M/s. Sporturf Const. (I) B.R No. 9795 4974 Landscaping work for Golf Course at Pvt,Ltd. Extension of Time Limit & 279 ------EE(GC) 2500.00 260.44 03/CIDCO/EE(GC)/2008-09 (-)10% 260.44 VC&MD. Kharghar, Navi Mumbai. old file ------30.01.20 Foreclosure of Contract 08 GIA for Renovation of crematorium at 280 5469 Boudhapada, Vadghar village under Vadghar EE(PNL-I) 9.29 Jt.MD. Gram panchayat Tal. Panvel. Construction of Costal police station (NRI) at Board Board Approval to take up the Belapur, Police Stations at Kharghar and B.R No. construction of three Police Kamothe nodes of Navi Mumbai. 10571 281 5470 SE(Ulwe) ------19.10.20 Station Buildings one each at 11 Belapur-Kharghar and Kamothe nodes at the cost of CIDCO. GIA for “Construction of Public Toilet for CSR 2010-11. Roadpali Village in Sector-16E near 282 5471 EE (KLM-I) 3.87 Jt. MD Crematorium under Grampanchayat Roadpali at Kalamboli.” Topographical survey of Chikhaldara Hill Station Notified Area using Terrestrial Laser 01/CIDCO/ACE(I&NT)/SE(D)/EE(N 283 5472 Scanning (LiDAR) Technology- Shahpur, GP)/2011-12 Aladoh and Motha Villages. 4878 Providing And Laying Sewer Lines In Sectors M/s. DAS Offshore 02/CIDCO/EE(Dron-II)/2009 284 47, 48, 50 to 56 & 59 Under 12.5% Scheme at EE(DRON-II) Engg. Pvt. Ltd Extension in Time Limit ------Dronagiri. 01/CIDCO/EE(Dron-I)/2009. old file Providing and laying balance 5.46 Km. M/s. SMC additional 1500mm dia M.S. pipeline parallel Infrastructure Pvt. Ltd to existing 1500mm dia M.S./PSC pipeline on Board 5122 opposite side along SH-81 @ Ch. 0.00 at BPT B.R No. st 285 ------to 1/056 at Chirner, 3/636 at Chirner to 7/100 EE(Env-Het) 3402.5 3599.16 10242 04/CIDCO/EE(ENV-HET)/2009-10. 3599.16 VC&MD. 1 Extension in Time Limit old file at Dighode and @ Ch. 10/700 @ Jambhulpada ------05.01.2 to 11/640 at MBR Vahal under Hetawane 010 Water Supply Scheme.

Construction of Balance S.W. Drains at Sector- CSR 2009-10, PWD 286 5473 19, Ulwe Node. EE(Ulwe-I) 293.57 VC&MD. DSR 2010-11 & Rate Analysis. Strengthening of road from SH-54 to Mass M/s. Kharpatil Const. CSR 2009-10, CSR 287 5474 Housing Scheme in Sector-30 at Dronagiri. EE(Dron-II) 361.89 VC&MD. 01/CIDCO/EE(Dron-II)/2011-12 Pvt. Ltd. (-)17% 2010-11, & 300.37 VC&MD. Approved Rates GIA for “Providing water storage tanks for CSR 2010-11. 288 5475 Adivasiwadi at Vadghar village under EE(PNL-I) 1.53 Jt.MD. Vadghar Grampanchayat , Tal. Panvel.” Ist Extension in time limit for 11 Contractors, awarded for Horticulture works in railway 289 5476 projects Viz Turbhe, Koparkhairane, Ghansoli, ACE(II) VC&MD. Extension in Time Limit Rabale, & Airoli Railway stations.

Asphalting of Peripheral Roads (Stage-II) in Board M/s. Monica CSR 2010-11 Sector-19, 21, & 22 & Asphalting of Internal B.R No. Construction 02/CIDCO/SE(P&K)/EE(KMT)/201 290 5477 Roads(Stage –II) in Sector-19 to 22 & 24 of EE(KMT) 698.20 10573 (-)20.16% 557.44 VC&MD. 1-12 Phase-II area under 12.5% Scheme at ------19.10.20 11 Kamothe. Development of Daily Bazar in Sector-19A, CSR 2009-10, CSR Ulwe. 2010-11, DSR 2010- 291 5478 EE(Ulwe-III) 12.89 VC&MD. 11 & Approved Rates. Maintenance of Grass Turf and Landscape For M/s. Irrigation lowest offer 18 Hole Golf Course at Kharghar, Navi Products International received from M/s 292 5479 Mumbai. EE(GC) 151.02 VC&MD. 02/CIDCO/EE (GC)/2011-12. Pvt. Ltd. (+) 3.90% Irrigation Products 151.02 VC&MD. International Pvt. Ltd Chennai. “Repairs to Elevated Storage Reservoirs (ESRs) M/s. Mahindra DSR 2008-09, at Sector-6E, Kalamboli and Sector -5A, New Realtors & Infrast. Pvt. Approved Rates and 5184 03/CIDCO/SE(ENV)/EE(ENV- 293 ------Panvel (E).” EE(ENV-III) 77.71 105.76 VC&MD. Ltd. (+)13% Rate Analysis given 105.76 VC&MD. III)/2009-10. old file by consultant.

GIA for “Construction of half round gutter DSR 2010-11& CSR along the pathway for village Pethpada under 2010-11 294 5480 EE(KHR-I) 12.59 Jt.MD Grampanchayat Owe at Sector 33, Kharghar, Navi Mumbai.” Designing, Providing, Constructing, Erecting M/s. Girish Enterprises Market Rates. and Commissioning of 1MLD capacity high Pvt. Ltd. tech Sewage Treatment Plant/PTP including O & M for 5 years to treat the predominantly domestic raw sewage to 5 mg/I BOD, 10 mg/I 02/CIDCO/SE (Ulwe)/EE(Ulwe- 295 5481 EE(Ulwe-III) 359.00 VC&MD. (-)1.41% 353.92 VC&MD. Suspended Solid, 100 mg/I COD, in Sector-20 III)/2011-12. at Ulwe Node, Navi Mumbai on Contractor’s own design with Cyclic Activated Sludge/SBR technology.

Comprehensive Operation & Maintenance of M/s. R.K. Patil Approved Rates. 296 5482 EE(W/S)-I 94.87 VC&MD. 94.87 VC&MD. MSW. Structural Design for CIDCO’s proposed Shri Satish C.Dhupelia offer received from Appointment of Structural EWS/LIG Housing Scheme in Sec- 36 at negotiate the consultant Consultant for an amount of 297 5483 EE(Hsg-I) 22.06 VC&MD. VC&MD. Kharghar. basis 22.06 lakhs plus 10.3% Service Tax. Construction of proposed EWS/LIG Housing IIT, Mumbai offer received from Appointment of IIT, Mumbai for Scheme in Sec- 36 at Kharghar, Navi Mumbai the consultant proof cheching of Structural negotiate 298 5484 -Appointment of IIT, Mumbai for proof EE(Hsg-I) 5.51 VC&MD. VC&MD. Designs & Drawings basis cheching of Structural Designs & Drawings-

Interior work of Auditorium of CIDCO CSR/DSR 2009-2010 Exhibition Centre on plot no. 1A, 15, 29, & 30 01/CIDCO/SE(Vashi & V and market rates of 299 5485 EE(Vashi) 279.72 VC&MD. (+)4% 279.72 in Sector 30A at Vashi, Navi Mumbai. V))/EE(Vashi)/2011-12 similar nature of works. Repairs & Rehabilitation of Community CSR 2010-11 & 300 5486 EE(KLM-I) 75.58 VC&MD. Centre building in Sector-5E at Kalamboli. Approved Rates. Facility Management Agency for M/s BVG Ltd CSR 2010-11 & Comprehensive operation & maintenance of negotiated Market Rates. 301 5487 EE(NL) 11.16 VC&MD. 11.16 VC&MD. Agri- Koli Sanskuti Bhavan in Sec-24 at Nerul. basis

Providing wash out arrangement to Main CSR 2010-11, 302 5488 Water Body in Sector -23 of Central Park at EE(CP) 9.54 VC&MD. market Rate & Rate Kharghar. Analysis GIA for “Construction of crematorium with CSR 2010-11, MJP allied works for Grampanchayat Taloja- 2009-10 & 303 5489 EE (KHR-I) 10.68 Jt.MD Pachnand, at Sector 39-B at Kharghar, Navi Approved Rates. Mumbai.” Supply, installation, testing & commissioning PWD DSR 2009-10 & of Traffic Signal System at Various locations Approved Rates 304 5490 on Sion-Panvel Highway & from Kalamboli to EE(Elect-I) 94.11 VC&MD. Navade Phata on Kalyan Panvel Highway.

Construction of balance 15m & 11m wide CSR 2010-11, DSR 305 5491 road in Sector-19 under 12.5 % Scheme at EE(Ulwe-I) 66.15 VC&MD. 2010-11 & Rate Ulwe, Navi Mumbai. Analysis. GIA for “Providing & Laying RCC Pipe Line for CSR 2009-10. Dongri Village under Grampanchayat Dongri 306 5492 EE (Dron-II) 6.18 Jt.MD Tal. Uran Dist. Raigad Navi Mumbai.”

YEAR 2012 Renovation work of Personnel and House M/s. Mahindra 10% DSR(Electrical)- nd Realtors & Infrast. Pvt. 2009-10, DSR-2010- 307 5493 Keeping Department, at 2 floor, CIDCO EE(NM) 48.06 47.39 VC&MD. 47.39 CE&GM(T) Bhavan, CBD-Belapur, Navi Mumbai. Ltd. 11 & Approved Rates Construction of RCC Box Culvert (3No.) in CSR 2010-11 & PWD 308 5494 between Sector-16A & Sector-17 at Ulwe EE(Ulwe-II) 59.09 VC&MD. DSR 2010-11. Node Construction of peripheral S.W. Drain at R&R MJP-DSR-2010- –I Pocket for NMIA at Vadghar, Navi Mumbai. 11/PWD-DSR-2010- 309 5495 EE(Airport-II) 498.63 VC&MD. 11, CSR 2010-11 & Rate Analysis. GIA for “Providing Water supply line for CSR 2010-11 & MJP 310 5496 village Asudgaon under Asudgaon EE(PNL-I) 16.47 Jt.MD. DSR 2010-11 Grampanchayat, Tal. Panvel.” GIA for “Construction of road from Aslam CSR 2010-11 Patel Furniture Shop to Noor Rice Mill at 311 5497 EE(KHR-II) 29.13 Jt.MD. Village Taloja, Kharghar under Gram Panchayat Taloge Panchanand.” Development of Land Near Village Vadghar & Dapoli earmarked for Resettlement of Airport EE(Airport- Permission for Invitation of 312 5498 VC&MD. Project Affected Villages. III) Tenders

GIA for “Construction of Internal Pathways at CSR 2010-11. 313 5499 Dapoli village, under Dapoli Grampanchayat, EE(PNL-I) 9.16 Jt.MD. Tal. Panvel.” GIA for “Construction of Grampanchayat CSR 2010-11, 314 5500 Office at Kundevahal village, under EE(PNL-I) 19.24 VC&MD. Approved Rates Kundevahal Grampanchayat, Tal. Panvel.” Development of Land near Village Vadghar & Board Dapoli ear-marked for Resettlement of B.R No. 10589 Airport Project Affected villages and policy EE(Airport- 315 5501 decision for award of works to Airport Project 4259.00 ------23.11.20 III) 11 affected persons (APAP’s) and other PAPs.

Enhancement of project allowance to Board Assistant Engineers and Assistant Executive B.R No. 316 5502 Personnel Engineers working on Saturday. 10600 ------22.12.20 11 1) Carrying out topographical survey of part CSR 2010-11 area of Regional Park adjacent to sector-17, 317 5503 Ulwe, Navi Mumbai.2)Carrying out soil EE(Ulwe-II) 5.38 VC&MD. investigation works for proposed roads in Sector-15 at Ulwe, Navi Mumbai. Construction of 10 Seated (04 Nos) of Toilet CSR 2010-11& DSR 318 5504 Blocks at Village Bamandongri Village under EE (Ulwe-I) 27.71 Jt.MD 2010-11. G.I.A at Ulwe node. Comprehensive Operation & Maintenance of M/.s R.K.Patil Negotiate Approved Rate 319 5505 EE(W/S-I) 95.05 VC&MD. 94.87 VC&MD. MSW for CIDCO Area(Part-III) Basis Construction of Police Station on Plot No. 23- M/s. TIPL CSR 2010-11 with the condition of Virtual A in Sector-7 at Kharghar, Navi Mumbai. 05/CIDCO/SE(KHR)/EE(KHR- 320 5506 EE (KHR-II) 218.41 VC&MD (+) 8.00% 218.41 VC&MD Asset Information II)/2011-12 System ( VAIS.) Construction of Peripheral Storm water CSR 2010-11 with the condition of Virtual Drains in Sector-16 A around a sports 321 5507 EE (Ulwe-II) 519.22 VC&MD Asset Information complex at Ulwe, Navi Mumbai. System (VAIS.) Construction of SWD for village Ghot under CSR 2009-10 322 5508 EE (Env-I) 28.66 VC&MD GIA Scheme. Construction of balance road adjacent to Plot M/s. Mahavir Roads & CSR-2010-11, PWD No. 9 to 10 including Storm water Drain& Infrastructure Pvt. Ltd. DSR 2010-11 MJP- footpath at Sector-35G at , Kharghar, Navi Board DSR 2009-10 Mumbai. B.R No. 9752 &.Approved Rates Board 4850 1627.28 B.R No. 09/CIDCO/SE(KHR-I)/EE(KHR- 323 ------EE(KHR-I) ------2068.27 ------15.11.20 (+)27.10% 2068.27 9790 ------I)/2007-08 old file Construction of balance road adjacent to Plot 52.95 07 ------23.01. ------VC No. 9 to 10 including Storm water Drain& 2008 &MD footpath at Sector-35G at , Kharghar, Navi Mumbai. Laying of water supply line, construction of CSR 2010-11, MJP S.W drain, Pathway & repairs to Crematorium DSR 2009-10 & 324 5509 EE (KLM-II) 64.84 VC&MD in Padghe village at Kalamboli under GIA Approved Rates. Scheme. Development of third cell of land fill for PWD DSR 2010-11. 4584 Municipal Solid Waste processing & Disposal 325 ------facility at Village Chal near Taloja MIDC as per EE(W/S-I) 117.14 VC&MD old file MSW (Management & Handling)Rules-2000.

“Providing and Constructing Concrete CSR 2010-11 326 5510 pathways for balance area of Shelghar Village EE(UL-II) 6.88 Jt.MD. under GIA Scheme at Ulwe, Navi Mumbai.” Construction of Club House for Golf Course at M/s. Kailashchandra CSR-2010-11, MIDC Kharghar, Navi Mumbai. Dilipkumar Const. Pvt. 2011-12, PWD 327 5511 EE(GC) 303.80 VC&MD. 06/CIDCO/EE(GC)/2011-12 (+)4.9% 318.69 CE&GM(T) Ltd. Electrical 2011-12& Market Rate. Construction of Sewage Pump House in M/s. Abhay quotation received 328 5512 Sector- 26, at Kamothe Node, Navi Mumbai. EE(KMT) 6.83 VC&MD. Consultants Pvt. Ltd. from Consultants 6.83 VC&MD.

Balance development of roads, footpath and M/s. P.E.Infrastructure CSR 2008-09 Foreclosure of Contract with net Board 5153 S. W. drains in Sector 10 at Kopra Village B.R No. 9474 07/CIDCO/SE(KHR-I)/EE(KHR- Developers Pvt. Ltd. &Market Rates saving of Rs. 298.34 lakhs i.e. 329 ------EE(KHR-II) 1297.28 (-)29.29% 651.42 VC&MD. under 12.5% scheme in Kharghar, Navi ------45.80% old file II)/2009-10 Mumbai. 2006

Construction of Drain & Pathway in village CSR 2010-11 330 5513 Boudhwadi under Grampanchayat Roadpali at EE(KLM-I) 32.33 Jt.MD. Kalamboli Asphalting of 15.00 m wide D.P Road through /s. Aadinath PWD/ DSR 2008-09 331 5514 M.G.M premises in Town Centre at New EE (AUR) 87.37 VC&MD 16/CIDCO/EE(AUR)/2010-11 Constructions (+) 43.80% of Aurangabad 87.37 VC&MD Aurangabad. region Repairs to existing UCR Masonry S.W Drain CSR 2010-11 from Kathewadi to Mali Chowk & Pimpalwadi 332 5515 EE(Dron-I) 3.97 Jt.MD. to Patil Chowk at Nagaon, at Dronagiri.

Providing & fixing of Kalzip Roofing & Skylight 2nd Extension in Time Limit with for Exhibition Centre at Plot No. 1A, 15, 29 & the condition that no further 333 5516 EE(Vashi) VC&MD 30 in Sector 30 A Vashi Navi Mumbai. extension will be granted to this work Development of power supply infrastructure distribution network including construction of Permission for Re-invitation of 33/11KV & 11/0.4KV HT substations & allied 334 5517 Elect-I VC&MD. 12/CIDCO/EE(Elect.-I)/2011-12 Tenders with modified marking electrical work in sector-25 to 45 Kharghar criteria. Node, Navi Mumbai. (Phase-I)

Construction of CIDCO Exhibition Center M/s. IVRCL 5171 including civil, interior and site development 01/CIDCO/CE&GM(T)/ACE(I&NT)/ Infrastructures & rd 335 ------EE(EC) VC&MD 3 Extension in Time Limit old file work at plot no. 1A, 15, 29 & 30 in Sector 30- 2008-09 Projects Ltd. A at Vashi, Navi Mumbai Construction of Balance 32m Wide Pandav CSR 2010-11, PWD 336 5518 Marg from Pandav Taloja Junction towards EEIKHR-II) 402.49 VC&MD DSR 2010-11 Jail road at Kharghar, Navi Mumbai. Construction of peripheral S.W drains in Board Rehabilitation & Resettlement pocket- Dapoli. B.R No. 337 5519 EE(Airport-III) 1124.56 10626 ------14. 03.2012 Asphalting of Road & Development of Board Footpath for 12.5% Scheme area at sector 34 B.R No. 338 5520 EE(KKHR-I) 763.53 10623 & 35 at Kharghar, Navi Mumbai. ------1 4.03.2012 Operation & Maintenance of water supply CIDCO’s BR No. pumps and other allied piping and other allied 10354 dtd st 339 5521 EE(Env-I) 105.69 VC&MD 1 Extension in Time Limit piping network at Kalamboli, New Mumbai. 06.08.2010 minimum wages. Consultancy services for Third party Quality Board approval to the following three Audit for Building & Infrastructure Projects. B.R No. short listed agencies:1.M/s IRS 10624 Industrial Services.2. M/s 340 5522 ACE(I&NT) ------14. Construction Industry 03.2012 Development Council. 3. M/s Certification Engineers India Ltd.” Construction of Coastal Police Station (NRI) at Board Belapur Node of Navi Mumbai. B.R No. 341 5523 EE(NL) 395.77 10632 ------1 4.03.2012 Construction of approach road from Pandav- CSR 2010-11 342 5524 Taloja Junction to HSR plot at Sector-22 EE(KKHR-I) 284.96 VC&MD Kharghar, Navi Mumbai. Repairs to Road from Pargaon pond (Near DSR 2011-12. 343 5525 Panvel –Uran Highway) to Waghiwali EE(PNL-I) 59.21 VC&MD Grampanchayat, Tal. Panvel. Designing, Providing, Constructing, Erecting, Board M/s. Hindustan Dorr Board Testing & Commissioning of 70 MLD B.R No. Oliver Ltd. B.R No. capacity High Tech Sewage Treatment Plant 10092 10092 4972 ------21. ------2 (STP) including O& M for 5 years in Sector- st 344 ------EE(ENV-I) 6006.64 6147.65 05.2009 6030.00 1.05.2009 1 Extension in Time Limit old file 16, Kharghar, Navi Mumbai on Contactors own Design with Cyclic Activated Sludge/ SBR Technology.

Geo- Technical Investigation for proposed culverts on S. W Channel, STP & SPH plot, 345 5526 EE(PNL-II.) 23.56 VC&MD roads in Sector-2A etc. in Sector-1 to 6 at Karanjale 12.50% area, Tal. Panvel. Development Of South Channel From M/s.Manoj Const. Co. CSR 2006-07 4855 Shreyash Hospital To Railway Staff Quarter Foreclosure of Contract with Net 346 ------Along With Bridge (2 Nos) In Sector 19, New EE(PNL) 105.56 125.83 VC&MD. 08/CIDCO/EE(PNL)/2007-08 (+)19.20% 125.83 VC&MD. saving of Rs. 62,29,957.01 i.e. old file Panvel (E) and Desilting of South Channel 49.50% w.r.t. contract value Upto NH-4 B.

Agreement between CIDCO & MSEDCL for Draft agreement between power supply infrastructure at Ulwe node. CIDCO & MSEDCL for power supply infrastructure at Ulwe 347 5527 EE(Elect) VC&MD. node placed at C/195 to C/213 in the original file CIDCO/EE(Electrical)/2011 of EE(Elect-II) 5061 Construction of Approach Road at Village M/s. Thakur CSR 2007-08 Foreclosure of Contract 348 ------Valavali & Tembhode in Kalamboli Node. EE(KLM) 470.83 VC&MD. 03/CIDCO/EE(KLM-II)/2009-10 Infraprojects Pvt. Ltd. (-)18.60% 383.25 VC&MD. old file Construction of Approach Road to Various CSR 2009-10. 349 5528 Toilets under GIA Scheme for Kopar Village at EE(B&U-II) 5.13 Jt.MD. Ulwe. Beautification of village pond and CSR 2010-11 construction of Ganesh Visarjan Ghat under 350 5529 GIA scheme in Belpada Village at Ulwe, Navi EE(Ulwe-II) 9.92 Jt.MD. Mumbai.

Retrieval & Relaying Of Water Supply Pipeline M/s. Sukhmani Const. 4911A Falling Under Navi Mumbai Special Economic 351 ------Zone (NMSEZ) Area At Kalamboli. EE(Env-Het) 264.39 318.18 VC&MD. 15/CIDCO/EE(ENV-HET) /2007-08 (+)37.00% 264.39 VC&MD. old file

Providing experienced manpower required appraisal about the action taken for Operation of kharghar valley Golf Course Board to engage the agency for B.R No. for a period of six months. providing experienced 352 5530 EE(GC) 10649 ------27.04.20 manpower required for 12 operation of Kharghar Valley Golf Course, Providing Street lighting on Approach & PWD (Elect) DSR Peripheral Road of Unnati Housing Scheme in 2009-10, market 353 5531 sector 19A & 30m wide road in Sector-20 & EE(Elect-II) 67.90 VC&MD. rates & Approved 21, Ulwe. Rates

Repairs & Rehabilitation of CIDCO Nodal CSR 2010-11 & 354 5532 EE(KLM-I.) 65.56 VC&MD. office Building in Sector-5E at Kalamboli. approved rates. Construction of lakes & concrete Cart path for Board M/s. Ajwani CSR 2008-09 & DSR 5214 Golf Course in Sector -22 at Kharghar, Navi B.R No. Infrastruct. Pvt. Ltd. 2008-09 355 ------EE(GC) 448.01 10015 10/CIDCO/EE(GC)/2008-09 (+)9.90% 492.36 VC&MD. Mumbai. old file ------05.1 2.2008 Operation & Maintenance of water Supply earlier awarded 356 5533 Pumps and other allied works at New Panvel contract of the (East & West) same agency. GIA for “Providing electrification to school DSR 2009-10 & 357 5534 EE(Elect-II) 15.39 VC&MD. building in Vahal Village, Ulwe Node.” Market Rates Construction of CIDCO Exhibition Center on Board Plot No. 1A, 15, 29 & 30 in Sector-30A, Vashi, B.R No. 358 5535 10659 Navi Mumbai. ------27.04 .2012 Providing street lighting on various roads Board M/s J. J Electric 4984 under 12.5% scheme at Sector-2 to 15 Taloja B.R No. 359 ------EE(KLM-I) 3313.38 10660 22/CIDCO/EE(Elect-II)/2011-12 (+) 4.49% 151.45 CE&GM(T) Phase-I Panchanandnagar , Kalamboli. old file ------27.0 4.2012 Construction of pathway in village Boudhwadi CSR 2010-11 360 5536 under Grampanchayat Roadpali at Kalamboli. EE(KLM-I) 1.37 Jt.MD.

Realignment of 36m wide road in sector-05 M/s. P.P.Kharpatil CSR 2010-11 & 361 5537 near existing ROB at Dronagiri. EE(Dron-I) 528.40 VC&MD. 06/CIDCO/EE(Dron-I)/2012-13. Construction Pvt. Ltd. (+)7.00% Approved Rates 528.40 VC&MD.

Structural repairs of flats in Mass Housing in CSR-2010-11& Rate The VC&MD has directed to sector 46, 48, & 48A in Nerul, Navi Mumbai Analysis debit this amount from the 362 5538 EE (Nerul) 45.85 VC&MD. including buildings visited by Hon Chairman respective societies where these CIDCO. . works are undertaken. Repairs & Rehabilitation of Fire Station CSR-2010-11& 363 5539 Complex Building in Sector-2E at Kalamboli. EE(KLM-I) 193.10 VC&MD. Approved Rates.

Repairs of internal 20M wide roads between CSR-2010-11& 364 5540 EE(KLM-I) 90.36 VC&MD. Sector 8 & 11at Kalamboli. Approved Rates Up gradation of Peripheral Roads including CSR-2010-11& 365 5541 SWD and Footpath Development around EE (Dron-I) 441.61 VC&MD. Approved Rates Navghar Village at Dronagiri . Providing Water Storage Tanks for Waghivali PWD-DSR 2011-12 366 5542 Village Under Waghivali Grampanchayat Tal. EE(PNL-I) 1.80 Jt.MD. Panvel. Providing Water Supply Pipe Line for Village CSR 2010-11 367 5543 Kolhi under Pargaon Grampanchayat Tal. EE (PNL-I) 6.98 VC&MD. Panvel. Providing and Laying 800mm dia. Water M/s. Thakkur Infra CSR-2010-11& MJP- 01/CIDCO/SE(Ulwe)/EE(UL- 368 5544 Supply Feeder Main for Phase-II area from EE(UL-II) 383.28 VC&MD. Projects Pvt. Ltd. (-)9.20% DSR-2010-11 348.02 VC&MD. II)/2012-13 Amra Marg to Sector-18, at Ulwe. Construction of balance S.W Drains in Sector- M/s. Zenith Const. Co. CSR-2010-11 & 369 5545 EEIKHR-II) 70.92 VC&MD. 04/CIDCO/ee(khr-ii)/2012-13 (-)18.18% 58.02 CE(S) 15 at Kharghar, Navi Mumbai. Approved Rates 5113 Integrated Development of 24 M wide M/s. Girish Enterprises DSR 2008-09, MJP CE&GM(Tech 370 ------EE(GC) 538.27 VC&MD 05/CIDCO/EE(GC)/2011-12 (-)13.37% 212.34 approach road to Golf Course at Kharghar, 2008-09 & CSR ) old file Navi Mumbai. 2007-08 Construction of Minor Bridge 40m wide The VC&MD has now accorded an channel from approach road to Vashi Railway approval for claim to M/s Safire 371 5546 EE (GHN) 03 /CIDCO/EE(NL Infra)/2004-05. Safire Construction Station on Southside in Sect-1 @ Sanpada Construction for balance amount of Rs 11,67,710.17 to the agency M/s Safire Construction“ Transmission arrangement for water supply M/s. Sukhmani Extension of Time Limit & 372 5547 to Valvali & Tembhode under 12.5% Scheme EE(KLM-II) 25.12 CE&GM(T) 01/CIDCO/EE(KLM-II)/2009-10 Construction Pvt. Ltd Foreclosure of Contract at Kalamboli. Development of Power Supply Network and Board Board 5284 Infrastructure Distribution Network & B.R No. B.R No. 373 ------Construction of 33/11 KV & 11/0.4 KV HT EE(Electrical) 10970.00 6097.73 10331 M/s IVRCL Ltd (+) 8.50% 10674 old file substations & allied work in Sector-25 to 45 at ------11.06.20 ------14.07.2 Kharghar Node. Phase-I. 10 012 Training of Existing Storm Water Channel Board from Golf Course to Taloja Creek at Kharghar, B.R No. 374 5548 EE(GC) 1237.92 10331 Part-II- from Ch.900m to Ch. 3205m ------11.06.20 11 Block Estimate for Replacing Water Supply MJP-DSR 2010-11 Lines of (From AC To DI ) Growth Centre & 375 5549 EE (AUR) 263.51 Housing Scheme at Nagar-I,CIDCO, Waluj Mahanagar. Construction of Balance work of 12m wide M/s Kailashchandra CSR 07-08,DSR 08- 5046 Road connecting Sanpada to the South Side 01/CIDCO/SE(NL)/EE(Sanpada)/2 Dilipkumar 09, MJP 07-08 & Approval for Extension in Time 376 ------EE(Sanpada) 132.06 VC&MD. (-)4.50% 126.12 CE&GM(T) Limit old file of Vashi Railway Station at Sanpada, Navi 009-10. Construction Pvt. Ltd Approved Rates Mumbai. Reclamation of area in sector 43&45 at CSR 2011-12 377 5550 EE(Dron-II) 384.01 VC&MD Dronagiri, Navi Mumbai . 5149 Construction of Bridge across Hardillia M/s Kailashchandra PWD/CSR 2008-09 378 ------channel near Sector-4, Nerul, Navi Mumbai. EE(NL) 253.21 VC&MD. 04/CIDCO/SE(D)/EE(NL)/2009-10. Dilipkumar (+)9.00% 275.99 old file Construction Pvt. Ltd Integrated development of balance Approval for Extension in Time Limit 5119 M/s . Swastik infrastructure in Sector-4, including from 07.01.2012 to 07.12.2012 on 379 ------EE(NL) 02/CIDCO/SE(D)/EE(NL)/2009-10. Infralogics (India) Pvt. construction of service Road in Sector-34 at the same terms & conditions of old file Ltd Nerul, Navi Mumbai. contracts. GIA for “Repairs to Anganwadi and CSR 2011-12. 380 5551 Crematorium at Gavan Village, Ulwe node”. EE(Ulwe-III) 1.77 Jt.MD.

Integrated Development work of Talavali CSR 2007-08, MJP Approval for Extension in Time Limit Industrial area in sector -25 at Ghansoli, Navi 2007-08 & MIDC upto 30.11.2012 of total 863 days 4982 M/s Shree Mumbai. 2007-08. (including earlier granted extension 381 ------EE(GHN-II) 03/CIDCO/EE(GHN-II)/2008-09. Venkateshwara of 345 days) i.e. 177% of the old file infrastructure Pvt. Ltd. original contract period with freezing of indices as on 30.06.22011. GIA for “Construction Crematorium at Jasai CSR 2010-11 382 5552 EE (Dron-I) 8.79 VC&MD Village at Dronagiri”. Integrated development of Infrastructural Board works of balance roads (up to stage-I) & B.R No. 383 5553 EE(Ulwe-I) 881.91 10681 SW drain etc in sector 20& 21 of 12.5% ------03.08.20 scheme at Ulwe, Navi Mumbai. 12 Development of integrated infrastructure Board M/s. Thakkur Board works under 12.5% scheme in sector-17at B.R No. Infraprojects Pvt. Ltd. B.R No. 10682 10751 384 5554 Ulwe, Navi Mumbai. EE(Ulwe-II) 1127.42 (-)18.20% 922.23 ------03.08.20 12 ------19.12. 12 “Third party Quality Audit” of Housing Rs. 79,900/- per visit at a total project of MIG/HIG type tenements with shop cost of Rs. 19,97,500/- excluding M/s. Indian Register of 385 5555 & offices and including on –site EE(NM) 0.79/Visit VC&MD. 01/CIDCO/EE(NM)/2012-13 service charges Shipping infrastructure works in sector -36, Kharghar, Navi Mumbai. Construction of roads upto WBM std. in DSR 2011-12 386 5556 growth Center-II of Nagar-II at CIDCO, Waluj EE(AUR) 274.73 VC&MD Mahanagar, Aurangabad. GIA for “Construction of Brick Drain for CSR 2011-12 387 5557 Uttarpada Village at Nhave Khadi, Nhave EE(Ulwe-II) 8.31 VC&MD. Grampanchayat Under GIA Scheme”. GIA for “Providing and laying of G.I. water CSR 2011-12 supply lines under GIA Scheme for Uttarpada 388 5558 Village, Nhava Grampanchayat, Ulwe Node, EE(Ulwe-II) 8.01 VC&MD. Navi Mumbai”. GIA for “Construction of S. W. Drain & CSR 2010-11 VC & MD has directed that pathways under GIA Scheme for Nhava CIDCO shall execute the work 389 5559 EE(Ulwe-II) 15.73 VC&MD. Village at Ulwe Node, Navi Mumbai”. under the intimation of concerned Zilla Parishad. 5182 Construction of channel in sector -41 under Approval for foreclosure of 390 ------12.5% scheme in Bokadvira Village at EE(Dron-II) VC&MD 10/CIDCO/EE(Dron-II)/2009-10. M/s L. T. Patil & Sons contract old file Dronagiri, Navi Mumbai. GIA for “Construction of compound wall to CSR 2011-12. 391 5560 Crematorium at Shivaji Nagar, Ghavan EE (Ulwe-III) 9.12 VC&MD Village at Ulwe Node, Navi Mumbai”. Integrated Infrastructure works in sector DSR 2008-09 & MJP Approval for Extension in Time Limit -10A at Airoli, Navi Mumbai. DSR 08-09. from 17/12/2010 to 17/06/2011 5017 07/CIDCO/CE&GM(T)/ACE(I&NT)/ M/s Ajwani 392 ------EE(GHN-I) VC&MD without freezing the indices, on old file EE(GHN-I)/2008-09. Infrastructure Pvt. Ltd. same terms & condition of contract on post facto basis. Renovation work for the office of CCUC CSR 11-12, Revised Administrative Approval nd 04/CIDCO/SE(HQ)/EE(NM)/2011- st 393 5561 section, 2 floor, Raigad Bhavan CBD EE (NM) 69.92 VC&MD Approved Rates & & 1 Extension in Time Limit Belapur, Navi Mumbai 2012 Rate Analysis. Integrated development of Balance Board Infrastructural works of Roads (Upto stage –I), B.R No. 10705&1072 394 5562 SW drain, sewerage and water supply, etc. in EE(Ulwe-I) 920.78 sector 23 under 12.5% scheme at Ulwe Node, 7 ------Navi Mumbai. 28.09.2012 &19.10.2012 Integrated development of Balance Board Infrastructural works of Roads (Upto stage –I), B.R No. 10706&1072 395 5563 SW drain, sewerage and water supply, etc. in EE(Ulwe-I) 621.14 sector 2,3 & 5 of 12.5% scheme at Ulwe 8 ------Node, Navi Mumbai. 28.09.2012 &19.10.2012 Development of integrated infrastructural Board works in sector 16 under 12.5% scheme at B.R No. Ulwe , Navi Mumbai. 10708&1073 396 5564 EE(Ulwe-II) 974.02 2 ------28.09.2012 GIA for “Construction of Brick drain along &19.10.2012 CSR 2011-12. VC & MD has also directed to with pathway for Madhalpada at Nhava execute the work by CIDCO 397 5565 EE (Ulwe-II) 26.38 VC&MD Khadi, Nhave Grampanchayat under GIA only. Schemei”. Construction of RCC box culvert on 36Mtr M/s P.P. Kharpatil CSR 2011-12. 398 5566 wide road near BPCL in sector-09 at Dronagiri. EE (Dron-I) 130.17 VC&MD Construction Pvt. Ltd. (-) 17.199 % 107.78 CE&GM(T)

Integrated Development of 11.00Mtr wide 399 5567 EE(NL) VC&MD road in sector-38 at Nerul, Navi Mumbai. Providing and fixing sprinkler system, fire detection and alarm system at all floors of 400 5568 EE(NM) 99.33 VC&MD CIDCO Bhavan, CBD Belapur, Navi Mumbai.

Providing and laying sewer line network near LIG & MIG Housing Scheme outside Growth 401 5569 EE(AUR) VC&MD center, Nagar-I , CIDCO Waluj Mahanagar.

Providing , Supplying, lowering, laying & jointing D.I. Water supply lines outside 402 5570 EE(AUR) VC&MD Growth Center, Nagar-I , CIDCO Waluj Mahanagar. Construction of 15M, 18M & 24M wide roads upto WBM standard in balance part outside 403 5571 EE(AUR) VC&MD Growth Center, Nagar-I , CIDCO Waluj Mahanagar. Improvement of approach road to Belpada 404 5572 village on SH-54 ( Package-II ), Ulwe, Navi EE(RC) VC&MD Mumbai. Design and Construction of EWS and LIG tye Tenements with shops and on-site 405 5573 EE(Hsg-III) Infrastructure work in Sector-36 at Kharghar, Navi Mumbai Construction of roads upto 1st stage of asphalting including Storm Water, Drains, 406 5574 balance sewer line work, channel and EE(Dron-ii) alongtwith Box type Culvert in Sector-56 & 59 under 12.5% Scheme at Dronagiri.

5553 Integrated development of Infrastructural Board M/s. Kailashchandra Board works of balance roads (up to stage-I) & SW B.R No. 01/CIDCO/SE(Ulwe)/EE(Ulwe- Dilipkumar Const. Pvt. B.R No. 407 EE(Ulwe-II) 881.91 (-)19.00% 714.35 -----old drains etc in sector 20& 21 of 12.5% scheme 10681 I)/2012-13 LTd. 10750 file at at Ulwe,Navi Mumbai. ------03.08. ------18.12. 2012 2012 5554 Development of Integrated Infrastructure Board M/s. Thakur Infra Board works under 12.5% Scheme in Sector-17 at B.R No. 04/CIDCO/SE(Ulwe)/EE(Ulwe- Projects Pvt. Ltd. B.R No. 408 EE(Ulwe-II) 1127.42 (-)18.20% 922.23 -----old Ulwe, Navi Mumbai. 10748 II)/2012-13 10751 file ------18.12. ------18.09. 2012 2012 Development of Integrated Infrastructure Board works under 12.5% scheme in sector-8 at B.R No. 409 5575 EE(Ulwe-II) 1018.11 Ulwe, Navi, Navi Mumbai. 10682 ------03.08. 2012 5549 Block Estimate for Replacing Water Supply Lines of (From AC To DI ) Growth Centre & 410 EE(AUR) -----old Housing Scheme at Nagar-I,CIDCO, Waluj file Mahanagar. 5556 Resurfacing of major roads in Growth Center-

411 II of Nagar-II at CIDCO Waluj Mahanagr. EE(AUR) -----old file 5554 Development of Integrated Infrastructure works under 12.5% Scheme in Sector-17 at 412 EE(Ulwe-II) -----old Ulwe, Navi Mumbai. file 5550 Reclamation of area in sector 43&45 at M/s.Ajwani Infrast. CSR2011-12 Dronagiri, Navi Mumbai . Pvt. Ltd. 413 EE(Dron-ii) 384.01 419.30 VC&MD. 02/CIDCO/EE(Dron-II)/2012-13 (+) 3.99% 419.30 VC&MD. -----old file Resurfacing to Major Roads in Growth Centre 414 5576 of Nagar-I, CIDCO, Waluj Mahanagar. EE(AUR)

5538 Structural repairs of flats in Mass Housing in sector 46, 48, & 48A in Nerul, Navi Mumbai 415 EE(NL) -----old including buildings visited by Hon Chairman file CIDCO. . 5544 Providing and Laying 800mm dia. Water

416 Supply Feeder Main for Phase-II area from EE(Ulwe-II) -----old Amra Marg to Sector-18, at Ulwe. file Consultancy for structural design and allied services for proposed boundary wall at 417 5577 EE(NL) Belapur Fort at Kille, CBD, Navi Mumbai. Providing IP Video Surveillance CCTV Cameras 418 5578 along with face recognition system at CIDCO EE(Elect-II) Bhavan, Navi Mumbai. 5194 Shifting of existing 900 mm dia. MS pipeline CSR 2008-09 & at 2 Box culverts on Panvel Uran Road SH-54, Approved Rates & 419 EE(Dron-II) 236.33 VC&MD. -----old CH-1/800 & CH-2/500 Tal. Uran,Dist-Raigad PWD DSR 2009-10 file (Deposit work) Deposit Work Providing & Laying Balance Underground 420 5579 Sewerage Network for Ambad City, Dist.- EE(AUR) Jalna. (Deposit Work)

Reinstatement of existing Water supply line 421 5580 for Funde village at Dronagiri . EE(Dron-II) 12.16 VC&MD. Providing & Making Sewerage Connection to 422 5581 Individual Houses in Ambad City, Dist.- Jalna. EE(AUR)

Topographical survey of Chikhaldara Hill Board M/s. Geokno India Pvt. Board 5472 Station Notified Area using Terrestrial Laser B.R No. Ltd. Kanpur(UP) B.R No. 01/CIDCO/ACE(I&NT)/SE(D)/EE(N 423 Scanning (LiDAR) Technology- Shahpur, EE(NGR) 42.59 10705 & (-)50% 64.85 10705 & -----old GP)/2011-12 Aladoh and Motha Villages. 10727 10727 file 64.85 ------28.09. ------28.09. 2012 2012 Beautification of pond near Bhendkhal village 424 5582 including construction of approach road in EE(Dron-I) Sector-10, at Dronagiri. Construction of road upto Ist stage of asphalting including storm water drains and balance sewer line works in Sectors 47 & 48 425 5583 EE(Dron-II) under 12.5% scheme at Dronagiri.

Construction of road up to Ist stage of asphalting including storm water Drains, 426 5584 water supply line and balance sewer line EE(Dron-II) works in Sectors 27 under 12.5% scheme at Dronagiri. Board Board 5564 Development of integrated infrastructural M/s. Thakkur Infra B.R No. B.R No. works in sector 16 under 12.5% scheme at 05/CIDCO/SE(Ulwe)/EE(Ulwe- Projects Pvt. LTd. 427 Ulwe , Navi Mumbai. EE(Ulwe-II) 974.02 10708 & (-)21.20% 737.53 10784 -----old 10732 II)/2012-13 ------16.03. file 2013 ------28.09. Construction of 12 nos. of Sulabh toilet 2012 complexes (total 155 seats) at village Vahal, 428 5585 EE(Ulwe-I) &19.10.2012 Morave and Bamandongri at Ulwe node.Navi Mumbai. Development of integrated infrastructural Board M/s. V.U.B.Engg. Pvt. CSR 2010-11 Board 5562 works in sector 16 under 12.5% scheme at B.R No. Ltd. B.R No. 03/CIDCO/SE(Ulwe)/EE(Ulwe- 429 Ulwe , Navi Mumbai. EE(Ulwe-I) 920.78 10705 & (-)17.559% 759.1 10783 -----old 10727 I)/2012-13 ------16.03. file ------28.09. 2013 2012 Strengthening/ Re-structuring of Arterial 430 5586 Road (36 M wide road ) from Khopta to IOTL, EE(Dron-I) Sector-1 at Dronagiri. Construction of CIDCO Exhibition Center 01/CIDCO/CE&GM(T)/ACE(I&NT)/ M/s. IVRCL 5171 including civil, interior and site development 2008-09 Infrastructures & 431 -----old work at plot no. 1A, 15, 29 & 30 in Sector 30- EE(EC) Projects Ltd. file A at Vashi, Navi Mumbai. Providing & fixing of Kalzip Roofing & Skylight 5516 for Exhibition Centre at Plot No. 1A, 15, 29 & 432 -----old EE(Vashi) 30 in Sector 30 A Vashi Navi Mumbai. file Value Added FTTH Services to Residents And M/s Darashaw & Cvo. Commercial Establishment for the Housing Pvt. Ltd. 433 5587 EE(Hsg-III) 16.77 VC&MD Schemes in Sector 36 at Kharghar, Navi Mumbai. Maintenance of 8 nos. of Sulabh toilet complexes (total 80 seats) at village Vahal, 434 5585 EE(Ulwe-I) Morave and Bamandongri at Ulwe node.Navi Mumbai. Integrated development of Balance 5563 Infrastructural works of Roads (Upto stage –I), 435 -----old SW drain, sewerage and water supply, etc. in EE(Ulwe-I) file sector 2,3 & 5 of 12.5% scheme at Ulwe Node, Navi Mumbai Beautification of pond near Bhendkhal village 436 5582 including construction of approach road in EE(Dron-I) Sector-10, at Dronagiri. Renovation of Law Officer’s Department & Renovation of Directors’ and Security 437 5588 Officer’s Cabin, etc at 2nd floor, CIDCO EE(NM) Bhavan, CBD Belapur, Navi Mumbai (Civil Works). Construction of concrete pathways & storm 438 5589 water drains for Kopar village under GIA at EE(Ulwe-II) 33.11 Jt.MD. Ulwe . Resurfacing of 24 M wide road from Mumbai 439 5590 Highway to proposed housing scheme at EE(AUR) 113.15 VC&MD. Nagar-I, Walunj Mahanagar. “Third party Quality Audit” of Housing 05/CIDCO/EE(NM)/2012-13. project of EWS/LIG type tenements with shop & offices and including on –site 440 5591 infrastructure works in sector -36, Kharghar, EE(NM) Navi Mumbai.