Design & Community Code

Total Page:16

File Type:pdf, Size:1020Kb

Design & Community Code TREWOLEK PHASE I NANSLEDAN DESIGN & COMMUnitY CODE December 2014 Contents Introduction • Background • Vision/Key principles, aspirations 1.0 The Legal and Management Framework • Reasons for Design Guidance/Code • How the Code is enforced 2.0 Guidance for Extensions • First Principles 3.0 Building Materials and Details Design & Community Code 4.0 External Walls • General • Doors and Porches • Windows 5.0 Roofs and Chimneys • General • Roof lights and Dormers • Rainwater Goods and Gutters • Chimneys 6.0 Outbuildings 7.0 Boundary Walls, Fences and Gardens 8.0 Subsidiary Elements • General • Lettering 9.0 Business and Commercial Premises 10.0 Accessibility 11.0 Environmental Issues • Photovoltaic Panels 12.0 Making your application APPENDICES Appendix A – Estate Stipulations Appendix B – Community Stakeholder Covenants Appendix C – Lettering on Homes and Streets Appendix D – Lettering on Shop fronts Appendix E – Photovoltaic Panels Design & Community Code 2 Trewolek Phase I Nansledan Introduction Each building in Nansledan has been designed to achieve Enquiry individuality and harmony within the overall masterplan concept by Design of a traditional Cornish urban community. The initial design and Summary construction of every building is required to comply with a suite Report of eight Strategy Documents which include the Design Statement, the Sustainability Strategy, the Energy Strategy, the Water Strategy, the Food Strategy, the Transport Principles, the Pattern Book and the Building Code. The relevant requirements of which are contained Masterplan Sustainability Design & Community Code within the Building Code, which are regulated by the Duchy of & Design Strategy Cornwall. The main objective is to ensure that all involved in the Statement development work within the framework of the Masterplan and the high design standards are matched by construction which achieves high performance and durability through traditional materials. Construction techniques incorporate energy efficient services and high insulation levels. Use of local Cornish and recycled Energy Water Food Transport Pattern Building materials is encouraged to comply with the concept of sustainable Strategy Strategy Strategy Principles Book Code development. For the building envelope, natural materials and traditional techniques have been adopted and will weather harmoniously over time. This Design and Community Code (“Code”) is intended to give Strategy Documents for Nansledan the principles of which have informed the design confidence to owners and occupiers that things will not change much and if change is sought the Duchy will regulate things so as to maintain the high standards for the benefit of all. The guidance set out within this Code incorporates the relevant provisions of the Building Code. More detailed guidance is given in the suite of Strategy Documents. 3 Design & Community Code Site masterplan 4 Trewolek Phase I Nansledan 1.00 The Legal and Management Framework 1.01 The purpose of this Code is to draw attention to the obligations, 1.05 The Nansledan Estate is to be developed in Quarters which in which are represented by the Estate Stipulations (“the turn comprise Phases. Management Companies are to be set Stipulations”), incorporated into the legal title and Estate Deed. up to manage and provide services in respect of each Phase or The Stipulations apply to both freehold and leasehold properties. a number of Phases. Owners of residential, commercial and The Stipulations which should be read in conjunction with the community properties within a Phase will become members Community Stakeholder Covenants (set out in the Planning of the Phase Management Company and will enter into Estate Agreement for Nansledan). The Stipulations provide for each Deeds with the relevant Management Company. The Estate freeholder and tenant (both long-term and short-term tenants) Deeds cover the provision of services by the Phase Management to be provided with the Code so that they are fully aware of Company and each owner’s obligation to pay the relevant Design & Community Code the Stipulations and the Community Stakeholder Covenants, service charge. enclosed at Appendix A and Appendix B respectively. 1.06 In respect of the overall Nansledan Estate domain and items 1.02 Attention to detail, within the overall guiding concept, has been which are applicable to the whole of the Nansledan Estate, the key to successful design and development at Nansledan. management is to be undertaken by the Nansledan Management Completion will witness the transformation of a construction site Company of which the various Phase / Phases Management to a living, organic community. The conclusion of each sale or Companies will be members. The Estate Deed also covers the 2014 rental agreement brings owners and occupiers into the equation. provision of services by the Nansledan Management Company It also brings the obligation to observe the Stipulations imposed and each owner’s obligation to pay an Estate service charge. It couldn’t happen here...? by the Duchy of Cornwall not to alter or extend the exterior of a 1.07 Cornwall Council is the planning authority for Nansledan. The property without the Duchy’s written approval. The Stipulations Council have granted planning permission for the construction bind all properties, and their owners and occupiers. They of the development, covering every individual building and its regulate the use and appearance at Nansledan. As and when use and use of the land. The Nansledan development is outlined new buildings are completed, purchasers are supplied with the in the Masterplan which identifies the Quarters and Phases and Stipulations so that all owners and occupiers are aware of them. proposed land uses. The Duchy of Cornwall and Consortium Breaches of the Stipulations could result in enforcement action may vary the Masterplan, the Quarters and proposed uses from and may prejudice the sale of individual properties. time to time. 1.03 The Stipulations are enforceable by the Duchy and the Phase and 1.08 The images of the proposed development in this Code are Estate Management Companies and the application process is indicative only and not definitive. They are not, and should described at the end of this Code. not be treated as, representations as to the final design and 1.04 All matters relating to the construction of buildings and use of appearance of all or part of the development. land constitute ‘development’ and as such are brought under the statutory planning process. However, for owners and occupiers, 2024 there is an exemption for minor matters, such as small extensions, which are known as ‘permitted development’. Thus, alterations to residential properties at Nansledan, including the construction of small extensions, the removal and changing of windows and doors, insertion of dormer windows on rear roof slopes, erection of porches, or retiling roofs in modern materials, do not require express planning permission. However, this does not exempt the work from control by the Duchy. Such work is covered by the Stipulations and requires prior approval from the Duchy. 5 2.00 Guidance for Extensions 2.01 Every house at Nansledan has been designed to provide 2.03 The terraced configuration of many properties will strictly limit b. Not unduly complex in plan, or elevation (tall conservatories accommodation which will meet the needs of owners and the scope for side extensions. In cases where such extensions with pent roofs are not acceptable); occupiers. However, it is recognised that individual taste varies, will be allowed, they will comply with the following principles: c. Of simple design, with windows and other elements of good and that needs change over time, for example addition to a family, a. The extension is clearly perceived to be subservient to the original proportion, to complement the existing house (elaborate retirement, or working from home. There may be a perception that building, complementing, not competing with its presence in Victorian reproductions are not acceptable); more room is required. It may be possible to reorganise internal the street picture; space, without affecting the exterior of the building. Occasionally d. Of timber construction (UPVC is not considered to be a owners may conclude that an extension, or a loft conversion is the b. The building frontage line is respected; sustainable material within the meaning of the Building Code); solution. There may also be applications to add conservatories to c. The form, materials and detailing of the extension match those of e. Capable of substantial concealment by the property boundary Design & Community Code houses, to erect garden shed, or close-in car ports. the existing house; wall which may be raised (subject to impact on neighbouring properties or the group - this will also apply to conservatories at a. All proposals for external alterations, loft conversions, extensions, d. The extension does not adversely affect the privacy or amenity of the side of houses, as well as at the rear). conservatories, garden sheds, car port infilling, or the addition of neighbouring properties. Photovoltaic Panels (PV’s) will require consent from the Duchy 2.04 Rear extensions are the most likely to be contemplated, and to The close spacing of the buildings, compact gardens, and overall design be found acceptable. It should be borne in mind, however, that concept at Nansledan will strictly limit the scope for such work. In the design of back elevations, and grouping of properties, has considering such applications, the impact on the integrity of the building been as carefully considered as the fronts. The appearance from concerned will be assessed, together with the effect on neighbouring the mews or parking courtyards is as important as the street properties, and the character and appearance of the surroundings, pictures. To be acceptable rear extensions must comply with particularly where designed groups of buildings are involved. the following principles: a. The extension is clearly perceived to be subservient to the original building, complementing not competing with its overall form; b. The form, the materials and detailing either match or complement those of the existing house; c.
Recommended publications
  • NIMBY to YIMBY: How to Win Votes by Building More Homes Part One: the Questions Less Asked
    From NIMBY to YIMBY: How to win votes by building more homes Part one: the questions less asked Nicholas Boys Smith Kieran Toms © CREATEstreets in 2018 Printed by Copyprint UK Ltd. Contents Summary .......................................................................................................................... 2 Chapter 1 – is Britain worse than others at building enough homes? ....................................... 8 Chapter 2 – How British planning is so odd and why it matters ............................................. 30 Chapter 3 – Why are people NIMBYs? ................................................................................ 59 Chapter 4 – A case study: Creating Streets in Cornwall with consent ...................................... 77 Chapter 5 – where and how to break the circle: a menu of options ....................................... 104 Conclusion – building homes, winning votes...................................................................... 119 Acknowledgements ........................................................................................................ 120 Bibliography ................................................................................................................... 121 The authors .................................................................................................................... 126 ‘Any citizen, who tries to defend their home and their neighbourhood from plans which would destroy the view, pollute the environment, overload the transport network, upset
    [Show full text]
  • Environmentol Protection Report WATER QUALITY MONITORING
    5k Environmentol Protection Report WATER QUALITY MONITORING LOCATIONS 1992 April 1992 FW P/9 2/ 0 0 1 Author: B Steele Technicol Assistant, Freshwater NRA National Rivers Authority CVM Davies South West Region Environmental Protection Manager HATER QUALITY MONITORING LOCATIONS 1992 _ . - - TECHNICAL REPORT NO: FWP/92/001 The maps in this report indicate the monitoring locations for the 1992 Regional Water Quality Monitoring Programme which is described separately. The presentation of all monitoring features into these catchment maps will assist in developing an integrated approach to catchment management and operation. The water quality monitoring maps and index were originally incorporated into the Catchment Action Plans. They provide a visual presentation of monitored sites within a catchment and enable water quality data to be accessed easily by all departments and external organisations. The maps bring together information from different sections within Water Quality. The routine river monitoring and tidal water monitoring points, the licensed waste disposal sites and the monitored effluent discharges (pic, non-plc, fish farms, COPA Variation Order [non-plc and pic]) are plotted. The type of discharge is identified such as sewage effluent, dairy factory, etc. Additionally, river impact and control sites are indicated for significant effluent discharges. If the watercourse is not sampled then the location symbol is qualified by (*). Additional details give the type of monitoring undertaken at sites (ie chemical, biological and algological) and whether they are analysed for more specialised substances as required by: a. EC Dangerous Substances Directive b. EC Freshwater Fish Water Quality Directive c. DOE Harmonised Monitoring Scheme d. DOE Red List Reduction Programme c.
    [Show full text]
  • Duchy of Cornwall Estate Nansledan Executive Assistant Job Description
    Duchy of Cornwall Estate Nansledan Executive Assistant Job Description Main purpose of role The Executive Assistant role involves providing secretarial and administrative support to the Duchy of Cornwall’s Estate Director, and the wider Nansledan team, responsible for the management of the Duchy’s development projects across the South West, including Nansledan, Newquay Position The post reports to the Estates Director and has no direct reports. Scope of role o Supporting the Estates Director in the day to day administration of development projects through regular monitoring of email traffic in his or her absence, close liaison with all team members, in addition to liaising with key partner organisations, tenants, and external agencies. o Working alongside the Nansledan Team Administrator to assist the project team in the efficient and effective operation of the Nansledan office o Diary Management for the Estate Director including booking travel, and co-ordination with other administrators and parties as appropriate o Filing and accessing of information within both the paper and electronic archives to ensure easy access of historic data as and when necessary. o Minute taking, typing and filing on a day to day basis. o Compilation of reports from raw data including finance matters, presentations and tenancy matters. o Helping draft Board reports, committee papers and briefing notes o Supporting the teams on Duchy development projects where necessary, dealing with day to day queries and issues to ensure a satisfactory outcome. o Assisting the Estate Director in managing communications with and correspondence from the Royal Household, key partners, the local community, public agencies and the Media.
    [Show full text]
  • Duchy of Cornwall Estate Nansledan Project Administrator Lostwithiel
    Duchy of Cornwall Estate Nansledan Project Administrator Lostwithiel The Duchy of Cornwall Estate The Duchy of Cornwall Estate is a private estate, which funds the public, charitable and private activities of The Prince of Wales and his family. The Duchy consists of around 53,154 hectares of land in 24 counties, mostly in the South West of England. The Duchy estate was created in 1337 by Edward III for his son and heir, Prince Edward, and its primary function was to provide him and future Princes of Wales with an income from its assets. A charter ruled that each future Duke of Cornwall would be the eldest surviving son of the Monarch and the heir to the throne. The current Duke of Cornwall, HRH The Prince of Wales, is actively involved in running the Duchy and his philosophy is to improve the estate and pass it on to future Dukes in a stronger and better condition. Nansledan Project Administrator Main purpose of role A new position has arisen for an experienced part-time administrator. The role involves providing coordinated secretarial and administrative support to the Nansledan Development Team. Nansledan is an extension to the Cornish coastal town of Newquay that embodies the principles of architecture and urban planning championed by HRH The Prince of Wales and which will eventually comprise a sustainable mixed use community of 4,000 homes. Position The post reports to the Project Manager and has no direct reports. Scope of role Managing correspondence, communications and diary appointments for the Nansledan Development Team. Receiving telephone calls and assisting to field calls to the Project Manager.
    [Show full text]
  • Draft Design Guide
    DraftDesign guide How to achieve quality in development for people, wildlife & the environment NB Not all links are live in this draft document www.cornwall.gov.uk consultation draft 1 Foreword 1.1 Design quality is vital to Cornwall’s planning agenda. There has never been a more critical time to create and take up opportunities to make new development better. Improving the quality of our places and buildings will help us to respond positively to climate change and the drive for our residents to lead healthier lives. We have a long history of Cornish ingenuity and creativity that can be continued to establish modern design solutions that enhance our environment, celebrate our heritage and culture and secure our resilience. 1.2 New development needs to establish good quality, empowering and distinctive places to live for all residents, both now and into the long term. Currently, over 3,000 homes are being delivered each year to meet the needs of Cornwall’s population but not all developments are reaching the high standards communities deserve. We need to find ways to make it possible to build high quality, attractive and efficient homes at a price that is affordable on a Cornish income. 1.3 Environmental growth is fundamental to boosting the quality of our lives and supporting Cornwall’s resilience. New development led by green infrastructure that provides the systems we rely on to live and thrive presents a considerable environmental growth opportunity. 1.4 Embedding great design practice involves change across all sectors and we have overhauled our guidance to provide a better way of communicating the components of good quality design and places.
    [Show full text]
  • The Conservation Value of Abandoned Pits and Quarries In
    Contents Foreword 1 Professor Keith Atkinson The Derelict Land Advisory Group 2 Adrian Spalding Geological map of Cornwall 4 Chapter 1. Geology 5 Colin Bristow Chapter 2. The Historic Environment 29 Nicholas Johnson, Peter Herring & Adam Sharpe Chapter 3. The Nature Conservation Value Of Abandoned Pits And Quarries 47 Adrian Spalding, Jeremy Clitherow & Trevor Renals Chapter 4. The Land Use Planning Context for Abandoned Pits and Quarries 59 David Owens Chapter 5: The Waste Management Licensing Aspects 63 Ralph Seymour Chapter 6: Abandoned pits and quarries: a resource for research, education, leisure and tourism 69 John Macadam & Robin Shail Case Study 1: Burrator Quarries 81 Peter Keene Case Study 2: The Reclamation of Holman's Quarry 84 Jon Mitchell Case Study 3: Cheesewring Quarry, bolts, blackfaces and bertrandite 93 Martin Eddy Case Study 4: Prince of Wales Quarry - reuse of an abandoned slate quarry as a recreational and educational site 97 Charlie David Case Study 5: St Erth Pits - Cornwall Wildlife Trust's first geological nature reserve 101 J.D. Macadam (Cornwall RIGS Group) The Way Forward 105 Stephen Hartgroves, Dave Owens & Adrian Spalding Contributors Professor Keith Atkinson (Camborne School of Mines, University of Exeter) Colin Bristow (Camborne School of Mines, University of Exeter) Jeremy Clitherow (English Nature) Charlie David (North Cornwall District Council) Martin Eddy (Caradon Countryside Service, Caradon District Council) Peter Herring (The Historic Environment Service, Cornwall County Council) Nicholas Johnson
    [Show full text]
  • We Would Like to Wish You All a Very Happy and Safe Easter and Look Forward to Starting the Summer Term, New Term Starts Monday 16Th April
    We would like to wish you all a very happy and safe Easter and look forward to starting the Summer term, new term starts Monday 16th April. We will have no clubs other than Allsorts on the first week back after the Easter holidays, letters will be sent home with details about the new clubs at the start of the new term. Also there will be no Allsorts or After School Clubs on Thursday 19th April due to staff training. Thank you to everyone for the massive response to our battery hunt. We really have got some battery recycling champions. All of the batteries need to back into school by Thursday 19th April, lets see if Summercourt can win some prizes!! We are delighted to announce that Miss Devonport will be joining us next term as the new Class 3 Teacher. We are confident that she will be a great addition to our team here at Summercourt. Miss Devonport is excited to be joining us and we are very much looking forward to welcoming her to our Summercourt family. There will be a meet and greet session with Miss Devonport at the start of the Summer term Spring Term 2018 … working together… inspiring excellence ... Skol Nansledan Bugle Serenades Royalty The official ‘unveiling of the name’ ceremony took Thursday 22nd March also saw place on Thursday 22nd March at the site of the the Y6 class from Bugle new Aspire free school, Skol Nansledan, on the Nans- School sing for HRH The Duke ledan urban development, Newquay. The school is of Cornwall at the Bi- due to open in September 2019 with two Reception centenary celebrations of the classes and will eventually be a two-form entry school Royal Cornwall Museum.
    [Show full text]
  • Duchy of Cornwall Rental Properties
    Duchy Of Cornwall Rental Properties Ungrassed Filmore electrifies mutely or set-up gramophonically when Ugo is blame. Alan is interpleural: she casserole pleasantly and jigsawed her photocells. Remotest and nativist Tony hypnotising so sorrowfully that Romain jawboning his clock. Duchy of Cornwall Creating opportunities for new entrants. It is feudal and I suspect many of those who work for it would say so if they felt able. Savills, one of the leading commercial property agents globally. Start a search then tap the heart to save properties to this Trip Board. Norfolk estate when they can. The Prince has long been concerned by the quality of both the natural and built environments in which we live. Properties are NOT individually inspected by us. Eden Project for a superb day out with the children. The houses, though objectionable in construction, are not in such a condition as to enable the Local Authorities to obtain a closing order. Prince Charles and the Duchess of Cornwall oversaw a sensitive redecoration of the property, hiring their favourite interior designer Robert Kime for the job, but they were careful to retain its distinctive character. There may be opportunity to expand the holding in the future. There was definitely a ghost. Duchy Field Brochure FINAL. Where does the royal family get their money? In accordance with the Stipulations, the Duchy of Cornwall reserves an absolute prerogative in considering these matters. Most property is tenanted out, particularly farmland, while the forest land and holiday cottages are managed directly by the Duchy. Have you seen these posts? Polperro is perfect to explore on foot as many of its streets are narrow.
    [Show full text]
  • This Walk Description Is from Happyhiker.Co.Uk Boscastle to Bossiney Haven Introduction: Although I Have Called This Walk Boscas
    This walk description is from happyhiker.co.uk Boscastle to Bossiney Haven Starting point and OS Grid reference Boscastle – Paradise Road (SX096905) Ordnance Survey map OS Explorer 111 - Bude, Boscastle & Tintagel Distance 6.6 miles Date of Walk 15 September 2016 Traffic light rating Introduction: Although I have called this walk Boscastle to Bossiney Haven, really to define the furthest points, there is so much more to it. It is full of interesting features and a great walk. A brief list is: Boscastle St Nectan’s Glen and Waterfall St Piran’s Church and Well Ancient rock carvings Rocky Valley Site of Iron Age Fort Boscastle is best left to the end of the walk. It is a very pretty setting with a river flowing down it. Sadly, the river was almost the end of Boscastle, when there was a severe flood in 2014. However, strenuous efforts mean there is no trace of the destruction now and one could be forgiven for thing nothing happened. St Nectan’s Glen provides a lovely walk through attractive woodlands. These are privately owned and although the public footpath runs through them, this does not unfortunately include the waterfalls area. To see these you have to pay at the café. Whether this is worth the cost is up to you – potentially £5.95 per adult, or £4.70 (2016 prices) for coffin dodgers like me! However, having bitten the bullet and paid up, I thought it was worth it as the main waterfall particularly is amazing. For the best view, you have to “paddle”.
    [Show full text]
  • Kessedhek Rag Henwyn Tyller Ha Arwodhyow Place-Name and Signage Panel
    Kessedhek rag Henwyn Tyller ha Arwodhyow Place-name and Signage Panel Dydh / Date: 19 mis Gortheren, 2015 / 19 July 2015, 10am. Le / Venue: Stevel/Room 2N:06, Lys Kernow / County Hall, Truru / Truro. AGENDA / ROL NEGYS 1. Diharasow / Apologies 2. Kovnotyansow / Minutes 3. Materow ow sordya / Matters arising 4. Materow Ughella / Strategic Issues Highways England – A30 Temple Cornwall Council – Planning Mapping 5. Arwodhow yn stret / Street signs Outstanding translations 6. Henwyn leow / Place names a) Rol Henwyn Tyller – Pluwvadern 7. Towlennow a) Taves an Tir - Rol Henwyn Tyller – Pluwvadern b) Nansledan / Tregurra Valley c) Withiel 8. Negys aral / Any Other Business 9. Dydh an kuntelles nessa / Date of Next Meeting – TBA Paperow a vern / Background papers Kovnotyansow kuntelles a veu synsys 16/06/2015 Minutes of the meeting held 16/06/2015 – Previously circulated Rol Henwyn Stret Gesys – Update to be circulated. Ober A-dheu / Future Work Finish Parishes Towlen Taves an Tir - Resrudh Complete names on OS 1:250,000 map. KESKOWETHYANS AN TAVES KERNEWEK CORNISH LANGUAGE PARTNERSHIP KESSEDHEK ARWODHYOW HA HENWYN-LE SIGNAGE AND PLACENAME PANEL Kovnotyansow an kuntelles synsys: dy’Gwener 17 mis Gortheren 2015 th Draft Minutes of the meeting held: Friday 17 July 2015 Present: N Meek (Chair), R Lyon, L Jenkin In attendance: P Hodge, S Rogerson No. Item Action 1. Diharesow / Apologies J. Edmondson, K. George, J. Holmes 2. Kovnotyansow / Minutes The minutes of the meeting on Friday 19th June 2015 were read and agreed. 3. Materow ow sordya / Matters arising Reskadinnick (Camborne) = Reskadenek This place-name had previously been translated as <Roskasedhek>.
    [Show full text]
  • Design Codes and the Historic Environment
    Design codes and the historic environment Briefing Report : Summary of Key Findings December 2020 Node Imperial & Whitehall 23 Colmore Row Birmingham B3 2BS thisisnode.com | 0121 667 9259 Prepared on behalf of Historic England by Node Project Ref: Historic England - 8003 ; Node - HIS0562 Document Ref: HIS0562 DESIGN CODES AND THE HISTORIC ENVIRONMENT SUMMARY REPORT.indd Date: December 2020 COPYRIGHT The contents of this document must not be copied or reproduced without the written consent of Node Urban Design Ltd. Ordnance Survey material is used with the permission of the Controller of HMSO, Crown copyright 0100031673 2 Design Codes and the Historic Environment | Summary of findings Contents 1 Introduction and methodology 5 2 Key lessons 9 3 Recommendations for Historic England 35 Summary of findings |Design Codes and the Historic Environment 1 “A design code is ... ... a set of design specifications for both buildings and streets. The cookbook that sets the recipe for a place.” Create Streets Foundation 2020 ... a set of illustrated design requirements that provide specific, detailed parameters for the physical development of a site or area. The graphic and written components of the code should build upon a design vision, such as a masterplan or other design and development framework for a site or area. .” National Planning Policy Framework 2019 ... a set of three- dimensional, site-specific design rules or requirements for development. It is informed by a spatial masterplan or other form of urban design proposals and describes the rules through words and graphics. “ CABE 2004 2 Design Codes and the Historic Environment | Summary of findings 1 Introduction and methodology 1 Introduction and methodology 2 Key lessons 3 Recommendations for Historic England Summary of findings |Design Codes and the Historic Environment 3 1.
    [Show full text]
  • Duchy Presentation 2019 Final.Pages
    DUCHY PRESENTATION TO RESIDENTS OF NANSLEDAN Thursday 16 May 2019 INTRODUCTION AND BACKGROUND • Ben Murphy provided a brief introduction to the Duchy and Nansledan Team and explained their role in the management of the development. The Prince’s vision and Nansledan masterplan aims to build a mixed use and mixed income community, inspired by traditional Cornish architecture, using local materials and creating new businesses and jobs. It hopes to create a place with a real sense of community and strong Cornish identity and it is a reaction to “more of the same” low quality Plc housing developments. Examples were given of how Nansledan is already providing opportunity for local businesses, using local materials and employing local tradesmen. • Newquay and Truro are taking over most of the housing growth throughout Cornwall. Nansledan is on Duchy of Cornwall land and they control design and build quality by acting as the master developer and estate manager, retaining a long-term interest in realising the masterplan vision. CURRENT PHASING PLAN • The new CEO of Wainhomes is Alex Hugo, who has confirmed that the site compound will be moving from Phase 1 so that the new allotments and play area can finally be built. Wainhomes will be moving onto phase 4 (south of Phase 1). CG Fry are moving onto phase 7 and Morrish are intending to move across the main road into the Rialton Quarter for their next phase. • Nansledan house sales are very good, and it is currently the best performing site within the South West for all three house builders. BUSINESSES • All of the new businesses are doing well and set in a good location.
    [Show full text]