High-Speed Rail Around the World and Its Promise for America a Track Record of Success High-Speed Rail Around the World and Its Promise for America
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Robustness of Railway Rolling Stock Speed Calculation Using Ground Vibration Measurements
Heriot-Watt University Research Gateway Robustness of railway rolling stock speed calculation using ground vibration measurements Citation for published version: Kouroussis, G, Connolly, D, Laghrouche, O, Forde, MC, Woodward, PK & Verlinden, O 2015, 'Robustness of railway rolling stock speed calculation using ground vibration measurements', MATEC Web of Conferences, vol. 20, 07002. https://doi.org/10.1051/matecconf/20152007002 Digital Object Identifier (DOI): 10.1051/matecconf/20152007002 Link: Link to publication record in Heriot-Watt Research Portal Document Version: Publisher's PDF, also known as Version of record Published In: MATEC Web of Conferences Publisher Rights Statement: Open access General rights Copyright for the publications made accessible via Heriot-Watt Research Portal is retained by the author(s) and / or other copyright owners and it is a condition of accessing these publications that users recognise and abide by the legal requirements associated with these rights. Take down policy Heriot-Watt University has made every reasonable effort to ensure that the content in Heriot-Watt Research Portal complies with UK legislation. If you believe that the public display of this file breaches copyright please contact [email protected] providing details, and we will remove access to the work immediately and investigate your claim. Download date: 26. Sep. 2021 MATEC Web of Conferences 20, 07002 (2015) DOI: 10.1051/matecconf/20152007002 c Owned by the authors, published by EDP Sciences, 2015 Robustness of railway rolling stock speed calculation using ground vibration measurements Georges Kouroussis1,a, David P. Connolly2,b, Omar Laghrouche2,c, Mike C. Forde3,d, Peter Woodward2,e and Olivier Verlinden1,f 1 University of Mons, Department of Theoretical Mechanics, Dynamics and Vibrations, 31 Boulevard Dolez, 7000 Mons, Belgium 2 Heriot-Watt University, Institute for Infrastructure & Environment, Edinburgh EH14 4AS, UK 3 University of Edinburgh, Institute for Infrastructure and Environment, Alexander Graham Bell Building, Edinburgh EH9 3JF, UK Abstract. -
Pioneering the Application of High Speed Rail Express Trainsets in the United States
Parsons Brinckerhoff 2010 William Barclay Parsons Fellowship Monograph 26 Pioneering the Application of High Speed Rail Express Trainsets in the United States Fellow: Francis P. Banko Professional Associate Principal Project Manager Lead Investigator: Jackson H. Xue Rail Vehicle Engineer December 2012 136763_Cover.indd 1 3/22/13 7:38 AM 136763_Cover.indd 1 3/22/13 7:38 AM Parsons Brinckerhoff 2010 William Barclay Parsons Fellowship Monograph 26 Pioneering the Application of High Speed Rail Express Trainsets in the United States Fellow: Francis P. Banko Professional Associate Principal Project Manager Lead Investigator: Jackson H. Xue Rail Vehicle Engineer December 2012 First Printing 2013 Copyright © 2013, Parsons Brinckerhoff Group Inc. All rights reserved. No part of this work may be reproduced or used in any form or by any means—graphic, electronic, mechanical (including photocopying), recording, taping, or information or retrieval systems—without permission of the pub- lisher. Published by: Parsons Brinckerhoff Group Inc. One Penn Plaza New York, New York 10119 Graphics Database: V212 CONTENTS FOREWORD XV PREFACE XVII PART 1: INTRODUCTION 1 CHAPTER 1 INTRODUCTION TO THE RESEARCH 3 1.1 Unprecedented Support for High Speed Rail in the U.S. ....................3 1.2 Pioneering the Application of High Speed Rail Express Trainsets in the U.S. .....4 1.3 Research Objectives . 6 1.4 William Barclay Parsons Fellowship Participants ...........................6 1.5 Host Manufacturers and Operators......................................7 1.6 A Snapshot in Time .................................................10 CHAPTER 2 HOST MANUFACTURERS AND OPERATORS, THEIR PRODUCTS AND SERVICES 11 2.1 Overview . 11 2.2 Introduction to Host HSR Manufacturers . 11 2.3 Introduction to Host HSR Operators and Regulatory Agencies . -
Development and Maintenance of Class 395 High-Speed Train for UK High Speed 1
Hitachi Review Vol. 59 (2010), No. 1 39 Development and Maintenance of Class 395 High-speed Train for UK High Speed 1 Toshihiko Mochida OVERVIEW: Hitachi supplied 174 cars to consist of 29 train sets for the Class Naoaki Yamamoto 395 universal AC/DC high-speed trains able to transfer directly between the Kenjiro Goda UK’s existing network and High Speed 1, the country’s first dedicated high- speed railway line. The Class 395 was developed by applying technologies Takashi Matsushita for lighter weight and higher speed developed in Japan to the UK railway Takashi Kamei system based on the A-train concept which features a lightweight aluminum carbody and self-supporting interior module. Hitachi is also responsible for conducting operating trials to verify the reliability and ride comfort of the trains and for providing maintenance services after the trains start operation. The trains, which formally commenced commercial operation in December 2009, are helping to increase the speed of domestic services in Southeast England and it is anticipated that they will have an important role in transporting visitors between venues during the London 2012 Olympic Games. INTRODUCTION for the Eurostar international train which previously HIGH Speed 1 (HS1) is a new 109-km high-speed ran on the UK’s existing railway network. Hitachi railway line linking London to the Channel Tunnel supplied the new Class 395 high-speed train to be able [prior to completion of the whole link, the line was to run on both HS1 and the existing network as part known as the CTRL (Channel Tunnel Rail Link)]. -
High Speed Rail
House of Commons Transport Committee High Speed Rail Tenth Report of Session 2010–12 Volume III Additional written evidence Ordered by the House of Commons to be published 24 May, 7, 14, 21 and 28 June, 12 July, 6, 7 and 13 September and 11 October 2011 Published on 8 November 2011 by authority of the House of Commons London: The Stationery Office Limited The Transport Committee The Transport Committee is appointed by the House of Commons to examine the expenditure, administration, and policy of the Department for Transport and its Associate Public Bodies. Current membership Mrs Louise Ellman (Labour/Co-operative, Liverpool Riverside) (Chair) Steve Baker (Conservative, Wycombe) Jim Dobbin (Labour/Co-operative, Heywood and Middleton) Mr Tom Harris (Labour, Glasgow South) Julie Hilling (Labour, Bolton West) Kwasi Kwarteng (Conservative, Spelthorne) Mr John Leech (Liberal Democrat, Manchester Withington) Paul Maynard (Conservative, Blackpool North and Cleveleys) Iain Stewart (Conservative, Milton Keynes South) Graham Stringer (Labour, Blackley and Broughton) Julian Sturdy (Conservative, York Outer) The following were also members of the committee during the Parliament. Angie Bray (Conservative, Ealing Central and Acton) Lilian Greenwood (Labour, Nottingham South) Kelvin Hopkins (Labour, Luton North) Gavin Shuker (Labour/Co-operative, Luton South) Angela Smith (Labour, Penistone and Stocksbridge) Powers The committee is one of the departmental select committees, the powers of which are set out in House of Commons Standing Orders, principally in SO No 152. These are available on the internet via www.parliament.uk. Publication The Reports and evidence of the Committee are published by The Stationery Office by Order of the House. -
Economic Impact of High Speed 1 Final Report
Economic Impact of High Speed 1 Final report London & Continental Railways January 2009 In association with Economic Impact of High Speed 1 Final report Project No: 149231 January 2009 10 Eastbourne Terrace, London, W2 6LG Telephone: 020 7053 1300 Fax: 020 7053 1301 Email : [email protected] Prepared by: Approved by: ____________________________________________ ____________________________________________ Kieran Arter Paul Buchanan Status: Final Issue no: 2 Date: 08 January 2009 149231 draft report v4.1.doc (C) Copyright Colin Buchanan and Partners Limited. All rights reserved. This report has been prepared for the exclusive use of the commissioning party and unless otherwise agreed in writing by Colin Buchanan and Partners Limited, no other party may copy, reproduce, distribute, make use of, or rely on the contents of the report. No liability is accepted by Colin Buchanan and Partners Limited for any use of this report, other than for the purposes for which it was originally prepared and provided. Opinions and information provided in this report are on the basis of Colin Buchanan and Partners Limited using due skill, care and diligence in the preparation of the same and no explicit warranty is provided as to their accuracy. It should be noted and is expressly stated that no independent verification of any of the documents or information supplied to Colin Buchanan and Partners Limited has been made Economic Impact of High Speed 1 Final report Contents Summary 1 1 Introduction 4 2 Transport user benefits 5 2.1 Journey time savings -
High-Speed Rail Projects in the United States: Identifying the Elements of Success Part 2
San Jose State University SJSU ScholarWorks Faculty Publications, Urban and Regional Planning Urban and Regional Planning January 2007 High-Speed Rail Projects in the United States: Identifying the Elements of Success Part 2 Allison deCerreno Shishir Mathur San Jose State University, [email protected] Follow this and additional works at: https://scholarworks.sjsu.edu/urban_plan_pub Part of the Infrastructure Commons, Public Economics Commons, Public Policy Commons, Real Estate Commons, Transportation Commons, Urban, Community and Regional Planning Commons, Urban Studies Commons, and the Urban Studies and Planning Commons Recommended Citation Allison deCerreno and Shishir Mathur. "High-Speed Rail Projects in the United States: Identifying the Elements of Success Part 2" Faculty Publications, Urban and Regional Planning (2007). This Report is brought to you for free and open access by the Urban and Regional Planning at SJSU ScholarWorks. It has been accepted for inclusion in Faculty Publications, Urban and Regional Planning by an authorized administrator of SJSU ScholarWorks. For more information, please contact [email protected]. MTI Report 06-03 MTI HIGH-SPEED RAIL PROJECTS IN THE UNITED STATES: IDENTIFYING THE ELEMENTS OF SUCCESS-PART 2 IDENTIFYING THE ELEMENTS OF SUCCESS-PART HIGH-SPEED RAIL PROJECTS IN THE UNITED STATES: Funded by U.S. Department of HIGH-SPEED RAIL Transportation and California Department PROJECTS IN THE UNITED of Transportation STATES: IDENTIFYING THE ELEMENTS OF SUCCESS PART 2 Report 06-03 Mineta Transportation November Institute Created by 2006 Congress in 1991 MTI REPORT 06-03 HIGH-SPEED RAIL PROJECTS IN THE UNITED STATES: IDENTIFYING THE ELEMENTS OF SUCCESS PART 2 November 2006 Allison L. -
Train Sim World 2 Southeastern High Speed Driver's Manual EN.Pdf
EN SOUTHEASTERN HIGH SPEED ©2021 Dovetail Games, a trading name of RailSimulator.com Limited (“DTG”). "Dovetail Games", “Train Sim World” and “SimuGraph” are trademarks or registered trademarks of DTG. Unreal® Engine, ©1998-2021, Epic Games, Inc. All rights reserved. Unreal® is a registered trademark of Epic Games. Portions of this software utilise SpeedTree® technology (©2014 Interactive Data Visualization, Inc.). SpeedTree® is a registered trademark of Interactive Data Visualization, Inc. All rights reserved. Southeastern is the registered trade mark of The Go-Ahead Group PLC. Permission to use the Double Arrow Trade Mark is granted by the Secretary of State for Transport. All other copyrights or trademarks are the property of their respective owners and are used here with permission. Unauthorised copying, adaptation, rental, re-sale, arcade use, charging for use, broadcast, cable transmission, public performance, distribution or extraction of the product or any trademark or copyright work that forms part of this product is prohibited. Developed and published by DTG. CONTENTS 1 SOUTHEASTERN HIGH SPEED OVERVIEW 5 TRAIN SAFETY & IN-CAB SIGNALLING SYSTEMS 5 INTRODUCING SOUTHEASTERN HIGH SPEED 43 AUTOMATIC WARNING SYSTEM (AWS) 6 ROUTE MAP & POINTS OF INTEREST 44 TRAIN PROTECTION & WARNING SYSTEM (TPWS) 7 GAME MODES 45 KVB 2 THE BR CLASS 395 'JAVELIN' 47 TVM-430 8 INTRODUCING THE BR CLASS 395 'JAVELIN' 6 BRITISH RAILWAY SIGNALLING 9 BR CLASS 395 DRIVING CAB: FRONT 50 COLOUR LIGHT 10 BR CLASS 395 DRIVING CAB: REAR 56 SEMAPHORE 11 BR CLASS -
Cfs0997all2.Pdf
Acknowledgements United States Department of Transportation Secretary Federico F. Peña; Rodney E. Slater Deputy Secretary Mortimer L. Downey Federal Railroad Administration Administrator Jolene M. Molitoris Deputy Administrator Donald M. Itzkoff Associate Administrator for Railroad Development James T. McQueen Deputy Associate Administrator for Railroad Development Arrigo P. Mongini Study manager; general editor; principal writer Neil E. Moyer System benefits; financing; Alice M. Alexander Magnetic levitation John T. Harding contract administration James L. Milner Transportation analysis Bruce Goldberg Chapter 1; liability; State Gareth W. Rosenau Helen Ng opportunities Volpe National Transportation Systems Center Senior study advisor; Volpe Center project manager Ronald A. Mauri Travel demand forecasting Simon P. Prensky System concept definition Michael N. Coltman David M. Nienhaus Leonore I. Katz-Rhoads Sarah J. Lawrence* Robert P. Brodesky* Model implementation: Todd C. Green* Energy and emissions model Howard M. Eichenbaum* projections of operating results David L. Skinner implementation and investment needs *EG&G/Dynatrend Argonne National Laboratories Charles River Associates Energy and emissions model Donald M. Rote Demand model development Dan Brand development Zian Wang Thomas E. Parody Mark R. Kiefer DeLeuw, Cather & Co. and Associated Firms DeLeuw, Cather project manager Michael Holowaty Operating expense model Duncan W. Allen Ancillary activities model Steven A. LaRocco development Winn B. Frank development Richard L. Tower (Wilbur Eric C. MacDonald Smith) Charles H. Banks (R.L. Banks) Public benefits model design and Guillaume Shearin Liability Charles A. Spitulnik implementation Robert J. Zuelsdorf (Wilbur (Hopkins & Sutter) Smith) Kenneth G. Sislak (Wilbur Anne G. Reyner (Wilbur Smith) Smith) Jeffrey B. Allen Parsons Brinckerhoff Quade & Douglas, Inc. Parsons, Brinckerhoff project manager John A. -
Cincinnati 7
- city of CINCINNATI 7 RAILROAD IMPROVEMENT AND SAFETY PLAN Ekpatm~d Tra tim & Engineering Tran~~murnPlanning & Urhn 'Design EXHIBIT Table of Contents I. Executive Summary 1 Introduction 1 Background 7 Purpose 7 I. Enhance Rail Passenger Service to the Cincinnati Union Terminal 15 11. Enhance Freight Railroad Service to and Through Cincinnati 21 111. Identify Railroad Related Safety Improvements 22 RlSP Projects 26 Conclusions 26 Recommendations 27 Credits List of Figures Figure 1 Cincinnati Area Railroads Map (1965) Figure 2 Cincinnati Area Railroads Map (Existing) Figure 3 Amtrak's Cardinal on the C&O of Indiana Figure 4 Penn Central Locomotive on the Blue Ash Subdivision Figure 5 CSX Industrial Track (Former B&0 Mainline) at Winton Road Figure 6 Cincinnati Riverfront with Produce Companies Figure 7 Railroads on the Cincinnati Riverfront Map (1976) Figure 8 Former Southwest Connection Piers Figure 9 Connection from the C&O Railroad Bridge to the Conrail Ditch Track Figure 10 Amtrak's Cardinal at the Cincinnati Union Terminal Figure 11 Chicago Hub Network - High Speed Rail Corridor Map Figure 12 Amtrak Locomotive at the CSX Queensgate Yard Locomotive Facility Figure 13 Conceptual Passenger Rail Corridor Figure 14 Southwest Connection Figure 15 Winton Place Junction Figure 16 Train on CSX Industrial Track Near Evans Street Crossing Figure 17 Potential Railroad Abandonments Map Figure 18 Proposed RlSP Projects Map Figure 19 RlSP Project Cost and Priority Executive Summary Introduction The railroad infrastructure in Cincinnati is critical for the movement of goods within the City, region, and country. It also provides the infrastructure for intercity passenger rail. -
Purpose and Need for Action
2. Purpose and Need for Action 2. Purpose and Need for Section PURPOSE AND NEED 2 FOR ACTION 2.0 Purpose and Need for Action This chapter describes the purpose and need for improved high speed passenger rail on the Chicago to St. Louis HSR Corridor. In addition, this chapter describes the proposals and provides information on its history, previous and current rail studies along the corridor, and existing and future corridor conditions. Finally, this chapter identifies major authorizing laws and regulations; discusses the relationship of the proposal to statutes, regulations, policies, programs, and plans; and lists federal permits, licenses, and other requirements for program implementation. An overview map of the proposed program is shown on Exhibit 2.0‐1. 2.1 Background 2.1.1 History For more than two decades, IDOT has pursued improvements to passenger rail service between Chicago and St. Louis. The Chicago to St. Louis HSR Corridor is part of the Midwest Regional Rail Initiative program’s intent to develop and implement a 21st‐ century regional passenger rail system. 2.1.1.1 Previous Studies High‐speed rail in the Chicago to St. Louis corridor was first studied in 1979, when a system consisting of a 150 mph, electrified, double tracked network on a new alignment was evaluated. At the end of the study, it was concluded that the potential cost of new alignment high‐speed rail service was unaffordable, and that efforts should be concentrated on improving existing passenger train service along existing alignments. In 1992, the Secretary of the U.S. Department of Transportation designated the Chicago to St. -
Kent Rail Strategy 2021
Kent Rail Strategy 2021 County Hall, Maidstone March 2021 1 Contents Map of Kent Rail Network ……………………………………………………………… 3 Foreword by Roger Gough, Leader of Kent County Council ………………………. 4 Executive Summary ……………………………………………………………………. 5 1. Introduction ……………………………………………………………………… 7 2. National Rail Policy …………………………………………………………….. 9 3. Kent’s Local Transport Policy …………………………………………………. 15 4. Key Drivers of Demand for Rail Services in Kent ………………..……….… 18 5. Rail Infrastructure Outputs Required in Kent ……………..……………….… 23 6. Rolling-Stock Outputs Required in Kent ……………………………………... 29 7. Rail Service Outcomes Required in Kent ……………………………………. 33 8. Passenger Communications and Station Facilities in Kent ………………... 43 9. Community Rail Partnerships in Kent ………………………………………... 46 10. Rail Freight Services in Kent …………………………………………..…….…50 11. International Rail Services in Kent ……………………………………………. 55 12. Conclusion …………………………………………………………………….… 58 Summary of Recommended Actions …………………………………………………. 60 Glossary of Railway Terminology……………………………………………………... 64 Sources ………………………………………………………………………………….. 66 Tables and Maps ……………………………………………………………………….. 67 Appendix A - Proposed Service Specifications ……………………………………… 68 Front cover image The new Class 800 series produced by Hitachi is one example of a new train design that could provide the bespoke additional fleet which will be required for Kent’s High Speed services. The picture shows a Class 800 train on a test run before entry into service. [source: Hitachi Ltd, 2015] 2 3 Foreword By the Leader of -
2021 HS1 NETWORK STATEMENT Dated Edition: 1 April 2021 HIGH SPEED 1 (HS1) HS1 LIMITED
2021 HS1 NETWORK STATEMENT Dated Edition: 1 April 2021 HIGH SPEED 1 (HS1) HS1 LIMITED 1 GLOSSARY OF TERMS ACC Ashford Control Centre Access Agreement Framework Track Access Agreement, Track Access Agreement or Station Access Agreement (as applicable) AIC Additional Inspection Charge Applicant Any person that wants to apply for a train path including TOCs, shippers, freight forwarding agents and combined transport operators intending to employ a TOC to operate the train path on their behalf APC Magnets Automatic Power Control Magnets ATCS Automatic Train Control System AWS Automatic Warning System Access Proposal Any notification made by any Applicant for a Train Slot as provided under the HS1 Network Code Competent authority Any restriction of use taken by the Infrastructure Manager restriction of use pursuant to a direction or an agreement with any competent authority (a public authority of a Member State(s) which has the power to intervene in public passenger transport in a given geographical area) Concession Agreement The agreement made between the Secretary of State and the Infrastructure Manager granting the concession to the Infrastructure Manager for the operation and financing of HS1 and the repair, maintenance and replacement of HS1 DAPR Delay Attribution Principles & Rules DBC DB Cargo (UK) Limited Disruptive Event Any event or circumstance which materially prevents or materially disrupts the operation of trains on any part of HS1 in accordance with the relevant Working Timetable EIL Eurostar International Limited Engineering