Andrada Quarry Expansion Environmental Assessment

Total Page:16

File Type:pdf, Size:1020Kb

Andrada Quarry Expansion Environmental Assessment United States Department of the Interior Bureau of Land Management Environmental Assessment DOI-BLM-AZ-G020-2013-0019-EA ANDRADA MARBLE QUARRY December 09, 2019 U.S. Department of the Interior Bureau of Land Management Gila District Tucson Field Office 3201 East Universal Way Tucson, AZ 85756 Phone: (520) 258-7200 FAX: (520) 258-7238 1 This page intentionally left blank. 2 1 INTRODUCTION 1.1 Background Mining Background The Andrada Quarry is located approximately 25 miles southeast of Tucson, Arizona, at the north end of the Santa Rita Mountains, one mile south of the intersection of Sahuarita and Wentworth Roads (Figure 1). The existing quarry is located on privately owned land. Andrada Holdings, LLC proposes to expand the quarry onto adjacent split-estate land where the Arizona State Trust holds the surface estate and the United States Bureau of Land Management (BLM) holds the mineral estate. The surface estate and mineral estate were severed in 1941, the result of a state exchange patent being granted by the United States to the State of Arizona for ownership of the surface estate. The quarry is in a rural area with low density residential neighborhoods 0.5 miles to the east and 1.5 miles to the north. The area is undergoing rapid development with high density housing subdivisions two miles to the west. The quarry has been in operation for more than 45 years and has produced a variety of high grade calcium carbonate products that have been utilized in the construction, paint, paper, and landscaping industries. The area is underlain by the Escabrosa Limestone which has been mined and exposed by numerous pits, drill holes, and exploration trenches including a pit mined by former owner Georgia Marble Company. This mine pit intersects the water table. While the complete operational history of the privately owned Andrada Quarry is uncertain, key dates are as follows: • The Andrada Marble Company initially began quarrying for marble at the site in 1959. • Georgia Marble purchased the operation from the Andrada Marble Company in 1991 and operated the quarry until 1997. • Imerys Marble purchased the Georgia Marble Company in 1997. • Imerys ceased quarrying marble, but continued material processing and bagging operations through 2003 using material from existing stockpiles and material produced from their mine near Sahuarita, Arizona. • W.R. Henderson acquired the site from Imerys Marble in August 2003. • Andrada Holdings LLC acquired the site in September 2011 and currently holds title to private lands and mining claims on state lands associated with the quarry. • Lamb Rock and Southern Arizona Rock operated the site for aggregate production from late 2003 through March 2014. • The site has been inactive since March 2014 while Andrada Holdings is in negotiations with a new operator. Process Background A mine plan of operations (MPO) for the proposed operation at the Andrada Marble Quarry was submitted by Andrada in 2004. In accordance with provisions of the National Environmental Policy Act (NEPA), the impacts of the proposed operation were analyzed through an environmental assessment (EA). The Tucson Field Office issued a Finding of No Significant Impact (FONSI) and Decision Record approving the EA and MPO in July 2005. In August 2005, a request for a State Director review of the decision was received. A remand of the decision and subsequent stay was issued by the BLM Arizona State Director in November 2005. The BLM revised the MPO and the environmental analysis to better address the issues brought forth by the petitioners. 3 The revised MPO and EA were approved March 12, 2007. This decision was then appealed to the Interior Board of Land Appeals (IBLA). Pursuant to the IBLA order (IBLA 2007-164) of July 31, 2007, the decision to approve the MPO was set aside and remanded. A new EA and unsigned FONSI were prepared and made available for public comment from April through June 2013. Nearly three hundred separate comments were received including one hundred seventy two substantive comments. Refer to Section 1.6.3 below for more information on how comments were addressed. This EA addresses the substantive comments received in 2013 and new information provided by Andrada Holdings. 1.2 Purpose and Need for Action The purpose of this action is to respond to the submission of a proposed MPO from Andrada Holdings to expand their existing quarry site. Pursuant to the U.S. mining laws, Andrada is entitled to conduct operations that are reasonably incident to exploration and development of mineral deposits on its unpatented mining claims. The need for the action is established by BLM’s responsibility under the Federal Land Policy Management Act (FLPMA) and the Mining and Minerals Policy Act of 1970, and as described in regulations at 43 CFR 3809. 1.3 Decision to be Made The BLM must determine if the proposed MPO meets the requirements of 43 CFR 3809.401. Based on an evaluation of alternatives and potential impacts, the BLM will make a decision determining whether or not to approve the proposed MPO. The BLM may add additional mitigation measures to reduce resource impacts, if warranted. Although a portion of the proposed project would occur on Arizona State Trust lands, the BLM is the approving surface management agency with regard to approval of the MPO. At a minimum, this includes BLM’s authority to require the following: • Avoidance of sensitive resources and relocation of a surface disturbance activity in order to protect a sensitive resource. • Submittal and implementation of an adequate reclamation plan and achievement of reclamation goals. • Conduct operations in a manner that avoids unnecessary or undue impacts to other resources. 1.4 Conformance with Applicable Land Use Plan(s) The Proposed Action is subject to the Phoenix Resource Management Plan (RMP), approved September 1989. Page 14 of the RMP under the Minerals Management section states that mineral development is generally encouraged on public lands that are open to entry and location under the U.S. mining laws in adherence to BLM’s multiple-use mission. The Proposed Action has been determined to conform to the land use plan terms and conditions as required by 43 CFR 1610.5. 1.5 Relationship to Statutes, Regulations or Other Plans Per 30 USC Sec. 1602 it is the continuing policy of the United States to promote an adequate and stable supply of materials necessary to maintain national security, economic well-being, and industrial production with appropriate attention to a long-term balance between resource production, energy use, a healthy environment, natural resources conservation, and social needs. Further, the Mining and Minerals Policy Act of 1970 declares that the policy of the Federal Government is “to foster and encourage private enterprise in the development of a stable domestic minerals industry and the orderly and economic development of domestic mineral resources”. 4 Exploration and development of locatable mineral resources are provided for under the regulations found at 43 CFR 3809 and 3715. Mining activity is administered on a case-by-case basis. The BLM decision would authorize the use of mineral estate held in reserve by the federal government and managed under the authority of the BLM. Use of non-BLM land (State Trust land and private land) is subject to the agency or private landowners' permission. Pursuant to A.R.S. 27-254, Andrada has acquired a land use permit from the Arizona State Land Department. Special Land Use Permit 23-114960-11 encompasses 100 acres within the State of Arizona Lease located in the Northwest Quarter of the Northwest Quarter of Section 21, Township 17 South, Range 16 East, G&SR Meridian. Quarry access is located on Arizona State Trust land. Andrada has access via a right-of-way from the Arizona State Land Department. Haul Road Right of Way, Lease No 18-116832, is located by metes and bounds through the West Half of Section 16, Township 17 South, Range 16 East, and by metes and bounds through the Northeast Quarter of the Northwest Quarter of the Northwest Quarter of Section 21, Township 17 South, Range 16 East, Gila & Salt River Meridian as identified on the Mount Fagan, Arizona, 7.5 Minute USGS Quadrangle Map (1996). In 2006, Pima County prepared the Pima County Comprehensive Land Use Plan (PCCLUP) – Planned Land Use – Eastern Pima County, to regulate future development of undeveloped areas of Pima County (Pima County 2006). According to the PCCLUP, the proposed project area occurs within an area designated as a Biological Core within Pima County’s Conservation Land System. Pima County designated land use of the area where Andrada is proposing operations as low-to-medium urban development. The Pima County plan calls for protection of Biological Core lands within the Conservation Land System through low-intensity uses and acquisition by the County. Although provisions for mining are not addressed in the PCCLUP, jurisdiction over the mineral estate of the subject lands remains with the federal government. Pima County Outdoor Lighting Code, Ordinance 2012-14, provides rules and guidelines for lighting with the purposes described in Section 101 of the code: The purpose of this code is to preserve the relationship of the residents of the City of Tucson, Arizona and Pima County, Arizona to their unique desert environment through protection of access to the dark night sky. Intended outcomes include continuing support of astronomical activity and minimizing wasted energy, while not compromising the safety, security, and wellbeing of persons engaged in outdoor night time activities. It is the intent of this code to control the obtrusive aspects of excessive and careless outdoor lighting usage while preserving, protecting, and enhancing the lawful nighttime use and enjoyment of any and all property.
Recommended publications
  • Multi-Criteria Decision Analysis for an Abandoned Quarry in the Evros Region (NE Greece)
    land Article Multi-Criteria Decision Analysis for an Abandoned Quarry in the Evros Region (NE Greece) Sapfo Tsolaki-Fiaka 1, George D. Bathrellos 1,2,* ID and Hariklia D. Skilodimou 2 1 School of Science and Technology, Hellenic Open University, Parodos Aristotelous 18, ZC 26335 Patra, Greece; [email protected] or [email protected] 2 Department of Geography and Climatology, Faculty of Geology and Geoenvironment, National and Kapodistrian University of Athens, University Campus, Zografou, ZC 15784 Athens, Greece; [email protected] * Correspondence: [email protected]; Tel.: +30-210-727-4882 Received: 2 March 2018; Accepted: 6 April 2018; Published: 10 April 2018 Abstract: The purpose of this study is to identify the impacts of abandoned quarries and to examine scenarios for their restoration. Two quarries were selected as case studies, which are located in the Evros Region (NE Greece). Initially, the current state of the abandoned quarries was recorded and evaluated, including slopes, landscape, land use, as well as cultural elements. Four alterative scenarios for the exploitation of each quarry were proposed, taking into account the specifics of each site. Financial, environmental, and socioeconomic criteria were then used to evaluate these scenarios. The PROMETHEE method is a multi-criteria decision analysis approach and was applied to rank the alterative scenarios. The results show that the “do nothing” scenario is the worst solution for both quarries. In the quarry at Asvestades, the restoration of the area by returning the land to pre-quarry use with the shaping of the slopes and planting is considered the best solution. On the other hand, in the quarry Mikro Derio two scenarios are proposed; one provides restoring the site to its pre-quarry land use and the other is the restoration of the quarry combined with the creation of a wildlife observatory and places for alternative forms of tourism.
    [Show full text]
  • Comparative Study on the Environmental Impact of Traditional Clay Bricks Mixed with Organic Waste Using Life Cycle Analysis
    sustainability Article Comparative Study on the Environmental Impact of Traditional Clay Bricks Mixed with Organic Waste Using Life Cycle Analysis José Adolfo Lozano-Miralles 1, Manuel Jesús Hermoso-Orzáez 1,* ID , Carmen Martínez-García 2 ID and José Ignacio Rojas-Sola 1 ID 1 Department of Engineering Graphics, Design and Projects, University of Jaén, 23071 Jaen, Spain; [email protected] (J.A.L.-M.); [email protected] (J.I.R.-S.) 2 Department of Chemical, Environmental and Material Engineering, High Polytechnic School of Linares, University of Jaen, Linares Scientific and Technological Campus, Cinturon Sur, s/n, 23700 Linares, Spain; [email protected] * Correspondence: [email protected]; Tel.: +34-610-389-020 Received: 3 July 2018; Accepted: 1 August 2018; Published: 18 August 2018 Abstract: The construction industry is responsible for 40–45% of primary energy consumption in Europe. Therefore, it is essential to find new materials with a lower environmental impact to achieve sustainable buildings. The objective of this study was to carry out the life cycle analysis (LCA) to evaluate the environmental impacts of baked clay bricks incorporating organic waste. The scope of this comparative study of LCA covers cradle to gate and involves the extraction of clay and organic waste from the brick, transport, crushing, modelling, drying and cooking. Local sustainability within a circular economy strategy is used as a laboratory test. The energy used during the cooking process of the bricks modified with organic waste, the gas emission concentrate and the emission factors are quantified experimentally in the laboratory. Potential environmental impacts are analysed and compared using the ReCiPe midpoint LCA method using SimaPro 8.0.5.13.
    [Show full text]
  • Reviewing the Impact of Vehicular Pollution on Road-Side Plants—Future Perspectives
    sustainability Review Reviewing the Impact of Vehicular Pollution on Road-Side Plants—Future Perspectives Manikandan Muthu 1, Judy Gopal 1 , Doo-Hwan Kim 2 and Iyyakkannu Sivanesan 2,* 1 Laboratory of Neo Natural Farming, Chunnampet, Tamil Nadu 603 401, India; [email protected] (M.M.); [email protected] (J.G.) 2 Department of Bioresources and Food Science, Institute of Natural Science and Agriculture, Konkuk University, 1 Hwayang-dong, Gwangjin-gu, Seoul 05029, Korea; [email protected] * Correspondence: [email protected]; Tel.: +82-24500574; Fax: +82-24503310 Abstract: With population explosion, automobiles have also exploded and so has pollution due to vehicular emissions. Road-side plants and highway vegetation are the first targets of these vehicular emissions. This review briefly presents a snapshot of how vehicular emission can affect plants. On the contrary, the positive perspective of how road-side plants may be able to affect and influence the harmful effects of vehicular emissions has also been discussed. Ways and means by which plants can become potential bio indicators of air pollution have also been speculated. The fact that the nanocarbon particulate aspect of automobile pollutants and their interactions with road-side plants and more so on road-side agricultural crops, has not been appropriately investigated has been raised as a key concern. The need to arrive at mitigation methods to identify permanent solutions to these rising concerns has been highlighted. Keywords: automobile emission; highway/roadside plants; carbon nanoparticles; dust; pollution; Citation: Muthu, M.; Gopal, J.; air pollution Kim, D.-H.; Sivanesan, I. Reviewing the Impact of Vehicular Pollution on Road-Side Plants—Future Perspectives.
    [Show full text]
  • Red Dots Indicate Where DEIR's Noise Measurements Were Taken. Ie LT-2
    [Red dots indicate where DEIR's noise measurements were taken. i.e. LT-2: Long-term measurements] MAP OF QUARRY PROJECT'S NOISE IMPACTS TO SKYLINE WILDERNESS PARK You Commissioners have noise regulations and State environmental laws as the means to achieve such protection. But those regulations will work only if they are properly applied to this Syar Napa Quarry expansion project. So far however, Syar's consultants and EIR preparers have misled the Planning Department, the public and you Commissioners by concluding Syar's noise impacts to the Skyline Wilderness Park will be less-than-significant if mitigated as they propose. DL&A Noise Comment Letter #2 9-1-15 Syar Napa Quarry Expansion Project EIR - 2 - They have failed to accurately analyze the most severe noise impacts to this Park. Those most severe impacts will be the temporary or periodic increases in noise exposure from unshielded heavy equipment operations as the quarry is expanded on its north and east sides. There may also be significant sleep-disturbance impacts to campground users in tents or RVs from Syar's operations, either during the quarry's occasional 24-hour night and day operations or its early morning operations that may begin at 6:00 a.m. While the DEIR does not evaluate these significant impacts of large temporary increases in noise or sleep-disturbance, there is nonetheless strong evidence in the DEIR that points to such impacts. The DEIR's data is there for all to read, but its significance has been overlooked by County planners who have reviewed the DEIR.
    [Show full text]
  • QUARRY RECLAMATION in ENGLAND: a REVIEW of TECHNIQUES1 Israel A
    JASMR, 2015 Volume 4, Issue 2 QUARRY RECLAMATION IN ENGLAND: A REVIEW OF TECHNIQUES1 Israel A. Legwaila2, Eckart Lange, and John Cripps Abstract. This article reviews different techniques for reclaiming quarries in England. They can be used to reclaim abandoned quarries as well as those that are still operating. A number of reclamation techniques have been developed to revert land that has been quarried for minerals to some productive state. The techniques discussed in this paper include rollover slopes, backfilling, bench-planting, and restoration blasting. These techniques are mainly used to prepare quarry landform to support vegetation, ensure safety at site, as well as accommodate different after- uses. A less conventional method of natural recovery or spontaneous succession is also discussed. Whether applied solely or in combination, the use of these techniques has a potential to enhance the environmental qualities of land degraded by quarrying. Additional Keywords: daleside; limestone; rollover; after-use; post-mine land- use; environmental design. __________________ 1 Oral paper presented at the 2015 National Meeting of the American Society of Mining and Reclamation, Lexington, KY Reclamation Opportunities for a Sustainable Future June 6-11, 2015. R.I. Barnhisel (Ed.) Published by ASMR, 1305 Weathervane Dr, Champaign, IL 61821. 2 Dr Israel A. Legwaila, Lecturer, Landscape Architecture, Botswana College of Agriculture, P/Bag 0027, Gaborone Botswana; Professor Eckart Lange, Professor of Landscape, University of Sheffield, Arts Tower, Western Bank, S10 2TN, Sheffield England; Dr John Cripps, Emeritus, Department of Civil and Structural Engineering, University of Sheffield, Sir Frederick Mappin Building, Mappin Street, S1 3JD, Sheffield, England. Journal American Society of Mining and Reclamation, 2015 Volume 4, Issue 2 pp 55-79 DOI: http://doi.org/10.21000/JASMR15020055 55 JASMR, 2015 Volume 4, Issue 2 Introduction Quarrying is an ancient practice, dating back at least to the Stone Age.
    [Show full text]
  • No Longer Just a Hole in the Ground the Adaptive Re-Use of Derelict Quarries
    1 NO LONGER JUST A HOLE IN THE GROUND The Adaptive Re-Use of Resource Depleted Quarries Catherine McCandless Urban Nature and City Design Professor Anne Whiston Spirn MIT 4.213J/11.308J Fall 2013 2 Table of Contents ABSTRACT 3 Introduction 4 Quarrying Activity 5 Cases 6 1. Brownstone Park 7 2. Quarry Falls 9 3. Bellwood Quarry 11 4. Butchart Gardens 13 5. Groundscraper Hotel 15 Conclusion from Cases 17 Looking Forward 18 REFERENCES 19 3 Abstract A quarry is an area from which rocks such as marble, limestone, and granite are extracted for industrial use. Once depleted of their desired resources, quarries are frequently abandoned. The resulting gaping holes can fill with water and form dangerous quarry lakes while others are turned into unsightly landfills. When quarries are in close proximity to urban environments, inhabitants are subjected to pollution and noise, and the undeniable eyesore of an abandoned quarry remains long after excavation is completed. Sustainable redevelopment has become a shining solution for these abandoned, resource-depleted quarries. Dozens of cities in America and abroad have undertaken adaptive re-use projects to transform quarries into a variety of public and private spaces. The potential new uses for these expanses of land include sites for research and education, aquaculture, recreational activities, storage, industry and housing. The goal of my research is to encourage the rehabilitation of land disturbed by quarrying by making the areas suitable for new sustainable land uses. I will examine cases that successfully transformed resource-depleted quarries into commercial and residential communities, and will discuss how further to improve future redevelopment of quarries with greater consideration to environmental impact and biodiversity.
    [Show full text]
  • White Rot Fungi and Advanced Combined Biotechnology with Nanomaterials: Promising Tools for Endocrine-Disrupting Compounds Biotransformation
    CRITICAL REVIEWS IN BIOTECHNOLOGY 2018, VOL. 38, NO. 5, 671–689 https://doi.org/10.1080/07388551.2017.1386613 REVIEW ARTICLE White rot fungi and advanced combined biotechnology with nanomaterials: promising tools for endocrine-disrupting compounds biotransformation Danlian Huanga,b, Xueying Guoa,b, Zhiwei Penga,b, Guangming Zenga,b, Piao Xua,b, Xiaomin Gonga,b, Rui Denga,b, Wenjing Xuea,b, Rongzhong Wanga,b, Huan Yia,b and Caihong Liua,b aCollege of Environmental Science and Engineering, Hunan University, Changsha, China; bKey Laboratory of Environmental Biology and Pollution Control (Hunan University), Ministry of Education, Changsha, China ABSTRACT ARTICLE HISTORY Endocrine-disrupting compounds (EDCs) can interfere with endocrine systems and bio-accumu- Received 12 July 2017 late through the food chain and even decrease biodiversity in contaminated areas. This review Revised 16 August 2017 discusses a critical overview of recent research progress in the biotransformation of EDCs (includ- Accepted 18 September 2017 ing polychlorinated biphenyl and nonylphenol, and suspected EDCs such as heavy metals and sulfonamide antibiotics) by white rot fungi (WRF) based on techniques with an emphasis on sum- KEYWORDS marizing and analyzing fungal molecular, metabolic and genetic mechanisms. Not only intracellu- White rot fungi; endocrine- lar metabolism which seems to perform essential roles in the ability of WRF to transform EDCs, disrupting compounds; but also advanced applications are deeply discussed. This review mainly reveals the removal biotransformation; meta- pathway of heavy metal and antibiotic pollutants because the single pollution almost did not bolic pathways; exist in a real environment while the combined pollution has become more serious and close to nanomaterials; combined people’s life.
    [Show full text]
  • Rosemont Copper Mine Complaint
    Case 4:19-cv-00177-JAS Document 1 Filed 03/27/19 Page 1 of 94 1 Roger Flynn (CO Bar # 21078) (Applicant Pro Hac Vice) Jeffrey C. Parsons (CO Bar # 30210) (Applicant Pro Hac Vice) 2 WESTERN MINING ACTION PROJECT 3 P.O. Box 349, 440 Main Street, #2 Lyons, CO 80540 4 Phone: 303-823-5738 5 Email: [email protected] 6 Marc D. Fink (MN Bar # 343407) (Applicant Pro Hac Vice) 7 Center for Biological Diversity 209 East 7th Street 8 Duluth, Minnesota 55805 Phone: 218-464-0539 9 Email: [email protected] 10 Allison N. Melton (CO Bar # 45088) (Applicant Pro Hac Vice) 11 Center for Biological Diversity 12 128 Cascadilla St./#3024 Crested Butte, CO 81224 13 Phone: 970-309-2008 14 Email: [email protected] 15 Attorneys for Plaintiffs 16 IN THE UNITED STATES DISTRICT COURT 17 FOR THE DISTRICT OF ARIZONA TUCSON DIVISION 18 19 Save the Scenic Santa Ritas; ) Center for Biological Diversity; ) Case No. 20 Arizona Mining Reform Coalition; ) 21 Sierra Club Grand Canyon Chapter; ) COMPLAINT FOR 22 ) VACATUR, AND 23 Plaintiffs, ) EQUITABLE, v. ) DECLARATORY, AND 24 ) INJUNCTIVE RELIEF 25 U.S. Army Corps of Engineers; ) 26 D. Peter Helmlinger, Brigadier General, U.S. ) Army, in his official capacity; ) 27 ) 28 Defendants. ) Case 4:19-cv-00177-JAS Document 1 Filed 03/27/19 Page 2 of 94 1 INTRODUCTION 2 1. This case challenges the decisions of the U.S. Army Corps of Engineers 3 (“Corps”) to issue a permit that authorizes the construction and operation of the 4 5 Rosemont Copper Project (“Rosemont Project” or “Mine”), a large-scale open pit copper 6 mine in the heart of the Santa Rita Mountains south of Tucson, Arizona.
    [Show full text]
  • Supply and Demand for Natural Aggregates in the Mid-Atlantic
    Sociocultural Dimensions of Supply and Demand for Natural Aggregate— Examples from the Mid-Atlantic Region, United States By Gilpin R. Robinson, Jr., and William M. Brown U.S. Geological Survey Open-File Report 02-350 This report is preliminary and has not been reviewed for conformity with U.S. Geological Survey editorial standards and stratigraphic nomenclature. Any use of trade names is for descriptive purposes only, and does not imply endorsement by the U.S. Government. Contents Page Sociocultural Dimensions of Supply and Demand for Natural Aggregate— Examples from the Mid-Atlantic Region, United States by Gilpin R. Robinson, Jr. and William M. Brown Abstract 2 Introduction 5 Transportation Costs are Significant for Aggregate 9 Transporting Aggregate From Distant Sources 10 Natural Aggregate in the Mid-Atlantic Region of the United States 12 Regional Demand for Aggregate 15 Trends in Demand, Availability and Production of Aggregate 16 Marketplace and Management Issues 22 Sociocultural Constraints and Drivers to Aggregate Supplies 24 Sociocultural Constraints 25 Sociocultural Drivers 29 Resource Conservation and Availability Strategies 30 Industry Response to Sociocultural Constraints and Drivers 31 Superquarries 35 Summary 37 References 40 Internet References 43 1 Sociocultural Dimensions of Supply and Demand for Natural Aggregate— Examples from the Mid-Atlantic Region, United States By Gilpin R. Robinson, Jr. and William M. Brown Abstract The United States uses large quantities of natural aggregate to build and maintain a continuously expanding infrastructure. In recent years, per capita demand for aggregate in the United States has grown to about 9.7 metric tons (10.7 tons) per person per year.
    [Show full text]
  • Rosemont Preliminary Injunction Release
    For Immediate Release, May 16, 2019 Court Order Sought to Stop Rosemont Mine Construction in Arizona TUCSON, Ariz.— Conservation groups and tribes yesterday asked a federal court to prevent construction from starting on the Rosemont Copper Mine in southern Arizona until a judge rules on pending lawsuits filed by the parties. Yesterday’s motion for a preliminary inJunction, filed in U.S. District Court in Tucson, pertains to five lawsuits filed over the past two years by Save the Scenic Santa Ritas, the Center for Biological Diversity, the Arizona Mining Reform Coalition, the Sierra Club’s Grand Canyon Chapter, and the Tohono O’odham, Pascua Yaqui and Hopi tribes. The lawsuits seek to overturn a series of federal approvals greenlighting the controversial open-pit copper mine in the Santa Rita Mountains. “The Rosemont mine would cause irreparable and permanent damage to our water and mountains,” said Gayle Hartmann, president of Save the Scenic Santa Ritas. “Allowing Rosemont to commence construction activities prior to a judge addressing the serious issues in our suit would deny southern Arizonans the Justice to which they are entitled under the law.” The lawsuits say that federal agencies violated fundamental environmental laws, including the Clean Water Act and the Endangered Species Act, when they approved the massive Rosemont Mine. The mile-wide, 3,000-foot-deep mine would dry up critical water sources, harm a number of endangered species and destroy thousands of acres of public land in the Coronado National Forest. Hudbay Minerals, the proJect’s owner, has announced plans to begin ground-disturbing activities in July.
    [Show full text]
  • Bulletin 442 Seismic Effects of Quarry Blasting
    UNITED STATES DEPARTMENT OF THE INTERIOR HAROLD L. ICKES, Secretary BUREAU OF MINES R. R. SAYERS, Director Bulletin 442 SEISMIC EFFECTS OF QUARRY BLASTING BY J. R. THOENEN and S. L. WINDES UNITED STATES GOVERNMENT PRINTING OFFICE WASHINGTON : 1942 For sale by the Superintendent of Documents, Washington, D. C. ---- Price 15 cents CONTENTS .Pare Introduction _____________________________________________________ _ 1 Object of bulletin _________________________________________________ _ 1 History of study __________________________________________________ _ 2 Acknowledgments------------------------------------------------- 4 Previous publications _____________________________ -_-_---_------_.- & Preliminary studies of building vibrations ____________________________ _ 7 Summary of 1936 quarry tests ______________________________________ _ g; Path of a vibrating point ______________________________________ _ 9 Speed of seismic wave _________________________________________ _ 10 Amplitude of seismic wave _____________________________________ _ 10 Frequency of seismic wave _____________________________________ _ 10 Duration of seismic wave _______________________________ ----- __ _ 10 Correlation of amplitude, frequency, and duration ________________ _ 11 Correlation of amplitude and distance ___________________________ _ 11 Correlation of amplitude and weight of explosive charge ___________ _ 11 Effect of moisture on amplitude ________________________________ _ 11 Effect of geographic direction on amplitude ______________________ _ 12 Effect
    [Show full text]
  • Draft Environmental Impact Statement for the Rosemont Copper Project V Executive Summary
    Executive Summary Introduction Augusta Resource Corporation (Augusta Resource), the parent company of Rosemont Copper Company (Rosemont Copper), submitted a preliminary mine plan of operations (MPO) to the Coronado National Forest (the Coronado), an administrative unit of the U.S. Department of Agriculture Forest Service (Forest Service), for development of the Rosemont ore deposit. The proposed mine site is located on the east side of the Santa Rita Mountains of the Nogales Ranger District, approximately 30 miles south of Tucson, Arizona (figure ES1). Activity is proposed on approximately 995 acres of private land owned by Rosemont Copper, 3,670 acres of National Forest System land, 15 acres of Bureau of Land Management administered land, and 75 acres of Arizona State Land Department land administered as a State Trust. This includes a proposed utility corridor that is needed to provide utility services to the project area. The mine life, including construction, operation, reclamation, and closure, is approximately 25 years and may include beneficial and adverse impacts on the human environment. Three Federal agencies have authority regarding the preliminary MPO approval: the Forest Service, Bureau of Land Management, and U.S. Army Corps of Engineers. A number of permits would need to be obtained before mine construction could commence. These permits, which are described in chapter 2 of the draft environmental impact statement (DEIS), are regulated by a variety of Federal, State, and local agencies. The Forest Service is the lead agency, and land managers for the Coronado National Forest prepared the DEIS. The Rosemont Copper Project DEIS describes the direct, indirect, and cumulative impacts on environmental resources for the proposed action and alternatives.
    [Show full text]