1 Transport Lin Ks a Brand New Development of Sixteen Stylish One

Total Page:16

File Type:pdf, Size:1020Kb

1 Transport Lin Ks a Brand New Development of Sixteen Stylish One 1 T ransport Lin k s A brand new development of sixteen stylish one, two and three bedroom apartments E3 2ZP A collection of sixteen high specifcation apartments in the heart of East London’s creative hub. COMPUTER GENERATED IMAGE FOR ILLUSTRATIVE PURPOSES ONLY Welcome to the Bow Collection With a tactile palette of high quality materials, the Bow Collection has been created to provide a sanctuary of calm within the vibrance of one of East London’s most dynamic locations. COMPUTER GENERATED IMAGES FOR ILLUSTRATIVE PURPOSES ONLY 7 Welcome Culture Vultures Museums include the V&A Museum of Childhood in Bethnal Green, the to E3 Museum of London Docklands and Keep busy in Bow’s enviable pockets of The Gefrye Museum, a wonderful serenity, where you’ll find a great selection museum dedicated to the history of of traditional pubs, peaceful green spaces interiors.There’s also the Ragged School and an ever evolving arts scene. Museum—where you can experience how Victorian children were taught—and the Sweet Tea House, which is dedicated to promoting Tibetan art. Out and about in East London One of the best things about East London Once you’ve enjoyed the peaceful is its abundance of open spaces. You’re sure surroundings of the Bow Collection, to find the perfect outside spot to kick back be sure to sample some of the local cuisine. and relax. You’ll be spoilt for choice whether East London is home to the most diverse you’re up for a wander and a bite to eat, want range of restaurants in the entire capital, to burn some calories, or just let nature including the best places to eat Vietnamese, revitalise you. traditional British pub grub and a chance to sample smoked salmon at Britain’s oldest salmon curers. Your new local hangouts London is a city rich in culture, and East London is one of the best areas for art galleries, small theatre venues and independent shops. Galleries include the Whitechapel, the White Cube, Matt’s Gallery and The Wapping Project, all of which are within a stone’s throw from the Bow Collection for an easy Sunday outing. 9 The Bow Collection – Matchstick Apartments, 115 Fairfield Road, Bow, E3 2ZP On foot from the Bow Collection Getting Around Bow Church DLR Station Docklands Light Railway The Bow Collection is brilliantly located for Close by is Bow Church DLR Station 8 minutes easy access to the centre of the capital and with frequent direct trains to Stratford beyond. A pleasant ten minute stroll to Bow International and Canary Wharf Stations. — Road Underground Staton, gets you on to The development is also near several Bow Road Underground Station both the District and the Hammersmith bus stops which run services across District/Hammersmith & City & City lines into town. Another ten minutes the capital twenty four hours a day, up the road is Mile End Station, served seven days a week. 11 minutes by the 24 hour Central Line. — Mile End Road Station Central Line (24/7) 19 minutes Travel Times ON FOOT BY BIKE BY BUS BY TUBE Roman Road Market London Fields Victoria Park Village Liverpool Street 8 minutes 16 minutes 13 minutes 25 minutes — — — — Victoria Park Shoreditch Stratford International Embankment 12 minutes 21 minutes 22 minutes 33 minutes — — — — Columbia Road The City Liverpool Street Leicester Square 47 minutes 23 minutes 38 minutes 41 minutes N N Fairfield Road Fairfield Road Fairfield 1 W/M BALCONY 1 2 STORAGE BALCONY W/M Apartment 101 Apartment 105 First Floor Kitchen/Living Bedroom 2 First Floor Kitchen/Living Balcony 66 sqm/714 sqft 8 x 3 m 4 x 2 m 56 sqm/604 sqft 8 x 3 m 4 sqm Two Bed/Two Bath Bedroom 1 Balcony One Bed/One Bath Bedroom 1 Balcony 4 x 3 m 5 sqm Balcony 4 x 3 m N N Fairfield Road Fairfield Road Fairfield DURING CONSTRUCTION. PLANS ARE DRAWN TO SCALE AT A DESIGN PHASE AND MAY VARY DURING BUILD. VARY A DESIGN PHASE AND MAY SCALE AT TO PLANS ARE DRAWN DURING CONSTRUCTION. CHANGE AND MAY THESE ARE APPROXIMATE FOR MARKETING PURPOSES. ALL MEASUREMENTS ARE CREATED BALCONY BALCONY 1 2 STORAGE W/M W/M 1 2 Apartment 102 Apartment 201 First Floor Kitchen / Living Bedroom 2 Second Floor Kitchen/Living Bedroom 2 71 sqm / 761 sqft 5 x 5 m 5 x 2 m 66 sqm/714 sqft 8 x 3 m 4 x 2 m Two Bed / Two Bath Bedroom 1 Balcony Two Bed/Two Bath Bedroom 1 Balcony Balcony 5 x 3 m 5 sqm Balcony 4 x 3 m 5 sqm N N Fairfield Road Fairfield Road Fairfield BALCONY BALCONY STORAGE W/M W/M 1 1 2 Apartment 202 Apartment 204 Second Floor Kitchen/Living Bedroom 2 Second Floor Kitchen/Living Balcony 71 sqm/761 sqft 5 x 5 m 5 x 2 m 51 sqm/544 sqft 7 x 4 m 5 sqm Two Bed/Two Bath Bedroom 1 Balcony One Bed/One Bath Bedroom 1 Balcony 5 x 3 m 5 sqm Balcony 5 x 3 m N N Fairfield Road Fairfield Road Fairfield DURING CONSTRUCTION. PLANS ARE DRAWN TO SCALE AT A DESIGN PHASE AND MAY VARY DURING BUILD. VARY A DESIGN PHASE AND MAY SCALE AT TO PLANS ARE DRAWN DURING CONSTRUCTION. CHANGE AND MAY THESE ARE APPROXIMATE FOR MARKETING PURPOSES. ALL MEASUREMENTS ARE CREATED 1 W/M BALCONY 1 STORAGE BALCONY Apartment 203 Apartment 205 Second Floor Kitchen/Living Balcony Second Floor Kitchen/Living Balcony 54 sqm/586 sqft 8 x 3 m 5 sqm 56 sqm/604 sqft 8 x 3 m 4 sqm One Bed/One Bath Bedroom 1 One Bed/One Bath Bedroom 1 Balcony 4 x 5 m Balcony 4 x 3 m N N Fairfield Road Fairfield Road Fairfield BALCONY BALCONY BALCONY 1 1 STORAGE 2 W/M Apartment 301 Apartment 303 Third Floor Kitchen/Living Bedroom 2 Third Floor Kitchen/Living Balcony 66 sqm/714 sqft 8 x 3 m 4 x 2 m 54 sqm/586 sqft 8 x 3 m 5 sqm Two Bed/Two Bath Bedroom 1 Balcony One Bed/One Bath Bedroom 1 Balcony 4 x 3 m 5 sqm Balcony 4 x 5 m N N Fairfield Road Fairfield Road Fairfield DURING CONSTRUCTION. PLANS ARE DRAWN TO SCALE AT A DESIGN PHASE AND MAY VARY DURING BUILD. VARY A DESIGN PHASE AND MAY SCALE AT TO PLANS ARE DRAWN DURING CONSTRUCTION. CHANGE AND MAY THESE ARE APPROXIMATE FOR MARKETING PURPOSES. ALL MEASUREMENTS ARE CREATED BALCONY BALCONY STORAGE W/M W/M 1 1 2 Apartment 302 Apartment 304 Third Floor Kitchen/Living Bedroom 2 Third Floor Kitchen/Living Balcony 71 sqm/761 sqft 5 x 5 m 5 x 2 m 51 sqm/544 sqft 7 x 4 m 5 sqm Two Bed/Two Bath Bedroom 1 Balcony One Bed/One Bath Bedroom 1 Balcony 5 x 3 m 5 sqm Balcony 5 x 3 m N N Fairfield Road Fairfield Road Fairfield 1 W/M TERRACE 1 BALCONY W/M STORAGE 2 Apartment 305 Penthouse 4.02 Third Floor Kitchen/Living Balcony Fourth Floor Kitchen/Living Bedroom 2 Terrace 56 sqm/604 sqft 8 x 3 m 4 sqm 70 sqm/756 sqft 7 x 5 m 4 x 3 m 7 sqm One Bed/One Bath Bedroom 1 Two Bed / One Bath Bedroom 1 Balcony 4 x 3 m Terrace 5 x 3 m N N Fairfield Road Fairfield Road Fairfield DURING CONSTRUCTION. PLANS ARE DRAWN TO SCALE AT A DESIGN PHASE AND MAY VARY DURING BUILD. VARY A DESIGN PHASE AND MAY SCALE AT TO PLANS ARE DRAWN DURING CONSTRUCTION. CHANGE AND MAY THESE ARE APPROXIMATE FOR MARKETING PURPOSES. ALL MEASUREMENTS ARE CREATED 1 TERRACE 2 TERRACE 3 W/M W/M 3 2 1 TERRACE Penthouse 4.01 Penthouse 4.03 Fourth Floor Kitchen/Living Bedroom 2 Terrace Fourth Floor Kitchen/Living Bedroom 2 Large Terrace 73 sqm/783 sqft 6 x 5 m 4 x 2 m 10 sqm 76 sqm/814 sqft 5 x 6 m 3 x 3 m 53 sqm Three Bed/One Bath Bedroom 1 Bedroom 3 Three Bed/Two Bath Bedroom 1 Bedroom 3 Terrace 4 x 3 m 5 x 3 m Large Terrace 4 x 3 m 3 x 2 m 18 Specifcations Kitchen Bathroom Internal General Security t Combination units: t Ceramic tiles: t Chrome sockets t Audio and visual top units matt biscuit brown in kitchen area door entry system t Suites with chrome t Chrome switches and t Fire doors taps and mixer sockets in living and grey rustic colour Flats External t Bath with glazed bedroom areas t Bosch built-in oven screen and t Telephone outlet t Private balconies, t Bosch four zone thermostatic mixer sockets patios or terraces ceramic induction shower t Connection points to all apartments hob t Mirrored cabinet ready for Sky Q, t Lighting on balconies t Bosch built-in fridge unit above sink Satellite, BT, Terrestrial t Composite durable freezer 70/30 t Heated chrome TV and/or radio in decking to balconies t Bosch built-in towel rail living room dishwasher t Gas central heating Main Entrance t Shaver socket & Common Areas t Bosch washer dryer t Vertical radiators En Suites t Lobby entrance: t Smeg integrated t LED spotlighting durable grey tiles extractor hood t Ivory ceramic tiles Floor Finishes t Communal lighting t Blanco Supra Sink t Shower enclosure with movement t Bathrooms and en t Blanco Max tap t Heated chrome sensors suites: ceramic tiles steel towel rail t Opal quartz super t Stairs and communal t Living rooms, white worktop with t Shaver socket corridors: dark grey hallways, kitchens 100mm upstand carpet t Mirror and bedrooms: engineered wood t Secure cycle storage flooring t Bin storage on ground floor Paint Finishes t Dulux matt emulsion Building Standards paint to walls & Warranty t Dulux matt emulsion t Build-Zone 10 year paint to ceilings warranty t Dulux eggshell paint to skirting and architraves SPECIFICATIONS MAY VARY DURING BUILD AND ACCORDING TO AVAILABILITY ALL DETAILS CONTAINED WITHIN THIS SALES INFORMATION ARE CORRECT AT THE TIME OF PRODUCTION.
Recommended publications
  • Vebraalto.Com
    Nougat Court, Taylor Place, Bow, London, E3 2SP £360 Per Week ZERO DEPOSIT AVAILABLE ON THIS PROPERTY* A very large 2 double bedroom 2 bathroom top floor apartment for rent, located in Bow E3, within gated secure development. Offering spacious accommodation, stunning luxury specification throughout, open plan living room with designer kitchen, 2 double bedrooms, 2 beautiful bathroom suites, good storage space, bright and airy rooms with floor to ceiling windows. Short walk to Bow Road tube station and Bow Church DLR station. Comes furnished. PROPERTY AVAILABLE FROM NOW. *Zero deposit is available via a third party company who charge a fee for their service. This scheme is further subject to references and the landlords final approval. • 2 Double Bedrooms • 2 Luxury Bathroom Suites • Available From Now • Bow E3 • Very Large Apartment • Stunning Fitted Kitchen • Comes Furnished • Walk To Bow Road Tube • Walk to Bow Church DLR • Zero Deposit Available* Nougat Court, Taylor Place, Bow, London, E3 2SP MILE END STATION BOW CHURCH DLR PUDDING MILL LANE DLR BOW ROAD STATION STRATFORD STATION BROMLEY-BY-BOW STATION Nougat Court, Taylor Place, Bow, London, E3 2SP NOUGAT COURT KITCHEN RECEPTION ROOM RECEPTION ROOM RECEPTION ROOM RECEPTION ROOM Nougat Court, Taylor Place, Bow, London, E3 2SP RECEPTION ROOM BEDROOM 2 UTILITY ROOM BEDROOM 1 BEDROOM 2 BEDROOM 1 Nougat Court, Taylor Place, Bow, London, E3 2SP EN SUITE SHOWER ROOM BATHROOM We have prepared these property particulars as a general guide to a broad description of the property. They are not intended to constitute part of an offer or contract. We have not carried out a structural survey and the services, appliances and specific fittings have not been tested.
    [Show full text]
  • Development Committee ______
    Meeting of the DEVELOPMENT COMMITTEE ________________________________________________ Wednesday, 2 July 2008 at 7.30 p.m. ______________________________________ A G E N D A __________________________________________ VENUE Council Chamber, 1st Floor, Town Hall, Mulberry Place, 5 Clove Crescent, London, E14 2BG Members: Deputies (if any): Chair: Councillor Shafiqul Haque Vice-Chair:Councillor Denise Jones Councillor Shahed Ali Councillor Helal Abbas, (Designated Councillor Lutfa Begum Deputy representing Councillor Shafiqul Councillor Fazlul Haque Haque, Fazlul Haque, Alex Heslop, Councillor Alexander Heslop Denise Jones and Ahmed Omer) Councillor Tim O'Flaherty Councillor Stephanie Eaton, (Designated Councillor Ahmed Adam Omer Deputy representing Councillor Tim Vacancy O'Flaherty) Councillor Waiseul Islam, (Designated Deputy representing Councillor Shafiqul Haque, Fazlul Haque, Alex Heslop, Denise Jones and Ahmed Omer) Councillor Azizur Rahman Khan, (Designated Deputy representing Councillor Tim O'Flaherty) Councillor Rania Khan, (Designated Deputy representing Councillor Rania Khan) Councillor Abdul Matin, (Designated Deputy representing Councillor Tim O'Flaherty) Councillor Harun Miah, (Designated Deputy representing Councillor Shahed Ali) Councillor Abjol Miah, (Designated Deputy representing Councillor Shahed Ali) Councillor Abdul Munim, (Designated Deputy representing Councillor Shahed Ali) Councillor Oliur Rahman, (Designated Deputy representing Councillor Lutfa Begum) Councillor Salim Ullah, (Designated Deputy representing Councillors
    [Show full text]
  • Standard Schedule N108-49214-Ssant-LC-1-1
    Schedule N108-49214-sSaNt-LC-1-1 Schedule information Route: N108 No. of vehicles used on 9 schedule: Service change: 49214 - SCHEDULE, STOP SEQUENCE CHANGE Implementation date: 20 January 2018 Day type: sSaNt - Special Saturday Night/Sunday Morning Operator: LC - LONDON CENTRAL Option: 1 Version: 1 Schedule comment: Copy from Schedule: N108-47744-sSaNt-LC-1-2 Option comment: Timing points Timing point Transit node Stop BHTHRS Blackheath, Royal Standard GJ01 BLACKHEATH ROYAL STAND'D 13536 Blackheath / Royal Standard BHTHRS Blackheath, Royal Standard GJ03 RYL STANDARD CHARLTON RD 44007 Blackheath / Royal Standard BHTHSN Blackheath Station 2B01 BLACKHEATH STATION 33777 Blackheath Station BHTHSN Blackheath Station 2B01 BLACKHEATH STATION 34268 Blackheath Station BWCHSN Bow Church D L R Station BE10 BOW CHURCH DLR STATION 25096 Bow Church Station BWCHSN Bow Church D L R Station BE10 BOW CHURCH DLR STATION 902 Bow Church Station CANNBS Canning Town Bus Station A501 CANNING TOWN BUS STATION BP2281 Canning Town Bus Station CANNBS Canning Town Bus Station A501 CANNING TOWN BUS STATION BP2284 Canning Town Station CANNBW1S Canning Town Bus Station, Stand W1 J3805 CANNING TOWN BUS STATION CANNB Canning Town Bus Station, Stand W1 W1S DEVRSN Devons Road D L R Station BP30 DEVONS ROAD DLR STATION LE131 Devons Road Station DEVRSN Devons Road D L R Station BP30 DEVONS ROAD DLR STATION LE132 Devons Road Station GNCPSY Greenwich Peninsula, Sainsburys GQ06 SAINSBURY'S G PENINSULA BP2401 Millennium Leisure Park East GNCPSY Greenwich Peninsula, Sainsburys
    [Show full text]
  • A Selection of Four Outstanding Shared Ownership Apartments 1 Edicule Square 17 Tutelage Court (679.20Sq Ft / 63.10M2) (782.53Sq Ft / 72.70M2)
    A SELECTION OF FOUR OUTSTANDING SHARED OWNERSHIP APARTMENTS 1 Edicule Square 17 Tutelage Court (679.20sq ft / 63.10m2) (782.53sq ft / 72.70m2) Bathroom En-Suite Bedroom 1 En-Suite Store Bedroom 1 Bathroom Lounge/Dining Bedroom 2 Lounge/Dining Bedroom 3 Bedroom 2 Lounge & Dining Bedroom 2 Lounge & Dining Bedroom 2 16’ 6” x 13’ 10” 8’ 12” x 13’ 11” 10’4” x 23’7” 9’1” x 8’ 1” 5.12 x 4.21 m 2.74 x 4.23 m 3.16 x 7.19 m 2.78 x 2.48 m Bedroom 1 Bedroom 1 Bedroom 3 10’ 2” x 11’ 12” 17’8” x 7’8” 9’ 5” x 11’ 9” 3.09 x 3.65 m 5.39 x 2.34 m 2.87 x 3.58 m 6 Pedantry 3 Edicule Square (695.34sq ft / 64.60m2) (625.38sq ft / 58.10m2) Bathroom En-Suite Bedroom 1 Bedroom 2 Bedroom 2 Bathroom En-Suite Lounge/Dining Bedroom 1 Lounge/Dining Lounge & Dining Bedroom 2 16’ 7” x 14’ 3” 10’ 9” x 11’ 6” Lounge & Dining Bedroom 2 5.05 x 4.35 m 3.27 x 3.50 m 21’ 4” x 12’ 6” 8’ 9” x 12’ 2” 6.50 x 3.80 m 2.68 x 3.7 m Bedroom 1 9’ 1” x 10’ 8” Bedroom 1 2.77 x 3.26 m 9’ 9” x 12’ 2” 2.97 x 3.71 m All floor plans in this brochure are for general guidance only. All room dimensions are subject to a 5% tolerance.
    [Show full text]
  • Site at Stroudley Walk, London, E3 3EW
    STRATEGIC DEVELOPMENT COMMITTEE 18 May 2021 Report of the Corporate Director of Place Classification: Unrestricted Application for Planning Permission click here for case file Reference PA/20/01696 Site Site at Stroudley Walk, London, E3 3EW. Ward Bromley North Proposal D emolition of existing buildings and structures and redevelopment to provide four buildings, including a tall building of up to 25 storeys, comprising residential units and flexible commercial space (A1/A2/A3/B1) at ground floor level and alterati ons to façade of retained building, together with associated ancillary floorspace, cycle and car parking, landscaping and highway works. Summary Grant planning permission with conditions and planning obligations Recommendation Applicant Muse Developments Limited and Poplar HARCA Architect /agent DP9 (agent) Case Officer Kevin Crilly Key dates - Application registered as valid on 10 / 08 / 2020 - Significant amendments received on 29 / 03 / 2021 - Public consultation finished on 29 / 04 / 2021 EXECUTIVE SUMMARY The application proposes the demolition of the Warren House building, the two Stroudley Walk buildings and other structures on the site, and the construction of 4 buildings between 5 and 25 - storeys, comprising flexible commercial space (on the ground floor of two of the buildings and 274 new homes, together with extensive landscaping and sh ared outdoor amenity space. The development would re - provide the existing 50 affordable rented properties on site and deliver 50% affordable housing overall. The proposed unit sizes meet the London Plan’s minimum space standards. All units would have priv ate amenity space provision that meets minimum standards, and the proposed duplex homes would benefit from defensible space to the front and rear.
    [Show full text]
  • Capital Towers
    Capital Towers – Sky View Tower Stratford, London E15 “Galliard Homes’ most exclusive apartment opportunity 11 minutes tube time from The City and the heart of Canary Wharf and central to the largest regeneration project in the UK.” The Developer Project rental return Galliard Homes Between £300 - £720 per week Local Authority Pricing The London borough of Newham 1 Beds from £199,000 2 Beds from £311,500 Location 3 Beds from £350,000 2-12 High Street, Stratford, London E15 2PW Net internal floor areas Tenure 538 - 1,675 sq.ft 999 year leasehold Ground Rent Building Insurance 1 beds - £300 p.a 10 Year NHBC 2 beds - £350 p.a 3 beds - £400 p.a Anticipated Completion Q3 2016 Parking Parking available for 3 beds only at an additional £25,000 Page 1 of 11 Capital Towers – Sky View Tower Stratford, London E15 DEVELOPMENT SPECIFICATION LIVING/DINING COMMUNAL AREAS •Oak wood strip veneer flooring to living/dining and • Stone tiled entrance lobbies, carpeted common stairs up to hall areas. second floor level. •Thermostatically controlled wet radiator central • Carpeted lift lobbies and common corridors to all floor heating. levels. • Quality oak veneer vertical grain doors with • Lifts serving each tower at all levels. polished stainless steel door furniture. • Communal secure cycle store. • Recessed low energy down lights. • Low energy wall lighting. • Brushed steel switch and socket plates. • Gym • Satellite TV (Sky+) terrestrial TV, FM radio and telephone socket. SECURITY • All with balcony or terrace. • Audio and video entry phone system to each apartment, • Matt paint finish walls and ceilings connected to communal entrance door.
    [Show full text]
  • Commissioner's Report
    Commissioner’s report 16 March 2021 1 Introduction 3 2 Safety and security 4 3 Restart and recovery 10 4 Improving transport and generating growth 16 5 Healthy Streets 26 6 Crossrail 36 7 Finance 37 Commissioner’s report 2 This paper will be considered in public 1 Introduction This report provides a review of major As part of this, I am delighted that we issues and developments since the Board have confirmed our five, equally meeting on 3 February 2021. weighted, priorities for the year ahead. These are: Like many others, I was pleased to see the Government publish its plans to gradually • Securing a long-term sustainable ease lockdown over the coming months, financial deal subject to a number of tests. As the • Completing the Northern Line stages unlock, we will still be here for Extension, finishing Crossrail and Londoners to help them see the people opening the Elizabeth line and places they have missed. The first big • Safely supporting and driving milestone will be the return of all school forward London’s post-pandemic children from 8 March and, as before, we recovery and winning back our will do everything to get them back into customers the classroom safely through our • Creating a people-centric vision dedicated school services. and a more diverse and inclusive organisation, informed by and for With restrictions remaining for some our colleagues time, our focus remains on protecting our • Improving London’s air quality and people and our customers and ensuring accelerating decarbonisation services run for those who need them. We are still in the midst of a global By working together as one team, we will pandemic, and I am deeply saddened that be able to achieve these and help to 87 of our colleagues have now tragically rebuild a brighter future for our passed away from COVID-19.
    [Show full text]
  • Agenda Document for Board, 09/06/2021 10:00
    Agenda Meeting: Board Date: Wednesday 9 June 2021 Time: 10.00am Place: Teams Virtual Meeting Members Sadiq Khan (Chair) Anne McMeel Heidi Alexander (Deputy Chair) Dr Mee Ling Ng OBE Cllr Julian Bell Dr Nelson Ogunshakin OBE Kay Carberry CBE Mark Phillips Prof Greg Clark CBE Dr Nina Skorupska CBE Bronwen Handyside Dr Lynn Sloman MBE Dr Alice Maynard CBE Ben Story Government Special Representatives Andrew Gilligan TBC How decisions will be taken during the current social distancing measures The 2020 regulations that provided the flexibility to hold and take decisions by meetings held using videoconference expired on 6 May 2021. While social distancing measures remain in place to manage the coronavirus pandemic, Members will attend a videoconference briefing held in lieu of a meeting of the Board. Any decisions that need to be taken within the remit of the Board will be discussed at the briefing and, in consultation with available Members, will be taken by the Chair using Chair’s Action. A note of the decisions taken, including the key issues discussed, will be published on tfl.gov.uk. As far as possible, TfL will run the briefing as if it were a meeting but without physical attendance at a specified venue by Members, staff, the public or press. Papers will be published in advance on tfl.gov.uk How We Are Governed Apart from any discussion of exempt information, the briefing will be webcast live for the public and press on TfL’s YouTube channel. A guide for the press and public on attending and reporting meetings of local government bodies, including the use of film, photography, social media and other means is available on www.london.gov.uk/sites/default/files/Openness-in- Meetings.pdf.
    [Show full text]
  • Crossrail Assessment of Atmospheric Emissions & Air Quality Impacts
    Cross London Rail Links Limited Crossrail Assessment of Atmospheric Emissions & Air Quality Impacts Technical Report Volume I of IV Crossrail Reference: 1E0320-G0E00-00001 February 2005 Mott MacDonald Assessment of Atmospheric Emissions and Air Quality Impacts Mott MacDonald Technical Report CLRL Limited Volume I of IV Crossrail Assessment of Atmospheric Emissions & Air Quality Impacts Technical Report 1E0320-G0E00-00001 Final Report This document has been prepared for the titled project or named part thereof and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authority of Mott MacDonald being obtained. Mott MacDonald accepts no responsibility or liability for the consequences of this document being used for a purpose other than the purposes for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify Mott MacDonald for all loss or damage resulting therefrom. Mott MacDonald accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned. To the extent that the report commissioned is to be based on information supplied by other parties, Mott MacDonald accepts no liability for any loss or damage suffered by the client, whether contractual or tortious, stemming from any conclusions based on data supplied by parties other than Mott MacDonald and used by Mott MacDonald
    [Show full text]
  • Standard Schedule 205-42509-Su-IF-1-1
    Schedule 205-42509-Su-IF-1-1 Schedule information Route: 205 No. of vehicles used on 22 schedule: Service change: 42509 - SCHEDULE Implementation date: 20 February 2016 Day type: Su - Sunday Operator: IF - EAST LONDON Option: 1 Version: 1 Schedule comment: Option comment: Option 1 Timing points Timing point Transit node Stop ALDESN Aldgate East Station B001 COMMERCIAL S SEVEN STARS 13494 Aldgate East Station ALDESN Aldgate East Station B101 ALDGATE EAST STATION BP5408 Adler Street BKSTMR Baker Street Station, Marylebone Road 0704 BAKER ST STN PLANETARIUM 723 Baker Street Station BKSTMR Baker Street Station, Marylebone Road 0704 BAKER ST STN PLANETARIUM 724 Baker Street Station BOW CH S BOW CHURCH STAND J3301 BOW, BOW ROAD/FAIRFIELD ROAD BOW CH Bow Church, South Side S BOW CH Bow Church BF04 BOW CHURCH 29981 Bow Church BW GR S BOW BUS GARAGE STAND J3312 BOW BUS GARAGE BW GR SBOW BUS GARAGE BWCHSN Bow Church D L R Station BE10 BOW CHURCH DLR STATION 902 Bow Church Station BW BOW J3312 BOW BUS GARAGE BW BOW EUSTER Euston Station, Euston Road 8305 EUSTON STATION EUSTON RD 20917 Euston Station EUSTSN Euston Bus Station 8301 EUSTON BUS STATION 36513 Euston Station ISLNCR Islington, Angel, City Road C105 ANGEL CITY RD 363 Angel Islington / City Road ISLNCR Islington, Angel, City Road C105 ANGEL CITY RD BP1079 Angel Islington LEYTDR S LEYTON, DOWNSELL ROAD STAND J3668 LEYTON DOWNSELL ROAD LEYTDR LEYTON, DOWNSELL ROAD S MNSNME Mile End Station, Mile End Road BE07 MILE END STATION 20674 Mile End Station MNSNME Mile End Station, Mile End Road BE07 MILE END STATION 4826 Mile End Station OLSTSN Old Street Station C607 OLD ST STATION EAST SIDE 13476 Old Street Station OLSTSN Old Street Station C607 OLD ST STATION EAST SIDE 13477 Shoreditch Fire Station PADDCT S Paddington, Cleveland Terrace Stand J1540 PADDINGTON, BISHOPS BDG PADDCT Paddington, Cleveland Terrace RD/EASTBOURNE T.
    [Show full text]
  • ROUTE A8 Bow Church Station Via Liverpool Street Station, Bishopsgate, EC2
    APPENDIX A: LONDON SERVICE PERMIT No. LSP0490 ROUTE A8 Bow Church Station via Liverpool Street Station, Bishopsgate, EC2 (NOTE: operated as part of through service from/to Stansted Airport) ROUTE RECORD Effective from 8 December 2014 STREETS TRAVERSED (GREATER LONDON SECTION) Loop Working From Bow Road, Mile End Road, Whitechapel Road, Whitechapel High Street, Aldgate High Street, Duke’s Place, Bevis Marks, Camomile Street, Outwich Street, Hounsditch, Bishopsgate, Norton Folgate, Shoreditch High Street, Bethnal Green Road, Cambridge Heath Road, Mile End Road, Bow Road. TERMINAL POINT NOTE: Drivers MUST switch off engines during layover periods on stands. LIVERPOOL STREET STATION, BISHOPSGATE EC1 Coach stop G (BP4637) opposite Artillery Lane. No standing permitted. Coaches only to stop for no longer then is necessary to set down and pick up. National Express Ltd to provide daily supervision. PICKING UP AND SETTING DOWN POINTS (GREATER LONDON SECTION) Coaches may stop to pick up and set down passengers at the specified stopping points shown below as agreed by London Buses. Coaches must not wait at these points for longer than is necessary to pick up and set down passengers. LOCATION STOP NO 2 Bow Bow Road, Bow Church DLR Station, Bus Stop B. 25096 3 Mile End Station Bow Road, Bus Stop C. 4826 4 Whitechapel Station, Royal Whitechapel Road, Bus Stop A. 943 London Hospital 5 Liverpool Street Station Bishopsgate, Coach Stop G. BP4637 NOTE: National Express Ltd to provide daily supervision at this point, ensuring that coaches depart as soon as passengers have alighted or boarded. Maximum dwell time six minutes per coach.
    [Show full text]
  • Bromley by Bow North London Thames Gateway Development Corporation (In the London Borough of Tower Hamlets) Planning Application No
    planning report PDU/2861/02 3 September 2012 Bromley by Bow North London Thames Gateway Development Corporation (in the London Borough of Tower Hamlets) planning application no. PA/11/02423 Strategic planning application stage II referral (new powers) Town & Country Planning Act 1990 (as amended); Greater London Authority Acts 1999 and 2007; Town & Country Planning (Mayor of London) Order 2008. The proposal Hybrid application has been submitted for 741 residential units and 10,527 sq.m. commercial floorspace including office, car dealership, bar/public house and other flexible restaurant, cafe and bar uses. The proposals also includes works to the highway, existing River Lea towpath, vehicle and cycle parking and associated landscaping. The applicant The applicant is East Thames Group and Southern Housing Group, and the architect is John Thompson & Partners. Strategic issues The strategic matters including the principle of development, employment land; comprehensive development and phasing of housing delivery, affordable housing, design, access, transport, energy, noise, air quality, biodiversity and climate change have been broadly addressed. The Development Corporation’s decision In this instance the London Thames Gateway Development Corporation has resolved to grant permission subject to conditions and section 106 agreement. Recommendation That the Corporation be advised that the Mayor is content for it to determine the case itself, subject to any action that the Secretary of State may take, and does not therefore wish to direct refusal. Context 1 On 11 October 2011 the Mayor of London received documents from Tower Hamlets Council, on behalf of the London Thames Gateway Development Corporation (LTGDC) notifying him of a planning application of potential strategic importance to develop the above site for the page 1 above uses.
    [Show full text]