Borders Railway Year 2 Evaluation Survey of Users and Non-Users February 2018 Borders Railway Year 2 Evaluation Survey of Users and Non-Users Transport Scotland

Total Page:16

File Type:pdf, Size:1020Kb

Borders Railway Year 2 Evaluation Survey of Users and Non-Users February 2018 Borders Railway Year 2 Evaluation Survey of Users and Non-Users Transport Scotland transport.gov.scot Borders Railway Year 2 Evaluation Survey of users and non-users February 2018 Borders Railway Year 2 Evaluation Survey of users and non-users Transport Scotland Table of Contents 1 Introduction 10 2 Background 11 3 Primary Research Approach 15 4 Investment Objectives 22 5 Visitor Survey 55 6 Service Quality and Barriers to Use 67 2 Borders Railway Year 2 Evaluation Survey of users and non-users Transport Scotland Transport Research Summary The Borders Railway re-opened in September 2015. In line with Scottish Transport Appraisal Guidance (STAG) and Transport Scotland’s Guidance on the Evaluation of Rail Projects, Transport Scotland completed a Stage 1 Evaluation of the Railway in November 2016. This research aims to build on the findings of the Stage 1 Evaluation and further develop understanding of the extent to which the Borders Railway is on track to meet its investment objectives. In addition, the study aims to capture the views and experiences of tourists using the railway. While the views of tourists were captured in the Year 1 Study, it was recognised that, due to the time at which the surveys were undertaken, the results are likely to underestimate the true tourism impact. A key aim of this study is therefore to record visitor numbers during the summer peak and, in so doing, provide greater clarity on the overall tourism impact of the new line. As with the Stage 1 Study, the research involved: an on-train survey of users of the Borders Railway; a telephone survey of non- and infrequent users of the Borders Railway based within the Scottish Borders and Midlothian; secondary data analysis including a review of ticket sales and passenger count data and an analysis of public transport connectivity. In addition, a series of consultations were completed with bus operators / local councils in the Borders and Midlothian to help develop a understanding of the impacts of the Borders Railway on bus services. The purpose of this report is to set out the overall findings from the study. The document includes a detailed discussion of the research approach as well as a summary of the key findings from both the primary and secondary research. Main Findings In Year 2, overall travel on the line has increased by 9.5%. As in Year 1, the majority of patronage on the line is towards Edinburgh with Tweedbank accounting for the biggest component of demand and Edinburgh Waverley the most frequent destination. Compared to Year 1, has been an increase in inbound and outbound travel at all the Midlothian stations while the number of people travelling to Galashiels and Tweedbank has fallen with the latter likely a reflection of the novelty impact of the line. Based on the frequency with which respondents indicated they made their current trip, it is estimated that approximately 35,900 (35%) of the estimated annual single trips recorded via the sample were ‘new trips’. 3 Borders Railway Year 2 Evaluation Survey of users and non-users Transport Scotland In terms of tourists, 71% said that the re-opening of the line had been a factor in choosing to make their trip and 25% stated that they would not have made the trip had the line not been in place. Commuting is the most common journey purpose. In comparison to the Year 1 Survey, there is a higher proportion of commuting and leisure trips and a smaller proportion of educational trips. In total, 60% of respondents to the User Survey reported that the purpose of their trip was either a tourist day trip or an overnight stay. Of these, 25% were travelling to Midlothian and / or the Scottish Borders. The re-opening of the Borders Railway has resulted in significant modal shift from the car to public transport with 61% of respondents stating that they previously made their journey by another mode. Of these, 64% reported that they previously drove all their way to their destination resulting in approximately 35,800 saved single car trips. There has also been a shift from bus to rail with 25% of those who formerly travelled by another method reporting that they took the bus, equating to a reduction in approximately 14,100 annual single trips. While the re-opening of the railway has resulted in improvements in access between stations, there have been changes in the bus network which are likely to have led to declines in accessibility at some locations. Most notable amongst these declines is the reduction in frequency of the X95 Service which is likely to have led to a reduction in access for areas on the A7 served by this bus which are not directly served by the Borders Railway. The data indicates that the Borders Railway has influenced people’s residential and workplace choices with nearly 17% stating that they had moved house since the re-opening of the line of which 58% stated that the re- opening of the Borders Railway was a factor in their decision. The proportion who stated that the line had been a factor in their decision to move was slightly higher in Year 2 compared to Year 1 although the difference is marginal. Of those who had moved house, 29% stated that they would not have moved to their current address in the absence of the railway, a similar figure to that seen in Year 1. There is evidence that the Borders Railway has had an impact on people’s choice of workplace with 52%% of those who had moved employment stating that the re-opening of the line had been a factor in their decision. Generally, there was a high level of satisfaction with 95% of respondents rating the quality of service as Very Good or Good. Users were least satisfied with Other aspects of service such as the on-board facilities (toilets, Wi-Fi) as well as Storage facilities for bicycles / buggies on the train’. The greater convenience offered by the car was the most popular reason amongst one-off, non- and irregular users for not using the service / not using the service more frequently. In Midlothian, the bus was highlighted as a greater draw than in the Scottish Borders with 51% finding the bus cheaper than the train and 40% finding it more convenient. Overall, 40% of one-off, non- and irregular users said that improvements to the Borders Railway would encourage them to use the railway / use it more frequently, with ‘lower train fares’ being the most popular improvement. 4 Borders Railway Year 2 Evaluation Survey of users and non-users Transport Scotland Executive Summary Aims of the Research The aim of this research was to complete a repeat of the Stage 1 Evaluation two years after the re-opening of the Borders Railway. As with the Stage 1 Evaluation this research aims to provide a high-level assessment of the extent to which the investment is on track to meet its Investment Objectives. The Investment Objectives for the Borders Railway, as outlined in the Final Business Case (FBC) for the scheme1, are included in Table S1 below. Table S1: Borders Railway Investment Objectives Objective Description Investment Objective 1 Promote accessibility to and from the Scottish Borders and Midlothian to Edinburgh and the central belt Investment Objective 2 Foster social inclusion by improving services for those without access to a car Investment Objective 3 Prevent decline in the Borders population by securing ready access to Edinburgh’s labour market Investment Objective 4 Create modal shift from the car to public transport In addition to exploring the above, the research also sought to explore views of the service and barriers to use amongst one-off and non-users and examine the impact of the line on visitor numbers during the summer peak and, in so doing, provide greater clarity on the overall tourism impact of the new line. Methodological Approach To inform the research a primary data collection exercise was completed comprising: an on-train survey of users of the Borders Railway. a telephone survey of non-, one-off and infrequent users of the Borders Railway based within the Scottish Borders and Midlothian; and secondary data analysis, including a review of ticket sales and passenger count data and an analysis of public transport connectivity. In addition, a series of consultations were carried out with bus operators / local councils in the Borders and Midlothian to help develop understanding of the impacts of the Borders Railway on bus services. In total, 825 responses were received to the User Survey and 250 responses were received to the Non-User Survey. While the response numbers were lower than achieved at the Year 1 stage, this was to be expected given that the survey period was shorter. Summing the number of journeys made by respondents to the User 1 http://www.transport.gov.scot/system/files/documents/reports/TS_Borders_FBC_final_version_issued.pdf 5 Borders Railway Year 2 Evaluation Survey of users and non-users Transport Scotland Survey over a year equates to over 102,000 single trips – approximately 7% of the passenger journeys recorded during the first full year of opening. Key Findings Investment Objectives A summary of the key findings with respect to the Investment Objectives is provided below. Investment Objective 1: Promote accessibility to and from the Scottish Borders and Midlothian to Edinburgh and the central belt The results of the research suggest that the Borders Railway is achieving Investment Objective 1. There are large volumes of users using the service to travel between the Scottish Borders / Midlothian and Edinburgh, with total patronage on the line increasing by 9.5% since Year 1.
Recommended publications
  • A Railway to Regenerate Levenmouth
    A railway to regenerate Levenmouth This booklet shows the benefits of reinstating the mothballed Levenmouth railway and how this would transform the A project that ticks local community. all the boxes Scottish National Transport Policy LMRC High Level Promote economic growth √ Objectives Promote social inclusion √ Protect environment and improve health √ Improve safety of journeys √ Improve integration √ Key Strategic Improved journey times and connections √ Outcomes Reduced emissions √ Improved quality, accessibility and affordability √ CONTENTS Page 1. INTRODUCTION 1.1 Executive Summary 1 1.2 The Vision 2 1.3 The Proposal 3 2. BACKGROUND INFORMATION 2.1 The mothballed Leven line 4 2.2 Population 6 2.3 Previous studies 8 2.4 Potential rail freight 10 2.5 Support for Levenmouth rail link 11 3. BENEFITS 3.1 Personal stories 12 3.2 What makes a good rail reopening project? 14 3.3 Delivering Scottish Government policy 15 3.4 Freight 16 3.5 Land Value Capture 17 3.6 Tourism 18 3.7 Wider economic and regional benefits 20 3.8 The business case - Benefit to Cost ratio 21 4. RE-INSTATING THE RAILWAY 4.1 Construction costs - Comparing Levenmouth with Borders 22 4.2 Timetable issues 24 4.3 Other project issues 25 5. MOVING FORWARD 5.1 Conclusions 26 5.2 The final report? 26 6. LEVENMOUTH RAIL CAMPAIGN 6.1 About our campaign 27 6.2 Our Charter 28 6.3 More information 29 - 1 - 1. Introduction 1.1 Executive Summary This booklet has been produced by the Levenmouth Rail Campaign (LMRC) with the support of a group of railway professionals who wish to lend their expertise to the campaign.
    [Show full text]
  • Investing for the Future
    The new ScotRail franchise: good for passengers, staff and Scotland Improving your journey from door to door magazine Abellio ScotRail Investing for the future The Abellio Way Magazine – Abellio ScotRail special – Spring 2015 Travelling on the Forth Bridge and enjoying the wonderful view A northern gannet flying in front of Bass Rock SCOTRAIL SPECIAL - SPRING 2015 3 CONTENTS Ambitious plans and Abellio It is with enormous pleasure that I find myself writing 4 WE ARE ABELLIO the introduction to this special edition of The Abellio What can you expect from us? Way Magazine from my home in Edinburgh. When Abellio was granted the privilege of operating 6 JEFF HOOGESTEGER MEETS TRANSPORT Scotland’s rail services, I had no hesitation in making this my home. You may consider that a rather self- MINISTER DEREK MACKAY serving decision, after all who wouldn’t choose to live “This is an incredibly exciting period for transport in this beautiful country! However, as a Dutchman, it in Scotland” won’t surprise you that it was also a sensible business decision. 10 ABELLIO’S VISION FOR THE NEW The Scottish Government has ambitious plans to SCOTRAIL FRANCHISE transform its railways and I am grateful to them for Good for passengers, good for staff and choosing Abellio to assist in that purpose. We have many exciting and challenging plans for ScotRail, as good for Scotland you will read in this special edition, and it is my intention to work with the team wherever possible 13 WORKING TOGETHER FOR THE PASSENGER to deliver them. ScotRail and Network Rail Performance for passengers 14 BOOSTING TOURISM Living here, I will also be travelling by train most days to our new UK headquarters in Glasgow, and regularly Travel the Great Scenic Railways of Scotland using other parts of the ScotRail network.
    [Show full text]
  • Appendix J Haddington Branch Line Survey
    Appendix J Haddington Branch Line Survey AllanRail East Lothian Access STAG Physical feasibility of re-opening the Haddington Rail Branch Line Background The reopening of the Haddington Railway branch line from the East Coast Main Line (ECML) at Longniddry to Haddington is one of the options that are required to be considered in the East Lothian Access STAG. This initial report informs the appraisal work of the feasibility of re-opening the railway, some of the issues and problems that would need to be resolved, choices that are available and suggests an order of magnitude cost. Because the rest of the railway is electrified it is assumed that the Haddington branch will also be equipped with standard 25Kv overhead electrification equipment. The report is based on a physical site walk-over on 21 February 2019, carried out by David Prescott of AllanRail who has considerable experience in the initial development of re-opened railways in Scotland including walk-overs on the Stirling – Alloa – Kincardine, Airdrie- Bathgate and Borders Railway routes in the inception and pre-construction stages. This is not an engineering assessment, but an initial view based on observation and experience. The route is considered in the Longniddry to Haddington direction and the report is broken down into key route sections. Connecting to the ECML The ideal connection to the main line has several desirable operating and engineering requirements: · It should be on the Edinburgh side of Longniddry to minimise the occupation of the ECML; · It should provide as
    [Show full text]
  • Muirhouse • Pilton • Ferry Road • Leith • Bridges • Prestonfield • Greendykes
    service 14 at a glance... frequency During the day During the day During the day During the Mon-Fri Saturday Sunday evening every every every every 12 15 20 30 mins mins mins mins City Centre bus stops Omni Centre See previous page for City Centre bus stops Whilst we’ve taken every effort in the preparation of this guide, Lothian Buses Ltd cannot accept any liability arising from inaccuracies, amendments or changes. The routes and times shown are for guidance – we would advise customers to check details by calling 0131 555 6363 before travelling. On occasion due to circumstances beyond our control and during special events, our services can be delayed by traffic congestion and diversion. 14 Muirhouse • Pilton • Ferry Road • Leith • Bridges • Prestonfield • Greendykes Muirhouse, Pennywell Place — — — 0552 — — 0617 — — 0637 0649 0700 0713 0724 0735 0747 0759 0811 0823 Pilton, Granton Primary — — — 0558 — — 0623 — — 0643 0655 0706 0719 0731 0742 0754 0806 0818 0830 Goldenacre — — — 0603 — — 0628 — — 0649 0701 0712 0726 0738 0749 0803 0815 0827 0839 Leith Walk (foot) — — — 0610 — — 0635 — — 0658 0710 0721 0738 0750 0802 0816 0828 0840 0852 Elm Row 0518 0538 0558 0615 0626 0634 0640 0654 0701 0705 0717 0728 0745 0757 0809 0823 0835 0847 0859 North Bridge 0522 0542 0602 0619 0630 0638 0644 0658 0705 0709 0721 0733 0751 0803 0815 0829 0841 0853 0905 Friday to Monday Prestonfield Avenue, East End 0531 0551 0611 0628 0639 0648 0654 0708 0715 0719 0734 0746 0806 0818 0830 0844 0856 0908 0920 Greendykes Terminus 0538 0558 0618 0635 0647 0656 0702
    [Show full text]
  • Border Union Railway
    BORDER UNION RAILWAY TRAIN TIMES 31st March to 29th September 2013 Trains run each Sunday, every hour, on the hour between 10:00 and 16:00 Trips last 10 minutes 2013 OPERATING CALENDAR FOR WHITROPE HERITAGE CENTRE & BORDER UNION RAILWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 March F S Su M T W T F S Su M T W T F S Su M T W T F S Su M T W T F S Su April M T W T F S Su M T W T F S Su M T W T F S Su M T W T F S Su M T May W T F S Su M T W T F S Su M T W T F S Su M T W T F S Su M T W T F June S Su M T W T F S Su M T W T F S Su M T W T F S Su M T W T F S Su July M T W T F S Su M T W T F S Su M T W T F S Su M T W T F S Su M T W August T F S Su M T W T F S Su M T W T F S Su M T W T F S Su M T W T F S September Su M T W T F S Su M T W T F S Su M T W T F S Su M T W T F S Su M October T W T F S Su M T W T F S Su M T W T F S Su M T W T F S Su M T W T Heritage Centre, shop and buffet open Heritage Centre etc.
    [Show full text]
  • 300 Airport • Gyle • Sighthill • Chesser • Fountainbridge • Surgeons’ Hall • Newington • Cameron Toll
    Services X12 & Skylink 400 also serve RBS Gogarburn - see separate timetable leaflets for details. Whilst we’ve taken every effort in the preparation of this guide, Lothian Buses Ltd cannot accept any liability arising from inaccuracies, amendments or changes. The routes and times shown are for guidance – we would advise customers to check details by calling 0131 555 6363 before travelling. On occasion due to circumstances beyond our control and during special events, our services can be delayed by traffic congestion and diversion. 300 Airport • Gyle • Sighthill • Chesser • Fountainbridge • Surgeons’ Hall • Newington • Cameron Toll Edinburgh Airport — — — — 0550 — 0620 — 0650 — 0725 0750 0810 — 0837 0857 0920 0940 1000 Ingliston Park & Ride — — — — 0554 — 0624 — 0655 — 0730 0755 0815 0835 0842 0902 0925 0945 1005 RBS Gogarburn — — — — 0558 — 0628 — 0659 — 0735 0800 0820 0840 0847 0907 0929 0949 1009 Gyle Centre — — — — 0602 — 0632 — 0704 — 0740 0806 0826 0846 0853 0913 0934 0954 1014 Edinburgh Park, Redheughs Ave — — — — 0604 — 0634 — 0707 — 0744 0810 0830 0850 0857 0917 0937 0957 1017 Friday to Monday Sighthill, Napier Uni G G G G 0609 G 0639 0655 0713 0731 0751 0817 0837 0857 0904 0924 0944 1004 1024 Saughton Mains 0419 0449 0519 0549 0612 0627 0642 0659 0717 0736 0756 0822 0842 L 0909 0929 0949 1009 1029 Slateford Station 0423 0453 0523 0553 0617 0632 0647 0704 0722 0743 0803 0830 0850 — 0916 0936 0956 1016 1036 Fountainbridge, Semple St 0431 0501 0531 0601 0625 0640 0656 0716 0735 0801 0821 0848 0908 — 0929 0949 1009 1029 1049 Surgeons’
    [Show full text]
  • Borders Railway Business Guide You’Re on the Right Tracks to Develop Your Business
    BORDERS RAILWAY BUSINESS GUIDE You’re on the right traCKS TO DEVELOP YOUR BUSINESS You’re on the right traCKS TO DEVELOP YOUR BUSINESS 1 2 BORDERS RAILWAY BUSINESS GUIDE CONTENTS Introduction 3 All On Track 4 Midlothian & Borders: Great Destinations to Visit 5 Opportunities for Business 7 Be Inspired: Case Studies 11 Next Steps: Making the Most of the Opportunities 14 Support and Resources 15 INTRODUCTION Tourism is key to the economic development of Midlothian and the Scottish Borders Tourism is central to to the Midlothian and Scottish Borders’ economies and the opening of the Borders Railway offers an exciting opportunity for tourism businesses to benefit. The investment in the Borders Railway supports the ambitions for growth and will be a catalyst for attracting visitors with the promise of compelling experiences and immersion in Borders’ and Midlothian’s history, heritage, culture and landscape. How can you make the most of the Borders Railway and use it to benefit your business? This guide has been created to help you find out. It is packed with ideas and tips that will give you a competitive edge. It will also help you identify opportunities to drive new custom and enhance the quality of your visitors’ experience. “We are very excited about the Borders Railway. For commuters and tourists alike, the line will provide opportunities to enjoy the beautiful scenery and many attractions on offer between Edinburgh and the Borders.” Gillian Rankin, Marketing & Events Officer National Mining Museum Scotland “The opening of the Borders Railway in 2015 presents exciting opportunities for the Borders region and for Abbotsford.
    [Show full text]
  • 400 Airport • Ingliston P&R • Gyle • Wester Hailes • Fairmilehead • Moredun • Royal Infirmary • Fort Kinnaird
    Real time information Get real-time departures from your local bus stop: TfEapp.com Live service updates are also available online at www.lothianbuses.co.uk 400 Airport • Ingliston P&R • Gyle • Wester Hailes • Fairmilehead • Moredun • Royal Infirmary • Fort Kinnaird Edinburgh Airport — — — — 0540 0610 0640 0718 0748 0818 0853 0923 0953 1453 1523 1553 1623 1650 Ingliston Park & Ride — — — — 0544 0614 0644 0723 0753 0823 0858 0928 0958 1458 1528 1558 1628 1655 RBS Gogarburn — — — — 0548 0618 0648 0727 0758 0828 0903 0932 1002 1502 1532 1603 1633 1700 Gyle Centre — — — — 0552 0622 0653 0732 0805 0835 0909 0937 1007 1507 1537 1609 1639 1706 then Edinburgh Park, Redheughs Ave G G G G 0554 0624 0655 0734 0807 0837 0911 0939 1009 1509 1539 1612 1642 1709 every Westside Plaza 0428 0458 0523 0543 0605 0635 0707 0748 0821 0851 0924 0951 1021 1521 1554 1632 1702 1729 Friday to Monday Clovenstone 0432 0502 0527 0547 0609 0639 0712 0753 0826 0856 0928 0955 1025 30 1525 1558 1636 1706 1733 Oxgangs Bank 0443 0513 0538 0558 0620 0651 0725 0808 0840 0910 0941 1008 1038 1538 1613 1651 1721 1748 mins Kaimes Crossroads 0450 0520 0545 0605 0627 0700 0734 0818 0849 0919 0949 1016 1046 until 1546 1623 1701 1731 1758 Hyvots Bank 0454 0524 0549 0609 0631 0705 0741 0825 0855 0925 0955 1022 1052 1553 1630 1708 1738 1805 Royal Infirmary 0503 0533 0558 0618 0640 0715 0752 0836 0906 0936 1005 1032 1102 1604 1641 1719 1749 1816 Hay Drive 0509 0539 0604 0624 0646 0721 0758 0842 0912 0942 1011 1038 1108 1611 1648 1726 1756 1823 Fort Kinnaird (west) 0512 0542 0607 0627
    [Show full text]
  • Campaign for Borders Railway
    A regional injustice put right Presentation to RailFuture conference – 16th June 2012 Bill Jamieson and David Spaven Today’s presentation 1. Decline, closure & abandonment 1963-1972 2. Wilderness years, then the tide turns 3. Parliamentary progress 2000-2006 4. The abortive DBFM process 5. Network Rail takes over in 2011 6. Looking ahead to 2014/15 re-opening 1963 – the Beeching Report • one of the longest lines threatened • Hawick & Gala in highest revenue category • passengers & freight in decline • up to 5 hours between trains • less uproar than in the Highlands • Scottish Office / MoT skirmishes • conflict with economic plans 1966 – closure proposal & hearing • the whole route to go – 97 miles & 24 stations • 508 objectors – but East Suffolk line 1,916! • TUCC verdict – “substantial hardship” • then 19 months in limbo • small stations destaffed • dieselisation, but few DMUs • service pattern unchanged 1968 – the final decision • 2nd May – Barbara Castle backs closure • 6th May – Marsh takes over from Castle • 21st May Ministerial Committee meeting: - Willie Ross backs Edinburgh-Hawick retention - but a majority votes for complete closure • 23rd May Ross memo to Harold Wilson: - “I would beg you to look at the…consequences” • 5th June Wilson memo: - “I do not think it would be right to reopen the the decisions reached by the Committee.” Closure: 6th January 1969 • last train: 21.56 Edinburgh-St Pancras • David Steel MP on board • Hawick delay while pilot runs ahead • the Rev Brydon Maben and the the Newcastleton blockade • David Steel’s appeal to the crowd • the train finally departs 2 hrs late • the Anglo-Scottish route is dead 1969-72: a lingering death • Hawick trip survives till 25th April • the Border Union Railway Co: - breathtakingly ambitious - commuters / tourism / steam / timber - financial projections debatable - BR negotiations break down late 1969 • the last tracks lifted in 1972 • “by far the largest population grouping in Britain with no accessible railway services” Why was the Waverley Route lost? 1.
    [Show full text]
  • Borders Railway Blueprint – Delivery of Action Plan
    ITEM 9(b) BORDERS RAILWAY BLUEPRINT – DELIVERY OF ACTION PLAN Report by Corporate Transformation and Services Director Scottish Borders Council 2 April 2015 1 PURPOSE AND SUMMARY 1.1 This report provides an update on the work to date to deliver the Borders Railway Blueprint Action Plan. 1.2 ‘Borders Railway Maximising the Impact: A Blueprint for the Future’ was launched in November 2014 by the First Minister (Annex 1). It aims to maximise the economic benefits of the new Borders Railway connection by helping to stimulate the growth of businesses, generate employment and boost visitor numbers. 1.3 The development of the Blueprint has been led by the Scottish Government in partnership with Scottish Enterprise, Transport Scotland, VisitScotland, and City of Edinburgh, Midlothian and Scottish Borders Councils. 1.4 Since the launch, work has focused on developing the Action Plan to deliver the key investments and commitments made by partners in the Blueprint. The Action Plan (Annex 2) outlines project activity across three strategic themes: Great Places for Working and Investing, Great Communities for Living and Learning, and Great Destinations to Visit. 1.4 The report outlines the Blueprint governance structure, action plan projects and the Council’s current contribution to the financial deal. 2 RECOMMENDATIONS 2.1 I recommend that the Council:- (a) Notes the significant progress made in developing the Borders Railway Blueprint Action Plan. (b) Approves the funding identified in Annex 2 to deliver the Action Plan. (c) Agrees that further reports on implementation of the Borders Railway Blueprint Action Plan will form part of the Executive Committee’s regular quarterly monitoring of the Council’s Corporate Transformation Plan.
    [Show full text]
  • City Centre Airport in 30 Minutes
    TICKET ADULT CHILD (5-15 yrs) Single ticket £4.50 £2.00 Open Return £7.50 £3.00 CITY CENTRE Network £9.00 £4.50 Day Ticket AIRPORT NIGHT TIME JOURNEYS National Concession Cards (including Young Person Concession) are not valid on night time journeys. A special Airlink Night Single (£3) can be purchased between Maybury and the City Centre on night time journeys. IN 30 MINUTES Night time journeys do not run on 25th & 26th December and 1st January. NOTES ON TICKETS • Citysingles, Citysmart cards, Day Tickets, Day & Night Tickets and Night Tickets are not valid for any journey on Airlink. • National Concession (inc Young Person Concession) Cards are valid on Airlink except night time journeys (between 0015 & 0345 from Edinburgh City Centre or between 0040 & 0415 from the Airport). • Airlink Single Fares (Adult £2.50 / Child £1.50) are available on journeys between Edinburgh Airport and Maybury and also on journeys between Maybury and Edinburgh City Centre. • Airlink Night Singles (Adult £3) are available on journeys between Maybury and Edinburgh City Centre on night time journeys as detailed above. • Airlink returns are valid on NightBus service N22 and Skylink services. • Ridacards are valid on all Airlink journeys. • Network Day Tickets (£9) are valid on Airlink. Brought to you by Lothian Buses Ltd cannot accept any responsibility arising from inaccuracies or changes affecting this guide. The routes and times are shown for guidance. For up to date details, please visit lothianbuses.co.uk/airlink or call 0131 555 6363. On occasion due to circumstances beyond our control and during special events, our services can be delayed by traffic congestion and diversion.
    [Show full text]
  • City Mobility Plan Connecting People, Transforming Places
    City Mobility Plan Connecting people, transforming places SCHOOL Draft: 16th January 2020 Contents Foreword Part 1 ..................................................................................................................................... 1 The City Mobility Plan ............................................................................................................. 2 1. The Case for Change .......................................................................................................... 3 2. Listening to People ............................................................................................................. 11 3. City Leadership in a Changing World ............................................................................. 13 4. Our City’s Progress ........................................................................................................... 16 5. A three stage vision - 2022, 2025, and 2030 .................................................................. 17 Spatial Vision ............................................................................................................................. 19 Part 2 .................................................................................................................................... 20 6 . Strategic priorities .............................................................................................................. 21 Enhancing Public Transport ...............................................................................................
    [Show full text]