BOROUGHWIDE PLANS

KEY: FUNDING FULLY SECURED FUNDING PARTIALLY SECURED ASPIRATIONAL PROJECT - FUNDING TO BE SECURED Boroughwide Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING High Street improvements - £45k of public realm Autumn/Winter Partially Ward painted lighting columns, new street £42,000 £0 £0 £42,000 BW1 improvements delivered furniture - benches, bins, bollards 2020

£7,600 of public realm In Various public realm improvements 2020 - 2021 £7,600 £0 £0 £7,600 BW2 Newcomen Ward improvements development

£13,750 of public realm In Play area improvements Early 2021 £13,750 £0 £0 £13,750 BW3 improvements development

£25k of public realm In Longbeck Pontac Road play area improvements Early 2021 £25,000 £0 £0 £25,000 BW4 improvements development

£20k of public realm In High street improvements Spring 2021 £20,000 £0 £0 £20,000 BW5 St Germains improvements development

Play area improvements at renovated £13k of public realm In Winter 2020 £13,000 £0 £0 £13,000 BW6 Zetland paddling pool site improvements development

£12k of public realm In Street furniture and fencing 2020 - 2021 £12,000 £0 £0 £12,000 BW7 improvements development

Gladstone Street - close the High Street £10k of public realm In end of Gladstone Street, creating a 2021 £10,000 £0 £0 £10,000 BW8 improvements development continuous footway on the High Street

Paving works at Normanby Top (just £10k of public realm In Normanby Spring 2021 £10,000 £0 £0 £10,000 BW9 off High Street) improvements development

Normanby High Street - new railings £15k of public realm In Normanby Spring 2021 £15,000 £0 £0 £15,000 BW10 and street furniture improvements development

South Park Wood - improved entrances £10k of public realm In Normanby Spring 2021 £10,000 £0 £0 £10,000 BW11 to park, improved footpath improvements development

Wardwide lighting of sculptures and £16,500 of public realm In Eston Spring 2021 £16,500 £0 £0 £16,500 BW12 artwork improvements development

£9k of public realm In Grangetown Gateways signage features Autumn 2020 £9000 £0 £0 £9000 BW13 improvements development Boroughwide Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING To deliver further improvements to the Eston space working with the ‘You Got This’ £25k of public realm In project. This will enhance the park 2021 - 2023 £25,000 £0 £0 £25,000 BW14 Recreational improvements development Ground further, create better connections and security and increase participation.

Improvements to public realm and £30k of public realm In Spring 2021 £30,000 £0 £0 £30,000 BW15 access to Ormesby Library improvements development

Marine Parade - various public realm £23k of public realm In Winter 2020 £23,000 £0 £0 £23,000 BW16 Saltburn improvements improvements development

Seafront improvement to the boat £6k of public realm In Winter 2020 £6,000 £0 £0 £6,000 BW17 sculpture improvements development

Deepdale Lane - match funding for improvements to the footpaths and £10k of public realm In 2021 - 2022 £10,000 £0 £0 £10,000 BW18 Loftus creation of a heritage/arts trail. improvements development (See the EC25 Growth Plan)

£17,500 of public realm In - car park improvements 2021 £17,500 £0 £0 £17,500 BW19 Lockwood improvements development

The - car parking £19k of public realm In 2021 £19,000 £0 £0 £19,000 BW20 improvements improvements development

Improvements to Play area at £20k of public realm In Lingdale 2020-2021 £20,000 £0 £0 £20,000 BW21 The Charltons improvements development Boroughwide Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING New car park on the site of the £35k of public realm In former Institute - match funding to 2021 £35,000 £0 £0 £35,000 BW22 Skelton improvements development larger scheme

£29,500 of public realm In Various public realm improvements 2021 £29,500 £0 £0 £29.500 BW23 Skelton improvements development

£7,800 of public realm In Various public realm improvements 2021 £7,800 £0 £0 £7,800 BW24 improvements development

To continue to deliver our successful grant programme for businesses in our retail areas to allow them to invest in property and bring them back into sustainable use. Sustainable High Street Scheme for businesses to create new shop fronts or do internal works. Jobs created 270 Bring Your Business To… which will ensure that any business setting up will High Street have access to help to do shop fitting and Jobs sustained 350 In £1,180,000 Support other capital elements required 2020 - 2023 £0 £0 £1,180,000 BW25 delivery TVCA IGF Above Shops Scheme to bring upper Schemes Businesses created 95 floors of our High Streets back into use to increase vibrancy Secure Towns - this scheme will provide Businesses assisted 211 funding to businesses in the town centre to make their properties secure and prevent crime on our High Streets. Larger Works Grants scheme – this is a fund for premises that have major investment needed to bring back into use – where there is a viability issue.

This scheme will also enable people to realise their potential and aspirations and will provide capital grants for new Welcome to or existing businesses that wish to £450,000 create new accommodation to support Welcome to Redcar & In the visitor economy. Any grant funding 110 new bed spaces 2021 - 2023 £0 £0 Redcar £450,000 BW26 delivery Cleveland will be subject to Visit & Cleveland Grant Schemes Accreditation to ensure the quality of the Programme offer. This grant scheme will be available to businesses in , Loftus and Saltburn. Boroughwide Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING

Potential set up of a Housing Company Housing Delivery In BW27 to help deliver housing particularly in £0 £10m £0 £10m development Vehicle regen areas across the borough.

New routes and uplifts of existing to £1,000,000 New walking and Cycle lanes and Pre- ensure visitors can enjoy our assets 2021 - 2024 £0 £0 TVCA Welcome £1,000,000 BW28 routes uplifted development cycling routes and attractions to Redcar & Cleveland fund DFE Grant as The schools' investment programme available - Schools seeks to address condition issues in funding Investment in maintained Continuous Varies Investment the Council's maintained community 2020 - 2025 £0 £0 dependent on BW29 schools build fabric development annually Programme schools in the borough where identified numbers of through periodic survey. schools under RCBC control

Dependent on need and We will work with the DFE to attract funding Schools Major further major funding to deliver Major school Continuous available rebuild existing school rebuilds or major building 2021 - 2031 £0 £0 TBC BW30 development through the extensions/improvements where replacement Programme priority required. school building programme EAST CLEVELAND GROWTH PLANS

KEY: FUNDING FULLY SECURED FUNDING PARTIALLY SECURED ASPIRATIONAL PROJECT - FUNDING TO BE SECURED East Cleveland Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING Various improvements to add car £1m from the parking capacity including, Marine TVCA Welcome 150 net additional car In Parade, Cat Nab and the pumping 2021-2022 £0 £0 to R&C Visitor EC1 Saltburn Car Park parking spaces development £1m station sites, improvements to Milton Infrastructure Street Junction and event parking Fund spaces

£50k from the Enhancing Enhancements to Milton Street 6 Properties enhanced. Pre- TVCA EC2 Saltburn’s canopies and railings on this important Streetscene 2021 £0 £0 £50,000 delivery Indigenous street improvements Victorian Heritage Growth Fund

Restoration and repair of Albert 400m2 Public realm £250k from Saltburn memorial, bankside footpath repairs, improvements In the TVCA Valleys’ woodland management to restore 2021-2023 £0 £0 £250,000 EC3 2 jobs delivery Indigenous historic vista's new street furniture, Improvements 2 businesses assisted Growth Fund wayfinding and interpretation.

Delivery of improvements to the foreshore area including improved £620k public realm, resurfacing for the 6000m2 public realm from the Saltburn promenade, uplift of the Grade II Listed improvements Pre- Welcome to EC4 2022-2024 £0 £0 £620,000 Foreshore Chalets, restoration of bankside footpath Increase in visitors development R&C Visitor improvements to the boat park area and 10 businesses assisted Infrastructure potential new events and concessions Fund areas. £1.165m from Delivery of the refurbishment of the the Heritage Guisborough Grade II listed former town Hall into 10 jobs created Lottery Fund visitor accommodation and visitor/ 1 business created £1.1m from the Town Hall and 2020 - 2021 On site £0 £0 £2.265m EC5 heritage facilities. Enhanced public 2 business spaces created Welcome to Public Realm realm to complement and support the 28 bed spaces R&C Visitor Guisborough Town Hall development Infrastructure Fund This project aims to improve the Chapel Beck environment around Chapel Beck and £50k from the link in with Westgate Park and Fountain New and enhanced Pre- S106 Funding TVCA EC6 Corridor 2021 £68,000 Street car park in making the beck area public realm delivery (18k) £0 Indigenous Guisborough a linear park through the centre of Growth Fund Guisborough

Improvements to the car park and £250k from 1 business assisted Fountain Street toilets to enhance the visitor the Welcome Pre- experience. Included creation of 2020-2021 £0 £0 to R&C Visitor £250,000 EC7 Car Park and 2500m2 public realm delivery licensable external space for existing Infrastructure toilets improvements Kiosk. Fund East Cleveland Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING Cleveland Gate To provide better access between the £50k from the Cleveland gate development and Pre- TVCA Access 4 businesses assisted 2021-2022 £0 £0 £50,000 EC8 Belmont House and retail/housing delivery Indigenous Improvements offer Growth Fund

Former Bus £503k Acquisition and remediation costs to In Future 23 units 2022-2024 £0 £0 £503,000 EC9 Depot Site create a new housing development High Street Loftus Funding

Acquisition and demolition of existing £687k from Arlington Chapel to create a possible Pre- the TVCA Arlington Chapel 9 units 2020-2021 £0 £0 £687,000 EC10 exemplar sustainable housing delivery Indigenous development funded by others Growth Fund

18 new parking spaces Proposals include making the created Streetscape £425k Future marketplace more flexible for events In Market Square improvements Public 2022-2024 £0 £0 High Street £425,000 EC11 by removing and relocating some of development Realm improvements Funding the street furniture and signage. Event Infrastructure

To be restored and converted into a £484k from 16 new bed spaces £160k £644,000 Former Barclays 'commercial hub' with some retail the TVCA 2 businesses created 2020 - 2022 On site (already £0 (160k spent EC12 opportunities, community services and Indigenous Bank 74m2 retail space created expended) to date) visitor accommodation above. Growth Fund

Removal of overhead cables (Zetland Road) with a below ground 3000m2 £286k Highways solution will enable major highway Highway improvements In Future 2022-2024 £492,000 £0 £778,000 EC13 Improvements improvements to West Road Junction. 6 businesses assisted development High Street Scheme to include new lighting to 6 car parking spaces Fund Zetland Road.

£150k Light up East Phase 1 to light up Loftus as a from the In pre-curser to lighting up other areas 3 Heritage buildings lit 2022-2024 £0 £0 Welcome to £150,000 EC14 Cleveland - development Loftus of East Cleveland as funds permit. R&C Visitor Fund

Existing library building demolished £510k Library Site and re-provided at Duncan Place. In Future New car parking 2022-2024 £0 £0 £510,000 EC15 car parking New visitor car park created along development High Street with new toilet provision for the town. Funding East Cleveland Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING Proposals are to revitalise Coronation Park through a series of enhancements £1.307m to create a better inviting environment In Future that can act as a space for events in New car parking 2022-2024 £0 £0 £1.307m EC16 Coronation Park development High Street Loftus and anchor the new library space. Funding This will also allow for additional car parking to be created.

To create a new library and community hub and to open up the building to the £1.480m New Library at park and high street. The new extension New cultural and In Future EC17 2022-2024 £0 £0 £1.480m Duncan Place on the existing building will enables the library space development High Street library to integrate more into a wide Funding variety of existing community groups.

The former United Reformed Church £876k from will potentially be converted into a new Creation of cultural space £52.5k £928.5k Former United In the TVCA business and cultural hub, including a 1 business created 2020-2022 (already £0 (£52.5k EC18 development Indigenous Reformed Church theatre/ exhibition space and some 4 jobs created expended) spent to date) Growth Fund rentable workspace.

The new contemporary market square £2.261m is part of a range of improvements to Future High the busy junction and footpaths, to open Street Funding up the area and provide some space. 10 jobs £200k Private Temperance In Proposals for the new square include a 3 businesses created 2022-2025 £0 £0 Investment £2.561m EC19 development Square leisure facility to complement the 7 parking spaces £100k from existing leisure centre in the town, with the TVCA fitness studios, a café and a soft play Indigenous area Growth Fund

To preserve and enhance the historic fabric of the buildings on Zetland Road £385k from Zetland Road and the High Street. This will make Pre- the TVCA 7 businesses assisted 2021-2024 £0 £0 £385,000 EC20 Heritage Scheme Loftus a more attractive place for development ndigenous residents, businesses and visitors. Growth Fund To include removal of roller shutters

£275k from New car park to be created next to 30 car parking spaces Pre- the TVCA Handale school to provide much 2 disabled spaces 2020-2021 £0 £0 £275,000 EC21 delivery Indigenous car park needed car parking spaces 2 E-charge points Growth Fund East Cleveland Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING

To preserve and enhance the historic Station Yard fabric of the buildings on Zetland Road 5 Light industrial units £1.544m and the High Street. This will make created In Future Workspace/ 2020-2023 £0 £0 £1.544m EC22 Loftus a more attractive place for 24 no parking spaces development High Street Training facility residents, businesses and visitors. for workspaces Funding To include removal of roller shutters

£175k from To deliver CCTV infrastructure across Loftus CCTV CCTV infrastructure Pre- the TVCA the town to support businesses and 2021-2024 £0 £0 £175,000 EC23 Reduction in crime development Indigenous Infrastructure the community. Growth Fund

New mini-roundabout at this important £118k Arlington Chapel New highway Pre- place on the High Street to allow visitors 2021-2023 £0 £0 Future High £118,000 EC24 infrastructure development Roundabout to easily access Loftus High Street Street Fund East Cleveland Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING £286k Loftus Transport Traffic calming to allow for a better New highway In Future and Connectivity pedestrian experience and new 2021-2024 £492.5k £0 £778,500 EC25 infrastructure development High Street walkways and cycle routes. Schemes Fund

High Street High Street Support schemes for £195k £195k 10 business assisted In support for Loftus including the Larger Works 2020-2022 (£103k £0 £0 (£103k EC26 5 jobs delivery Loftus Grant spent to date) spent to date)

To create bed spaces in Loftus and £100,000 £100,000 Welcome to In encourage overnight stays to support 16 bed spaces created 2020-2022 (£63k spent £0 £0 (£63k spent EC27 delivery Loftus the visitor economy. to date) to date)

This scheme would seek to creatively Loftus and uplift building elevations, such as Improvements to the Pre- gables ends and incorporate art, 2022-2025 £0 £0 £100k £100k EC28 streetscene development Art Trail living walls and other aesthetic improvements.

To create a safer and more welcoming Improved connectivity Skinningrove to link between Skinningrove, the In £175k Cleveland Ironstone Mining Museum 2021-2022 £0 £0 £175,000 EC29 Loftus Heritage Public Realm development RDPE Funding and the District Centre of Loftus along Trail Improvements Deepdale Lane

60 businesses assisted 4000m² road Skelton Business To take into ownership the roads and improvements In Park footpaths on the estate and repair 2021-2022 £572,000 £0 £0 £572,000 EC30 3000m² footpath development them along with lighting improvements Improvements improvements 45 new lighting columns

£300k TVCA 30 car parking spaces in Creation of a new car park on current from the Skelton Car total including - Pre Welcome to brownfield site in the heart of the 2020-2021 £0 £0 £300,000 EC31 2 disabled bays delivery R&C Visitor Park high street. 2 E-charge points Infrastructure Fund East Cleveland Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING Phase 2 Programme will see 4 £150k Skelton 4 New shop Fronts In National businesses assisted to have 2020-2021 £0 £0 £150,000 Townscape 4 Businesses assisted delivery Lottery EC32 improvements undertaken on their Heritage Scheme premises. This will build upon the Heritage Fund – Phase 2 excellent work already undertaken on Phase 1.

£800k coastal Cleveland Ironstone Mining Museum is communities seeking to enhance the heritage of the funding Museum with extended facilities 3 FTE's £800k Cleveland (which more than doubles the size of 15 businesses assisted Heritage Ironstone Mining the existing building) and new displays Increased visitor numbers IPre- 2018-2022 £0 £0 Lottery funding £1.850m EC33 alongside an enhanced activity 6,000 p.a delivery Museum £200k SSI programme. This will provide residents Vocational trainees - 20 investment Steel Heritage and visitors with a much-enhanced New floorspace - 652m2 Funding experience and will increase visitor £50k CIMM numbers to the Museum. contribution

Skinningrove To deliver uplifts to the visitor £224k from the infrastructure particularly to support Public realm and car Pre TVCA Visitor 2021-2022 £0 £0 £224,000 EC34 the investment in the Cleveland parking improvements development Indigenous Infrastructure Ironstone Mining Museum Growth Fund

£1.450m Project to secure the infrastructure from the East Cleveland Infrastructure for In Welcome to required for the potential for 2021-2025 £0 £0 £1.450m EC35 future rail projects development R&C Visitor Connectivity passenger railway into East Cleveland. Connectivity Fund GROWTH PLANS

KEY: FUNDING FULLY SECURED FUNDING PARTIALLY SECURED ASPIRATIONAL PROJECT - FUNDING TO BE SECURED Greater Eston Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING Deliver a scheme to attract a retailer to £2m from come to the site. This will mean A Thriving Eston In TVCA wholescale redevelopment of the 50 FTE Jobs 2021 - 2025 £0 £5m £7m GE1 development Indigenous Town Centre precinct and for the Council to act as Growth Fund developer and create retail space.

Improving and investing in industrial estates will retain existing businesses and jobs, as well as create new ones, and these two phases will ensure local 540 sqm (6,000sqft) residents and businesses are ideally placed to benefit from growth on the 20 jobs created Skippers Lane South Tees site immediately to the north. £3,491m Industrial Estate 25 construction jobs Pre £554.9k 2020 - 2023 £0 SSI Task £4,046m GE2 delivery Section 106 Extension – Phase 1a – Strategic Infrastructure Force funding 8 businesses created Phase 1 Allotment Site 0.3 HA of Brownfield Phase 1b – Construct 8 Speculative Land re-used Units at The Allotment Site and Rent Out for B1 (Business), B2 (General industrial) and B8 (Storage or distribution) uses.

7543 sqm (82,973 sq.ft)

120 jobs created Skippers Lane Phase 2 would develop the remaining 30 industrial units at the Allotments £14.9m Industrial Estate 45 construction jobs Pre- Site for B1 (Business), B2 (General 2022 - 2028 £0 £0 private and GE3 development £14.9m Extension – industrial) and B8 (Storage or public sector 30 businesses created Phase 2 distribution) uses. 3.0 HA of Brownfield Land re-used

£80k Fencing to support healthy activity on In from TVCA Kingsley Field Increased usage 2021 £0 £0 £80,000 GE4 the site. development Indigenous Growth Fund

Development of teaching space to cater for ongoing and new major housing Two Greater Eston development and demographic change. 2021-2025 – to be determined Pre- Section 106 £2.050m GE5 school capacity Precisely where this needs to be Up to 105 places £570,000 £0 agreements - potentially invested will be determined following by school place development places requirement £1.48m available feasibility work and discussion with available schools. Greater Eston Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING

South Bank Thirteen to deliver a 28-bed bungalow Pre 28 new homes 2020 - 2022 £0 £0 £3.5m £3.5m GE6 new housing scheme on Queen Street in South Bank. delivery

Project to enhance the environment A66 5000m² of around the A66 to improve this Pre £250k Environmental environmental £0 £0 £250,000 GE7 important gateway into the borough development Section 106 improvements Improvements and soften the industrial landscape

A Special Free Development of a new 100 place Special Free School on a brownfield 100 places, of which School for the In DfE approx. site in Grangetown, delivered by the 25 will be for RCBC 2022 £245k £0 £6.5m GE8 development £6.5m in Department for Education, providing children Grangetown places for 4 Tees Valley Authorities

Pathways site Clearance of former Pathways School 0.8hectare site for In GE9 2021 £200,000 £0 £0 £200,000 clearance site in Grangetown. redevelopment development REDCAR GROWTH PLANS

KEY: FUNDING FULLY SECURED FUNDING PARTIALLY SECURED ASPIRATIONAL PROJECT - FUNDING TO BE SECURED Redcar Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING

10 jobs £9.68m Redevelopment of the cinema site to 70,000 visitors a year TVCA Regent Cinema create a new 3 screen cinema with 2019 - 2022 On site £0 £0 £9.680m R1 80 Construction jobs Welcome to café/bar area. 1 new business R&C funding

£750k govt accelerated Redevelopment of this key seafront site 50 jobs Town Deal which include the demolition of existing 42 beds In Coatham Hotel 2020 - 2023 £0 £0 funding £7.250m R2 buildings and the creation of a 60 Construction jobs development £6.5m 42-bed hotel. 1 new business private investment Coatham bowl site tidied up and grassed Coatham Leisure to provide a car park and recreation 5 Jobs £3,000,000 R3 area. Creation of an 18-hole mini golf 20 Construction jobs 2020-2022 On site £0 £0 TVCA Welcome £3m Phase 1 course, a new play area and public 1New Businesses to R&C funding realm improvements on the seaward side

The addition of beach huts, stables and 1 business created Coatham Leisure Pre- other environmental and infrastructure Enhanced visitor 2021 - 2023 £0 £0 R4 development £1m £1m Phase 2 improvements. attractions

£5,000,000 Developing out the Coatham Bowl site Increase visitor numbers Coatham Leisure Pre- public sector for major indoor attractions to build on 50 jobs 2025 & beyond £0 £0 £15m R5 development £10,000,000 Phase 3 activity at Majuba 5 businesses created private sector

TThe existing building will be brought back to life as a living station with retail and café space, ticket office and business units. The station building provides an excellent future opportunity 10 new business £4,500,000 to create fantastic gateway and SSI funds Redcar Central appropriate sense of arrival to In 30 Jobs Created 2020 - 2024 £0 £0 £1,000,000 £5.5m R6 Station Road and the town. development Station TVCA Welcome The station building provides an 40 Construction jobs to R&C funding excellent future opportunity to expand and create a Civic Quarter and provide an appropriate sense of arrival to Station Road and the town. Redcar Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING Improvements to how the High Street Redcar Town Deal looks and works to include new street Outputs to be In – Attractive furniture, signage and greenery on both 2020 - 2026 £0 £0 £2.718m £2.718m R7 agreed development High Street the western end of the High Street and streets linking with the Esplanade.

Widening pavements, slowing traffic, Redcar Town Deal and creating crossing points, which make it easier to walk, cycle and Outputs to be In – Enhancing the 2021 - 2026 £0 £0 £1.986m £1.986m R8 spend time here, and move between agreed development Esplanade the beach and attractions on the south side.

A new public events space, creating a Redcar Town Deal direct link from Regents Walk and the Outputs to be In - Town Centre High Street through to the Esplanade, 2021-2026 £0 £0 £5.155m £5.155m R9 agreed development Event Space as well as a focal point which can be used to host events and activities. Redcar Town Deal Increasing the availability of grants to improve shop frontages and fit outs, - Business Grants Outputs to be In alongside a Town Centre Management 2021-2026 £0 £0 R10 agreed development £530,000 £530,000 and Town Centre function to support all of the town Management centre investments.

Co-ordinated improvements in between Redcar Town Deal the Regent Cinema and the station, Outputs to be In – Station Road including paving, seating, a feature 2021-2026 £0 £0 £1.351m £1.351m R11 agreed development Improvements public space, greenery and a new cycleway.

Redcar Town Deal This project will seek to develop a new Outputs to be In residential offer close to Redcar 2021-2026 £0 £0 £1.950m £1.950m R12 - New Housing on agreed development Station Road Central Station and key local amenities.

A dedicated training and skills offer, Redcar Town Deal focussed upon the green economy, - Centre for which helps to attract investment and Outputs to be In 2021-2026 £0 £0 £2.415m £2.415m R13 Energy and Skills create new jobs, alongside skills agreed development Planning planning which responds to employers' skills needs and future jobs. Redcar Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING This will help to promote Redcar a Redcar Town Deal active, sporty and vibrant, with Outputs to be In - Water Sports infrastructure to support outdoor 2021 - 2026 £0 £0 £600,000 £600,000 R14 agreed development Hub at Coatham activities, water sports and related events.

Redcar Town Deal The exterior of properties would be - Improving Outputs to be In repainted and re-decorated to create 2021 - 2026 £0 £0 £300,000 £300,000 R15 agreed development Seaside an attractive streetscape. Properties

This might include activities, such as bowling, a climbing wall, trampolining and soft play, which help to turn Redcar Redcar Town Deal nto a year-round destination. Alongside the reading offer, a new, relocated - Indoor Activity Outputs to be In library on or near the High Street could 2021-2026 £0 £0 £7.5m £7.5m R16 agreed development Centre and include access to new technologies, an Library Plus exciting story-telling area, computer spaces, visitor information and rooms for exhibitions, meetings and other events/functions.

20,000 visitors Kirkleatham Additional works required to complete 27 Traineeships £1.615m Walled Garden the garden, car park and surrounding 46 Apprentices 2020 Completed £0 £0 £1.615m R17 TVCA IGF and Estate estate linked to the new attraction. 21 Construction jobs 3 Jobs created

Kirkleatham Redevelopment of the stable block as Development otentially a mixed use, cultural venue/ 10,000 visitors funding of Stable Block and In accommodation and workspace. 2 new businesses created 2022-2025 £0 £0 £200k TVCA, £6.2m R18 development Estate Improvements to the wider Estate 25 jobs £6m funding to Improvements where required. be identified

Potential to work with a developer to Kirkleatham Outputs to be Pre create new workspace on this popular 2021-2023 £0 £0 £3.3m £3.3m R19 confirmed development Business Park estate.

Potential to work with a developer to Redcar Outputs to be Pre create new workspace in partnership 2021-2023 £0 £0 £40.5m £40.5m R20 confirmed development Employment Park on industrial land. Redcar Growth Plan 2021 - 2025

REF PROJECT TITLE PROJECT DESCRIPTION WHAT IT WILL WHEN PROJECT RCBC RCBC OTHER TOTAL DELIVER STATUS APPROVED ADDITIONAL FUNDING FUNDING FUNDS FUNDING An uplifted Coatham Common will create a range of spaces for fun, Pre exercise and recreation and will Enhanced Public Space 2021 - 2023 £0 £0 £300,000 £300,000 R21 Coatham Park development provide space for residents and visitors alike.

To deliver access improvements to on RCBC land to enhance South Gare Increased visitor Pre the visitor experience and create 2021 - 2024 £0 £0 £2m £2m R22 numbers development Phase 1 infrastructure for future visitor developments.

Investment in additional SEN capacity £2.7m inc will be undertaken (for those with Basic Need Kirkleatham moderate, severe and complex In SEN grants - R23 12 additional spaces 2019-2023 £0 £0 (Department £2.7m School learning difficulties) as well as development refurbishment and provision of key for Education) facilities currently lacking at the school. School, Section 106

To be Provision of new teaching capacity determined through either expansion of existing through Basic Need school(s) or seeking the development Additional school Section 106 Funding – Marske Area of a new school on land set aside on Pre places to be 2021-2031 Planning £0 Department £2.5m R24 the 'land south of Marske' housing site. development school capacity determined agreements – for Education Scope to be determined by scale of potentially TBC housing development, changing up to demographics and pupil projections. £2,500,000*