Dholera Special Investment Region

1 Key facts: Dholera SIR Key Facts: Dholera SIR

Delhi Mumbai Industrial Corridor

Vadodara

Dholera Km37

Surat Pipavav Port

Nearby Airports Distance (km) 35Km Ahmedabad 122 Nearby Ports Distance (km) 142 Pipavav 209 • Total Area – 920 sq. km • Developable area – 422 sq.km Bhavnagar 65 Mundra 408 • Estimated Investment – US$ 3.15 Billion Source: DICDIL 313 Kandla 350 Industrial Corridors of

DMIC AKIC (1504Km) (1839Km) $100 Billion $90 Billion

BMIC (1000Km) $85 Billion

VCIC (800Km) CBIC $90 Billion (560Km) $90 Billion MUMBAI

Expected Investment Expected Employment Dholera SIR is advantageous of being located $ 435 Billion 128 Million within the DMIC corridor Connecting Dholera NH8A: 6-laning is in progress NH8 Road Connectivity (6 Lane)

NH8A Ahmedabad Kandla Port ( 6 Lane)

Navlakhi NE1

Bagodara SH4

Jamnagar NH8A Limbdi SH1 (6 lane) SH20 SH40 Vataman SH6 `` Rajkot SH to Dholera: 4-laning Proposed Vadodara (Navagam) is completed Dholera SH 117 DSIR

NH8D Expressway proposed between NH8 Ahmedabad and Dholera Bhavnagar NH8B Travel time will reduce to 60 mins from 120 mins presently Porbandar Dahej Port Porbandar Port NH8D

NH8E NH8E LEGEND (6 Lane) Surat National Highways Hazira Port Expressways Pipavav Port Major State Highways Western DFC Prop. Expressway Veraval Port Connecting Dholera Sea route linkage

Ahmedabad Kandla Port

Navlakhi Mundra Port

Jamnagar

Vadodara

DSIR

Bhavnagar Porbandar Ro-Ro Ferry and Cargo Service between Dahej, Dahej Port Ghogha and Hazira Port Reduces the travel time from 7 hrs to 1.5 hr (- Bhavnagar) Surat LEGEND Hazira Port Prop. Western DFC Pipavav Port Ferry Service Veraval Port Connecting Dholera Mehsana Jn. Rail Connectivity

Viramgam Jn. Gandhidham Jn. MMLH Ahmedabad Kandla Port

Navlakhi

Mundra Port Surendranagar Jn.

Jamnagar

Implementation of BhimnathRajkot – Dholera rail Vadodara • Excellent connectivity to Ports Bhimnath Botad Jn. • Excellent connectivity to DFC and Dholera DSIR Logistics Multimodal Logistic hub (A’bad) Hub

Bhavnagar Bharuch Jn. Porbandar Dahej Port Doubling of BG track to Pipavav port in progress

Surat LEGEND Hazira Port Prop. Western DFC Pipavav Port Broad Gauge (BG) rail Major Rail Junctions Veraval Port Proposed rail link to DSIR Prospective Industrial Sectors

Aerospace & Defense Heavy Engineering Auto & Auto ancillaries Solar Industry

• Manufacturing of Steel, • Innovative information & • Auto parts, Automotive • Solar Park, Photovoltaic Pressure Vessel, Heat communication systems & electronics & components, exchangers, Reactor Internals cell & agriculture solar its equipment etc. Auto ancillaries pump manufacturing

Pharmaceuticals Agro & Food processing Electronic Industries IT & ITes

• Contract research • Nutra-cosmetics • Processed & packaged • ESDM: Design of • Drug manufacturing food, Agro products semiconductor, hi-tech • Cloud Computing & Data manufacturing analytics , Data Center etc.

Source: DIDCL Benchmarking: World Class Infrastructure for Dholera SIR Solid Waste Road Design • Brussels • London • Songdo • New York • New York • Singapore

Power & ICT Water & Waste Water • Singapore • Singapore • London • California • Canada & Denmark International • Hong Kong Benchmarking

Urban Planning Storm Water • London • Brussels • Chicago • Songdo • Milton Keynes • New York

Source: DIDCL Projects at Glance

Multimodal Transport Hub Dholera International Airport • Hub for MRTS, LTR, BRT, • Development area of 1428ha • Regional bur and rail, para • 2 runways (2900m & 4000m) transport, • Cycle and pedestrian integration Ahmedabad – Dholera 6 lane Expressway Bhimnath Dholera Freight • Access control Line connecting to DFC • Travel time 75 minutes) • Dedicated freight line connecting Dholera to DFC MRTS within the RoW • Total 7 stops - Ahmedabad to Dholera) • Travel time 60 minutes

Logistic Park Activation area (22.54 sq.km) • 50% Industrial Solar Park Development (in • 28% Residential CRZ -1B) 5000 MW • Services at plot level • 11000ha land • Green parks within 400 / 800 m • Phase I – 1000MW catchment • World`s largest

Govt. Investment approximately 22,000 Cr. Source: DIDCL Total Investment Approx. 1,00,000 Cr. Phase wise development of DSIR

Land Allotment ~ 17 days Blanket Environmental Plot Size No. of From date of application Clearance for 920 sq.km distribution plots

Activation Area for 0-5 Ha. 25 development: 2254 Ha. 5-10 Ha. 17 10-50 Ha. 32 50-100 Ha. 08 100-150 Ha. 01

Plots up to 150 Ha. - can be combined up to 750 Ha. Proposed total development 42,200 Ha. over 30 years

Proposed Phase-wise Particulars timeline for development for TP development Phase-I TP-1 & TP-2 2012-2022 Initial (Part of TP-2 & 2016-2020 Linear Development in Development TP-4) region: 13,700 Ha. Phase-II TP-3 & TP-4 2023-2032 Future phase development : Phase-III TP-4 & TP-5 2033-2042 Source: DIDCL 26,300 Ha. Current Status (Activation Area)

Activation area land use Contracts awarded till date

Contacts of US$ 430 million awarded for: • Road & underground utility Land use distribution infrastructure • Admin & Business Center for Dholera Industrial (ABCD) • Water & Sewage treatment plant 4% High Access • Power & Raw water transmission Corridor line 6% Public Facility • River bunding Zone • Common Effluent Treatment Plant Recreational & (CETP) 28% Sports 52% Residential

Road Water charges are: • INR 38/kl for potable water 5% • INR 20 /kl for treated water 4% Tourism 1%

Power Tariff is available at: • INR 5.1/unit at 40% load factor • INR 4.65 /unit at 60% load factor Dholera International Airport

Ahmedabad Dholera Ready for Take-off Proposed Expressway Airstrip Details • Airport with two (2) runways Pipli • Runway 1- 2910 meter Junction • Runway 2 – 4000 meter

Proposed Dholera International Airport

• Approval from Ministry of Civil Aviation

Dholera SIR • NOC from Ministry of Defence • Airport Authority of India (AAI) on board as 51% equity partner Dholera providing Plug & play infra City Integrated Operations Center

Source: DIDCL Dholera SIR: Power Tariff Comparison

Dholera has Lowest Power Tariff (Average 38% Cheaper than Other States) Power tariff @ Dholera Rs. 5.1/unit at 40% load factor Power requirement = ~60 MW Rs. 4.65/unit at 60% load factor (Proposed Leading Tariff for Tariff of other Tariff industrial UNITS (Per/ Load Factor Dholera) DISCOMS Difference Annual savings at states Month) (%) (Rs/unit) (Rs/unit) (Rs/unit) Dholera@ 60% LF

State-1 2,59,20,000 60% 4.65 8.7 4.05 INR 126 Cr. USD 18M

State-2 2,59,20,000 60% 4.65 7.55 2.9 INR 90 Cr. USD 12.8M

State-3 INR 62 Cr. USD 8.8M 2,59,20,000 60% 4.65 6.64 1.99

INR 81 Cr. USD 11.6M State-4 2,59,20,000 60% 4.65 7.25 2.6 Dholera - An ideal “Incubator City”

Electric Vehicle (EV) Mobility Sea water desalination using renewable energy

• Renewable energy sources • Advanced technology (Forward Osmosis & Membrane Distillation) • Potable water (reduce dependency of ground & surface water)

Ultra Mega Solar Park

• 11000 ha land in possession • Capacity 5000MW, Phase I – 1000MW • Makes city self sustainable • Will be one of ’s largest solar mega park • Pre planned dedicated charging stations • 1 charging station at every 1X1 Km grid • Solar based DC fast charging • All set for EV Eco-system Awards & Recognition

Geospatial Excellence Award Bentley “Be Inspired” Sep 2016 Mar 2016 Mar 2016

Best City for Integrated Best Green City Planning

Feb 2017 Feb 2017 Source: DIDCL Status update on Dholera SIR

Recent Snapshot of progress in Dholera SIR

Source: DIDCL 3D Renders of Dholera City India`s 1st “Platinum” Rated Greenfield Industrial City

Plug & Play Social sustainability Ease of World class Ease of External Technology infrastructure business infrastructure governance connectivity Connect for more Information

Dholera Industrial City Development Ltd. (DICDL)

A Joint Venture Company of DSIRDA (Govt. of Gujarat) & NICDC (Govt. of India)

Block No. 1, 6th Floor, Udyog Bhavan, Gandhinagar, Gujarat, India - 382 010 http://dicdl.Gujarat.gov.in / www.dholerasir.com Phone: 079-2975 05000 E-mail: [email protected] / [email protected] 21