£169,950 Ll65 1Nw

Total Page:16

File Type:pdf, Size:1020Kb

£169,950 Ll65 1Nw 44A Garreglwyd Park REALISTICALLY Holyhead PRICED - O.I.R.O. Anglesey £169,950 LL65 1NW LOUNGE/DINER & STUDY GAS CENTRAL HEATING & PVCu DOUBLE GLAZING FITTED KITCHEN/DINER & UTILITY ROOM ON-SITE PARKING & INTEGRAL DOUBLE GARAGE G FLR CLOAK ROOM/W.C. SMALL OPEN-PLAN FRONT GARDEN & SMALL 4 BEDROOMS (1 WITH EN SUITE SHOWER ROOM) REAR PAVED/SITTING AREA & FAMILY BATHROOM/W.C. NO ON-GOING CHAIN 01407 762165 www.nwpuk.co.uk [email protected] 15/17 Market Street, Holyhead, Anglesey, LL65 1UL Description: Impressive spacious executive-style detached house situated on this forever popular and established residential cul-de-sac, in the sought-after area of Llaingoch virtually opposite Holyhead Park and convenient for Llaingoch primary school, town centre, harbour, Holyhead Mountain and fine country and coastal walks. The accommodation comprises entrance hall; cloak room/W.C.; study; lounge/dining room with the lounge area having a marble fireplace with living flame gas fire set in a timber effect surround, with a wide opening into dining area which has PVCu double glazed patio doors; fitted kitchen comprising of an excellent range of worktops and base cupboards incorporating a single drainer twin-basin stainless steel sink unit, gas hob with electric oven beneath, tiled surround, range of wall units to accord, stainless steel extractor hood, plumbing for dishwasher; utility room again having a good range of worktops and base cupboards incorporating a single drainer twin-basin stainless steel sink unit, tiled surround to working surfaces, plumbing for washing machine, triple wall unit, wall mounted gas combination boiler, extractor fan. 1st floor landing with built-in linen cupboard; master bedroom with en suite shower room having a 3-piece suite; 3 further bedrooms; family bathroom/W.C. having a white suite with panelled bath, low level W.C., pedestal wash hand-basin, tiled surround to suite, extractor fan. Location The property is situated on this popular and established development, in a sought after location, virtually opposite Holyhead park and convenient for Llaingoch primary school, Holyhead high school, town centre and most local amenities. Llaingoch is on the cusp of fine rural and coastal walks and Holyhead harbour is within walking distance. Entrance Hall Cloak Room/W.C. Study Approx. 1.98m x 2.96m (6'6'' x 9'9'') Lounge/Diner (L-shaped) - Lounge Area Approx. 4.01m x 4.58m (13'2'' x 15'0'') Dining Area Approx. 3.38m x 2.87m (11'1'' x 9'5'') Kitchen Approx. 3.80m x 3.15m (12'6'' x 10'4'') (max.) Utility Room Approx. 3.76m x 2.53m (12'4'' x 8'4'') 1st Floor Landing Bedroom 1 Approx. 4.00m x 3.28m (13'1'' x 10'9'') En Suite Shower Room Bedroom 2 Approx. 3.20m x 3.30m (10'6'' x 10'10'') Bedroom 3 Approx. 2.61m x 2.84m (8'7'' x 9'4'') (mainly) Bedroom 4 Approx. 2.61m x 2.17m (8'7'' x 7'1'') Family Bathroom/W.C. Exterior Wide brick pavier drive to front offering good on-site parking with small open-plan lawned garden with tree. Integral Double Garage Approx. 5.63m x 3.78m (18'6'' x 12'5'') Electric double up-and-over door; light and power; consumer unit; plasterboard ceiling, painted walls and floor. Exterior (Continued) Brick paved path to either side with gates lead to a wider bricked paved path to rear providing a small private sitting area. Tenure We have been advised by the Seller that the property is Freehold. Interested purchasers should seek clarification of this from their Solicitor. Directions When entering Holyhead off the A55 take the 3rd exit off the roundabout towards the town centre. Proceed through the traffic lights turning left at the cenotaph into the high street and proceed up Thomas Street hill. Turn left onto South Stack Road/Alderley Terrace adjacent to Holyhead High School and continue past the school. Just after passing the park on the right take the next left into Garreglwyd Road turning immediately right on the junction into Garreglwyd Park. The property will be seen on the right-hand side. PARTICULARS PREPARED JHB/AH 28-03-15 UPDATED 25-01-16 REF: 5542643 THE PROPERTY MISDESCRIPTIONS ACT 1991 The Agent has not tested any apparatus, equipment, fixtures and fittings or services and so cannot verify that they are in working order or fit for the purpose. A Buyer is advised to obtain verification from their Solicitor or Surveyor. References to the Tenure of a Property are based on information supplied by the Seller. The Agent has not had sight of the title documents. A Buyer is advised to obtain verification from their Solicitor. You are advised to check the availability of this property before travelling any distance to view. We have taken every precaution to ensure that these details are accurate and not misleading. If there is any point which is of particular importance to you, please contact us and we will provide any information you require. This is advisable, particularly if you intend to travel some distance to view the property. The mention of any appliances and services within these details does not imply that they are in full and efficient working order. .
Recommended publications
  • Holyhead Waterfront Regeneration Scheme
    Holyhead Waterfront Regeneration Scheme Archaeology and Heritage Scoping By Richard Scott Jones (BA Hons, MA, MIFA) Report No. 577 ISTER Cambrian Archaeological Projects Ltd G E E D Old Chapel Farm, Llanidloes R Powys SY18 6JR O I A Telephone: 01686 413857 R N G O E-mail: [email protected] A I N I S A T Holyhead Waterfront Regeneration Scheme Archaeology and Heritage Scoping Prepared For: AXIS On Behalf of: Conygar Stena Line Ltd Edited by Authorised by Signed: Signed: Position: Position: Date: Date: By Richard Scott Jones (BA Hons, MA, MIFA) Report No: 577 Date: July 2009 ISTER Cambrian Archaeological Projects Ltd G E E D Old Chapel Farm, Llanidloes R Powys SY18 6JR O I A Telephone: 01686 413857 R N G O E-mail: [email protected] A I N I S A T Holyhead Waterfront Regeneration Shceme Archaeology & Heritage - Scoping Holyhead waterfront Regeneration Scheme Archaeology and Heritage Scoping 1 Introduction 1.1 This initial appraisal determines the scale and the scope of the Archaeological and Heritage work to be undertaken as part of a larger Environmental Impact Assessment for the proposed Holyhead Waterfront Regeneration Scheme. 1.2 This scoping appraisal has been written by Richard Scott Jones (BA, MA, MIFA) of Cambrian Archaeological Projects Ltd (henceforth CAP), following consultation with Gwynedd Archaeological Planning Services (henceforth GAPS), the Royal Commission on Ancient and Historic Monuments of Wales (henceforth RCAHMW) and Cadw. Overview of the Development 1.3 The site comprises circa 57 hectares of partially developed land (and an area of sea), which includes: some industrial buildings and hardstandings, redundant buildings of significant heritage interest, a wooded area, inter-tidal foreshore, seafront promenade and a harbour (lying adjacent to both an existing marina and a working ferry port).
    [Show full text]
  • Guide Template
    HOLYHEAD Town Guide 2017-2019 2 Official HOLYHEAD Town Guide 2017-2019 Contents Foreword . 5 Town Centre Visitor Map . 16/17 The Origins of the Name Caergybi / Holyhead . 6 Mynydd Twr Telegraph Station . 18 Ancients Left Their Mark On Historic Town . 7 South Stack . 18 Hut Circles & Hill Forts . 8 Maritime Museum . 19 Holyhead Holy Island Places of Interest: Anglesey Beaches and Attractions . 20 Holyhead Town Centre . 9 Holyhead Port . 20 St Cybi Church . 9 The Railway . 21 Ucheldre Centre . 10 Penrhos Coastal Park . 21 The Honourable W. O. Stanley . 10 What’s Going On . 22 The Stanley Sailors Home & Reading Room . 11 Anglesey Attractions . 24 The Market Hall & Market Cross . 12 Food Glorious Food . 28 Record Breaker Breakwater . 12 Holyhead Moving Forward . 28 Holyhead Breakwater Country Park . 13 Holyhead Town Council . 29 Holyhead Mountain . 15 Notes . 30 Every effort has been made to ensure that the information in Holyhead Town Guide is correct and neither SB Publishing nor Holyhead Town Council accept responsibility for any loss or inconvenience arising from any errors which may have occurred. Additional photography and editorial contributions: Holy Island Experience Limited. Contact: www.holyislandexperience.co.uk or email [email protected] or telephone 01407 769799 Copyright: SB Publishing, 17 Abbey Way, Willesborough, Ashford, Kent TN24 0HY B SPUBLISHING Tel: 01233 627274 • Email: [email protected] • Website: www.sbpublishing.net Conserve Protect Transform Our company values are rooted in a sustainable approach
    [Show full text]
  • Conservation Area Character Appraisals
    Conservation area character appraisals Holyhead beach area Adopted 3 March 2005 Copyright Maps in this document are based upon the Ordnance Survey mapping with permission of the Controller of Her Majesty's Stationery Office © Crown Copyright. Licence No LA09001L For further information contact the Built Environment and Landscape Section Old photographs © Archive Service, Isle of Anglesey County Council Permission must be sought from the Council before reproducing any part of the document. Contents Executive summary Location plan Original boundary Boundary review and recommendations 1. Introduction 2. Conservation area 3. Community 4. Date designated 5. Reason designated 6. Location 7. Area covered 8. Setting 9. Historical background Population change Archaeology 10. Open spaces Trees and hedgerows 11. Townscape Views 12. The local economy 13. Physical fabric 14. Principal buildings 15. Positive and negative elements 16. Appendices Executive Summary This Conservation Area Character Statement will become a working Supplementary Planning Guidance (SPG) upon adoption. It supports Ynys Môn Local Plan 1996 (Policy 40) and the emerging Unitary Development Plan (Policy EN13) which states that the character and appearance of all designated Conservation areas will be protected from unsympathetic development. Enhancement of their character will be achieved by carrying out improvements and permitting suitably designed new development. This document will be a material consideration in the determination of planning applications. Circular 61/96 (paragraph 20) states that the quality of place should be the prime consideration in identifying, protecting and enhancing Conservation areas. This depends on more than individual buildings. It is recognised that the special character of a place may derive from many factors, including: the grouping of buildings; their scale and relationship with outdoor spaces; architectural detailing; and so on.
    [Show full text]
  • Good Evening This Is the First in a Series of 8 E-Mails for the Wylfa
    From: Kieran Somers To: Wylfa Newydd; Kay Sully; KJ Johansson Cc: [email protected]; David Palmer (Contractor); [email protected]; Aron, Henry; [email protected]; [email protected]; Dylan Williams; PMO; Neil Burke Subject: FW: Email 1 of 8 [NOT PROTECTIVELY MARKED] Date: 17 December 2018 18:02:14 Attachments: 07 Horizon"s Response to Written Representation - Bryngwran Cymunedol Ltd .pdf 08 Horizon"s Response to Written Representation - Cemaes Bay History Group .pdf 09 Horizon"s Response to Written Representation - Conwy County Borough Council .pdf 10 Horizon"s Response to Written Representation - Dafydd Griffiths .pdf 11 Horizon"s Response to Written Representation - Greenpeace .pdf 12 Horizon"s Response to Written Representation - Gwynedd Council .pdf 13 Horizon"s Response to Written Representation - Magnox Ltd .pdf 14 Horizon"s Response to Written Representation - Michael Cominetti .pdf 15 Horizon"s Response to Written Representation - Nuclear Free Local Authorities .pdf 0 Deadline 3 Cover Letter.pdf 01 1.3 Guide to the Application.pdf 02 1.3 Guide to the Application (Rev 4.0) Welsh Language.pdf 03 Horizon’s Response to IACC’s Local Impact Report.pdf 04 Horizons response to Interested Parties responses to the ExA First Round Written Questions.pdf 05 Horizon"s Response to Written Representation - Arthur Wyn Owen .pdf 06 Horizon"s Response to Written Representation - Betsi Cadwaladr University Health Board .pdf Good Evening This is the first in a series of 8 e-mails for the Wylfa Newydd DCO Examination Deadline 3 deliverables. The list below provides a complete list of all documents attached to this e-mail and we will also be delivering 2x USB pen drives containing all of our Deadline 3 submission to your offices at 10:00 tomorrow (Tuesday 18th December).
    [Show full text]
  • Adroddiad Sylwadau Rhan 2
    Cynllun Adnau: Adroddiad Sylwadau Rhan 2—Mapiau Cynllun Datblygu Lleol ar y Cyd Gwynedd a Môn Hyd 2015 Contents 1.0 Cyflwyniad ......................................................................................................................................................4 2.0 Beth yw’r camau nesaf?.................................................................................................................................4 3.0 Gwybodaeth Bellach ......................................................................................................................................5 RHAN 2: Sylwadau ar y Ddogfen Mapiau1 CANOLFAN ISRANBARTHOL...................................................................................................................................6 1) Bangor ................................................................................................................................................................6 CANOLFANNAU GWASANAETH TREFOL ............................................................................................................11 2) Amlwch .............................................................................................................................................................11 3) Caergybi ...........................................................................................................................................................14 4) Llangefni...........................................................................................................................................................21
    [Show full text]
  • SUB-REGIONAL CENTRE 1) Bangor
    SUB-REGIONAL CENTRE 1) Bangor Rep Summary of Representation / Change(s) Name Section Type Comments and Recommendations ID to Plan Note the Support Dwr Cymru Welsh * This site has planning permission as POLICY TAI14, T1 - 1552 Water (Mr Dewi Support such we have no further comment to Recommendation Goetra Uchaf, Bangor Griffiths ) [2680] make No Change Not Accepted The representation seeks a deletion of a site within the Deposit Plan. In preparing the Deposit Plan, the JPPU collated an extensive range of supporting evidence that demonstrates the housing requirement over the JLDP period and has also identified the necessary infrastructure required to support the development. The Abolish plans to develop 1) the old Friars sites allocated within the plan are site on Ffriddoedd Road 2) the Pen y consistent with the overall plan Strategy CPERA (Cynghorydd POLICY TAI14, T2 - Ffridd site 3) check that there are no and are deliverable within the plan period 113 Elin Walker Jones) Former Friars School Object plans to develop the area between to enable the JLDP to meet the identified [2760] Playing Field, Bangor Ffordd Eithinog and Bryn Eithinog - build housing needs of the plan area up to 2026. on brownfield and not greenfield Furthermore, the Deposit Plan contains a suite of policies and supporting text that explains how development will be managed within the areas of change, and the mechanisms by which the necessary infrastructure, services and facilities will be secured. This policy framework also includes the Councils’ requirement to mitigate potential impacts of development in relation to enhancing and protecting the 1 Rep Summary of Representation / Change(s) Name Section Type Comments and Recommendations ID to Plan natural and built environment, provision of sustainable transport, community facilities, environmental assets and the careful management of development in environmentally sensitive areas or rural locations.
    [Show full text]
  • Isle of Anglesey Charitable Trust
    ISLE OF ANGLESEY CHARITABLE TRUST Committee : Isle of Anglesey Charitable Trust Date : 27 January 2016 Title of Report : 2014/15 Annual Report Purpose of Report : To submit the Draft Annual Report and Accounts for Adoption. Report by : Treasurer of the Isle on Anglesey Charitable Trust Action : Adopt Annual Report and Accounts and Authorise Submission to the Charity Commission. The audit of the attached draft annual report and accounts for 2014/15 have been completed and they are, therefore, submitted for adoption by the Charitable Trust. There are no significant changes to the format or contents of the accounts this year. The Charitable Trust is invited to adopt the annual report and accounts presented and to authorise the Chair of the Trust to sign the annual report and accounts and the Audit Letter of Representation. R MARC JONES TREASURER – ISLE OF ANGLESEY CHARITABLE TRUST 20 JANUARY 2016 YMDDIRIEDOLAETH ELUSENNOL YNYS MÔN ISLE OF ANGLESEY CHARITABLE TRUST ADRODDIAD BLYNYDDOL 2014/2015 ANNUAL REPORT Ymddiriedolaeth Elusennol Ynys Môn / Isle of Anglesey Charitable Trust Swyddfa’r Sir / County Offices LLANGEFNI Ynys Môn LL77 7TW ISLE OF ANGLESEY CHARITABLE TRUST County Offices Llangefni Ynys Môn LL77 7TW Registered Charity No. : 1000818 THE ANNUAL REPORT 2014/15 LEGAL AND ADMINISTRATIVE DETAILS TRUST DEED The Isle of Anglesey Charitable Trust (Registered Charity No. 1000818) was formed on 5 June 1990 and the Trust deed of that date specifies the duties, powers and conditions under which the Trust is required to operate. TRUSTEE The sole Trustee of the Isle of Anglesey Charitable Trust is the Isle of Anglesey County Council.
    [Show full text]
  • Community Infrastructure 13
    Background Paper 13: Community Infrastructure 13 February Gwynedd & Môn Joint Local Development Plan 2015 [Type text] Topic Paper 13: Infrastructure Background This is one of a range of topic papers prepared to offer more detailed information and explain the approach of the Plan to different topics and issues affecting the Joint Local Development Plan Area. This paper will look specifically at community infrastructure. It will explain the background which will help to identify the issues, objectives and options for the Deposit Plan. The Deposit Plan is the second statutory stage in the preparation of the Joint Local Development Plan (JLDP). The JLDP shapes the future growth of communities in the Joint Local Development Plan Area and will set out the policies and land allocations against which planning applications will be assessed. The Deposit Plan will be submitted to the Welsh Government, which will appoint an independent inspector to assess the soundness of the Plan in the Examination in Public. If the inspector considers the Plan to be sound it will be recommended for adoption. When adopted the JLDP will supersede the Gwynedd Unitary Development Plan (2009) for the Gwynedd Local Planning Authority Area and the Gwynedd Structure Plan (1993) and Ynys Môn Local Plan (1996) for the Ynys Môn Local Planning Authority. This topic paper can be read in isolation or in conjunction with the other Topic Papers and Background Papers that have been prepared to give a full picture the Joint Local Development Plan Area. You may refer to the Topic Paper as a basis for making comments about the Deposit Plan.
    [Show full text]
  • Supplementary Planning Guidance for Wylfa Newydd PDF 5 MB
    ISLE OF ANGLESEY COUNTY COUNCIL Report to: The County Council Date: 15th May 2018 Subject: Wylfa Newydd Supplementary Planning Guidance (SPG) Portfolio Holder(s): Cllr. Richard Dew Cllr. Carwyn Jones Report Author: Dylan J. Williams Head of Regulatory & Economic Development Service Tel: (01248) 752499 E-mail: [email protected] Local Members: All Elected Members A – Recommendation/s and reason/s Recommendation(s) That the County Council: i. Adopt the revised (Anglesey specific) Wylfa Newydd Supplementary Planning Guidance (SPG) and all Topic Papers & Statutory Assessments. Introduction The New Nuclear Build at Wylfa: Supplementary Planning Guidance (SPG) was produced and adopted by the Isle of Anglesey County Council (the IACC) in July 2014 (Link). Supplementary Planning Guidance is a means of setting out detailed thematic or site specific guidance on the way in which national and local policies will be applied in particular circumstances or areas. As the Joint Local Development Plan (JLDP) was yet to be adopted, the SPG was produced to fill this policy gap. This enabled the IACC to influence and inform Horizon Nuclear Power’s (Horizon) strategic decision making, it provided the basis for the County Council’s response to Horizon’s statutory consultations (PAC1, 2 and 3) and also provided a sound and robust policy framework for the IACC to make decisions in relation to any planning applications (as well as the DCO itself). However, since the SPG was adopted in 2014, there have been a number of fundamental changes which has necessitated the need to review and update this SPG. 1. Policy Changes – The JLDP was formally adopted by the IACC on the 31st July 2017 (Link).
    [Show full text]
  • The Morlais Project
    THE MORLAIS PROJECT Subsea UK April 2021 AGENDA • Menter Môn background • Morlais Project background • Tidal energy devices/developers • Resource use • Morlais Project timelines • Project Execution • Consent process • Onshore considerations • Marine Phasing considerations • Employment • Engagement • Morlais objectives • Background information • Energy Systems MENTER MÔN IS A NOT FOR PROFIT COMPANY PROVIDING SOLUTIONS TO THE CHALLENGES FACING RURAL WALES ABERLLEINIOG CASTLE YNYS MÔN • A Tidal Stream zone designated by the Crown Estate 2014 • 35 km2 of sea bed • 45 year lease to 2059 owned by Menter Môn • 240MW capacity • Strong tidal resource • Futureproofed grid potential • Identified customers. MORLAIS PROJECT - OBJECTIVES & BENEFITS BETH YW YNNI LLIF LLANW? WHAT IS TIDAL STREAM ENERGY? TIDAL ENERGY DEVICES FILLING THE GAP • The tide is one of the strongest forces of nature on Earth • Unlike other renewables, tidal energy is predictable to the minute – months, years and even decades in advance. • Water is 830 times denser than air. The high density of water means tidal energy has a much higher energy density than wind power. Tidal energy can generate the same amount of power as wind in a far smaller area. • Power generated relationship to velocity cubed : P = ½ ρ A.V3 • P = power • ρ = density of water • A = swept x-sectional area • V = velocity FILLING THE GAP • https://www.sciencedirect.c om/science/article/pii/S0360 544219313192#bib10 Predictability and quality of tidal-stream energy may be undervalued at present. Morlais Project
    [Show full text]
  • Protected Species Survey Gors Twr, Llaingoch, Holyhead
    Gors Twr, Llaingoch September, 2018 Protected Species Survey Gors Twr, Llaingoch, Holyhead Client Details Ann Parry Gors Twr, Llaingoch, Holyhead, Anglesey Grid Reference SH22838226 Planning Authority Anglesey County Council Planning Application No. Not known Date of Survey 30th August 2018 Architect Details Dafydd Edwards, 1 Trehwfa Road, Holyhead, LL65 1LE Report Version 0.1 Date of Report Writing September 2018 1 Gors Twr, Llaingoch September, 2018 CONTENTS 1.0 SUMMARY 3 2.0 INTRODUCTION 3 2.1 Surveyor details 4 2.2 Purpose of survey 4 2.3 Proposed works 5 2.4 Legislation and policy guidance summary 6 3.0 SITE AND PROPERTY DESCRIPTION 8 4.0 METHODOLOGY 11 4.1 Desktop study 11 4.2 Daylight building inspection 11 4.3 Bat activity surveys 12 5.0 RESULTS 12 5.1 Desktop study 12 5.2 Daylight building inspection 12 5.3 Bat activity survey 12 6.0 SURVEY LIMITATIONS 13 7.0 CONCLUSIONS 14 8.0 IMPACT ASSESSMENT 14 9.0 RECOMMENDATIONS & RAM 15 10.0 REFERENCES 16 11.0 APPENDICES 16 2 Gors Twr, Llaingoch September, 2018 1.0 SUMMARY Gors Twr is the subject of a planning application for conversion into a holiday let. As such a Protected Species Survey was commissioned to establish features with potential to support bats and other protected species and to determine past and present use of the building by bats and nesting birds The site has been assessed as having a high value to bats, as bats were observed and recorded commuting and foraging around the buildings. However no bats were observed emerging from the buildings during the survey.
    [Show full text]
  • Site Deliverability Report July 2016
    July 2016 Site Deliverability Report Anglesey and Gwynedd Joint Local Development Plan 1.0 Introduction 1.1 This paper has been prepared in response to questions raised regarding the deliverability of sites allocated for development within the Joint Local Development Plan (JLDP) on viability grounds due to the requirements for infrastructure, facilities and services to support the level of growth proposed in the JLDP, and the implications that this could have on the delivery of the Plan. 2.0 Infrastructure Requirements 2.1 Planning Policy Wales (Edition 8, January 2016) states that, “The capacity of existing infrastructure, and the need for additional facilities, should be taken into account in the preparation of development plans and the consideration of planning applications. In general, local planning authorities should seek to maximise the use of existing infrastructure and should consider how the provision of different types of infrastructure can be co-ordinated.” (para 12.1.6). 2.2 In preparing the Deposit JLDP the Councils have sought to identify existing infrastructure capacity and future infrastructure requirements associated with planned housing and employment growth required to support the delivery of the JLDP. This is identified in the Plan’s evidence base through the topic and background papers which cover a range of issues such as community infrastructure topic paper 13, PT.024), transport (topic paper 15, PT.026), open space assessment (topic paper 14, PT.025), candidate site assessment (topic papers 1 & 1A, PT.001 & PT.002), settlement profiles (topic paper 19, PT.019) and flood consequences assessment (topic paper 8, PT.015). 2.3 This paper aims to summarise the key infrastructure requirements already referred to within the background documents and, where possible, identifies the organisations responsible for providing the infrastructure and the means (financial or otherwise), by which the infrastructure will be provided.
    [Show full text]