Stirling Council Housing Land Audit 2020 Contents

Contents 1. Summary Page 2 2. Definitions Page 3 3. Local Development Plan Page 4 4. Methodology Page 5 5. Statistical Analysis Page 6 Appendix A: Schedule of Sites Appendix B: Sites completed 1st July 2018 – 30th June 2019

1

1. Summary

Stirling Council produces an annual audit of housing land to show completions and annual programming forecasts for the Stirling Council Planning Authority area. This excludes the area of the Council that forms the Loch Lomond and the Trossachs National Park. The audits provide a snapshot of the availability of housing land on the 30th June each year. Planning Advice Note 2/2010: Affordable Housing and Housing Land Audits and Scottish Planning Policy 2014 (SPP) establish Housing Land Audits as the method for monitoring housing land. The 2 key functions of the audits are to:

• Demonstrate the availability of sufficient effective housing land to meet the requirement for a 5 year effective supply at all times; and • Provide a snapshot of the amount of land available at any particular time. SPP highlights that all planning authorities must demonstrate that they are maintaining at least a 5 year effective supply of land at all times. This audit is the established means to monitor this requirement and is presented annually. SPP also requires that planning authorities allocate in their Local Development Plans (LDP'S) a range of sites which are effective or are expected to become effective within the plan period to meet the Housing Land Requirement in full. This audit monitors this progress and will inform future LDP reviews.

2020 Summary

Number of sites 78

5 Year Effective HLR 2290

5 Year Effective Programming 2778

Years supply 6.1

2 2. Definitions

The Stirling Council Housing Land Audit 2019, in accordance with SPP (2014) and PAN 2/2010 sets out the following definitions in relation to housing land supply: Time Periods

For a site to be considered as part of the 5 Year Effective Supply all 7 Tests of Effectiveness, as set out in PAN 2/2010, have to be satisfied.

5 Year Effective Supply Calculation

The 5 Year Effective Supply is the programmed output used to assess if the Council is in compliance with the requirement of SPP to maintain a 5 year effective supply of land at all times. This is based on the annual Housing Land Requirement as set out in the LDP. PAN 1/2020 sets out that the above method is the correct way to assess the 5 Year Effective Supply.

3

3. Local Development Plan

The adopted Local Development Plan is the Stirling Local Development Plan 2018. The plan was adopted by the Council on 8th October 2018.

4

4. Methodology

The audit is a continual process that starts by weekly monitoring of the planning schedule to identify new sites to be included in the audit. This is then supplemented by assessing sites from the previous audits for any changes, for example, to site capacity or contact details. On the 30th June, the base date of the audit, Developer Intention Surveys are sent out to all sites identified from the monitoring stage, except small sites of less than 4 units. This survey allows the Council to capture accurate and up to date information on each sites progress and expected future development. This information is provided by landowners and developers. The survey is supported by site visits to assess development where needed. Once this information has been compiled, draft programming is prepared and sent to Homes for Scotland to allow early discussion on sites included in the audit.

Agreement and Monitoring Publishing

Housing Land Audit Methodology Stakeholder Data meeting gathering

Drafting of programming

A meeting is then held, usually in September, to agree the contents of the audit with key stakeholders. Council officers, representing the Planning, Housing and Education departments, Registered Social Landlords, Homes for Scotland, developers and infrastructure providers are invited to attend the meeting. Once agreement has been reached on the programming the final audit document is prepared. There is a time lag while completion data for the previous year is prepared for all sites by Building Standards and the audit is usually published in October or November. This year due to Covid-19 restrictions, no meeting took place. However, programming on all sites was agreed with Homes for Scotland.

5. Statistical Analysis

5

Table 1 Effective/Established Land Supply - by Sub Area (Excluding Small Sites) Effective Land Non effective Land Established land Number of sites Sub Area Supply (2020/21 - supply (post 2027) supply in audit 2026/27) Core Area 3304 4336 7640 50 Rural Area 352 17 369 28 Total 3656 4353 8009 78 Table 1 / Chart 1 illustrate the breakdown of the land supply by sub area for audit sites. This does not include any output from small sites. The 2020 audit comprises 78 sites, expected to deliver 3,656 units by the end of the plan period in 2027. Not all sites are expected to deliver fully within the effective period till 2027. Strategic sites such as Durieshill and South Stirling Gateway are expected to deliver beyond this point.

6

Table 2 Established Land Supply - Planning Status (Excluding Small Sites) Planning Under Full Established Sub Area Permission In Proposal Construction Permission Land Supply Principle Core Area 439 548 89 6564 7640 Rural Area 67 50 0 252 369 Total 506 598 89 6816 8009 The established land supply of 8,009 units is broken down by planning status and sub area in Table 2 / Chart 2. It highlights that approximately 15% of the land supply is under construction or benefits from planning permission. The relatively high percentage of units classed as 'Proposal' is due in part to approx. 3,500 units expected from strategic sites at Durieshill and South Stirling Gateway, however, both applications are minded to grant subject to Section 75.

7

Table 3 Effective land Supply - Brownfield/greenfield split (Excluding Small Sites) Sub Brownfield Conversion Total Brownfield Greenfield Mixed sites Area New Build Core Area 958 26 984 2313 7

Rural Area 146 17 163 131 58 Total 1104 43 1147 2444 65 Total Effective 3656 Land Supply Table 3 / Chart 3 illustrates that approximately 31% of the effective land supply is expected to be delivered on brownfield land, which is land that has previously been developed and includes conversions. Greenfield land is land that has not previously been developed. The Council supports the reuse of brownfield land, however it is recognised in the Spatial Strategy for the LDP that there is a need for controlled greenfield expansion to accommodate the Housing Land Requirement. As only 31% of the supply is expected on brownfield land, this continues to highlight that there are few remaining brownfield sites suitable for housing development.

8

Table 4 Effective Land Supply - Market Tenure (Excludes Small Sites) Sub Area Market Affordable Total Core Area 2348 956 3304 Rural Area 299 53 352 Total 2647 1009 3656 Table 4 / Chart 4 show that as a proportion of development, there is a difference between the percentage of affordable housing to be delivered in the Core and Rural areas. The higher percentage of affordable units to be delivered in the Core Area is reflective of the Council's commitment to the Regeneration areas within Stirling and the Eastern Villages.

9

Table 5 Five Year Programmed Output (Excluding Small Sites) Programmed Output Total Sub Area 2020/21 2021/22 2022/23 2023/24 2024/25 2020/25

Core Area 242 343 478 629 578 2270

Rural Area 29 70 79 107 48 333

Total 271 413 557 736 626 2603

Within the Effective Land Supply of 3,656 units, as shown in Table 1, 2,603 units are expected to be delivered within the next 5 years on audit sites, as shown in Table 5 / Chart 5. This output is added to the output expected from small sites to calculate the 5 year supply, as shown in Table 9. The 5 year output rises from 2020/201 as this is when completions are expected to begin to be delivered from Strategic Sites and it is hoped that the construction sector will continue back to full capacity.

10

Table 6 Five Year Programmed Output by Market Tenure (Excludes Small Sites) Programmed Output Total Tenure 2020/21 2021/22 2022/23 2023/24 2024/25 2020/25 Market 148 274 379 492 495 1788 Affordable 123 139 178 244 131 815 Total 271 413 557 736 626 2603 Within the first 5 years of the effective supply it is expected that there will be 2,603 units completed across the plan area on audit sites, 815 of which are forecast to be affordable. The affordable element represents almost 31% of the 5 year supply. This is due in part to a commitment to accelerate the build out of the Raploch Masterplan and the policy requirement for sites for which detailed plans are not yet available. Raploch is a key regeneration priority for the Council.

11

Table 7a Programmed V Actual Completions (All Sites) 2019/2020 2020/2021 Monitoring Category Programmed Actual Difference Completions Completions Core Area 175 69 -106 Local Development Plan Rural Area 42 29 -13 More than 4 10 units Windfall Small sites 46 -12 less than 4 24 units Total 263 132 -131

The 2019/2020 audit has performed Chart 7a Programmed V Actual slightly less than expected in the Completions 2018/2019 audit. Tables and Charts 7a By Sub Area and 7b show that across all sites there were 131 units not delivered as expected. 300 This is largely due the impact of Covid-19 200 lockdowns and restrictions. 100 0 LDP LDP Windfall Total Core Rural Area Area

2018/19 Programmed Completions 2018/2019 Actual Completions

Table 7b Programmed V Actual Completions By Tenure 2019/20 2019/220 Tenure Programmed Actual Difference Completions Completions Market 149 93 -56 Affordable 114 39 -75 Total 263 132 -131

Chart 7b Programmed V Actual Completions By Tenure Difference

2019/220 Actual…

2019/20…

-200 -100 0 100 200 300 Total Affordable Market

12

Table 8 Programmed V Actual Completions 10 Year Trend (Excluding Small Sites) 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Anticipated 363 291 263 215 387 337 218 179 233 228 Actual 353 311 223 307 304 336 214 192 121 132 Difference -10 20 -40 92 -83 -1 -4 13 -112 -96

Chart 8 Programmed V Actual Completions 10 Year Trend (Excluding Small Sites) 500 400 300 Anticipated 200 Actual 100 0

When small sites are excluded, allocated LDP sites have performed broadly in line with expectations over the last 10 years, with deviations being due to some sites delivering quicker or slower than anticipated. However, in 2019/20 the deviation is largely down to the slowdown of the construction sector as a result of Covid-19 restrictions.

13

Table 9 Five Year Effective Land Supply 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Actual Completions Programmed Completions 344 306 247 319 322 368 234 205 142 132 306 448 592 771 661 612 511 Total Completions 2619 5 Year Effective Programming 2778 5 Year Effective HLR 2290 Years Gain/ 6.1 488 Supply Shortfall SPP requires that planning authorities maintain a 5 year supply of Effective Land at all times. The precise method of calculation is set out in PAN 1/2020 and set out in section 2 of this document. Table 9 demonstrates that Stirling Council is maintaining a 5 year supply of housing land as required by SPP, with evidence of a 6.1 years supply.

14

Appendix A: Schedule of Sites Appendix A: Schedule of Sites

KH Parsons Workshop, Balfron SC112 / H088 Actions Required to Deliver this site Landowner to release the site for development.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Effective Proposal 2 - Forth and Rural LDP Brownfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.28 67.86 Hugh Parsons 254777 / 06/00133/OUT 15/02/2010 - 688640 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 19 19 0 19 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2007 2007 2007 2014

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 13 6 0 Affordable 0 0 0 0 0 6 0 0

Market 0 0 0 0 0 7 6 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

15-23 Buchanan Street, Balfron SC176 / H091 Actions Required to Deliver this site Continue buid out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 2 - Forth and Rural LDP Brownfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.29 13.79 Cadder Investments 254638 / 17/00900/FUL 23/04/2021 - 688522 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 4 4 4 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2010 2010 2010 2014

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 2 2 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 2 2 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Depot Site, Balfron SC215 / H083 Actions Required to Deliver this site Site being marketed by Council. Planning brief prepared to support this.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 2 - Forth and Rural LDP Brownfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 1.13 8.85 Stirling Council 254573 / - 23/01/2021 - 688960 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 10 10 10 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 10 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 10 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

4 Inverallan Road, Bridge of Allan SC108 / H005 Actions Required to Deliver this site Site is non effective. Candidate for removal from next LDP.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 3 - Dunblane and Core LDP Brownfield New build Bridge of Allan Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.16 75.00 Gateway Builders 278772 / 10/00544/FUL 28/10/2013 - 697530 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 12 12 0 0 12 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2007 2007 2007 0

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 12 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 12

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use No Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Sunnylaw, Bridge of Allan SC259 / H135 Actions Required to Deliver this site Submission of a planning application.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 3 - Dunblane and Core LDP Greenfield New build Bridge of Allan Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 1.15 3.48 - 279300 / - 23/01/2021 - 698373 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 4 4 4 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2017 2017 2017 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 2 2 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 0 2 2 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

South of Fisher Place, Buchlyvie SC267 / H152 Actions Required to Deliver this site Council to work with landowner and developer to bring forward the site for development.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 2 - Forth and Rural LDP Greenfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.75 20.00 Mr Scoobie 257176 / - 23/01/2021 - 693819 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 15 15 15 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2018 2018 2018 2018

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 15 0 0 0 0 Affordable 0 0 0 5 0 0 0 0

Market 0 0 0 10 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Hayford Mills Phase 2, Cambusbarron SC115 / H011 Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 5 - Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.72 52.78 Hayford Estates Ltd 277555 / 18/00736/FUL 23/01/2021 - 690800 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 38 38 38 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2007 2007 2007 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 6 32 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 6 32 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Polmaise Road, Cambusbarron SC276 / H159 Actions Required to Deliver this site Council to work with developer to clarify development potential of the site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 5 - Stirling West Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 13.58 18.41 Barrat Homes 278166 / PPA-390-2046 04/09/2021 - 891968 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 250 250 133 77 40 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2017 2017 2017 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 35 58 40 40 37 40 Affordable 0 0 20 28 0 0 0 0

Market 0 0 15 30 40 40 37 40

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Berryhills, Cowie SC209 / H074 Actions Required to Deliver this site Decision to be made on MSC application.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 7 - Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 21.25 23.53 Taylor Wimpey Homes 283297 / PPA-390-2056 23/01/2021 Omnivale 689214 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 500 500 130 100 270 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 30 50 50 50 50 270 Affordable 0 0 10 10 10 10 10 75

Market 0 0 20 40 40 40 40 195

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Station Road, Cowie SC210 / H075 Actions Required to Deliver this site Planning application to be submitted.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 7 - Bannockburn Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 3.27 15.29 Cala Homes 283325 / - 23/01/2021 - 689533 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 50 50 25 25 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 25 25 0 0 Affordable 0 0 0 0 12 0 0 0

Market 0 0 0 0 13 25 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Ochilview, Cowie SC211 / H076 Actions Required to Deliver this site Planning application to be submitted.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 7 - Bannockburn Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 4.23 18.91 Ogilvie Homes 284269 / - 23/01/2021 - 6889301 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 80 80 60 20 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 20 20 20 20 0 0 Affordable 0 0 5 5 5 5 0 0

Market 0 0 15 15 15 15 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

St Margarets, Cowie SC265 / H146 Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 7 - Bannockburn Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.60 36.67 Stirling Council 283657 / 19/00583/FUL 28/11/2022 - 689476 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 22 22 22 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2017 2017 2017 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 5 17 0 0 0 0 0 0 Affordable 5 17 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Rear of McSherry Court, Cowie SC293 / B02 Actions Required to Deliver this site Continune build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 7 - Bannockburn Core Windfall Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.95 20.00 Sapphire Civil Enginering Ltd 283598 / 20/00463/FUL 21/10/2023 - 689173 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 19 19 19 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2020 2020 2020 2020

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 4 15 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 4 15 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Whitecross, Dunblane SC245 / H133 Actions Required to Deliver this site Submission of a planning application.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Effective Proposal 3 - Dunblane and Core LDP Greenfield New build Bridge of Allan Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.29 27.59 Messrs Andrew Fleming and Sons 278896 / - 23/01/2021 - 702336 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 8 8 0 8 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2014 2014 2014 2014

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 8 0 0 Affordable 0 0 0 0 0 3 0 0

Market 0 0 0 0 0 5 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes No Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Hillside, Dunblane SC261 / H137 Actions Required to Deliver this site S75 to be singed and start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 3 - Dunblane and Core LDP Greenfield New build Bridge of Allan Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.96 18.75 Dandara 277550 / - 23/01/2021 Arnbathie Developments Ltd 700302 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 18 18 18 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2017 2017 2017 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 5 13 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 5 13 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Barbush, Dunblane SC262 / H138 Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 3 - Dunblane and Core LDP Brownfield New build Bridge of Allan Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 3.55 22.25 Gladman 278632 / 18/00764/MSC 18/06/2024 - 702742 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 79 79 79 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2017 2017 2017 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 44 35 0 0 0 0 0 0 Affordable 26 0 0 0 0 0 0 0

Market 18 35 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Major Growth Area, Durieshill SC074 / H057 Actions Required to Deliver this site Section 75 to be completed.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 7 - Bannockburn Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 244.79 12.43 Springfield Homes 281503 / - 23/01/2021 - 687601 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 3042 3042 215 200 2627 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2006 2006 2006 2006

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 40 75 100 100 100 2627 Affordable 0 0 25 25 25 25 25 638

Market 0 0 15 50 75 75 75 1989

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

East Fallin, Fallin SC212 / H077 Actions Required to Deliver this site Planning application to be submitted.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 7 - Bannockburn Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 24.50 16.33 - 284237 / - 23/01/2021 - 691668 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 400 400 139 130 131 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 15 59 65 65 65 131 Affordable 0 0 0 15 15 15 15 40

Market 0 0 15 44 50 50 50 91

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Falcon House, Fallin SC251 / H158 Actions Required to Deliver this site Site is non effective. Candidate for removal from next LDP.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 7 - Bannockburn Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.58 41.38 Falcon Electrical Engineering 284268 / 09/00677/FUL 19/06/2017 - 691276 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 24 24 0 0 24 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2014 2014 2014 0

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 24 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 24

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use No Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Menzies Terrace, Fintry SC218 / H098 Actions Required to Deliver this site Submission of a planning application.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 2 - Forth and Rural LDP Greenfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 4.10 9.76 Ecovillage Enterprises 261672 / - 23/01/2021 0 687140 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 40 40 40 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2014

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 25 15 0 0 0 Affordable 0 0 0 15 0 0 0 0

Market 0 0 0 10 15 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Former Killearn Hotel, Killearn SC289 / - Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 2 - Forth and Rural Windfall Brownfield Mixture Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.34 41.18 APSIS Solutions 252273 / 17/00529/FUL 02/08/2022 Convey Prenty Architects 685935 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 14 14 14 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2019 2019 2019 2019

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 14 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 0 14 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Lampson Road, Killearn SC290 / - Actions Required to Deliver this site Decision to be made on Planning Application.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 2 - Forth and Rural Windfall Greenfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.48 22.92 Rural Stirling Housing Assoication 251454 / 17/00978/PPP 12/06/2023 - 685638 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 11 11 11 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2019 2019 2019 2019

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 11 0 0 0 0 0 0 Affordable 0 11 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Burnside, Kippen SC223 / H103 Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 2 - Forth and Rural LDP Greenfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 1.54 20.13 Dawn homes 265127 / - 23/01/2021 RSHA 694390 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 31 31 31 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2014 2014 2017 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 20 11 0 0 0 0 0 Affordable 0 10 0 0 0 0 0 0

Market 0 10 11 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Touchill Farm, Plean SC041 / H072 Actions Required to Deliver this site Council to work with landowner to deliver the development.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 7 - Bannockburn Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 6.89 24.24 Strawson Holdings Ltd 283234 / 16/00731/FUL 05/01/2020 - 687090 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 167 167 15 89 63 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 1989 1989 1989 2012

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 15 45 44 63 Affordable 0 0 0 0 0 0 0 19

Market 0 0 0 0 15 45 44 44

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Main Street 1, Plean SC044 / H073 Actions Required to Deliver this site Council to work with landowner to bring the site forward for development.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 7 - Bannockburn Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.83 19.28 Stewart Milne 283624 / 15/00104/FUL 12/06/2017 - 686685 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 16 16 0 0 16 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2002 2002 2007 2007

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 16 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 16

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

East Plean, Plean SC252 / H069 Actions Required to Deliver this site Decision to be made on applications.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 7 - Bannockburn Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 5.95 84.03 Story Homes 283796 / - 23/01/2021 Persimmon 686906 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 500 500 170 120 210 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2014 2014 2017 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 20 30 60 60 60 60 210 Affordable 0 0 0 14 15 0 20 76

Market 0 20 30 46 45 60 40 134

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Former Willam Simpsons Care Home, Plean SC291 / - Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 7 - Bannockburn Core Windfall Brownfield Conversion

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.81 17.28 Randolph Investments 283873 / 18/00839/FUL 12/09/2022 - 686648 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 14 14 14 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2020 2020 2020 2020

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 5 5 4 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 5 5 4 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Dalnair House, Rural SC132 / H116 Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 2 - Forth and Rural LDP Brownfield Mixture Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 3.06 10.46 Corum Properties 248257 / 18/00090/MSC 16/05/2018 - 686135 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 32 24 24 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 8 2008 2008 2008 2014

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 4 6 6 8 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 4 6 6 8 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 8 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 8 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Craigforth, Rural SC149 / H119 Actions Required to Deliver this site Site is non effective. Candidate for removal from next LDP.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 2.28 3.51 Prudential Corportate Property 277467 / 13/00803/FUL 24/02/2017 - 694863 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 8 8 0 0 8 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2008 2008 2012 2019

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 8 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 8

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use No Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Land at Wester Cambushinne Farmhouse, Rural SC175 / H124 Actions Required to Deliver this site Site is non effective. Candidate for removal from next LDP.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 3 - Dunblane and Rural LDP Brownfield Mixture Bridge of Allan Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.93 6.45 Guy Spurway 279080 / 12/00740/FUL 15/01/2016 - 706659 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 6 6 0 0 6 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2010 2010 2010 0

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 6 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 6

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use No Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Fairfield Farm, Rural SC184 / H126 Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 2 - Forth and Rural LDP Brownfield Conversion Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.28 17.86 Mr and Mrs David Steel 263831 / 18/00447/FUL 30/08/2021 - 695712 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 5 5 5 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2011 2011 2011 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 2 3 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 0 2 3 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Lower Canglour Farm, Rural SC236 / H151 Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 5 - Stirling West Rural LDP Brownfield Conversion

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.06 66.67 Mr J Versel 278385 / 12/00826/FUL 28/02/2016 - 686799 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 4 2 2 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 2 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 1 1 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 1 1 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 2 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 2 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Hill O Drip Farm, Rural SC255 / H154 Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 1 - Trossachs Rural LDP Brownfield Conversion and Teith Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.75 13.33 Bobby Haliday Architects 276623 / 17/00681/FUL 03/10/2021 - 695600 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 10 10 10 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2015 2015 2015 2015

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 6 4 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 6 4 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Kilearn Hospital, Rural SC270 / H157 Actions Required to Deliver this site Decision to be made on Planning Application.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 2 - Forth and Rural LDP Brownfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 10.89 6.43 Cala Homes 250998 / - 23/01/2021 - 684827 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 70 89 89 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2017 2017 2019 2019

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 30 30 29 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 0 30 30 29 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Gartcarron Filters, Rural SC272 / - Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 2 - Forth and Rural Windfall Brownfield Mixture Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.43 11.63 Property Mastery Academy 266720 / 20/00221/FUL 15/05/2023 - 686041 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 5 5 5 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2017 2017 2017 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 5 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 5 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Mains of Boquhapple, Rural SC277 / - Actions Required to Deliver this site Continue build out of site

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 1 - Trossachs Rural Windfall Brownfield New build and Teith Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 1.01 7.92 W S Dunsire 700048 / 15/00345/FUL 21/08/2020 - -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 8 5 5 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 3 2018 2018 2018 2018

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 1 4 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 1 4 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 2 1 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 2 1

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Cauldbarns Farm, Rural SC278 / - Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 5 - Stirling West Rural Windfall Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.52 13.46 The Stafford Trust 279156 / 14/00729/PPP 18/08/2020 - 266125 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 7 7 7 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2018 2018 2018 2018

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 5 2 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 5 2 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Station House, Rural SC279 / - Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 2 - Forth and Rural Windfall Brownfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 1.25 3.20 Mr J Steel 266435 / 16/00570/FUL 24/10/2020 - 695741 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 4 4 4 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2018 2018 2018 2018

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 2 2 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 2 2 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Blane Smithy, Rural SC281 / - Actions Required to Deliver this site Continue build out on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 2 - Forth and Rural Windfall Greenfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.84 5.95 Mr and Mrs John and Lillian McVicar 250672 / 17/00186/FUL 14/12/2020 - 685430 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 5 5 5 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2018 2018 2018 2018

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 5 0 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 5 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Gogar Mains, Rural SC282 / - Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 4 - Stirling North Rural Windfall Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.65 12.31 Mr Alistair Snowie 283709 / 17/00724/FUL 31/01/2021 - 696268 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 8 8 8 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2018 2018 2018 2018

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 4 4 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 4 4 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Kings Park Farm, Rural SC283 / - Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 5 - Stirling West Core Windfall Brownfield Mixture

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.49 14.29 Cramond Select Homes 278703 / 17/00632/FUL 26/04/2021 - 693578 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 7 7 7 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2018 2018 2018 2018

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 7 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 7 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Park of Keir, Rural SC284 / - Actions Required to Deliver this site Conclusion of S75 Agreement.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 3 - Dunblane and Core Windfall Greenfield New build Bridge of Allan Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.00 Park of Keir Partnership 278274 / - 23/01/2021 - 698971 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 19 19 8 8 3 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2018 2018 2018 2018

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 4 4 4 4 3 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 4 4 4 4 3

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Strewiebank Farm, Rural SC285 / - Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 2 - Forth and Rural Windfall Brownfield Mixture Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.71 8.45 Mr F Hillhouse 264354 / 14/00206/FUL 23/07/2021 - 695363 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 6 6 6 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2019 2019 2019 2019

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 3 3 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 3 3 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Gartur House, Rural SC286 / - Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 5 - Stirling West Rural Windfall Brownfield Mixture

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 3.30 2.42 Juniper Projects Ltd 276456 / 18/00318/FUL 08/11/2021 Scott Allan 692154 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 8 3 3 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 5 2019 2019 2019 2019

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 3 0 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 3 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 5 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 5

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Moor Road, Rural SC287 / - Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 2 - Forth and Rural Windfall Greenfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.14 28.57 Mosaic Architecture and Design 255905 / 16/00798/FUL 26/11/2021 Ewan Buchanan 678636 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 4 4 4 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2019 2019 2019 2019

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 4 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 4 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

East of Rochoill, Rural SC288 / - Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 2 - Forth and Rural Windfall Greenfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.42 11.90 Enspire Architects 266369 / 17/00428/FUL 20/12/2021 Gary Neill 694519 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 5 5 5 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2019 2019 2019 2019

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 2 3 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 2 3 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Deanston Farm, Rural SC292 / - Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 1 - Trossachs Rural Windfall Brownfield Mixture and Teith Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.72 8.33 David Alistair Dickson 270464 / 19/00466/FUL 17/09/2022 - 701629 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 6 6 6 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2020 2020 2020 2020

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 3 3 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 3 3 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Braehead 1, Stirling SC047 / H023 Actions Required to Deliver this site Council to explore how development can be brought forward on this site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 6 - Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 7.36 20.38 Stirling Council 280498 / - 23/01/2021 - 692058 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 150 150 0 0 150 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2002 2002 2002 0

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 150 Affordable 0 0 0 0 0 0 0 150

Market 0 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes No No No Yes No No Appendix A: Schedule of Sites

Area 8 Raploch Schools, Stirling SC049 / H061 Actions Required to Deliver this site Continue build out on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 6.10 34.59 Robertsons Homes 278412 / 18/00127/MSC 31/05/2023 CREHA 694748 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 211 211 211 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2002 2002 2002 2016

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 20 77 77 37 0 0 0 0 Affordable 20 77 39 0 0 0 0 0

Market 0 0 38 37 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Riverbank Works, Stirling SC054 / H028 Actions Required to Deliver this site Site is non effective. Candidate for removal from next LDP.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 3.35 23.88 Taylor Wimpey Homes 280549 / - 23/01/2021 - 695302 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 80 80 0 0 80 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2003 2003 2003 0

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 80 Affordable 0 0 0 0 0 0 0 20

Market 0 0 0 0 0 0 0 60

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use No No Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Forthside Phase 2, Stirling SC067B / H034 Actions Required to Deliver this site Council to work with landowner to bring forward rest of site for development.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Effective FUL 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 1.92 59.38 Stirling Council 279915 / 15/00790/FUL 26/10/2019 - 693735 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 114 40 40 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 74 2009 2009 2009 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 20 20 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 20 20 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 3 71 0 0 0 0 0 0 0 0 Af 0 0 14 0 0 0 0 0 0 0 0 Mkt 0 3 57 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Area 7 Craigforth Cresecent, Stirling SC075 / H063 Actions Required to Deliver this site Further exploratory work requried.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective PPP 4 - Stirling North Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 2.61 34.10 Stirling Council 278351 / 16/00771/PPP 31/01/2021 - 694352 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 89 89 0 0 89 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2002 2002 2002 0

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 89 Affordable 0 0 0 0 0 0 0 89

Market 0 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes No Yes Yes Yes Yes Appendix A: Schedule of Sites

Kildean Auction Market, Stirling SC126 / H054 Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 9.57 26.54 Barrat Homes 278205 / 18/00123/MSC 18/05/2023 Stirling Council 695207 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 254 17 17 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 237 2007 2007 2007 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 17 0 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 17 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 63 51 56 47 20 Af 0 0 0 0 0 0 12 8 0 0 0 Mkt 0 0 0 0 0 0 51 43 56 47 20

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Former MFI, Stirling SC133 / H142 Actions Required to Deliver this site Continue build out of site

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 6 - Stirling East Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.83 53.01 Allan Water Developments 279650 / 13/00410/FUL 15/08/2016 - 691207 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 44 44 44 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2017 2017 2017 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 18 18 8 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 18 18 8 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

21 Dumbarton Road East, Stirling SC135 / H036 Actions Required to Deliver this site Site is non effective. Candidate for removal from next LDP. However, agent is exploring other options for the site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.05 120.00 Mr Mark Crawford 279580 / 16/00266/FUL 04/10/2019 - 693207 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 6 6 0 0 6 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2008 2008 2008 0

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 6 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 6

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use No Yes Yes Yes No Yes Yes Appendix A: Schedule of Sites

32 Baker Street, Stirling SC136 / H037 Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.23 43.48 - 279555 / 18/00015/FUL 20/03/2021 - 693575 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 10 6 6 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 4 2010 2010 2010 2018

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 6 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 6 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 4 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 4 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes No Yes Yes Yes Appendix A: Schedule of Sites

Area 6 Gowanhill Gardens, Stirling SC145 / H066 Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 3.24 23.15 Robertsons Homes 278790 / 18/00127/MSC 31/05/2023 Forth Housing Association 694372

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 75 75 75 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2008 2008 2008 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 35 40 0 0 0 0 Affordable 0 0 35 40 0 0 0 0

Market 0 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Area 9 Kildean, Stirling SC146 / H067 Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.80 20.00 Robertsons Homes 278670 / 18/00127/MSC 31/05/2023 Forth Housing Association 694924 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 16 16 16 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2008 2008 2008 2014

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 16 0 0 0 0 0 0 0 Affordable 16 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Former Bolt Works Sunnyside, Stirling SC163 / H041 Actions Required to Deliver this site Site appears to have stalled. Site is non effective. Candidate for removal from next LDP.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 5 - Stirling West Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.05 80.00 Mr Brian Reid 279335 / 09/00266/FUL 11/06/2014 - 691716 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 4 4 0 0 4 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2009 2009 2009 0

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 4 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 4

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use No Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

70-76 Murray Place, Stirling SC170 / - Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective FUL 4 - Stirling North Core Windfall Brownfield Conversion

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.03 200.00 McEachern Architects 279669 / 18/00646/FUL 20/11/2021 Farcastle Ltd 693561 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 6 6 6 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2010 2019 2010 2019

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 6 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 6 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Ministry of Defence Site, Stirling SC198 / H049 Actions Required to Deliver this site Council to work with MOD to bring the site forward for development. Forthside Masterplan currently under preperation.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Effective Proposal 6 - Stirling East Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 14.00 17.86 Ministry of Defence 280502 / - 23/01/2021 - 693290 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 250 250 50 100 100 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 50 50 50 100 Affordable 0 0 0 0 10 10 10 32

Market 0 0 0 0 40 40 40 68

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes No Yes Yes Yes Yes Appendix A: Schedule of Sites

Viewforth, Stirling SC199 / H050 Actions Required to Deliver this site Council is working to bring forward the site for development and CDF proposals will free up part of the existing site for redevelopment.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 5 - Stirling West Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 9.47 8.45 Stirling Council 279662 / - 23/01/2021 - 692798 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 80 80 80 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2014

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 20 40 20 0 0 0 Affordable 0 0 0 20 0 0 0 0

Market 0 0 20 20 20 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Former Stirling Royal Infirmary Site, Stirling SC201A / H052 Actions Required to Deliver this site Council to work with NHSFV to bring forward site for development.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 5 - Stirling West Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 1.60 25.63 NHSFV 279755 / 13/00505/PPP 26/06/2017 Stirling Council 692094 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 41 41 10 31 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 10 0 31 0 0 Affordable 0 0 0 10 0 0 0 0

Market 0 0 0 0 0 31 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Area 23 Kildean Hospital, Stirling SC202 / H053 Actions Required to Deliver this site Site is non effective. Candidate for removal at next LDP.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 1.52 19.74 Raploch URC 278582 / - 23/01/2021 - 694925 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 30 30 0 0 30 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2012 2012 2012 0

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 30 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 30

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use No Yes Yes Yes Yes Yes No Appendix A: Schedule of Sites

South Stirling Gateway, Stirling SC203 / H055 Actions Required to Deliver this site Outsanding decision on planning application on part of site and S75 agreement to be finalised.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 6 - Stirling East Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 46.00 17.39 Tulloch Homes representing a variety of land owners 280895 / - 23/01/2021 - 689456 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 800 800 235 120 445 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 6 85 84 60 60 60 445 Affordable 0 0 20 20 20 20 20 100

Market 0 6 65 64 40 40 40 345

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Newpark Farm, Stirling SC205 / H058 Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 5 - Stirling West Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 8.60 21.51 Ogilvie Homes 278936 / 15/00669/FUL 23/07/2022 Stirling Council 690931 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 185 165 165 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 20 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 67 52 46 0 0 0 0 0 Affordable 22 0 24 0 0 0 0 0

Market 45 52 22 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 20 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 20

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Cultenhove Regeneration Areas, Stirling SC206 / H059 Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 5 - Stirling West Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 7.10 14.08 Stirling Council 279039 / 17/00542/FUL 14/12/2020 Forth Housing Association 691242 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 100 27 27 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 73 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 6 0 0 21 0 0 0 0 Affordable 6 0 0 21 0 0 0 0

Market 0 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 16 6 22 0 0 29 Af 0 0 0 0 0 16 6 22 0 0 29 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Cornton Regeneration Areas, Stirling SC207 / H060 Actions Required to Deliver this site Start on site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.00 0.00 Stirling Council 279558 / 16/00296/FUL 11/08/2019 Forth Housing Association 695335 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 100 52 24 0 28 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 48 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 24 0 0 0 0 0 28 Affordable 0 24 0 0 0 0 0 28

Market 0 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 9 16 0 10 13 0 Af 0 0 0 0 0 9 16 0 10 13 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Stirling Ice Rink, Stirling SC227 / H128 Actions Required to Deliver this site Submission of a planning application.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 5 - Stirling West Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.60 33.33 Stirling Council 279158 / - 23/01/2021 - 692049 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 20 20 20 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2012 2012 2012 2016

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 20 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 0 20 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Milne Park Road, Stirling SC229 / H130 Actions Required to Deliver this site Submission of a planning application.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 7 - Bannockburn Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.66 60.61 D. Roy Civil Engineering Limited 281114 / - 23/01/2021 - 689900 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 40 40 40 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2014

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 10 10 20 0 0 0 0 Affordable 0 0 0 10 0 0 0 0

Market 0 10 10 10 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Area 22 Drip Road Frontage, Stirling SC239 / H131 Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 4 - Stirling North Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.30 56.67 Robertsons Homes 279139 / 18/00127/MSC 31/05/2023 Stirling Council 694650 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 17 17 17 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2014 2014

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 17 0 0 0 0 0 0 0 Affordable 17 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Catherine Street, Stirling SC258 / H134 Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 6 - Stirling East Core LDP Brownfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.38 28.95 Stirling Council 280427 / 17/00920/FUL 15/02/2021 - 690460 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 11 11 11 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2017 2017 2017 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 11 0 0 0 0 0 0 0 Affordable 11 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Upper Craigs, Stirling SC294 / - Actions Required to Deliver this site Continue build out of site.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Under Construction 4 - Stirling North Core Windfall Brownfield Conversion

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.06 100.00 Westerlea Properties 279687 / 20/00088/FUL 03/06/2023 - 693169 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 6 6 6 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2020 2020 2020 2020

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 6 0 0 0 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 6 0 0 0 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

South of A81, Strathblane and Blanefield SC268 / H153 Actions Required to Deliver this site Council to work with landowner to bring forward the site for development.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Effective Proposal 2 - Forth and Rural LDP Greenfield New build Endrick Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 1.16 17.24 - 256314 / - 23/01/2021 - 679002 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 20 20 20 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2017 2017 2017 2017

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 10 10 0 0 0 0 Affordable 0 0 0 6 0 0 0 0

Market 0 0 10 4 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Norrieston Glebe, Thornhill SC064 / H111 Actions Required to Deliver this site Remainder of site is non effective. Candiate for removal from next LDP.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 1 - Trossachs Rural LDP Greenfield New build and Teith Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.57 24.56 Stirling Council 266915 / 14/00364/FUL 14/08/2017 - 699933 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 14 6 0 0 6 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 8 2000 2000 2008 0

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 6 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 6

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 8 0 0 0 Af 0 0 0 0 0 0 0 8 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use No Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Burnside Works, Thornhill SC225 / H109 Actions Required to Deliver this site Future development unclear. Candidate for removal at next LDP.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type Non effective Proposal 1 - Trossachs Rural LDP Brownfield New build and Teith Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.60 8.33 Robert Dykes and Son 266308 / - 23/01/2021 - 700057 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 5 5 0 0 5 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 0

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 0 0 0 0 5 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 0 0 0 0 5

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use No Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

East of 39 Kersie Road, Throsk SC109 / H081 Actions Required to Deliver this site Planning application to be submitted.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 7 - Bannockburn Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 0.66 7.58 Donnie Allan 285294 / 06/00624/OUT 05/04/2010 - 691132 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 5 5 5 0 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2007 2007 2007 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 5 0 0 0 0 Affordable 0 0 0 0 0 0 0 0

Market 0 0 0 5 0 0 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes Appendix A: Schedule of Sites

Throsk, Throsk SC213 / H080 Actions Required to Deliver this site Planning application to be submitted.

Site Details

Audit Status Planning Status Local Ward LDP Sub Monitoring Type Land and Area Development Type 5 year effective Proposal 7 - Bannockburn Core LDP Greenfield New build

Site Site Developer (s) X / Y Co- Latest Approval Expiry Date Area Density ordinates 5.70 13.16 Donnie Allan 285122 / - 23/01/2021 - 691256 -

Programming

Total Capacity Total Remaining 5 Year Effective Remaining Effective Non-Effective (2020/21 – 2024/25) (2025/26 – 2026/27) (Post 2027) 75 75 69 6 0 Total Completions First Year in Currently In Established First Year in Effective Currently in Effective Established Supply Supply Since Supply Supply Since 0 2013 2013 2013 2013

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 Post 2027

Total 0 0 0 20 49 6 0 0 Affordable 0 0 0 0 19 0 0 0

Market 0 0 0 20 30 6 0 0

Completions

Pre 2010 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total 0 0 0 0 0 0 0 0 0 0 0 Af 0 0 0 0 0 0 0 0 0 0 0 Mkt 0 0 0 0 0 0 0 0 0 0 0

Tests of Effectiveness

Ownership Physical Contamination Deficit Funding Marketability Infrastructure Land Use Yes Yes Yes Yes Yes Yes Yes

Appendix B: Sites Completed 1st July 2019 – 30th June 2020

Appendix B: Sites Completed 1st July 2019– 30th June 2020

Site Name Settlement HLA Ref / Total Completions Developer(s) LDP Ref Moray Street Doune SC027 / 56 Rural Stirling H096 Housing Assoication - - Former Fallin Fallin SC273 / - 4 Stirling Council Local Office - - Blairessan Killearn SC246 / 37 MacTaggart H102 and Mickel Rural Stirling Housing Association - / / / / / / / / / / / / /