The Engineering Institution for Civil Works (EICW)

The Engineering Institution for Civil Works

Page 1 of 29

The Engineering Institution for Civil Works (EICW)

TABLE OF CONTENTS

PAGE(S)

EICW: AN OVERVIEW 3, 4

EICW ORGANIZATION CHART 5

EICW MAJOR CLIENTS 6

EICW SERVICE AREA 7

EICW MAJOR PROJECTS FOR FLEXIBLE AND RIGID PAVEMENT 8, 9

PHOTOS OF EICW MAJOR PROJECTS FOR FLEXIBLE PAVEMENT 10,11

PHOTOS OF EICW MAJOR PROJECTS FOR RIGID PAVEMENT 12

EICW PROJECTS IN-PROGRESS FOR ROAD PAVEMENT WORKS 13 EICW MAJOR PROJECTS FOR BUILDING CONSTRUCTION/ FINISHING, 14,15 ELECTRO-MECHANICAL, AND LANDSCAPE WORKS

PHOTOS OF EICW MAJOR PROJECTS FOR BUILDING CONSTRUCTION/ 16-18 FINISHING, ELECTRO-MECHANICAL, AND LANDSCAPE WORKS EICW PROJECTS IN-PROGRESS FOR BUILDING CONSTRUCTION/ 19 FINISHING, ELECTRO-MECHANICAL, AND LANDSCAPE WORKS EICW MAJOR PROJECTS FOR INFRASTRUCTURE NETWORKS, AND 20 UTILITIES EICW PROJECTS IN-PROGRESS FOR INFRASTRUCTURE NETWORKS, 21 AND UTILITIES PHOTOS OF EICW MAJOR PROJECTS FOR INFRASTRUCTURE 22,23 NETWORKS, AND UTILITIES EICW MAJOR PROJECTS FOR VEHICLE BRIDGE CONSTRUCTION 24 PHOTOS OF EICW MAJOR PROJECTS FOR VEHICLE BRIDGE 25 CONSTRUCTION EICW OWNED PLANT & EQUIPMENT 26,27

EICW ANNUAL REVENUES & TOTAL EXECUTED WORK QUANTITIES 28

Page 2 of 29

The Engineering Institution for Civil Works (EICW)

WHO WE ARE

The Engineering Institution for Civil Works (EICW) was established in , , in 1996 as a firm specialized in civil works and development. Ever since the establishment of EICW, we have been striving to provide our Clients with the best, most precise, and highest quality services.

OUR VISION

We constantly aim to raise the standards of execution quality and cost efficiency of our civil works and services to higher professional levels, to satisfy and exceed our Clients expectations.

OUR MISSION Providing our Clients/ Investors with durable services and solutions that build up their trust in EICW. Gaining our Clients’ confidence by assuring that the quality and efficiency of our solutions/ services exceed their expectations. Continuously developing the skills of our staff members of engineers and surveyors, focusing on the new generation, and offering internships to undergraduates and graduate trainees, to build up their experience in various engineering/ contracting domains. Constantly maintaining our fixed assets, and acquiring sophisticated batching plants and heavy equipment to achieve highest work rates and high quality, within contracted time frames.

OUR SCOPE OF WORKS

Paving Works for Military and Commercial Airports, including flexible and rigid pavements for airside (runways, aprons, and taxiways), and landside (service roads and parking areas). Road Works, including all necessary earthworks, Sub- grades, sub-bases, bases, and pavement layers. Building Construction/ Finishing, Electro- mechanical and Landscape Works. Infrastructure Networks and Utilities for water supply, sewage, fire-fighting, irrigation, and natural gas. Vehicle Bridges. Surveying Solutions.

Page 3 of 29

The Engineering Institution for Civil Works (EICW)

OUR VALUES

Our team is the foundation of our success; investing in our team members is EICW philosophy to fulfill its commitments. Maintain integrity and competence in each and every task we execute. A major key to success is having the right project manager and team, with the right technical/ construction capabilities. Solid-structured Team and Functional Fluidity; EICW operates as a solid-structured work group to implement the projects, yet, functional fluidity for project processes is carefully maintained. Constantly re-evaluate and sustainably develop our integrated management skills, quality assurance/ value engineering processes, and construction resources.

WHY WORKING WITH EICW

EICW has a group of engineers and technicians who are qualified and experienced in all aspects of construction solutions, through all project phases: from conceptualization to implementation and commissioning, which guarantees a high-quality service delivery for all our Clients. EICW is continuously keen to use the latest construction technology, aiming to deliver quality services within project time schedule, and, hence, to heighten our Clients' satisfaction and trust.

Page 4 of 29

The Engineering Institution for Civil Works (EICW)

) (

EICW ORGANIZATION CHART

Page 5 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR CLIENTS

The Egyptian Armed Military Production The Ministry of Culture of The Egyptian Air Forces Forces Engineering Co. for Projects and The Arab Republic of Egypt Authority Engineering Consultancy and General Supplies

The General Co. for Construction and Road Paving

The National Organization For Potable Water & Sanitary Drainage

Page 6 of 29

The Engineering Institution for Civil Works (EICW)

EICW SERVICE AREA

Damietta East Port El-Aareesh Kafr-el-Dawar Salheya Saeed Ismailia 10th Ramadan Cairo/ City Alexandria Jenefa El-Meliz Desert Road Nekhel El-Gady 6th October City 15th May City Al-Ain Taba Al-Sokhna

St. Catherine

Suez Gulf Aqaba Gulf

Sharm El-Sheikh

Hurghada

Marsa-Aalam

Berniss

Toshka

Abu-Simbel

Wadi-Halfa

Page 7 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR FLEXIBLE AND RIGID PAVEMENT

Pavement Scope of Works

Flexible Pavement Rigid Pavement Contract S/N Scrap- Prime Demo- Project Name Duration Location Tack Surface On-grade Concrete/ Concrete Awarded by Base/ - ping Coat Binder lition

Coat Asphaltic Concrete Concrete / Asphalt Road

Old Layer Course of Old Marking and Level and Level Subgrade Sub Course Joints Adjustment (RC) Slabs Joints Earthworks Base Course Base Asphalt (MC) Concrete Road Works for Project of Modification of Traffic Axes in Heliopolis District, The Egyptian Armed Forces 1 07-08/2020 Heliopolis District, Cairo Cairo Engineering Authority ● ● ● ● ● ● Road Pavement Works for Project of Traffic Axes The Egyptian Armed Forces 2 06-08/2020 Nasr City, Cairo Modification (Phase 1), Nasr City, Cairo Engineering Authority ● ● ● ● ● ● The Egyptian Armed Forces 3 Road Works for Middle Ring Road ( City – Belbis) 06-08/2020 Middle Ring Road Engineering Authority ● ● ● ● ● ● ● The Egyptian Armed Forces 4 Road Works on Jenefa Road Extension 06-09/2019 Suez Engineering Authority ● ● ● ● ● ● ● Fiber-reinforced Rigid Pavement for Entrances of Aircraft Shelters, Taxiways, and Aprons; and Earthworks, Sub- Berniss, The Egyptian Armed Forces 5 2017-2019 grade and Sub-base/ Base Course for Internal Road Coast Engineering Authority ● ● ● ● ● ● ● ● ● Networks, at Berniss Airbase and Airport Road Works for Robeiky Leather Manufacturing City (First Ismailia Desert Nasr Company for Buildings 6 2017-2019 and Second Stages) Road and Construction (EGYCo) ● ● ● ● ● ● ● The Petroleum Projects and Road Works for Second Stage of SUMED Expansion Al-Ain Al-Sokhna, 7 2018 Technical Consultancies Co. Project Suez ● ● ● ● ● ● (PETROJET) Road Works (Prime Coat Layer and Binder Course) at Management Department of Ahmed 8 10-11/2018 Suez Ahmed Hamdy Tunnel (2), Suez Hamdy Tunnel (2) ● ● Road and Infrastructure Works for 100-feddan Area, in 15th Nasr Company for Buildings 9 2018 15th of May City of May City and Construction (EGYCo) ● ● ● ● ● Road Works for Jenefa Road Development The Egyptian Armed Forces 10 09/2018-01/2019 Suez (Road Length: 12 Kms.) Engineering Authority ● ● ● ● ● ● ● Upgrade and Development of Runway and Buildings of Cairo International The Egyptian Armed Forces 11 CCR Building, and Back-up Generators, at Cairo 2018 Airport Engineering Authority ● ● ● ● ● ● ● ● ● International Airport Military Production Co. for Projects Road Marking Works for Internal Roads, Sharm El-Sheikh 12 2018 and Engineering Consultancy and Sharm El-Sheikh City City ● General Supplies Rigid Pavement (Fiber-reinforced) for Entrances of Aircraft The Egyptian Armed Forces 13 2015-2017 Salheya Airbase Shelters, Taxiways, and Aprons, at Salheya Airbase Engineering Authority ● ● ● ● ● ● Road Construction (Length: 25 Kms.) at El-Gady Axis, in Sinai Central The Egyptian Armed Forces 14 2017 Sinai Central Region Region Engineering Authority ● ● ● ● ● ● ● Airside (Apron and Runway Threshold) and Landside Road Nasr Company for Buildings 15 Network, Demolition and Re-construction at 2015-2016 Hurghada and Construction (EGYCo) ● ● ● ● ● ● ● ● ● ● International Airport On-grade Concrete Slabs for Thresholds Area of Main and The Egyptian Armed Forces 16 Auxiliary Runways, for Military and Commercial Aprons, at 2014-2016 El-Meliz, Sinai Engineering Authority ● ● ● El-Meliz Airbase Internal Road Network for the Industrial Waste Water 10th of Ramadan 17 2014-2016 10th of Ramadan City Authority Treatment Plant City ● ● ● ● ● ● ● ● 18 Apron Demolition and Re-construction, Abu-Simbel Airport 2010-2011 Abu-Simbel, swan The Egyptian Airports Company ● ● Surrounding Road Network for New Air Traffic Controller, Cairo International 19 2010 The Egyptian Airports Company Cairo International Airport Airport ● ● ● ● ● ● Flexible Pavement Repair and Re-construction for Internal Nasr City Co. for Housing & 20 2009-2011 Nasr City, Cairo Road Network, at Al-Waha District Development ● ● ● ● ● Abu-Simbel City, Nasr Company for Buildings 21 Abu-Simbel Waste Water Treatment Plant 2009-2013 and Construction (EGYCo) ● Abu-Simbel Eastern and Western Seaports Pavement Abu-Simbel City, The Egyptian Armed Forces 22 2009-2012 Construction Aswan Logistics Authority ● ● ● ● ● ● ●

Page 8 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR FLEXIBLE AND RIGID PAVEMENT

Pavement Scope of Works

Flexible Pavement Rigid Pavement Contract S/N Scrap- Prime Demo- Project Name Duration Location Tack Surface On-grade Concrete/ Concrete Awarded by Base/ - ping Coat Binder lition

Coat Asphaltic Concrete Concrete / Asphalt Road

Old Layer Course of Old Marking and Level and Level Subgrade Sub Course Joints Adjustment (RC) Slabs Joints Earthworks Base Course Base Asphalt (MC) Concrete Heliopolis City Co. for Housing Infrastructure Networks, External/ Internal Road Networks, New Heliopolis & Development; and The General 23 2009-2010 and Parking Areas, at New Heliopolis City (5th District) City, Cairo Nile Co.for Construction and Road ● ● ● ● ● ● ● Paving The General Nile Co. for Abu-Simbel City, 24 Parking Area at Abu-Simbel Airport 2009-2010 Construction Aswan ● ● ● ● ● ● ● and Road Paving Construction of Container Yard (Interlock Tiled Area: El-Ain Al-Sokhna, The Egyptian Company 25 2006-2008 200,000 m2) Suez for Fertilizers (MOPCO) ● ● Sheraton Heliopolis Heliopolis City Co. for Housing 26 Area 1258 Re-pavement in 4th District, Sheraton City 2006-2007 City, Cairo & Development ● ● ● New Road Network for the Industrial Zone (First and El-Ain Al-Sokhna ORASCOM Construction Industries 27 2004-2005 Second Stages) City Co. ● ● ● ● ● ● ● Nasr Company for Buildings and 28 Internal Road Network for 3rd Housing Area, Badr City 2004 Badr City Construction (EGYCo) ● ● ● ● ●

Page 9 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR FLEXIBLE PAVEMENT AND EARTHWORK

  

  

Project Photographs (Clockwise):  Airside (Apron and Runway Threshold) and Landside Road Network, Demolition and Re-construction at Hurghada International Airport , External Road Network for 5th District, at New Heliopolis City, Cairo ;  Earthworks and Level Adjustments for Abu-Simbel Waste Water Treatment Plant, Aswan  Internal Road Network for the Industrial Waste Water Treatment Plant, 10th of Ramadan City;  Road Works for Jenefa Road Development (Road Length: 12Kms.), Suez

Page 10 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR FLEXIBLE PAVEMENT    \\\\\\\\\\\\\\\

  

Project Photographs (Clockwise): ,, ,  Sub-Base and Base Course for Road Works for Jenefa Road Development (Road Length: 12Kms.), Suez ,  Binder Course for External Road at Abu-Simble Airport, Aswan

Page 11 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR RIGID PAVEMENT

 

 

Project Photographs (Clockwise):  On-grade Concrete Slabs for Thresholds Area of Main and Auxiliary Runways; and Military and Commercial Aprons, at El-Meliz Airbase;  On-grade Concrete Slabs for Thresholds Area of Main Runway at Salheya Airbase;  On-grade Concrete Slabs for Refrigerator Factory and Storage Complex, at the Logistics Co. for Storage Sevices, Abu-Rawash, Guiza;  Construction of On-grade Concrete Slabs for 12 nos. Apache Stands, at El-Meliz Airbase, Sinai

Page 12 of 29

The Engineering Institution for Civil Works (EICW)

EICW PROJECTS IN-PROGRESS FOR ROAD PAVEMENT WORKS

Contract S/N Project Name Start Date Location Awarded by Road Pavement Works on Toshka- Toshka, Southern The Egyptian Armed Forces 1 Owaynat East Highway for 25-Kms. 09/2020 Egypt Engineering Authority Distance (from Km. 40 to Km. 65) Road Pavement Works in Menoof City and The Arab Organization for 2 09/2020 Menofeya Sers-el-Layan Province, Menofeya Industrialization Road Pavement Works in El-Mahalla The National Company for General 3 09/2020 El-Gharbia Second District, El-Gharbia Governorate Contracting and Supplies Road Pavement Works in Zefta Province, The National Company for General 4 09/2020 El-Gharbia El-Gharbia Contracting and Supplies Road Pavement Works for Project of Traffic The Egyptian Armed Forces 5 09/2020 Nasr City, Cairo Axes Modification (Phase 2), Nasr City, Cairo Engineering Authority Fill Works in Upper Axis on Nile The General Organization for Roads 6 07/2020 Menya Bank (Sixth Sector) and Bridges and Land Transportation Pavement Works for Internal Roads in Al-Shafar General Contracting 7 "Levana" and "Celesta" Zones, in "Up Town 07/2020 Cairo (ASGC) Cairo" Residential Compound Road Pavement Works in the Extension of The Egyptian Armed Forces 8 Mohamed Naguib Axis, start of El-Sokhna 06/2020 Cairo Engineering Authority Highway Repair Works for Runways and Irish The Egyptian Armed Forces 9 05/2020 Al-Aareesh City Sections, in Al-Aareesh Airbase Engineering Authority Pavement Works for Internal Roads in East The Egyptian Armed Forces 10 03/2020 East Port Saeed Port Saeed Naval Base Engineering Authority Borg-El-Arab Road Pavement Works on the International The Egyptian Armed Forces 11 02/2020 Region, West to Coastal Road, Borg-El-Arab Region Engineering Authority Alexandria Road Pavement Works for Industrial Waste 10th of Ramadan Nasr Company for Buildings and 12 05/2019 Water Treatment Plant (Phase 2) City Construction (EGYCo)

Page 13 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR BUILDING CONSTRUCTION/ FINISHING, ELECTRO-MECHANICAL AND LANDSCAPE WORKS

Civil & Building Scope of Works

Residential/ Administrative Buildings

Contract

S/N Project Name Duration Location Awarded by Structure Fences mechanical Works Earthworks - Roofing Structures Potable Water Finishing Works Sewage Network Foundation Structural Structural Steel Works Electro Landscape: Hardscape & Softscape Reinforced Concrete Structure

Upgrade of Routes Leading to The Egyptian Armed 1 Passenger Hall No. 3, Cairo 05-06/2020 Cairo Airport Forces Engineering ● ● ● ● ● Airport Authority Erection of Steel Structure of 4 The Egyptian Armed 122019 - 2 Nos. Communication Towers Sinai Forces Engineering 01/2020 ● (Heights: 100, 120, and 140m.) Authority Upgrade and Development of Cairo The Egyptian Armed VIP Hall, at Cairo International 2018 International Forces Engineering 3 ● ● ● ● Airport Airport Authority Upgrade and Development of Cairo The Egyptian Armed Runway, CCR Building, and 4 2018 International Forces Engineering Generator Building, at Cairo ● ● ● ● ● ● Airport Authority International Airport The Egyptian Armed Construction of the Egyptian 5 2017-2018 Ismailia Forces Engineering Japanese School ● ● ● ● ● ● ● ● Authority Construction of Mess Hall, Haikestep, The Egyptian Armed Kitchen, Natural Gas Utility 6 2017-2018 Cairo/ Forces Engineering Room, at Infantry Training ● ● ● ● ● ● ● Ismailia Road Authority Center Fence Construction (Length: 17 The Egyptian Air Forces Kms., Height: 4m) for Aswan 7 2014-2015 Aswan (The Civil Engineering Airbase and Aswan ● ● Department) International Airport Qwesna Terminal Roof The Egyptian Air Forces 8 Covering (Area: 3,000m2), at 2013 Qwesna (The Civil Engineering ● ● Qwesna Airbase Department) Construction of Paradise Hotel Building inside The Armed Nasr City, The Egyptian Armed 9 2012-2015 Forces Logistics Authority’s Cairo Forces Logistics Authority ● ● ● ● ● ● Club House Nile Co. for Construction Structural Steel Works for 10 2005-2006 Assyut City and Real Estate Assyut Courts Complex ● Investments Development of Touristic Nasr Co.for Buildings and Pathway and Southern City, Construction (EGYCo), 11 2004 Marinas, for Edfu City and for The Egyptian Ministry ● Temple of Culture

Page 14 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR BUILDING CONSTRUCTION/ FINISHING, ELECTRO-MECHANICAL AND LANDSCAPE WORKS

Civil & Building Scope of Works

Residential/ Administrative Buildings

Contract

S/N Project Name Duration Location Awarded by Fences mechanical Works Earthworks - Roofing Structures Potable Water Finishing Works Sewage Network Foundation Structure Structural Structural Steel Works Electro Landscape: Hardscape & Softscape Reinforced Concrete Structure

Nasr General Co. for Treatment, Restoration and Contracting (Hassan M. 12 Adjustment of N.B. Tunnel 2003 Cairo Aallam), for The Egyptian ● ● Walls, Cairo Ring Road Ministry of Housing Restoration, Injection and Nasr General Co. for Insulation Works for Houses of Contracting (Hassan M. 13 1999 Cairo Beit Al-Omma, and Gamal-el- Aallam), for The Egyptian ● Deen Al-Zahaby Ministry of Culture

Page 15 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR BUILDING CONSTRUCTION AND FINISHING WORKS

 

 

 

Project Photographs (Clockwise): ,, Construction of Paradise Hotel Building inside The Armed Forces Logistics Authority’s Club House; , Construction of Mess Hall (serving 3000 persons), Kitchen, Natural Gas Utility Room, at Infantry Training Center;  Refrigerator Factory and Storage Complex, at the Logistics Co. for Storage Sevices, Abu-Rawash, Guiza;  Development of Touristic Pathway and Southern Marinas, for Edfu City and Temple, Luxor.

Page 16 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR BUILDING CONSTRUCTION/ FINISHING AND ELECTRO-MECHANICAL WORKS

 

  

 

Project Photographs (Clockwise): ,,, Upgrade and Development of CCR Building, and Generator Building, at Cairo International Airport; ,, Erection of Steel Structure of 4 Nos. Communication Towers (Heights: 100, 120, and 140m.) Fence Construction for Edfu Temple, Luxor; , Fence Construction for Edfu Temple, Luxor.

Page 17 of 29 

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR LANDSCAPE WORKS

 

 

 

 

Project Photographs (Clockwise): ,,,,,, Hardscape and Softscape for Upgrade and Development of VIP Hall, at Cairo International Airport;  Development of Touristic Pathway and Southern Marinas, for Edfu City and Temple, Luxor.

Page 18 of 29

The Engineering Institution for Civil Works (EICW)

EICW PROJECTS IN-PROGRESS FOR BUILDING CONSTRUCTION/ FINISHING, ELECTRO-MECHANICAL, AND LANDSCAPE WORKS

Contract S/N Project Name Start Date Location Awarded by Upgrade and Rehabilitation Works Buildings the National Academy for Training 1 Nos. (1) and (5) at the National Academy for 02/2020 6th October City (NAT) Training (NAT), 6th October City Construction of 16 Nos. Residential Zone (R1), New The Egyptian Armed Forces 2 Buildings in Zone (R1), at the New 12/2018 Administrative Engineering Authority Administrative Capital Capital, East Cairo Construction of Concrete Structure and Zone (G2), New Finishing Works for 6 Nos. Residential The Egyptian Armed Forces 3 04/2020 Administrative Buildings in Zone (G2), at the New Engineering Authority Capital, East Cairo Administrative Capital Finishing Works for 10 Nos. Residential Zone (R1), New The Egyptian Armed Forces 4 Buildings in Zone (R1), at the New 12/2019 Administrative Engineering Authority Administrative Capital Capital, East Cairo Construction of 11 Nos. Residential Badr City, East Organization of New Urban 5 Buildings at Badr City Extensions (East of 08/2020 Cairo Societies Regional Road – Capital Parks) Construction of the Pearl Residential October Garden 6 Complex for the National Bank of Egypt, 02/2020 the National Bank of Egypt City, West Cairo October Garden City

Page 19 of 29

The Engineering Institution for Civil Works (EICW)

EICW PROJECTS IN-PROGRESS FOR BUILDING CONSTRUCTION/ FINISHING WORKS  

 

 

Project Photographs (Clockwise): , 3-D Designs Upgrade and Rehabilitation Works Buildings Nos. (1) and (5) at the National Academy for Training (NAT), 6th October City; , On-going Façade Glazing Works at Buildings Nos. (1) and (5) at the National Academy for Training (NAT), 6th October City; , Construction and Finishing Works of 16 Nos. Residential Buildings in Zone (R1), at the New Administrative Capital

Page 20 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR INFRASTRUCTURE NETWORKS AND UTILITIES

Infrastructure Scope of Works

Infrastructure Network

Contract Project Name Duration Location S/N Awarded by Irrigation Natural Gas Natural Culvert Structures Fire Fighting Fire Potable Water Potable Sewage Pumping Station Inspection Chambers Inspection Excavation in all Types of Soil Gravity Pipeline Sewers Pipeline Gravity

Construction of Culvert Berniss, The Egyptian Armed Structures for Protection 1 2018 Red Sea Forces Engineering against Flash Flood, Berniss ● ● Coast Authority Airbase Natural Gas Network for Pyramids 2 Pyramids Gardens Residential 2018 Gardens, Cairo Gas Co. ● ● District Natural Gas Network for 3 Sectors 34 and 35, in New 2018 Aswan Egypt Gas Co. ● ● Sadaqa District Main Natural Gas Feeder for City, 4 2018 Egypt Gas Co. Esna City Luxor ● ● Natural Gas Network for the Dakahleya 5 Districts of Mit-El-Korama and 2018 Egypt Gas Co. Governorate ● ● Goger Sewage Main Pipeline (Dia. Cairo/ Suez Nasr Co. for Utilities 6 1500 mm), from Cairo/ Suez 2012 Road and Fittings ● ● ● Road to Nasr Gardens Pumped Sewage Main Nasr Company for Abu-Simbel, 7 Pipeline, Abu-Simbel Touristic 2007 Buildings and Aswan ● ● ● City Construction (EGYCo) Infrastructure and Internal New The General Nile Co. 8 Road Network for 5th District, 2009-2010 Heliopolis for Construction and ● ● ● ● ● ● at New Heliopolis City City, Cairo Road Paving The Arab Organization for Industrialization Potable Water Pipelines for [Owner: The National South of 9 Seven Water Treatment 2004-2005 Organization for Upper Egypt ● ● Plants, for Remote Villages Potable Water & Sanitary Drainage (NOPWASD)] Nasr Company for Infrastructure Networks Abu-Simbel, Buildings and 10 (Length: 25,000 LM) for Abu- 2003-2005 Aswan Construction (EGYCo), ● ● ● Simbel Touristic City (Owner: NOPWASD)

Page 21 of 29

The Engineering Institution for Civil Works (EICW)

EICW PROJECTS IN-PROGRESS FOR INFRASTRUCTURE NETWORKS AND UTILITIES

Contract S/N Project Name Start Date Location Awarded by

Construction of Sanitary Landfill Facility in Sharm-el-Sheikh, The Arab Organization for 1 06/2020 Sharm-el-Sheikh Region, South Sinai South Sinai Industrialization

Sewage pipeline, and Pumping Station in El-Nasr Co. for General 2 Awlad-Ebrahim Village (West of Village), 08/2020 Assyut Contracting (Hassan Aallam) Assyut

Page 22 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR INFRASTRUCTURE NETWORKS

 

 

 

Project Photographs (Clockwise): ,  Sewage Pipeline (Dia. 1.8m) for Taj-Sultan City, Cairo; ,  Main Pressurized Sewage Pipeline, Badr City, Cairo; ,  Potable Water Pipeline for the 5th District, New Heliopolis City, Cairo.

Page 23 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR VEHICLE BRIDGE CONSTRUCTION

Vehicle Bridge Scope of Works

Contract S/N Project Name Duration Location Awarded by stressed Concrete stressed - Earthwork Road Works Road Pre Steel Structure Structure Steel Pile Foundation Pile Concrete Works Concrete Precast Precast The General Nile Civil Works for Adly Mansour Axis, Bani Sweif 1 2018 - 2018 Company for Road Bani Sweif Governorate ● ● ● ● Construction The General Nile Extension of Bridge No. 109 crossing Cairo-Suez 2 2017 - 2018 Company for Road Cairo- Suez Highway Highway ● ● ● ● ● Construction Bridge at Km 24.5 crossing Qalyoubia Drain, and Bridge crossing Abu- Shubra Axis/ The General Nile 3 Hashish Channel, for Project of 2017-2018 Banha Company for Road ● ● ● ● ● Bridges and Pile Works for Shubra Freeway Construction Axis/ Banha Freeway Bridge Project for Upgrade and The General Nile Development El-Dekheila Seaport El-Dekheila, 4 2016 - 2018 Company for Road and its link with Coastal International Alexandria ● ● ● ● Construction Highway Bridges for Ring Regional Road: The General Nile 5 Segment Linking Banha to Cairo- 2015 - 2018 Banha Company for Road ● ● ● ● Alexandria Desert Road Construction The General Nile 2 Vehicle Bridges crossing Cairo- Cairo-Suez 6 2015 - 2017 Company for Road Suez Highway Highway ● ● ● ● ● Construction

Page 24 of 29

The Engineering Institution for Civil Works (EICW)

EICW MAJOR PROJECTS FOR VEHICLE BRIDGE CONSTRUCTION   

 

 

 

Project Photographs (Clockwise): ,: Precast Pre-stressed Concreter Girders for Extension of Bridge No. 109 crossing Cairo- Suez Highway;  Civil Works for Adly Mansour Axis at Bani Sweif Governorate;  Steel Section for 2 Vehicle Bridges crossing Cairo- Suez Highway; ,: Reinforced Concrete Sections and Keystone Works for 2 Vehicle Bridges crossing Cairo- Suez Highway;  Bridge Project for Upgrade and Development El-Dekheila Seaport and its link with Coastal International Highway;  Steel Girder for Bridge at Km 24.5 crossing Qalyoubia Drain, and Bridge crossing Abu-Hashish Channel, for Project of Bridges and Pile Works for Shubra Axis/ Banha Freeway;  Bridges for Ring Regional Road: Segment Linking Banha to Cairo-Alexandria Desert Road

Page 25 of 29

The Engineering Institution for Civil Works (EICW)

EICW OWNED PLANT & EQUIPMENT A. PLANTS S/N Plant Type Model No. of Plants E-MAK Asphalt Plant 1 Asphalt Batch Plant 1 (Productivity: 160 Ton/hr.) TTM Asphalt Plant LB 1500 2 Asphalt Batch Plant 1 (Productivity: 120 Ton/hr.) ELKON Mobile Master - 100 Lion 3 Mobile Concrete Batch Plant 1 (Productivity: 100 m3/hr.)

B. HEAVY EQUIPMENT No. of S/N Equipment Type Model Equipment 4 Grader Komatsu GD755-AR 3 5 Grader CAT 14H 2 6 Grader CAT 12G 1 7 Grader CAT 140H 1 8 Loader CAT 246B 1 9 Loader CAT 950GC 1 10 Skid-steer Loader Bobcat 2 11 Vibratory Soil Roller Bomag BW 212 D-40 2 12 Vibratory Soil Roller Bittele 1 13 Vibratory Soil Roller Hamm 3412 1 14 Asphalt Tandem Roller Dynapac CC 422HF (10 Tons) 1 15 Asphalt Tandem Roller Bomag BW 100 AD (3 Tons) 1 16 Asphalt Tandem Roller Bomag BW 161 AD-50 1 17 Bitumen Sprayer/ Transport Truck Massenza 1 18 Pneumatic Tired Roller Bomag BW 24 RH (24 Tons) 1 19 Asphalt Paver/ Finisher Demag DF 135C 1 Asphalt Paver/ Finisher 20 Bomag BF800C-S600 2 (up to 6-m width) 21 Concrete Pump EVERDIGM 43CX 1 22 Excavator Liebherr 922 HDSL 1 23 Excavator Volvo EC240BLC 1 24 Jack Hammer Furukawa F20 2 25 Jack Hammer Furukawa F22 1 26 Tractor (with Water Tank) Belarus 1 27 Tractor Deutz-fahr 2 28 Tanker Truck (Vol. 12 m3) Mercedes Benz 1 29 Tanker Trailer (Vol. 8 m3) Motors 2 30 Power Generator Volvo 600 kVA 1 31 Power Generator LOXAM – 500 kVA 1 32 Power Generator Caterpillar 3406C – 362 kVA 1 33 Power Generator Perkins 330Kv-450 kV 2 34 Power Generator Himoinsa HFW-100 – 100 kVA 1 35 Air Compressor Atlas Copco XAS137KD/ 37-47KD 2

C. TRAILERS AND TRUCKS No. of S/N Equipment Type Model Equipment 36 Flatbed Trailer Mercedes Benz 1 37 Hauling Truck (Load: 44 m3) Mercedes Benz 1 38 Hauling Truck (Load: 30 m3) Mercedes Benz 1 39 Concrete Transit Mixer Mercedes Benz (ACTROS) Trans-mixer 5

Page 26 of 29

The Engineering Institution for Civil Works (EICW)

EICW OWNED PLANT & EQUIPMENT

Page 27 of 29

The Engineering Institution for Civil Works (EICW) EICW Annual Revenues

300.00

250.00

200.00

150.00

100.00

50.00

0.00 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 EICW Annual Revenues (Million EGP)

More than 300,000 LM EICW Utility Lines (Sewage, Potable Water, executed Natural Gas,..etc.)

More than More than 700,000 m2 10,000,000 m2 Rigid- Flexible Pavement Pavement

Page 28 of 29

The Engineering Institution for Civil Works (EICW)

EICW constantly aims to raise the standards of execution quality and cost efficiency of our civil works and services to higher professional levels, to satisfy and exceed our Clients expectations.

The Engineering Institution for Civil Works (EICW) 35 Abdel-Razak El-Sanhoury, Nasr City, Cairo, Egypt Tel.: +(202)22748595, +(202)22748669, Fax: +(202)22718320 E-mail: [email protected] www.eicwegypt.com

Page 29 of 29