The World Bank Report No: ISR7145

Implementation Status & Results and Second Solid Waste Management (P107998)

Operation Name: Second Solid Waste Management (P107998) Project Stage: Implementation Seq.No: 8 Status: ARCHIVED Archive Date: 26-Aug-2012 Country: Approval FY: 2009

Public Disclosure Authorized Product Line:IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): RS Ministry of Physical Planning, Construction and Ecology (MPPCE), Federal Ministry for Environment and Tourism (FMET) Key Dates Board Approval Date 25-Nov-2008 Original Closing Date 28-Feb-2014 Planned Mid Term Review Date 24-Sep-2012 Last Archived ISR Date 01-Jan-2012 Public Disclosure Copy Effectiveness Date 23-Oct-2009 Revised Closing Date 28-Feb-2014 Actual Mid Term Review Date

Project Development Objectives Project Development Objective (from Project Appraisal Document) The overall project development objective is to improve the availability, quality, environmental soundness, and financial viability of solid waste management services in participating utilities/regions. Has the Project Development Objective been changed since Board Approval of the Project?

Yes No Public Disclosure Authorized Component(s)

Component Name Component Cost Component A (Waste Management) 39.50 Component B (Capacity Building) 2.00 Component C (Project Management and Operating Cost) 2.00

Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory

Public Disclosure Authorized Overall Risk Rating

Implementation Status Overview Overall, although project implementation is progressing slower than planned, the Project is making steady progress towards achieving its development objective. Works are underway in five regions ; and progress has been made in providing support to two new regions, where works are expected to start shortly. Project preparatory activities for

Public Disclosure Copy Component B (Technical Assistance) are now underway, but have experienced delays. Selection of consultant to run the Public Campaign is underway. Project implementation will need to accelerate in the coming months.

Page 1 of 7 Public Disclosure Authorized The World Bank Report No: ISR7145

Locations Country First Administrative Division Location Planned Actual Bosnia and Herz

Bosnia and Herz Federation of Bosnia and Herzegovina

Bosnia and Herz Republika Srpska Modrica

Bosnia and Herz Federation of Bosnia and Herzegovina Moscanica

Bosnia and Herz Federation of Bosnia and Herzegovina Federation of Bosnia and Herzegovina

Bosnia and Herz Republika Srpska Republika Srpska Public Disclosure Copy

Bosnia and Herz Not Entered Bosnia and Herzegovina

Bosnia and Herz Not Entered Ramici

Results

Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Increased percentage of households in target Text Value 75% of households in 66.5% Number of unserved area served by formal waste management targeted area are not served households reduced by 50% system by the formal waste management system Date 04-Mar-2010 31-Jul-2012 28-Feb-2014 Comments Baseline value of unserved Number of unserved households estimated by households reduced for PMU is 750,000; equivalent to 50,000 equivalent to 6.5%. 75% of total Extension of regional solid waste management system ongoing. Rehabilitation of regional landfills ongoing in five regions. This will result soon in significant increase of percentage of households served by formal waste management system both in RS and FBiH. Public Disclosure Copy

Page 2 of 7 The World Bank Report No: ISR7145

Improved disposal management system as Text Value 145 out of estimated 1200 190 wild dumps closed 25% of wild dumps closed evidenced by number of wild dumps closed wild dumps closed Date 25-Nov-2008 31-Jul-2012 28-Feb-2014 Comments One of the biggest dumps in FBIH, “Sidje” is under rehabilitation and closure. The closure of dumps in 3 municipalities ( , and ) will start shortly under EC IPA 2011 financing. Plan for closure of wild dump is not Public Disclosure Copy prepared yet, however priorities will be dumps in the municipalities where regionally sanitary landfill becomes operational (Mostar, Zenica, Livno, , , Zvornik and their surrounding municipalities). Improved ground water quality at disposal sites Text Value Limited monitoring of leachate 1/4 of operational sites meet 2/3 of operational sites meet as evidenced by leachate quality quality at disposal sites minimal levels of leacheate mininum levels of leachate quality. quality Date 25-Nov-2008 31-Jul-2012 28-Feb-2014 Comments Leachate water treatment plant has been constructed in the landfill. Plant is operational and makes permanent monitoring of leachate in accordance to law. Landfills in Banja Luka and Zenica have lagoon for leached water which makes recirculation of leached water. Leachate water treatment plant is expected to be constructed in Mostar landfill soon. Increased cost recovery rate of participating Text Value Limited number of utilities 4 utilities 1/2 of participating utilities utilities cover operational costs cover operational cost Date 25-Nov-2008 31-Jul-2012 28-Feb-2014 Public Disclosure Copy Comments Zenica, Sarajevo, Banja Luka & utilities

Page 3 of 7 The World Bank Report No: ISR7145

Number of people in urban areas provided with Number Value 1000000.00 1050000.00 1500000.00 access to regular solid waste collection under Date 04-Mar-2010 31-Jul-2012 28-Feb-2014 the project Comments Number of households not Extension of regional solid Target value based on served by regular waste waste management system baseline etimate made by management services ongoing in five regions. This PMU within first year of estimated by the PMU is will result soon in significant implementation; target value 750,000; equivalent to 75% of increase of households is a 50 % increase against total (average 4 persons per served by formal waste baseline value household) management system

Intermediate Results Indicators

Public Disclosure Copy Indicator Name Core Unit of Measure Baseline Current End Target Increased number of established inter- Text Value 10 inter-municipal districts 10 16 inter-municipal districts municipal solid waste districts established established Date 25-Nov-2008 31-Jul-2012 28-Feb-2014 Comments 10 Inter-municipal councils established (SA, ZV, GV, BI, TZ, MO, , Livno, Prijedor, Bijeljina) Increased number of rehabilitated sanitary Text Value 4 regional sanitary landfills 6 12 regional sanitary landfills landfills become operational operational operational Date 25-Nov-2008 31-Jul-2012 28-Feb-2014 Comments 6 regional sanitary landfills operational (SA, ZE, TZ,MO, BL, Bijeljina) Implementation of regular monitoring for Text Value Regular monitoring at 2 6 Regular monitoring at 9 leachate and dump site surface coverage at operational landfills operational landfills operational landfills Date 25-Nov-2008 31-Jul-2012 28-Feb-2014 Comments 6 regional sanitary landfills with regular monitoring performed (Sarajevo, Zenica, , Banja Luka, Bijeljina, Prijedor). % of regional solid waste utilities complying Text Value 25 % of utilities comply with 38% 60 % of regional solid waste with national environmental standards standards utilities comply with national environmental standa rds Date 04-Mar-2010 31-Jul-2012 28-Feb-2014 Comments Baseline value updated by Implementation of Public Disclosure Copy improvement plans is on-

Page 4 of 7 The World Bank Report No: ISR7145

PMU in first year of going. 5 regional landfills now implementation comply with standards Number of utilities with sorting, recycling, and/ Text Value 2 utilities with recycling and/ 3 6 utilities with recycling and/ or gas capturing facilities or gas capturing or gas capturing Date 25-Nov-2008 31-Jul-2012 28-Feb-2014 Comments 3 utilities have recycling and/ or gas capturing facilities (SA, ZE, TZ). Recycling facility in Mostar landfill will be financed by IPA 2010 funds. Implementation of cost recovery plans in solid Text Value Limited number of utilities 5 9 utilities implement cost

Public Disclosure Copy waste management utilities cover operational costs recovery plans Date 25-Nov-2008 31-Jul-2012 28-Feb-2014 Comments Sarajevo, Zenica, Banja Luka, Bijeljina & Tuzla Increased share of collected solid waste Text Value 72 % of collected waste is not 50% Reduce share of collected disposed in regional sanitary landfills disposed in sanitary landfills waste not disposed in sanitary landfill by 60% Date 04-Mar-2010 31-Jul-2012 28-Feb-2014 Comments Baseline based on PMU Rehabilitation of landfills is estimate within first year of ongoing. 50% of collected implementation solid waste is not disposed in regional landfills. Increased support to regional sanitary landfills Text Value 5 landfills selected with 7 landfills Selected landfill sites as evidenced by percentage of local population consulted population agreeing supported by more than 60% agreeing to the location of landfill sites to site location of the consulted population Date 25-Nov-2008 31-Jul-2012 28-Feb-2014 Comments Selected landfill sites are supported by more than 50% of the consulted population. Improve regular environmental monitoring as Text Value 25 % of operational utilities 6 utilities 90 % of operating utilities evidenced by increased number of solid waste monitored (4 utilities) monitored utilities monitored for their compliance with Date 04-Mar-2010 31-Jul-2012 28-Feb-2014 national standards Comments Baseline updated by PMU 38% of operating utilities within first year of monitored. implementation Intensified policy debate on hazardous waste Text Value No public debate on No public debate on At least one report/article on management strategy as indicated by hazardous waste hazardous waste final draft of hazardous waste

Public Disclosure Copy increased media coverage management strategy management strategy in daily newspaper/ or TV/ Radio

Page 5 of 7 The World Bank Report No: ISR7145

Date 25-Nov-2008 31-Jul-2012 28-Feb-2014 Comments Activities regarding implementation of hazardous waste management program has been delayed, as the possibility of financing a regional study under the Western Balkan Investment Facility (WBIF) arose. Because of the recent negative assessment of the proposed study by the

Public Disclosure Copy European Commission under WBIF grant funding this year, PMUs will restart consultant selection process as soon as possible

Data on Financial Performance (as of 01-Aug-2012)

Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P107998 IBRD-76290 Effective 25-Nov-2008 25-Jun-2009 23-Oct-2009 28-Feb-2014 28-Feb-2014 P107998 IDA-45400 Effective 25-Nov-2008 25-Jun-2009 23-Oct-2009 28-Feb-2014 28-Feb-2014

Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P107998 IBRD-76290 Effective USD 25.00 25.00 0.00 2.23 22.42 9.00 P107998 IDA-45400 Effective USD 15.00 15.00 0.00 4.37 10.23 29.00

Disbursement Graph Public Disclosure Copy

Page 6 of 7 The World Bank Report No: ISR7145 Public Disclosure Copy

Key Decisions Regarding Implementation No key decisions were made.

Restructuring History There has been no restructuring to date.

Related Projects There are no related projects. Public Disclosure Copy

Page 7 of 7