Minor Mineral Ordinary Sand Mine

(Proposed Project)

Village : Bodhan, Ta : Mandvi, Dist : () Production Capacity : 1,10,000TPA Area : 01-48-00 Ha.

Proposal For

Environmental Clearance

(Category "B" Under item 1 (a), of EIA Notification dated 14.09.06 and its subsequent amentdments and as per

Office Memorandum No. L-110011/47/2011-IA.II (M) dated 26.06.2012

Proponent Manharbhai Morarbhai Vaghela

At: Bodhan, Opp.sr.no.516,277,2 & gamtal Tapi nadi Patt paiky

Taluka:- Mandvi Dist:- Surat

Mo :- +91 9624023362

1 Manharbhai Morarbhai Vaghela

At:- Bhada

Taluka:-,

Dsit : Surat.

Date :- 14-09-2016

To,

Assistant Geologist,

Geology & Mining Department,

Collector Offices,

Surat.

Sub :- Application for Environmental Clearance Certificate (Ec.)

Respected Sir,

As per the EIA Notification 15th January 2016, it is compulsory to get Ec. to do mining activities of minor mineral. I the applicant Manharbhai Morarbhai Vaghela applied of a lease of mineral Ordinary Sand Opp. Sr.no.516,277,2 Gamtal Tapi Nadi Patt Paiky of area 01-48-00 Ha. at Village : Bodhan, Taluka : Mandvi, Dist. Surat from collector Surat. I am submitting the application for EC. In prescribe form and format.

Your Thanking

(Manharbhai Morarbhai Vaghela )

Submissions: (A) From - 1 M (B) Form - 1 (C) Pre-feasibility Report

2 (A)

FROM - 1 M

APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY "B2" FOR LESS THAN AND EQUAL TO FIVE HECTARE

Basic Information:-

(viii) Name of the Mining Lease site Manharbhai Morarbhai Vaghela (ix) Location / site (GPS Co-ordinates) Bodhan / 21°17’2.62”N”N 73° 5'33.71"E (x) Size of the Mining Lease (Hectare) 01-48-00Hectare (Govt. land) (xi) Capacity of Mining Lease (TPA) 1,10,000TPA (xii) Period of Mining Lease Approximately 5 Years (xiii) Expected cost of the Project Approximately 2.00 Lacs. (xiv) Contact Information 98242 18590

Environmental Sensitivity:-

Sr. Area Distance in No. Kilometer/Details 1. Distance of project site from nearest rail or road Distance from the bridge over the concerned River, Rivulet, Nallah nearest bridge over the etc, River is about 0.80 Km 2. Distance from infrastructural facilities Railway line 19.95 Km National Highway 14.57 Km N.H. No.8 State Highway 0.79 Km S.H. No. 165 Major District Road 14.57 Km N.H. No. 8 Any Other Road Bodhan 0.10 Km Gramya Marg. Electric Transmission Line pole or tower Electric Pole is 0.10 Km away from lease boundary. Canal or check dam or reservoirs or lake or Dam 28.21km near ponds Mandvi away from lease boundary. In-take for drinking water pump house Drinking water tank Bodhan Intake for Irrigation canal pumps None 3. Areas protected under international None conventions, national or local legislation for their ecological, landscape, cultural or other related value

3 4. Areas which are important or sensitive for None ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 5. Areas used by protected, important or sensitive None species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 6. Inland, coastal, marine or underground waters Underground water level is below 30 Mtr. 7. State, National boundaries None 8. Routes or facilities used by the public for access None to recreation or other tourist, pilgrim areas 9. Defence installations None 10. Densely populated or built-up area, distance Mandvi about 28 Km away from nearest human habitation from lease boundary. 11. Areas occupied by sensitive man-made land Mandvi is about 28 Km uses (Hospitals, Schools, Places of worship, away from lease community facilities) boundary. 12. Areas containing important, high quality or None scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 13 Areas already subjected to pollution or No critically polluted area environmental damage. (those where existing in the periphery of 10.00 legal environmental standards are exceeded) Km from lease boundary. 14. Areas susceptible to natural hazard which could None cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) 15. Is proposed mining site located over or near No, Proposed mining fissure / fracture for ground water recharge project will not affect ground water recharge system. 16. Whether the proposal involves approval or None clearance under the following Regulations or Acts, namely : (a) The Forest (Conservation) Act, 1980 None (b) The Wild life conservation Act, 1972 None (c) The Coastal Regulation Zone Notification, None 2011. If yes, details of the same and their status to be given. 17. Forest land involved (hectares) None. 18. Whether there is any litigation pending against No Litigation is pending the project and/or land in which the project is against the lease area / propose to be set up ? applicant of this lease area in not any court of law as per our best

4 knowledge. (a) Name of the Court - (b) Case No. - (c) Orders or directions of the Court, if any, - and its relevance with the proposed project.

(Signature of Project Proponent)

Manharbhai Morarbhai Vaghela

At: Bodhan,

Ta: Mandvi,

Dist: Surat

 

5 (B) FROM 1 (Application for Environment Clearance Certificate) Sr. Item Details No. 1 Name of the Project River Sand Mining Project of Manharbhai Morarbhai Vaghela At Village : Bodhan, Taluka : Mandvi, Dist : Surat 2 S. No in schedule As per Gazette Notification dated 15th January 2016. 3 Proposed S.No. Proposed Area capacity/area/length/tonnage Capacity to be handled/command 1. 1,10,000TPA 01-48-00 Ha area/lease area/number of well to be drilled 4 New/expansion/modernization It is a Proposed project. 5 Proposed capacity/area etc. The Production capacity would be 1,10,000TPA Lease Area : 01-48-00 Ha. 6 Category of project i.e. “A” or B-Category as per EIA Notification 2016 “B” 7 Does it attract the general No, it does not attract the general Condition. condition? If yes please specify 8 Does it attract the specific No, it does not attract the Specific Condition. condition? If yes please specify 9 Location The lease area of Ordinary Sand situated near village : Bodhan, Ta : Mandvi, Dist : Surat The geographical location of the mine is as under :- Corner N0 E0

A 21°17'2.62"N 73° 5'33.71"E Plot/Survey/Khasra No OPP.SR.NO.516,277,2 Gamtal Tapi Nadi Patt Paiky Village Bodhan Tehsil Mandvi District Surat State Gujarat 10 Nearest railway station/airport S. Particulars Name Distance along with distance in Kms. No. (From Lease

6 Sr. Item Details No. boundary) 1 Nearest railway 16.23 km station 2 Nearest Airport Surat 29.82 km 11 Nearest town, city, district S. Particulars Name Distance headquarter along with No. (From distance in Kms. Lease boundary) 1 Nearest Bodhan 0.10 km Village 2 Nearest City Mandvi 28 km 3 Nearest District Surat 29.82 km Headquarter 12 Village Panchayat, Zila Village Bodhan Gram 0.10 km Parishad, Municipal Panchayat Panchayat Corporation, local body Zilla Surat 29.82 km (Complete postal address Panchayat Zilla with telephone nos to be Panchayat given) Nagarpalika Mandvi 28km Postal Manharbhai Morarbhai Address with Vaghela telephone At:-Bhada No. Taluka:-Kamrej Dsit : Surat.

13 Name of the applicant Manharbhai Morarbhai Vaghela 14 Registered address Manharbhai Morarbhai Vaghela

At:-Bhada

Taluka:-Kamrej

Dsit : Surat.

15 Address for correspondence Manharbhai Morarbhai Vaghela

At:-Bhada

Taluka:-Kamrej

Dsit : Surat

Name Manharbhai Morarbhai Vaghela Designation Owner

7 Sr. Item Details No. Address Manharbhai Morarbhai Vaghela

At:-Bhada

Taluka:-Kamrej

Dsit : Surat.

Pin code E-mail [email protected] Telephone 09624023362 Fax No -- 16 Details of alternative sites Mineral river sand is naturally occurring examined, if any. Location of resource and this is a site specific project these sites should be shown Hence no alternative can be chosen. on a topo sheet 17 Interlinked Project N.A. 18 Whether separate application N.A. for interlinked project has been submitted? 19 If yes date of submission N.A. 20 If no reason N.A. 21 Whether the proposal N.A. involves approval/ clearance under: if yes, details of the same and their status to be given The Forest (Conservation) Act, 1980

The Wildlife (Protection) Act, 1972 The CRZ Notification 1991 22 Whether there is any N.A. Government order/policy relevant/ relating to site 23 Forest Land involved? N.A. 24 Whether there is any litigation No litigation is pending in any court of law as pending against the project per our best knowledge. it is fresh application and / or land in which the and waiting for grant order of collector. project is propose to be set up

8 Sr. Item Details No. Name of court Case no Order/directions of the court, if any and its relevance with the proposed project. 25 Expected cost of the project Rs. 2,00,000

1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc) Sr. Information/Checklist Ye Details there of with approximate No. confirmation s/ quantity/rate wherever possible with No source of information of data ? 1.1 Permanent or temporary Yes Land USE :- change in land use, land The land use classification as per cover or topography revenue record is Govt. River Bed land. including increase in Due to mining activities there will be intensity of land use (with slightly changes in topographical respect to local land use features because proposed mining plan) confined to river bed only, no other area disturbed except some mineral is stacked at earmarked site of surface. Area is covered with water flow sand. There would be temporarily change in topography but river itself replenishes with sediment carried during monsoon season. 1.2 Clearance of proposed land, Yes lease area is river bed area so there vegetation and buildings? will be no clearance of vegetation and buildings. 1.3 Creation of new land uses? No N.A 1.4 Pre-construction No N.A. investigations e.g. bore holes, soil testing? 1.5 Construction works? No No construction work will be carried out. 1.6 Demolition works? No N.A. 1.7 Temporary sites used for No Local people will be employed so only construction works or temporary rest shelter and toilet facility

9 Sr. Information/Checklist Ye Details there of with approximate No. confirmation s/ quantity/rate wherever possible with No source of information of data ? housing of construction is constructed at the mine site on workers? 0.0030 ha. 1.8 Above ground buildings, Yes There will not be any significant structures or earthworks construction activity except for workers including linear structures, rest room and urinal facility. cut and fill or excavations 1.9 Underground works including No There will not be any underground mining or tunneling? working since the proposal is for opencast mining activities only. 1.10 Reclamation works? No No reclamation measures will be adopted at site except leveling of river bed alter achieving UPL of 3mtr from river bed level. River itself replenishes with sediment carried during monsoon season. 1.11 Dredging? No Mining will not proposed in underwater so no requirement of dredging at all. 1.12 Offshore Structures? No Not applicable

1.13 Production and Yes @ 1,10,000TPA manufacturing processes? 1.14 Facilities for storage of No N.A. goods or materials?

1.15 Facilities for treatment or Yes Nature of Waste : No waste generated disposal of solid waste or at all except some amount of top soil in liquid effluents? the from of alluvium will come out. Disposal : Top soil will be stacked separately. A 30.0 m buffer zone is left along riparian zone. 1.16 Facilities for long term No There is no need to provide housing housing of operational within the lease area as the local workers? persons will be given employment. 1.17 New road, rail or sea traffic No N.A. during construction or operation?

10 Sr. Information/Checklist Ye Details there of with approximate No. confirmation s/ quantity/rate wherever possible with No source of information of data ? 1.18 New road, rail, air No N.A. waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No Not applicable proposed transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not applicable lines or pipelines? 1.21 Impoundment, damming, No Not applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable 1.23 Abstraction or transfers of No No abstraction or transfers of ground water form ground or surface water. waters? 1.24 Changes in water bodies or No During mining no alteration or changes the land surface affecting in the passage or route of river. drainage or run-off? 1.25 Transport of personnel or Yes Minerals Ordinary Sand will be materials for construction, transported in tractors & trucks by operation or road to consumers. Workers will come decommissioning? from nearby villages on their convenience. 1.26 Long-term dismantling or Yes Whenever achieving 3mtr BGI, from decommissioning or river bed level, mining will not do at all. restoration works? In restoration/reclamation programme, after 3 mtr mining provision of levelling or grading of river bed will be taken. River itself carried huge amount of sediment during every monsoon season so there will be no reclamation measures proposed at mine site. 1.27 Ongoing activity during Yes In 10 mtr buffer along riparian zone will

11 Sr. Information/Checklist Ye Details there of with approximate No. confirmation s/ quantity/rate wherever possible with No source of information of data ? decommissioning which be planted preferring local plant could have an impact on the species. It will be checking riparian environment? erosion and creating aesthetic environment of surrounding area. By this project of river sand mining in the area. river will be holding more volume of water making to ensure availability of water in nearby area. 1.28 Influx of people to an area No Impact will be insignificant, as the local either temporarily or people will be provided employment. permanently? About 15 local peoples will be getting employment from this project. 1.29 Introduction of alien species? No Not applicable 1.30 Loss of native species or No N.A. genetic diversity? 1.31 Any other actions? No Not applicable 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sr. Information/Checklist Yes/ Details there of with approximate No confirmation No? quantity/rate , wherever possible with source of information data 2.1 Land especially undeveloped or No The mining lease area is Govt. River agricultural land (ha) bed area (Opp.Sr.no.516,277,2 Gamtal Tapi Nadi Patt Paiky).

2.2 Water (expected source & Yes The daily water demand will be only competing users) unit: KLD 3.0 KLD. The domestic water demand will be met from the village Bodhan. 2.3 Minerals (MT) Yes Ordinary Sand @ 1,10,000TPA 2.4 Construction material - stone, No N.A. aggregates, sand / soil (expected source, MT) 2.5 Forests and timber (source, MT) No Not applicable 2.6 Energy including electricity and Yes Presently there will be no electric fuels (source, competing users) power at mine. Diesel will be used unit: fuel (MT), energy (MW) on an average 50 LPD. Source Nearest Pump / Depot. 2.7 Any other natural resources (use No Not applicable

12 Sr. Information/Checklist Yes/ Details there of with approximate No confirmation No? quantity/rate , wherever possible with source of information data appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr. Information / Checklist Yes/ Details there of with approximate No. confirmation No? quantity/rate wherever possible with source of information of data 3.1 Use of substances or materials, No N.A. which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No The proposed mining project will not disease or affect disease affect in occurrence of disease due to vectors (e.g. insect or water transport, handing or production of borne diseases) mineral / Ordinary Sand. 3.3 Affect the welfare of people e.g. No The proposed project will provide by changing living conditions? Ordinary Sand for the end use in the local region and will not affect the welfare of people due to use, storage, transport, handling or production of the mineral. 3.4 Vulnerable groups of people No The proposed project will be not who could be affected by the harmful for the vulnerable groups of project e.g. hospital patients, the people due to storage, transport, children, the elderly etc., handling or production of the mineral. 3.5 Any other causes No None 4. Production of solid wastes during construction or operation or decommissioning (MT/month) Sr. Information/Checklist Yes/ Details there of with approximate No. confirmation No? quantity/rate wherever applicable with source of information of data 4.1 Soil, overburden or mine wastes Yes Waste comprises of some amount of top soil occurring as alluvium. 4.2 Municipal waste (domestic and No N.A. or commercial wastes) 4.3 Hazardous wastes (as per No N.A. Hazardous Waste Management

13 Sr. Information/Checklist Yes/ Details there of with approximate No. confirmation No? quantity/rate wherever applicable with source of information of data Rules) 4.4 Other industrial process wastes No Not applicable 4.5 Surplus product No No surplus product will generate. 4.6 Sewage sludge or other sludge No N.A. from effluent treatment 4.7 Construction or demolition No Not Applicable wastes 4.8 Redundant machinery or No There will be not any redundant equipment machinery or equipment. 4.9 Contaminated soils or other No Not Applicable materials 4.10 Agricultural wastes? No Not Applicable 4.11 Other solid wastes? No N.A.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr) Sr. Information/Checklist Yes Details are there of with approximate No. confirmation /No? quantity/rate wherever applicable with source of information of data 5.1 Emissions from Yes Mobile sources like diesel equipments used combustion of fossil fuels in the process generate gaseous emission, from stationary or mobile however it will be insignificant as the use of sources fuel will not be considerable. Proper maintenance of vehicles, loading equipments and machineries reduce the diesel consumption and thereby emissions. Source Mitigation Measures Mobile • Regular maintenance of sources equipments like diesel • Proper calibration of fuel equipments injection pumps. • Proper air / fuel ratio • Timely changing of filters (fuel/oil) • Proper maintenance of silencers/mufflers 5.2 Emissions from No N.A. production processes 5.3 Emissions from materials No There will be fugitive emissions generating

14 Sr. Information/Checklist Yes Details are there of with approximate No. confirmation /No? quantity/rate wherever applicable with source of information of data handling including during material handling transportation, storage or transport loading and unloading etc. Transportation :- Movement of vehicles like dumper trucks tankers etc. will generate dust particles. Regular water sprinkling on haul road will be suppressing the dust particles and prevent them from getting air-borne. Loading :- Dust emission will be generating as the material is loaded into dumpers by loader. 5.4 Emissions from No There will not be any significant construction activities construction activities except for workers including plant and rest room and office. equipment 5.5 Dust or odours from No Only dust due to transportation and loading handling of materials of Ordinary Sand. The dust emission will be including construction controlled by adopting suitable measures materials, sewage and viz. Water sprinkling, plantation, making waste enclosures & maintaining roads. 5.6 Emissions from No Not Applicable incineration of waste 5.7 Emissions from burning No Not Applicable of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No Not Applicable sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat: Sr. Information/Checklist Yes/ Details are there of with No confirmation No? approximate quantity/rate wherever . applicable with source of information of data

15 6.1 From operation of Yes Noise will be generated during equipment e.g. engines, operation of Diesel engine of vehicles. ventilation plant, crushers Mitigation Measures :- The following measures are adopted to control the noise and vibration: » Proper and regular maintenance of machinery » Earmuffs and earplugs are provided » Periodical medical checkup is being conducted. P.P.E. like earmuffs are provided to the persons exposed to noise levels. » Measures will be taken to contain noise levels up to 75 dB(A) 6.2 From industrial or similar No Not Applicable processes 6.3 From construction or No Not Applicable demolition 6.4 From blasting or piling No N.A. 6.5 From construction or No There will not any construction operational traffic proposed at mine. Only mining of mineral will be carried out. 6.6 From lighting or cooling No Proposed mining will be open cast systems thus emission of light and heat will be negligible. All the mining operation is being done in day only. No cooling system is required. 6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea Sr. Information/Checklist Yes Details are there of with No. confirmation /No? approximate quantity/rate wherever applicable with source of information of data 7.1 From handling, storage, use or No The proposed mine is not involve spillage of hazardous materials handling, storage and use of hazardous materials. 7.2 From discharge of sewage or No There will be no risk of contamination other effluents to water or the of land and water due to discharge of land (expected mode and place untreated waste water. However, no

16 Sr. Information/Checklist Yes Details are there of with No. confirmation /No? approximate quantity/rate wherever applicable with source of information of data of discharge) untreated sewage will be to discharged in the open land causing the contamination to ground water. The waste water generated treated in the septic tank followed by soak pit. 7.3 By deposition of pollutants Yes During operation phase there will be emitted to air into the land or emissions generate from loading and into water unloading and mineral handling, transportation and mobile sources. Dust generation will be controlled by water sprinkling. Hence, no risk of contamination of air, water will envisaged. 7.4 From any other sources No There is not be any other sources, which will contaminate land and water resources. 7.5 Is there a risk of long term build No Not Applicable. up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Sr. Information/Checklist Yes/No? Details are there of with No. confirmation approximate quantity/rate wherever applicable with source of information of data 8.1 From explosions, spillages, No N.A. fires etc from storage, handling, use or production of hazardous substances 8.2 From any other causes No N.A. 8.3 Could the project be affected No The project is located in seismic by natural disasters causing zone-III. There is no flood. environmental damage e.g. cloudburst and landslide reported floods, earthquakes, so far. Seismic zone map. landslides, cloudburst etc)?

17 Sr. Information/Checklist Yes/No? Details are there of with No. confirmation approximate quantity/rate wherever applicable with source of information of data

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other proposed or planned activities in the locality Sr. Information/Checklist Yes/No? Details are there of with No. confirmation approximate quantity/rate wherever applicable with source of information of data 9.1 Lead to development of Yes Roads and transport facility will supporting. Facilities , ancillary improved due to frequently development or development available of mine vehicles. stimulated by the project which Project proponent will organize could have impact on the regular medical checkup camps environment e.g.: supporting and recreational activities. infrastructure (roads, power Employment to local people will be supply, waste or waste water generated. treatment, etc.) housing Overall living standard of nearby development extractive people will have positive impact. industries supply industries, (other) 9.2 Lead to after-use of the site, Yes The mining activities will have which could have an impact on positive impact if environment the environment measures are effectively implemented. Greenbelt along riparian zone of 10.0 mtr. will have positive impact on surrounding environment. 9.3 Set a precedent for later Yes Mining of mineral is proposed with developments rated capacity of @ 1,10,000TPA and to obtain this, loading of mineral by manual.

18 Sr. Information/Checklist Yes/No? Details are there of with No. confirmation approximate quantity/rate wherever applicable with source of information of data Proposed green belt development will help in increasing the aesthetic beauty of the area. 9.4 Have cumulative effects due to No The area will be free from any proximity to other Proposed or disturbances. There will not be planned projects with similar any industries or development effects projects in its close proximity.

10. Environmental Sensitivity Sr. Area Name / Aerial distance (within 10 km) from No identity proposed location boundary 1 Areas protected under None Not Applicable international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important No Not Applicable or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, No. Not Applicable important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or No Not Applicable underground waters 5 State, National boundaries No Not Applicable 6 Routes or facilities used by No Not Applicable the public for access to recreation or other tourist, pilgrim areas 7 Defense installations No Not Applicable 8 Densely populated or built- Yes Nearest village Bodhan (Population

19 Sr. Area Name / Aerial distance (within 10 km) from No identity proposed location boundary up area 2000) is about 0.10 km. 9 Areas occupied by Yea All facilities are available at city Surat sensitive man-made land which is 29.82 km away from lease uses (hospitals, schools, area. places of worship, community facilities) 10 Areas containing important, Not Applicable high quality or scarce resources (ground water No resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to No None pollution or environmental damage. (those where proposed legal environmental standards are exceeded) 12 Areas susceptible to Yes The water level in river may fluctuate natural hazard which could depending on the rainfall intensity. cause the project to According to BMTPC Vulnerability Atlas present environmental (earthquake), the study area falls in a problems (earthquakes, Zone-III. subsidence, landslides, There is no incidence of landslide but in erosion, flooding or 2001 a major incidence of earth quake extreme or adverse climatic was there. conditions) There is no date available flooding of the area.

20 (IV).Proposed Terms of Reference for EIA studies

We commit to undertake only controlled blasting for minimizing noise and vibration from blasting operation. We request you to consider our project as B2 category project looking to tiny scale of our project and negligible potential of environmental impacts.

“I hereby given undertake that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any project will be revoked at our risk and cost.”

Date :- 14-09-2016 Place :- Surat Signature of the applicant

(Manharbhai Morarbhai Vaghela) At Village : Bodhan, Ta : Mandvi, Dist : Surat. (Project Proponent/Authorised Signatory)

21 NOTE :

1. The projects involving clearance under Coastal Regulation Zone Notification. 1991 shall submit with the application a C.R.Z. map duly demarcated by one of the authorized agencies. showing the project activates, w.r.t. C.R.Z. (at the stage of TOR) and the recommendations of the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z. Notification, 1991 for the activites to be located in the CRZ. 2. The projects to be located within 10 km of national Parks. Sanctuaries. Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the stage of EC)". 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarification, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project".