Bruhat Mahanagara Palike Office of the Executive Engineer Road Infrastructure -East Division

Template for Section 4 (1) (a)- indexing and cataloging of all information Date on Date on which file which Opened can be Sl. (Files to be Category Location of File No. Subject of file destroyed No. listed A,B,C,D,E file / Chronological custodian ly) of file 2011-12 Strengthening and Asphalting of EE(MR)- Kavalbyrasandra main road from Parachute Assistant 1 4/11/2011 A East)/WO/01/10- Wardrobe - 1 gate to Doddannanagar Main road in Ward no. Engineer 11 47 EE(MR)- Improvements and asphalting of Chinnappa Assistant 2 4/11/2011 A East)/WO/02/10-Garden main road from Church road to Wardrobe - 1 Engineer 11 Nandhidurga Link Road. Improvement and asphalting work to 6th cross EE/RI(East)/03/ Assistant 3 4/11/2011 A 8th A main road at Sampangiramanagara Wardrobe - 1 11-12 Engineer ward. Improvement and asphalting work to 8th cross EE/RI(East)/04/ Assistant 4 4/11/2011 A road and drain work at Sampangiramanagara. Wardrobe - 1 11-12 Engineer EE/RI(East)/05/ Improvement and asphalting work to1st main Assistant 5 4/11/2011 A Wardrobe - 1 11-12 at Sampangiramanagara ward. Engineer Improvement and asphalting of Kamraj Road from Dispensary road signal to Veerpally EE/RI(East)/06/ Assistant 6 4/11/2011 A Street near Temple (including eurocan tiles Wardrobe - 1 11-12 Engineer to footpath) at Sampangiramanagara ward.

Improvement and asphalting of Dispensary road and Dikenson road from Jumma Masjid EE/RI(East)/07/ Assistant 7 4/11/2011 A Road to St johns road (Near Goodlook Wardrobe - 1 11-12 Engineer furniture Shop) at Sampangiramanagara ward.

EE/RI(East)/08/ Improvement and asphalting of Plain Street Assistant 8 4/11/2011 A Wardrobe - 1 11-12 and Park road in Sampangiramanagara ward Engineer Improvement and asphalting of hospital road EE/RI(East)/09/ Assistant 9 4/11/2011 A (From plain street to Shivajinagar Bus Stand) Wardrobe - 1 11-12 Engineer in Sampangiramanagara ward . 2012-13 EE/RI(East)/23/ Development of Magrath road from Assistant 10 3/7/2012 A Wardrobe - 1 12-13 Garudamall to Hosmat junction Engineer Estimate for resurfacing of damaged stretches EE/RI(East)/29/ and filling pot hole of arterial and sub arterial Assistant 11 15-02-2013 A Wardrobe - 1 12-13 roads in Shanthinagar and Shivajinagar Engineer constituency in East Division Estimate for asphalting of damaged stretches EE/RI(East)/30/ and filling pot hole of arterial and sub arterial Assistant 12 15-02-2013 A Wardrobe - 1 12-13 roads in C.V Raman nagar and Sarvjnanagar Engineer constituency in East Division Asphalting of damaged strengthening and EE/RI(East)/31/ Assistant 13 8/3/2013 A filling pothole of important sub arterial roads Wardrobe - 1 12-13 Engineer in East zone EE/RI(East)/32/ Improvement, strengthening and Asphaling of Assistant 14 15/03/2013 A Wardrobe - 1 12-13 selected arterial roads in East zone Engineer 2013-14

1 Improvements and Asphalting to Palace road EE(MR)EAST/ Assistant 15 20.12.13 A from Mysore road circle to M.V. Jayaraman Wardrobe - 1 11/ 13-14 Engineer Junction. Improvements and Asphalting of Aliaskar EE(MR)EAST/ Assistant 16 20.12.13 A road from Rajbhavan road Junction to Wardrobe - 1 12/ 13-14 Engineer . Improvements and Asphalting of Lower EE(MR)EAST/ Assistant 17 20.12.13 A Agram road from Hindustan motor Junction to Wardrobe - 1 13/13-14 Engineer Viveknagar Improvements and Asphalting of EE(MR)EAST/ Assistant 18 20.12.13 A Kadidalmanjappa (Longford) road from Wardrobe - 1 14/ 13-14 Engineer Richmond circle to Hosur-laskar road. EE(MR)EAST/ Improvements and Asphalting of Rhenius Assistant 19 20.12.13 A Wardrobe - 1 15/ 13-14 street in Engineer Improvements and Asphalting of Old Airport EE(MR)EAST/ Assistant 20 20.12.13 A road from Trinity Circle to ASC Centre Wardrobe - 1 16/ 13-14 Engineer EE(MR)EAST/ Improvements and Asphalting of Victoria road Assistant 21 20.12.13 A Wardrobe - 1 17/ 13-14 from ASC Centre to D'souza circle Engineer Improvements and Asphalting of Gurudwara EE(MR)EAST/ Assistant 22 20.12.13 A Main road from Trinity circle to Old Madras Wardrobe - 1 18/ 13-14 Engineer road via Gurudwara EE(MR)EAST/ Improvements and Asphalting to Devanga Assistant 23 20.12.13 A Wardrobe - 1 19/ 13-14 Hostel road and Mission road Engineer Resurfacing of Old Madras road from EE(MR)EAST/ Assistant 24 20.12.13 A Indranagar 100ft road Junction to Wardrobe - 1 20/ 13-14 Engineer Byappanahalli Metro station Improvements and Asphalting of Swamy EE(MR)EAST/ Assistant 25 20.12.13 A Vivekananda road from Trinity Circle to Old Wardrobe - 1 21/ 13-14 Engineer Madras road via Adarsha Theater Resurfacing of Old madras road from EE(MR)EAST/ Assistant 26 20.12.13 A Byappanahalli Metro station to Benniganahalli Wardrobe - 1 22/ 13-14 Engineer Railway underpass Improvements and Asphalting of Pottery road EE/RI(East)/ and Bore Bank road from Wheeler road Assistant 27 20.12.13 A Wardrobe - 1 23 /13-14 extension road upto Benson town cross road Engineer

Improvements and Asphalting of Swamy EE/RI(East)/ Vivekananda road from Vinayaka temple Assistant 28 20.12.13 A Wardrobe - 1 24 / 13-14 street to Outer Ring Road via Ganapathi Engineer temple in HBR Layout Improvements and Asphalting of 1st main EE/RI(East)/ road from Siddappa Reddy circle to Assistant 29 20.12.13 A Wardrobe - 1 25 /13-14 Nagavara main road BDA Complex Engineer (Narendra Theater Road) Improvements and Asphalting of St. John EE(RI)EAST/2 Assistant 30 20.12.13 A church road from lake to Coles Park. Wardrobe - 1 6/ 13-14 Engineer Improvements and Asphalting to EE(RI)EAST/2 Assistant 31 20.12.13 A main road from Banasawadi Wardrobe - 1 7/ 13-14 Engineer flyover upto Ullasappa circle Improvements and Asphalting of Nethaji road EE/RI(East)/ Assistant 32 20.12.13 A and MM road from Bomboo bazzar circle to Wardrobe - 1 Engineer 28/13-14 Coxtown circle EE/RI(East)/ Improvements and Asphalting Haines road Assistant 33 20.12.13 A Wardrobe - 1 29/13-14 from MM road to St John church road Engineer Improvements and Asphalting Davis road EE/RI(East)/ Assistant 34 20.12.13 A from Wheeler road extension to Tannery road Wardrobe - 1 30/13-14 Engineer Improvements and Asphalting of Vishwanath EE/RI(East)/ Assistant 35 20.12.13 A Nagenahalli Main road from Bellary main Wardrobe - 1 Engineer 31/13-14 road to Kanakanagara

2 Improvements and Asphalting to Infantry road EE/RI(East)/ Assistant 36 20.12.13 A from Aliaskar road to Commercial street road Wardrobe - 1 32/13-14 Engineer EE/RI(East)/ Improvements and Asphalting of Assistant 37 20.12.13 A Wardrobe - 1 33/13-14 100 ft road old airport to Old madras road Engineer Improvement to Drain and footpath to EE/RI(East)/ Assistant 38 26.12.13 A Inner Ring Road from Wardrobe - 1 Engineer 34/13-14 Junction to ASC Underpass Estimate for Modification of residency park EE/RI(East)/ Assistant 39 26/12/2014 A road (Infront of KPSC Office ) in to concrete Wardrobe - 1 Engineer 35/13-14 road “Consultancy Services for Construction Supervision, Project Management and Quality Control for the Work of Improvements and EE/RI(East)/ Assistant 40 21/01/2014 A Asphalting of Eight selected Arterial and Sub- Wardrobe - 1 Engineer 36/13-14 Arterial Roads In East Zone, Road Infrastructure (Package 2)

“Consultancy Services for Construction Supervision, Project Management and Quality Control for the Work of Improvements and EE/RI(East)/ Assistant 41 21/01/2014 A Asphalting of Eight selected Arterial and Sub- Wardrobe - 1 Engineer 37/13-14 Arterial Roads In East Zone, Road Infrastructure (Package 3)

Estimate for strengthening and asphalting of EE/RI(East)/ damaged stretch and filling pot hole of Hosur Assistant 42 21/01/2014 A Wardrobe - 1 38/13-14 lashkar road in Shanthinagar constituency in Engineer East Division Estimate for asphalting of damaged stretches EE/RI(East)/ and filling pot hole of old airport road in East Assistant 43 21/01/2014 A Wardrobe - 1 39/13-14 Division Engineer

Estimate for asphalting of damaged stretches EE/RI(East)/ Assistant 44 21/01/2014 A and filling pot hole of old madras roads in Wardrobe - 1 Engineer 40/13-14 East Division Estimate for asphalting of damaged stretches EE/RI(East)/ and filling pot hole of arterial and sub arterial Assistant 45 21/01/2014 A Wardrobe - 1 41/13-14 roads in Hebbal and Pulakeshinagar Engineer constituency in East Division Estimate for asphalting of damaged stretches EE/RI(East)/ and filling pot hole of arterial and sub arterial Assistant 46 27/02/2014 A Wardrobe - 1 42/13-14 roads in C.V Ramannagar and Sarvjnanagar Engineer constituency in East Division Estimate for strengthening of Bad stretches in EE/RI(East)/ Assistant 47 27/02/2014 A Thamaraikannan road near Adarsha theatre in Wardrobe - 1 Engineer 44/13-14 East Division Strengthening of Bad stretch on Vivekananda EE/RI(East)/ road opposite to Subramanya swamy Temple Assistant 48 27/02/14 A Wardrobe - 1 45/ 13-14 in Ulsoor in East Division Engineer

Estimate for resurfacing of damaged stretches EE/RI(East)/ Assistant 49 27/02/2014 A and arterial and sub arterial surroundings Wardrobe - 1 Engineer 46/ 13-14 Ulsoor lake in East Divion. EE(MR)EAST/ Improvement and Asphalting of Cubbon road Assistant 50 01.02.14 A Wardrobe - 1 47/ 2013-14 Manipal Center to central street. Engineer “Consultancy Services for Construction Supervision, Project Management and Quality EE/RI(East)/ Control for the Work of Improvements and Assistant 51 12/2/2014 A Wardrobe - 1 48/ 13-14 Asphalting of Eight selected Arterial and Sub- Engineer Arterial Roads In East Zone, Road Infrastructure (Package 1)

3 Estimate for Modification of North park road EE/RI(East)/ from Harekrishna road to Kumara Krupa road Assistant 52 12/2/2014 A Wardrobe - 1 49/ 13-14 to Concrete road in Kumara Krupa East Engineer

Estimate for formation of adjacent road of EE/RI(East)/ Assistant 53 12/2/2014 A Jayamahal road from Mekhri Circle to Wardrobe - 1 Engineer 50/13-14 Doordarshan junction. Estimate for formation of adjacent road of EE/RI(East)/ Assistant 54 12/2/2014 A Jayamahal road from Doordarshan junction to Wardrobe - 1 Engineer 51/13-16 Munireddy palya circle. Estimate for formation of temporary right side EE/RI(East)/ diversion road from Cauvery junction to Assistant 55 12/2/2014 A Wardrobe - 1 52/13-16 Gayathri vihar gate palace grounds side at Engineer Bellary road. Estimate for formation of temporary side EE/RI(East)/ diversion road from BDA junction to Cauvery Assistant 56 12/2/2014 A Wardrobe - 1 53/ 13-14 theatre junction palce grounds side at Bellary Engineer road. Estimate for formation of temporary right side EE/RI(East)/ diversion road from Gayathri vihar gate to Assistant 57 12/2/2014 A Wardrobe - 1 54/ 13-14 Mekhri circle, palace grounds side at Bellary Engineer road. Asphalting of Dr. Ambedkar road from K.R. EE/RI(East)/ Assistant 58 28/02/2014 A Circle to Vikasa Soudha Entrance in East Wardrobe - 1 55/13-14 Division Engineer Improvent to footpath and Asphalting to EE/RI(East)/ Assistant 59 28/02/2014 A Aliaskar Road from Miller Road to Embassy Wardrobe - 1 Engineer 56/13-14 Apartment. “Consultancy Services for Construction Supervision, Project Management and Quality Control for the Work of Improvements and EE/RI(East)/ Assistant 60 28/02/2014 A Asphalting of Eight selected Arterial and Sub- Wardrobe - 1 Engineer 57/13-14 Arterial Roads In East Zone, Road Infrastructure (Package 4)

EE/RI(East)/ Improvement and Asphalting to Sankey Road Assistant 61 28/02/2014 A Wardrobe - 1 58/13-14 from Rajbhavan to Mekhri Circle underpass Engineer Improvements and Asphalting of CIL road EE/RI(East)/ Assistant 62 28/02/2014 A from Doordarshan and Mattadahalli main road Wardrobe - 1 Engineer 59/ 13-14 to R.T. Nagar road circle Improvements and providing pointing to Rajbhavan road, Dr. Ambedkar street, Race EE/RI(East)/ Assistant 63 28/03/2014 A course road, bellary main road,Kumar krupa Wardrobe - 1 Engineer 60/ 13-14 road, Vittal malya road & Hudson circle surrounding in east division. Improvements and providing pointing to Rajbhavan road, Dr. Ambedkar street, Race EE/RI(East)/ Assistant 64 3/3/2014 A course road, bellary main road,Kumar krupa Wardrobe - 1 Engineer 61/ 13-14 road, Vittal malya road & Hudson circle surrounding in east division. Improvements and Asphalting Govindapura EE/RI(East)/ Assistant 65 3/3/2014 A main road from Nagavara main road to Aryan Wardrobe - 1 Engineer 62/13-14 medicals

4 Improvements and Asphalting of Hennur main EE/RI(East)/ Assistant 66 3/3/2014 A Road from East Railway Station to Wardrobe - 1 Engineer 63/13-14 flyover White topping of Victoria cross road from Hosmat Junciton to Hindustan motors EE/RI(East)/ Assistant 67 3/3/2014 A junction to Victoria road and Lower Agram Wardrobe - 1 Engineer 64/13-14 road from Hindustan motors junction to Hosmat junction Improvements and Asphalting of Race Course road from Basaveswara circle to Railway EE/RI(East)/ Assistant 68 3/3/2014 A Underbridge(Nehru circle) via Hare Krishna Wardrobe - 1 Engineer 65/13-14 road.,and Cresent road from chitrakala parishat college to Hare krishna road 2014-15 Providing consultancy services for preparation of DPR for construction of Minor bridge EE/RI(East)/ Assistant 1 7/5/2014 A across nalla and new road formation at Wardrobe - 1 Engineer 01/ 14-15 lottegollahalli(New BEL Road) in East zone RI BBMP Providing consultancy services for preparation of fasibility report for construction of elevated EE/RI(East)/ Assistant 2 7/5/2014 A flyover from ITC factory to Banasawadi fire Wardrobe - 1 Engineer 02 /14-15 station on Banasawadi road in East Zone

Providing consultancy services fof DPR for improvement and asphalting of Tannery road EE/RI(East)/ up to Kadugondanahalli police station and Assistant 3 7/5/2014 A Wardrobe - 1 03/ 14-15 from Nagavara main road from Engineer Kadugondanahalli police station to Outer ring road in East zone Providing consultancy services for preparation of feasibility project report for road widening EE/RI(East)/ Assistant 4 7/5/2014 A and improvements from Dinnur main road via Wardrobe - 1 Engineer 04/ 14-15 KHB main road, Kanakanagar TO Outer Ring Road.(ORR) EE/RI(East)/ Estimate for water leakage repairs in Assistant 5 A Wardrobe - 1 05/ 14-15 underpass in mekri circle in East Division Engineer Estimate for Strengthening of damaged EE/RI(East)/ stretches of Arterial and Sub Arterial roads in Assistant 6 5/7/2014 A Wardrobe - 1 06/ 14-15 Shivajinagara and Shanthinagara constituency Engineer under East Division EE/RI(East)/ Strengthening and asphalting to 13th, 14th & Assistant 7 23/08/14 A Wardrobe - 1 9/ 14-15 15th cross RMV 2nd Stage in East Engineer EE/RI(East)/ Improvements and asphalting to Anepalya Assistant 8 11/9/2014 A Wardrobe - 1 10/ 14-15 main road & junction Engineer Estimate for Development of Magrath Road EE/RI(East)/ Assistant 9 11/9/2014 A from to Hosmat Junction Roads Wardrobe - 1 Engineer 11/ 14-15 in East Division”. Improvements and asphalting to 2nd cross EE/RI(East)/ (80'feet road) RMT 8th E main road in HRBR Assistant 10 11/9/2014 A Wardrobe - 1 12/ 14-15 layout Kalyan nagar in Bengaluru city in East Engineer

Widening of Shampura main road from EE/RI(East)/ Assistant 11 11/9/2014 A Nagavara main road to Railway level Wardrobe - 1 Engineer 13/ 14-15 Crossing. Estimate for Resurfacing of damaged stretches EE/RI(East)/ Assistant 12 29/09/14 A of arterial and sub arterial Surrounding Wardrobe - 1 Engineer 14/ 14-15 Tannery road in East Division

5 Estimate for Resurfacing of damaged stretches EE/RI(East)/ of arterial and sub arterial Surrounding of Assistant 13 29/09/14 A Wardrobe - 1 15/ 14-15 main road and R.T Nagar main Engineer road in East Division Strengthening and asphalting to road cut EE/RI(East)/ portion of old madras road from Assistant 14 20/10/14 A Wardrobe - 1 16/ 14-15 Byappanahalli levelling cross to to Engineer Benniganahalli in East division Valuation of building proposed for demolition EE/RI(East)/ Assistant 15 20/10/14 A at road widening portion of from Wardrobe - 1 17/ 14-15 yenkey factory junction to silk board Engineer Valuationof 49 properties proposed for EE/RI(East)/ requistion at road widening portion of Hosur Assistant 16 5/11/2014 A Wardrobe - 1 18/ 14-15 luskar road at Audugodi and lakkasandra ward Engineer Surrounding road Resurfacing of damaged portions of Old EE/RI(East)/ Assistant 17 26/11/14 A Airport road from ASC Centre to Wardrobe - 1 19/ 14-15 flyover Engineer “Consultancy Services for Construction EE/RI(East)/ Supervision, Project Management and Quality Assistant 20 26/11/14 A Wardrobe - 1 20/ 14-15 Control for the GOK Works in 2nd phase.8 Engineer

“Construction of pedestrian crossing and light EE/RI(East)/ Assistant 21 26/11/14 A vehivle under pass at Lingarajpura Railway Wardrobe - 1 Engineer 21/ 14-15 level crossing at Bagalore Estimate for asphalting of damaged portion in EE/RI(East)/ Assistant 22 24/12/2014 A Hebbal and Pulakeshinagar under East Wardrobe - 1 Engineer 22/ 14-15 Division Strengthening and asphalting of 3rd Cross & EE/RI(East)/ Sri Gangadareshwara Temple Road at HMT Assistant 23 5/1/2015 A Wardrobe - 1 23/ 14-15 Layout R.T Nagar in East Division Engineer

Estimate for Strengthening of damaged EE/RI(East)/ stretches of Arterial and Sub Arterial roads in Assistant 24 7/1/2015 A Wardrobe - 1 24/ 14-15 Sarvajnanagara, C.V.Raman nagara Engineer constituency under East Division Providing consultancy services for preparation EE/RI(East)/ of aeasibility report for widening to mekri Assistant 25 19/01/2015 A Wardrobe - 1 25/ 14-15 circle in the adjoining palace property Engineer

Consultancy services for construction, EE/RI(East)/ supervission, project manage,ment & quality Assistant 26 19/01/2015 A Wardrobe - 1 26/ 14-15 control for the works of GOK- 2013-14 in RI Engineer East Division. Consultancy services for construction, EE/RI(East)/ supervission, project manage,ment & quality Assistant 27 19/01/2015 A Wardrobe - 1 27/ 14-15 control for the works of GOK- 2013-14 in RI Engineer East Division. EE/RI(East)/ Filling of Pot holes of damaged steatchs of Assistant 28 19/01/2015 A Wardrobe - 1 28/ 14-15 Hosur Lashkar road in East Zone Engineer Consultancy assignmant for cpreparation of EE/RI(East)/ detailed estimate and tender ducuments for the Assistant 29 25.02.2015 A Wardrobe - 1 29/ 14-15 following roads in east division (In BBMP- Engineer Sarvgnanagara Package-I) Consultancy assignmant for cpreparation of EE/RI(East)/ detailed estimate and tender ducuments for the Assistant 30 25.02.2015 A Wardrobe - 1 30/ 14-15 following roads in east division (In BBMP- Engineer Sarvgnanagara Package-II) Consultancy assignmant for cpreparation of EE/RI(East)/ detailed estimate and tender ducuments for the Assistant 31 25.02.2015 A Wardrobe - 1 31/ 14-15 following roads in east division (In BBMP- Engineer Sarvgnanagara Package-II)

6 Consultancy assignmant for cpreparation of EE/RI(East)/ detailed estimate and tender ducuments for the Assistant 32 25.02.2015 A Wardrobe - 1 32/ 14-15 following roads in east division (In BBMP- Engineer Shanthinagar Package-I) Consultancy assignmant for cpreparation of EE/RI(East)/ detailed estimate and tender ducuments for the Assistant 33 25.02.2015 A Wardrobe - 1 33/ 14-15 following roads in east division (In BBMP- Engineer Shanthinagar Package-II) Consultancy assignmant for cpreparation of EE/RI(East)/ detailed estimate and tender ducuments for the Assistant 34 25.02.2015 A Wardrobe - 1 34/ 14-15 following roads in east division (In BBMP- Engineer Shivajinagar Package-I) Consultancy assignmant for cpreparation of EE/RI(East)/ detailed estimate and tender ducuments for the Assistant 35 25.02.2015 A Wardrobe - 1 35/ 14-15 following roads in east division (In BBMP- Engineer CV RamananagarPackage-I) Consultancy assignmant for cpreparation of EE/RI(East)/ detailed estimate and tender ducuments for the Assistant 36 25.02.2015 A Wardrobe - 1 36/ 14-15 following roads in east division (In BBMP- Engineer Hebbala Package-I) Consultancy assignmant for cpreparation of EE/RI(East)/ detailed estimate and tender ducuments for the Assistant 37 25.02.2015 A Wardrobe - 1 37/ 14-15 following roads in east division (In BBMP- Engineer Hebbala Package-II) Consultancy assignmant for cpreparation of EE/RI(East)/ detailed estimate and tender ducuments for the Assistant 38 25.02.2015 A Wardrobe - 1 38/ 14-15 following roads in east division (In BBMP- Engineer Shivajinagar Package-I) Consultancy services for construction, EE/RI(East)/ supervission, project manage,ment & quality Assistant 39 25-02-2015 A Wardrobe - 1 39/ 14-15 control for the works of GOK- 2013-14 in RI Engineer East Division. 2015-16 :- Improvement, Strengthening and Asphalting EE/RI(East)/ of selected Arterial and Sub- Arterial Roads Assistant 1 25-06-2015 A Wardrobe - 1 01/15-16 in East zone – Package E 2014-15 (1) Engineer

Restoration of damaged stretches of Arterial EE/RI(East)/ and Sub Arterial roads in Hebbala, Assistant 2 25-06-2015 A Wardrobe - 1 02/15-16 Pulakeshinagara & Sarvagnanagar Engineer constituency wise under East Division Restoration of damaged stretches of occurred EE/RI(East)/ during laying of pipeline by BWSSB in Dr. Assistant 3 25-06-2015 A Wardrobe - 1 03/15-16 Ambedkar road Sarvgnanagar, Bangalore Engineer

Damaged stretches of Arterial and Sub EE/RI(East)/ Assistant 4 25-06-2015 A Arterial roads in Banasawadi main road , 7th Wardrobe - 1 04/15-16 main & road at East Engineer ResurfacingDivision of damaged stretches of Arterial EE/RI(East)/ and Sub Arterial roads in Shivajinagar, Assistant 5 25-06-2015 A Wardrobe - 1 05/15-16 Shanthinagar & C.V.Raman nagara Engineer constituency under East Division :- Improvement, Strengthening and Asphalting EE/RI(East)/ Assistant 6 15-07-2015 A of selected Arterial and Sub- Arterial Roads Wardrobe - 1 06/15-16 in East zone – Package E 2014-15 (2) Engineer :- Improvement, Strengthening and Asphalting EE/RI(East)/ Assistant 7 15-07-2015 A of selected Arterial and Sub- Arterial Roads Wardrobe - 1 07/15-16 in East zone – Package E 2014-15 (3) Engineer

Executive Engineer Road Infrastructure - East Division

7