State Sen. Rep. Recipient Loans Project Description AL and Richard Shelby, Martha Roby PowerSouth Energy Cooperative $540,000,000 This Rural Development investment will be used to finance transmission FL Doug Jones (AL 02), and generation facilities. PowerSouth, headquartered in Andalusia, Ala., provides (AL); Robert Aderholt the wholesale power needs of 16 electric distribution cooperatives and four Marco Rubio, (AL 04), municipal electric systems serving approximately 1 million end-users in 39 Rick Scott Bradley Byrne counties in Alabama and 10 counties in Florida. (FL) (AL 01), Neal Dunn (FL 02), Matt Gaetz (FL 01), Gary Palmer (AL 06), Mike Rogers (AL 03), Terri Sewell (AL 07)

AR Tom Cotton, Rick Crawford North Arkansas Electric Cooperative $87,487,000 This Rural Development investment will be used to finance the installation of 3,802 John Boozman (01) miles of main line fiber for communication and monitoring purposes between all substations. This loan includes $87,487,000 in smart grid technologies. North Arkansas, headquartered in Salem, serves an average of 37,022 members over 5,000 miles of line in parts of six counties in north central Arkansas.

AR, LA, Tom Cotton, Rick Crawford Arkansas Electric Cooperative Corp. $129,089,000 This Rural Development investment will be used to finance generation system MO, OK, John Boozman (AR 01), improvements. Arkansas Electric is a generation and transmission cooperative and TX (AR); Steve Womack based in Little Rock, Ark. It provides wholesale electric service to 17 electric Bill Cassidy, (AR 03), distribution cooperative members serving 74 Arkansas counties. John Neely Kennedy Bruce Westerman (LA); (AR 04), Roy Blunt, Ralph Abraham Josh Hawley (LA 05), (MO); Ann Wagner (MO 02), , Billy Long (MO 07), James Inhofe Jason T. Smith (OK); (MO 08), Ted Cruz, John Cornyn (OK 02), (TX) John Ratcliffe (TX 04)

AR Tom Cotton, French Hill Today's Power Inc. $8,857,000 This Rural Development investment will be used to construct four solar John Boozman (02) photovoltaic projects and one solar and battery storage facility.

USDA is an equal opportunity provider, employer and lender. 1 Electric Loan Program October 22, 2020

State Sen. Rep. Recipient Loans Project Description AR and John Neely Rick Crawford Ashley-Chicot Electric Cooperative $10,900,000 This Rural Development investment will be used to connect 371 consumers, and LA Kennedy, (AR 01), build and improve 66 miles of line. Ashley-Chicot, headquartered in Hamburg, Bill Cassidy Bruce Westerman serves an average of 5,017 members over 1,736 miles of line in in parts of four (LA); (AR 04), counties in southeastern Arkansas and one parish in Louisiana. Tom Cotton, Ralph Abraham John Boozman (LA 05) (AR)

AR, TX Tom Cotton, Bruce Westerman Southwest Arkansas Electric $81,148,000 This Rural Development investment will be used to connect 1,740 consumers, and and OK John Boozman (AR 04), Cooperative Corp. build and improve 121 miles of line. This loan includes $9,187,114 in smart grid (AR); John Ratcliffe technologies. Southwest Arkansas, headquartered in Texarkana, Arkansas, serves Ted Cruz, (TX 04), an average of 28,310 members over 5,000 miles of line in nine counties in John Cornyn Markwayne Mullin Arkansas, one county in , and two in Texas. (TX); (OK 02) James Lankford, James Inhofe (OK)

CA Dianne Feinstein, Jackie Speier Bodega Avenue Solar LLC $4,198,000 This Rural Development investment will be used to develop two, 1.996 megawatt, Kamala Harris (14) single-axis tracking solar photovoltaic generating systems in Petaluma, Calif. The expected rated capacity of Bodega West and Petaluma East will each be about 0.998 megawatts (MW) and together they will have a peak capacity of 1.996 MW of electric power.

CA Dianne Feinstein, Jared Huffman Redwood Coast Energy Authority $6,600,000 This Rural Development investment will be used to develop the Redwood Coast Kamala Harris (02) Airport Renewable Energy Microgrid Project in Humboldt County. The loan funds will be used to finance the development of the Redwood Coast Airport Renewable Energy Microgrid Project with battery storage to be constructed at the AVC Airport in McKinleyville in Humboldt County.

CO Michael Bennet, Diana DeGette CoBank $375,000,000 This Rural Development investments will be used to make utility infrastructure Cory Gardner (01) loans or to refinance bonds or notes issued for utility infrastructure projects. CoBank is one of four banks of the Farm Credit System that Congress created to fill a need for long-term agricultural credit. CoBank is cooperatively owned by its U.S. customer-owners, including agricultural cooperatives, rural energy companies, and financial institutions that serve rural America.

CO Michael Bennet, Ken Buck K C Electric Association Inc. $9,295,000 This Rural Development investment will be used to connect six consumers, and Cory Gardner (04) build and improve 49 miles of line. This loan includes $1,275,462 in smart grid technologies. K.C. Electric, headquartered in Hugo, Colo., serves approximately 6,500 members over 3,067 miles in Cheyenne, Kiowa, Kit Carson and Lincoln counties in Colorado.

USDA is an equal opportunity provider, employer and lender. 2 Electric Loan Program October 22, 2020

State Sen. Rep. Recipient Loans Project Description FL Marco Rubio, Daniel Webster Sumter Electric Cooperative $150,000,000 This Rural Development investment will be used to connect 4,988 consumers, and Rick Scott (11) build and improve 1,061 miles of line. This loan includes $2,300,000 in smart grid technologies. Sumter Electric, headquartered in Sumterville, serves an average of 208,691 members over 12,734 miles of line in Citrus, Hernando, Lake, Levy, Marion, Pasco and Sumter counties.

FL Marco Rubio, Debbie Wasserman Seminole Electric Cooperative $124,759,000 This Rural Development investment will be used to finance transmission system Rick Scott Schultz (23), Alcee L. improvements, generation system capital improvements and replacement projects. Hastings (20), Neal Seminole Electric, headquartered in Tampa, is one of the top generation and Dunn (02), Daniel transmission (G&T) electric cooperatives in the United States. It provides Webster (11), Greg wholesale electric service to nine electric distribution cooperatives members Steube (17), Darren serving about 1.8 million people and businesses in parts of 42 of Florida's 67 Soto (09), Michael counties. Waltz (06), John Rutherford (04), Kathy Castor (14), Ted Deutch (22), Vern Buchanan (16), Bill Posey (08), Frederica Wilson (24), Gus M. Bilirakis (12), Al Lawson (05), Ross Spano (15), Francis Rooney (19), Ted Yoho (03), Mario Diaz-Balart (25)

FL Marco Rubio, Al Lawson Tri-County Electric Coop $10,000,000 This Rural Development investment will be used to connect 901 consumers, and Rick Scott (05) build and improve 100 miles of line. This loan includes $400,000 in smart grid technologies. Tri-County is headquartered in Madison, Florida, and serves an average of 18,552 members over 3,078 miles of line throughout seven counties in the northwestern region of Florida.

FL Marco Rubio, Gus M. Bilirakis Withlacoochee River Electric $100,000,000 This Rural Development investment will be used to connect 9,550 consumers, and Rick Scott (12) Cooperative build and improve 298 miles of line. This loan includes $3,741,964 in smart grid technologies. Withlacoochee River, headquartered in Dade City, serves an average of 216,000 members over 11,134 miles of line in Citrus, Hernando, Pasco, Polk and Sumter counties.

USDA is an equal opportunity provider, employer and lender. 3 Electric Loan Program October 22, 2020

State Sen. Rep. Recipient Loans Project Description GA, AL David Perdue, Mike Rogers (AL 03), Georgia Transmission Corp. $114,220,000 This Rural Development investment will be used to finance transmission system and FL Kelly Loeffler John Rutherford improvements by providing adequate transmission capacity, and ensuring greater (GA); (FL 04), reliability of service to its member loads in rural communities. Georgia Richard Shelby, Al Lawson (FL 05), Transmission Corp. is a transmission cooperative headquartered in Tucker, Ga. It Doug Jones Earl Carter (GA 01), serves 38 electric cooperatives that provide power to residential and commercial (AL); Sanford Bishop consumers throughout Georgia. Marco Rubio, (GA 02), Rick Scott A. Ferguson (GA 03), (FL) Henry Johnson (GA 04), (Vacant) GA 05, Lucy McBath (GA 06), Rob Woodall (GA 07), Austin Scott (GA 08), Doug Collins (GA 09), Jody Hice (GA 10), Barry Loudermilk (GA 11), Rick Allen (GA 12), David Scott (GA 13), Tom Graves (GA 14)

GA David Perdue, Doug Collins Hart EMC $38,660,000 This Rural Development investment will be used to connect 3,748 consumers, and Kelly Loeffler (09) build and improve 272 miles of line. Hart EMC, headquartered in Hartwell, Ga, serves an average of 36,663 members through 4,903 miles of line in Banks, Elbert, Franklin, Hart, Madison and Stephens counties.

GA David Perdue, Rick Allen Canoochee Electric Membership Corp. $36,247,000 This Rural Development investment will be used to connect 1,613 consumers, and Kelly Loeffler (12) build and improve 56 miles of line. This loan includes $4,572,120 in smart grid technologies. Canoochee, headquartered in Reidsville, serves an average of 22,134 members over 2,614 miles of line throughout nine counties in southeastern Georgia.

GA David Perdue, Drew Ferguson Carroll EMC $22,035,000 This Rural Development investment will be used to connect 1,547 consumers, and Kelly Loeffler (03) build and improve 236 miles of line. Carroll EMC, headquartered in Carrollton, serves an average of 51,760 members over 5,475 miles of line in all or part of seven counties in western Georgia.

GA David Perdue, Rick Allen Planters Electric Membership Corp. $17,605,000 This Rural Development investment will be used to connect 1,323 consumers, and Kelly Loeffler (12) build and improve 430 miles of line. This loan includes $1,107,577 in smart grid technologies. Planters EMC, headquartered in Millen, serves an average of 17,000 members through 3,166 miles of line in Burke, Jenkins, Screven, Bulloch, Effingham, Emanuel and Richmond counties.

USDA is an equal opportunity provider, employer and lender. 4 Electric Loan Program October 22, 2020

State Sen. Rep. Recipient Loans Project Description IA Chuck Grassley, Steve King Butler County REC $14,500,000 This Rural Development investment will be used to connect 231 consumers, and Joni Ernst (04) build and improve 208 miles of line. Butler County, headquartered the city of Allison, serves an average of 5,083 members over 1,825 miles of line in seven counties in North-Eastern and North-Central Iowa.

IA Chuck Grassley, Abby Finkenauer Maquoketa Valley Electric Cooperative $10,000,000 This Rural Development investment will be used to connect 88 consumers, and Joni Ernst (01) build and improve 411 miles of line. This loan includes $6,749,904 in smart grid technologies. Maquoketa Valley, headquartered in Anamosa, serves an average of 16,000 members over 3,272 miles of line nine counties in northeastern Iowa.

IA Chuck Grassley, Cindy Axne Farmers Electric Cooperative $11,100,000 This Rural Development investment will be used to connect 262 new consumers, Joni Ernst (03) and build and improve 138 miles of line. This loan includes $1,459,600 in smart grid technologies. Farmers, headquartered in Greenfield, serves an average of 4,918 members over 1,807 miles of line in six counties in west-central Iowa.

KY Mitch McConnell, James Comer Big Rivers Electric Corporation $39,050,000 This Rural Development investment will be used to finance transmission Rand Paul (01) system improvements. Big Rivers is a generation and transmission rural electric cooperative that is headquartered in Henderson, Kentucky. The three distribution cooperatives of Big Rivers include Kenergy Corporation, Jackson Purchase Energy Corporation, and Meade County Rural Electric Cooperative Corporation. These three member-owners serve more than 118,000 members in 22 counties in KY Mitch McConnell, James Comer Kenergy Corp. $35,000,000 This Rural Development investment will be used to connect 3,248 consumers, and Rand Paul (01) build and improve 247 miles of line. This loan includes $1,784,847 in smart grid technologies. Kenergy, headquartered in Henderson, serves an average of 57,927 members over 7,178 miles of line in 14 counties in Kentucky.

KY Mitch McConnell, Harold Rogers Grayson Rural Electric Cooperative Corp. $17,000,000 This Rural Development investment will be used to connect 856 consumers, and Rand Paul (05) build and improve 121 miles of line. This loan includes $350,062 in smart grid technologies. Grayson RECC, headquartered in Grayson, serves an average of 15,320 members over 2,469 miles of line in six counties in eastern Kentucky.

KY and Mitch McConnell, James Comer South Kentucky RECC $44,000,000 This Rural Development investment will be used to connect 4,044 consumers, and TN Rand Paul (KY 01), build and improve 178 miles of line. This loan includes $2,392,741 n smart grid (KY); Harold Rogers technologies. South Kentucky, headquartered in Winchester, serves an average of Lamar Alexander, (KY 05), 68,245 members over 6,932 miles of line throughout 11 counties in southeastern Marsha Blackburn Chuck Fleischmann Kentucky and two counties in northeastern Tennessee. (TN) (TN 03), John Rose (TN 06)

USDA is an equal opportunity provider, employer and lender. 5 Electric Loan Program October 22, 2020

State Sen. Rep. Recipient Loans Project Description ME Susan Collins, Jared Golden Eastern Maine Electric Cooperative $9,500,000 This Rural Development investment will be used to connect 412 consumers, and Angus King (02) build and improve 61 miles of line. This loan includes $1,005,000 in smart grid technologies. Eastern Maine, headquartered in Calais, serves an average of 12,637 members over 1,756 miles of line in Aroostook, Penobscot and Washington counties in eastern Maine.

MN Amy Klobuchar, Jim Hagedom Brown County Rural Electric Association $8,000,000 This Rural Development investment will be used to connect 189 consumers, and Tina Smith (01) build and improve 54 miles of line. This loan includes $555,900 in smart grid technologies. Brown County, headquartered in Sleepy Eye, serves an average of 4,531 members over 1,515 miles of line in eight counties in south-central Minnesota. MN and Amy Klobuchar, Jim Hagedom Nobles Cooperative Electric $12,500,000 This Rural Development investment will be used to connect 201 customers, and IA Tina Smith (MN 01), build and improve 114 miles of line. This loan includes $1,480,500 in Smart Grid (MN); Steve King technologies. Nobles, headquartered in Worthington, Minn., serves approximately Charles Grassley, (IA 04) 6,800 members over 2,273 miles of line in nine counties in Minnesota and two Joni Ernst counties in Iowa. (IA)

MO Roy Blunt, Billy Long Southwest Electric Cooperative $17,613,000 This Rural Development investment will be used to connect 1,083 consumers, and Josh Hawley (07) build 33 miles of line. Southwest, headquartered in Bolivar, serves an average of 41,500 members over 5,475 miles of line in 11 counties in southwestern and south- central Missouri. NC Richard Burr, Mark Walker (06), North Carolina Electric Membership $51,117,000 This Rural Development investment will be used to finance generation system Thom Tillis George Holding (02), Corp. improvement projects. NCEMC, headquartered in Raleigh, provides wholesale Vacant (11), energy and services to 25 electric membership corporations serving 93 of North David Price (04), Carolina's 100 counties. Patrick T. McHenry (10), G.K. Butterfield (01), David Rouzer (07), Vacant (09), Gregory Francis Murphy (03), Alma Adams (12), Virginia Foxx (05), Richard Hudson (08), Ted Budd (13)

ND John Hoeven, Kelly Armstrong Cass County Electric Cooperative $45,000,000 This Rural Development investment will be used to connect 8,358 consumers, and Kevin Cramer (At Large) build and improve 785 miles of line. This loan includes $5,385,000 in smart grid technologies. Cass County, headquartered in Fargo, serves an average of 51,000 members over 5,685 miles of line in 10 counties in North Dakota.

USDA is an equal opportunity provider, employer and lender. 6 Electric Loan Program October 22, 2020

State Sen. Rep. Recipient Loans Project Description ND John Hoeven, Kelly Armstrong Central Power Electric Cooperative $23,997,000 This Rural Development investment will be used to finance transmission system Kevin Cramer (At Large) improvements. Central Power is a wholesale power supply and transmission cooperative headquartered in Minot. It serves six distribution cooperatives with more than 67,300 consumers located in a service area of 25 counties across the central and southeastern third of North Dakota.

NE, MO Ben Sasse, Adrian Smith Atchison-Holt Electric Cooperative $6,586,000 This Rural Development investment will be used to connect 216 consumers, and and IA Deb Fischer (NE 03), build and improve 36 miles of line. This loan includes $36,420 in smart grid (NE), Sam Graves technologies. Atchison-Holt Electric, headquartered in Rock Port, Mo., serves an Charles Grassley (MO 06), average of 3,255 members over 1,290 miles in Atchison, Holt and Nodaway Joni Ernst, Cindy Axne counties in Missouri; in Fremont and Page counties in Iowa; and in Nemaha County (IA) (IA 03) in Nebraska. Josh Hawley Roy Blunt (MO)

NE, MO Ben Sasse, Adrian Smith N.W. Electric Power Cooperative $35,381,000 This Rural Development investment will be used to improve 27 miles of line. N.W. and IA Deb Fischer (NE 03), Electric, headquartered in Cameron, Mo., and is responsible for maintaining 130 (NE), David Loebsack substations and approximately 18,000 miles of transmission line. It Charles Grassley (IA 02), delivers wholesale power to seven distribution cooperatives. In addition, N.W. Joni Ernst, Cindy Axne Electric provides wheeling services to other electric utilities. (IA) (IA 03), Josh Hawley Emanuel Cleaver Roy Blunt (MO 05), (MO) Vicky Hartzler (MO 04), Sam Graves (MO 06)

NM and Tom Udall, Ben R. Lujan Syncarpha Questa $2,000,000 This Rural Development investment will be used to finance a 1.56 megawatt, NY Martin Heinrich (NM 03), ground-mounted, single-axis-tracking solar photovoltaic farm in Taos County, New (NM); Carolyn Maloney Mexico. Chuck Schumer, (NY 12) Kirsten Gillibrand (NY) NM Tom Udall, Ben R. Lujan Syncarpha El Rito $1,900,000 This Rural Development investment will be used to partially finance a 1.96 Martin Heinrich (03) megawatt DC (1.56 megawatt AC) solar farm in Rio Arriba County, New Mexico.

NM Tom Udall, Ben R. Lujan Kit Carson Electric Cooperative $47,521,000 This Rural Development investment will be used to connect 250 consumers, and Martin Heinrich (03) build and improve 114 miles of line. This loan includes $9,176,080 in smart grid technologies. Kit Carson, headquartered in Taos, serves an average of 29,000 members over 2,924 miles of line in Colfax, Rio Arriba and Taos counties in north- central New Mexico.

USDA is an equal opportunity provider, employer and lender. 7 Electric Loan Program October 22, 2020

State Sen. Rep. Recipient Loans Project Description OK James Lankford, Frank Lucas CKenergy Electric Cooperative, Inc. $69,249,000 This Rural Development investment will be used to connect 1,480 consumers, and James Inhofe (03) build and improve 1,276 miles of line. This loan includes $5,735,046 in smart grid technologies. CKenergy, headquartered in Binger, Okla., serves approximately 26,000 members through 7,799 miles of line in 10 counties in western and west- central Oklahoma.

OK James Lankford, Markwayne Mullin Southeastern Electric Cooperative $7,286,000 This Rural Development investment will be used to connect 474 consumers, and James Inhofe (02) build 18 miles of line. Southeastern Electric, headquartered in Durant, serves an average of 14,993 members over 2,773 miles of line in five counties in southeastern Oklahoma. OK, MO James Inhofe, Blaine Luetkemeyer Associated Electric Cooperative $52,000,000 This Rural Development investment will be used to finance generation system and IA James Lankford (MO 03), improvement projects. Associated Electric Cooperative, headquartered in (OK); Ann Wagner (MO 02), Springfield, Mo., provides wholesale power to its six generation and transmission Roy Blunt, Vicky Hartzler members that provide wholesale power to 51 distribution-member cooperatives Josh Hawley (MO 04), that serve 910,000 customers in Missouri, southeastern Iowa and northeastern (MO); Markwayne Mullin, Oklahoma. Chuck Grassley, (OK 02), Joni Ernst (OK 04), (IA) Sam Graves (MO 06), Emanuel Cleaver (MO 05), Frank Lucas (OK 03), Billy Long (MO 07), David Loebsack (IA 2), Jason T. Smith (MO 08), Kendra Horn (OK 05), (OK 01)

PA Robert Casey, Dan Meuser REA Energy Cooperative, Inc. $4,500,000 This Rural Development investment will be used to finance the reimbursement of Patrick Toomey (09) general funds for electric distribution facilities that were approved in the Construction Work Plan. REA Energy, headquartered in Indiana, Pa., serves approximately 23,000 members over 2,696 miles in Armstrong, Blair, Cambria, Clearfield, Indiana, Jefferson and Westmoreland counties.

SC Lindsey Graham, James E. Clyburn Santee Electric Cooperative $42,000,000 This Rural Development investment will be used to connect 2,608 consumers, and Tim Scott (06) build and improve 183 miles of line. This loan includes $1,564,648 in smart grid technologies. Santee, headquartered in Kingstree, S.C., serves an average of 43,000 members through 5,641 miles of line in Clarendon, Florence, Georgetown and Williamsburg counties in northeastern South Carolina.

USDA is an equal opportunity provider, employer and lender. 8 Electric Loan Program October 22, 2020

State Sen. Rep. Recipient Loans Project Description SC Lindsey Graham, Ralph Norman York Electric Cooperative $20,000,000 This Rural Development investment will be used to connect 7,904 consumers and Tim Scott (05) build 4,872 miles of line. York Electric, headquartered in York, S.C., serves an average of 61,480 members through 3,977 miles of line in portions of Cherokee, Chester, Lancaster and York counties.

SD John Thune, Dusty Johnson Codington-Clark Electric Cooperative $8,668,000 This Rural Development investment will be used to connect 194 consumers, and Mike Rounds (At Large) build and improve 148 miles of line. This loan includes $275,100 in smart grid technologies. Codington-Clark, headquartered in Watertown, S.D., serves 3,345 members over 1,905 miles of line in 10 counties in northeastern South Dakota.

SD John Thune, Dusty Johnson Union County Electric Cooperative $3,287,000 This Rural Development investment will be used to connect 76 consumers, and Mike Rounds (At Large) build and improve 29 miles of line. This loan includes $175,912 in smart grid technologies. Union County Electric, headquartered in Elk Point, S.D., serves approximately 1,645 members over 512 miles in Union County in South Dakota.

SD, MN Mike Rounds, Dusty Johnson Sioux Valley Energy $66,342,000 This Rural Development investment will be used to connect 1,714 consumers, and and IA John Thune (SD At Large), build and improve 684 miles of line. This loan includes $1,390,073 in smart grid (SD); Jim Hagedorn technologies. Sioux Valley, headquartered in Colman, S.D., serves an average of Amy Klobuchar, (MN 01), 26,025 members over 6,000 miles of line in seven counties in eastern South Dakota, Tina Smith Collin C. Peterson five counties in southwestern Minnesota and one county in northwestern Iowa. (MN); (MN 07), Chuck Grassley, Steve King Joni Ernst (IA 04) (IA)

TX Ted Cruz, Louie Gohmert Houston County Electric Cooperative $24,702,000 This Rural Development investment will be used to connect 2,000 consumers, and John Cornyn (01), build and improve 421 miles of line. This loan includes $1,640,000 in smart grid Lance Gooden technologies. Houston County, headquartered in Crockett, serves an average of (05), 21,734 members over 5,162 miles of line in nine counties in southeastern Texas. Kevin Brady (08), Bill Flores (17)

TX John Cornyn, Filemon Vela San Patricio Electric Cooperative $19,253,000 This Rural Development investment will be used to connect 788 consumers, and Ted Cruz (34) build and improve 158 miles of line. This loan includes $357,600 in smart grid technologies. San Patricio, headquartered in Sinton, serves an average of 11,600 members over 3,136 miles of line in nine counties in south-central Texas.

USDA is an equal opportunity provider, employer and lender. 9 Electric Loan Program October 22, 2020

State Sen. Rep. Recipient Loans Project Description VA Mark Warner, Gerry Connolly National Rural Utilities Cooperative $375,000,000 This Rural Development will be used to finance rural electric and Tim Kaine (11) Finance Corporation telecommunications projects nationwide. CFC is a member-owned, nonprofit cooperative organized to supplement USDA's electric loan program. It makes loans to rural electric members to acquire, construct and operate electric distribution, generation, transmission and related facilities, and finances rural telecommunications members and their affiliates.

VA Mark Warner, Ben Cline Shenandoah Valley Electric Cooperative $101,709,000 This Rural Development investment will be used to connect 3,529 consumers, and Tim Kaine (06) build 236 miles of line. This loan includes $5,747,300 in smart grid technologies. Shenandoah Valley, headquartered in Mount Crawford, serves an average of 95,555 members over 7,820 miles of line in 10 counties and three independent cities in western Virginia.

WI, MN Ron Johnson, Mark Pocan Butter Solar $22,976,000 This Rural Development investment will be used to partially finance the and IA Tammy Baldwin (WI 02), development of a 22.9-megawatt solar project in Wisconsin, Minnesota and Iowa. (WI); Ron Kind The project includes 10 facilities ranging from 0.6 to 5 megawatts. Seven of the Amy Klobuchar, (WI 03) solar facilities are in Wisconsin, two are in Minnesota and one is in Iowa. Tina Smith Tom Tiffany Collectively they will serve 16 municipal utilities. (MN); (WI 07), Charles Grassley, Jim Hagedom Joni Ernst (MN 01), (IA) Steve King (IA 04)

WI Ron Johnson, Tom Tiffany St. Croix Electric Cooperative $10,000,000 This Rural Development investment will be used to connect 952 consumers, and Tammy Baldwin (07) build 33 miles of line. This loan includes $720,800 in smart grid technologies. St. Croix, headquartered in Hammond, serves an average of 11,000 members over 1,804 miles of line in four counties in western Wisconsin.

TOTAL $3,124,837,000