Delivering on Our Ambitions Getting the Basics Right

Total Page:16

File Type:pdf, Size:1020Kb

Delivering on Our Ambitions Getting the Basics Right December 2019 Delivering on our ambitions It’s been another big year for Edinburgh and I wanted to take this opportunity to pass on my greetings for the festive season and to reflect upon a busy and productive 12 months for us. This month also marks the midway point for this Administration, which I believe is making a real and positive impact on the residents of Edinburgh – giving all of our communities more opportunities to share in Edinburgh’s success. Our policies over the past year have aimed to deliver a better city for everyone and, as we go into 2020, we'll be delivering a whole host more to keep this progress in train. Once again, we’ve led the way from a national perspective, driving forward legislative change on the introduction of a tourist tax, workplace parking levy and on better regulation of short-term lets – all of which have been taken forward following our work pushing for change. And earlier this year we set Edinburgh a massively ambitious target of becoming a carbon neutral city by 2030 in response to the terrifying reality of climate change. Achieving carbon neutral status is no mean feat and it's going to involve a Herculean effort by public bodies, the private sector and from residents right across the city. In the meantime, as we’re quite rightly planning and investing in our city’s future, we must also keep our eyes on the day job: getting the basics right for the people of Edinburgh. Getting the basics right We know well from our annual Edinburgh People Survey (the largest of its kind in the UK) and, more recently, from knocking on doors during the election campaign, that residents want their basic services delivered well, whether that be reliable waste collection or investment in our roads and pavements. A renewed focus on improving waste collection has seen us drive down waste complaints over 2019 to a five-year low. New collection arrangements introduced late last year have now bedded in and our two new transfer stations at Seafield and Bankhead are making a positive difference. These, together with improvements in the special uplift service, are helping us give residents the level of service they deserve. We're never complacent, though, and we're working very hard to make our recycling and communal bin collections even better. Next year our communal bin review will make it even easier to recycle so that we can make further strides towards our 2030 target. Meanwhile, thanks to significant investment, conditions on Edinburgh's roads have seen the greatest annual improvement in more than a decade, with their condition at its best level since 2011/12. We’re investing more than £20m for repairs and improvements in 2019/20, with over 100 carriageway and 50 footway surface treatments carried out and a range of schemes to enhance the network already underway – plus a further £11m on upgrading our streetlights. Getting around We want Edinburgh to be pleasant, safe and accessible to get around and spend time in, which is why we’ve embarked on one of the most significant periods of transformation in generations. This is a truly radical rethink of the way we use our public spaces that addresses the twin challenges of our growing population and the urgent need to cut carbon emissions. We’re investing, or planning to invest, over £400m in our public transport and active travel infrastructure to make it as easy as possible to leave the car at home, helping us tackle congestion and air pollution. A ten-year City Centre Transformation strategy and delivery plan were approved in September and major projects are already underway, including the City Centre West to East Link, Meadows to George Street and West Edinburgh Link. Earlier in the summer, we were delighted to receive a further £20m from Sustrans Scotland’s Places for Everyone fund towards our transformative reimagination of George Street and the First New Town. With the green light given to bringing trams back to Leith and Newhaven, the project’s been progressing well since construction began in November. On completion, the route will not only provide a direct link from the north of the city to the centre and out to the airport, it will connect residents and visitors to major employment hubs along the route, as well as creating jobs during and after the project. To me, opening up the north of the city through a well-planned and self-financing tram route really is a no-brainer. Building for the future With our city’s undoubted success come the associated pressures on our core services and on the housing market. More and more people are choosing to live and work here and, put simply, they need somewhere affordable to live. It’s entirely right then that we committed ourselves to an ambitious target to build 20,000 affordable homes over 10 years and I’m pleased to report work is progressing well, with over 2,000 homes currently under construction on over 35 sites across the city. Such is the success of our work to date, we’ve secured more than £20m of additional grant funding from the Scottish Government, helping towards a number of significant completions over 2019. Residents in areas including Greendykes, North Sighthill, Pennywell, Dumbryden and Royston can now look forward to enjoying their first Christmas in their new homes. Homes they can afford. We will continue to work closely with the UK and Scottish Governments through the City Region Deal to secure more grant funding and greater certainty to deliver our building plans. Developing the next generation It’s been another exciting year for our school estate with our investment plans starting to bear fruit. Queensferry High and the new primary school in Broomhills will soon open their doors. Construction work is well underway on a replacement Castlebrae High School, a new St Crispin’s School and a replacement Victoria Primary School, while planning permission has been granted for a new primary in south Edinburgh. Add to this Scottish Government funding for a new Currie Community High School and our commitment to replacing six high schools in our Wave 4 programme, it’s clear to see creating a first-class education estate for all our children is a top priority for this Administration. We’ve also seen huge progress in delivering on our promise to upgrade our playpark facilities throughout the city. In 2019, we saw the completion of our projects in three parks – Saughton, Leith Links and West Pilton – as well as brand new equipment provided in three more – Fernieside Recreation Ground, West Meadows and Ferniehill Community Park – with work about to get underway in nine more across the city. Improving social care One of the key challenges facing the Edinburgh Integration Joint Board since it was established has been getting people home quickly and safely from hospital. Thanks to significant improvements to our approach – almost halving the number of people being delayed – we have seen an improving trend against a national picture of increases across Scotland. We have a clearly defined programme of work focused on reducing our delays further and we’re seeing those people who are waiting, being delayed for shorter periods of time and getting home - or to a homely setting – much sooner. Sharing in our success Looking ahead now, one of the first tasks that awaits us in the New Year will be to set a balanced three-year budget. With the dates of the UK Government and Scottish Government budgets still to be confirmed, we won’t have as much certainty as we’d normally expect at this stage of the process. What our residents can be certain of, however, will be our ongoing commitment to prioritising the services that matter most to them – with all decisions taken through the lenses of tackling poverty, encouraging sustainability and promoting wellbeing in communities. This has been another hugely successful year for Edinburgh and, through our forthcoming budget decisions and everything else we do, we’re clear that all of our residents should have the opportunity to share in that success. Season’s greetings I’d like to close by paying tribute to the many Council colleagues who’ll be working tirelessly throughout the festive period to deliver essential core services: our social care services, keeping our roads and pavements open and making sure that the city flows as it should do during the Christmas period. Season’s greetings to everyone who is celebrating Christmas, Hanukkah or another of the many other winter festivals that I know are going on across this incredibly diverse capital city of ours. I hope you have a great time enjoying the very best of what our fantastic city has to offer. Wishing you all the very best for a happy and successful 2020. Get involved Keep up to date with all council news via our news section online. You can watch live council and committee meetings via our webcast service and join the debate on Twitter using #edinwebcast. If you wish to unsubscribe, please email us. .
Recommended publications
  • EDXCR Venues
    East District Cross Country Relay Championships Scottish Athletics Federation/Scottish Athletics Ltd Male Female 87 2019-20 12-Oct, 2019 Deans Community High Livingston 39 86 2018-9 13-Oct, 2018 Glamis Castle Glamis 38 85 2017-8 14-Oct, 2017 Glamis Castle Glamis 37 84 2016-7 08-Oct, 2016 Deans Community School Livingston 36 83 2015-6 11-Oct, 2015 Peebles High School Peebles 35 82 2014-5 12-Oct, 2014 Peebles High School Peebles 34 81 2013-4 13-Oct, 2013 Deans Community School Livingston 33 80 2012-3 13-Oct, 2012 Camperdown Park Dundee 32 79 2011-2 08-Oct, 2011 Camperdown Park Dundee 31 78 2010-1 09-Oct, 2010 Meadowmill Prestonpans 30 77 2009-10 10-Oct, 2009 Meadowmill Prestonpans 29 76 2008-9 11-Oct, 2008 Meadowmill Prestonpans 28 75 2007-8 13-Oct, 2007 Duloch Park Dunfermline 27 74 2006-7 14-Oct, 2006 Duloch Park Dunfermline 26 73 2005-6 08-Oct, 2005 Corstorphine Hill Edinburgh 25 72 2004-5 16-Oct, 2004 Floors Castle Kelso 24 71 2003-4 11-Oct, 2003 Floors Castle Kelso 23 70 2002-3 12-Oct, 2002 Galashiels 22 69 2001-2 13-Oct, 2001 Corstorphine Hill Edinburgh 21 68 2000-1 14-Oct, 2000 Bell Baxter School Cupar 20 67 1999-2000 09-Oct, 1999 Corstorphine Hill Edinburgh 19 66 1998-9 10-Oct, 1998 Cupar 18 65 1997-8 11-Oct, 1997 Hawick Raceourse Hawick 17 64 1996-7 12-Oct, 1996 Scone Perth 16 63 1995-6 14-Oct, 1995 Gorebridge 15 62 1994-5 08-Oct, 1994 Galashiels 14 61 1993-4 09-Oct, 1993 Cupar 13 60 1992-3 17-Oct, 1992 Jack Kane Centre Edinburgh 12 Scottish Cross Country Union 59 1991-2 19-Oct, 1991 Hawick Raceourse Hawick 58 1990-1 20-Oct, 1990
    [Show full text]
  • The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report
    The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report January 2003 Ove Arup & Partners International Ltd Admiral House, Rose Wharf, 78 East Street, Leeds LS9 8EE Tel +44 (0)113 242 8498 Fax +44 (0)113 242 8573 REP/FI Job number 68772 The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report CONTENTS Page EXECUTIVE SUMMARY 1 1. INTRODUCTION 9 1.1 Scope of the Report 9 1.2 Study Background and Objectives 9 1.3 Transport Trends 10 1.4 Planning Context 10 1.5 The Integrated Transport Initiative 11 1.6 Study Approach 13 1.7 Light Rapid Transit Systems 13 2. PHASE 1 APPRAISAL 18 2.1 Introduction 18 2.2 Corridor Review 18 2.3 Development Proposals 21 2.4 The City of Edinburgh Conceptual Network 22 2.5 Priorities for Testing 23 2.6 North Edinburgh Loop 24 2.7 South Suburban Line 26 2.8 Appraisal of Long List of Corridor Schemes 29 2.9 Phase 1 Findings 47 3. APPROACH TO PHASE 2 50 3.1 Introduction 50 3.2 Technical Issues and Costs 50 3.3 Rolling Stock 54 3.4 Tram Services, Run Times and Operating Costs 55 3.5 Environmental Impact 55 3.6 Demand Forecasting 56 3.7 Appraisal 61 4. NORTH EDINBURGH LOOP 63 4.1 Alignment and Engineering Issues 63 4.2 Demand and Revenue 65 4.3 Environmental Issues 66 4.4 Integration 67 4.5 Tram Operations and Car Requirements 67 4.6 Costs 68 4.7 Appraisal 69 5.
    [Show full text]
  • Edinburgh Local Development Plan: Action Programme 2020 - Adoption
    Planning Committee 2.00pm, Wednesday, 26 February 2020 Edinburgh Local Development Plan: Action Programme 2020 - adoption Executive/routine Executive Wards All Council Commitments 1, 4, 6 10, 11 16, 17, 22, 26 28, 32 43 1. Recommendations 1.1 It is recommended that Committee agrees that the appended Edinburgh Local Development Plan (LDP) Action Programme 2020 be formally adopted, published and submitted to Scottish Ministers. Paul Lawrence Executive Director of Place Contact: Iain McFarlane, City Plan Programme Director E-mail: [email protected] | Tel: 0131 529 2419 Report Edinburgh Local Development Plan: Action Programme 2020 - adoption 2. Executive Summary 2.1 The Edinburgh Local Development Plan was adopted in November 2016. Planning authorities are required to prepare an Action Programme setting out how their Local Development Plan (LDP) will be implemented. 2.2 The Action Programme should be updated at least every two years. A new Action Programme has been prepared to align with financial planning and is now ready to be formally adopted and submitted to Scottish Ministers. 3. Background 3.1 Councils are required to publish an updated Action Programme at least every two years. It is intended that Edinburgh’s Action Programme is reviewed, reported and submitted to Scottish Ministers on an annual basis. To help to align with financial planning and keep track of changing circumstances. The first Edinburgh LDP Action Programme was adopted on 8 December 2016. The second was adopted in January 2018, and the third in January 2019. 4. Main report 4.1 The challenge for the adopted Edinburgh LDP is to help make the city of Edinburgh the best place it can be, for everyone, now and in the future.
    [Show full text]
  • Camera No Description Location/Address Area Postcode
    Camera No Description Location/Address Area Postcode 101 Broughton St The junction of Broughton St and London Street, Edinburgh City Centre EH1 3RJ 103 Picardy Place Picardy Place, Edinburgh City Centre EH1 3SP 104 East End The junction of North Bridge and Princes Street, Edinburgh City Centre EH2 2EQ 105 Sth St Andrews St The junction of South St. Andrew Street and Princes Street, Edinburgh City Centre EH2 2AN 106 Waverley Bridge The junction of Waverley Bridge and Princes Street, Edinburgh City Centre EH1 1BQ 107 Multrees Walk The junction of Multrees Walk and St. Andrew Square, Edinburgh. City Centre EH2 2AD 108 West St. Andrew Square The junction of St. Andrew Square and George Street, Edinburgh City Centre EH2 1AU 109 Queen Street The junction of Queen Street and Hanover Street, Edinburgh City Centre EH2 1JX 110 George St. East The junction of George Street and Hanover Street, Edinburgh City Centre EH2 2HN 111 The Mound The junction of Hanover Street and Princes Street, Edinburgh City Centre EH2 2DF 112 Frederick St The junction of Frederick Street and Princes Street, Edinburgh City Centre EH2 2ER 113 George St. West The junction of North Castle Street and George Street, Edinburgh City Centre EH2 2HN 114 Rose Street West The junction of Rose Street and Castle Street, Edinburgh City Centre EH2 3AH 115 Castle St The junction of Castle Street and Princes Street, Edinburgh City Centre EH2 4AA 116 Princes St West The junction of Lothian Road and Princes Street, Edinburgh City Centre EH2 4BL 117 Festival Sq Festival Square at Lothian Road,
    [Show full text]
  • Notice of Meeting and Agenda
    Minutes Item No 4.1 The City of Edinburgh Council Edinburgh, Thursday 22 September 2016 Present:- DEPUTE CONVENER Steve Cardownie COUNCILLORS Elaine Aitken Sandy Howat Robert C Aldridge Allan G Jackson Norma Austin Hart Karen Keil Nigel Bagshaw David Key Gavin Barrie Richard Lewis Angela Blacklock Alex Lunn Chas Booth Melanie Main Mike Bridgman Mark McInnes Steve Burgess Adam McVey Andrew Burns Eric Milligan Ronald Cairns Joanna Mowat Maureen M Child Gordon J Munro Bill Cook Jim Orr Nick Cook Lindsay Paterson Gavin Corbett Ian Perry Cammy Day Alasdair Rankin Denis C Dixon Vicki Redpath Marion Donaldson Lewis Ritchie Paul G Edie Keith Robson Catherine Fullerton Cameron Rose Nick Gardner Frank Ross Joan Griffiths Jason G Rust Paul Godzik Alastair Shields Bill Henderson Stefan Tymkewycz Ricky Henderson David Walker Dominic R C Heslop Iain Whyte Lesley Hinds Norman Work 1. Minutes Decision To approve the minute of the Council of 25 August 2016 as a correct record. 2. Questions The questions put by members to this meeting, written answers and supplementary questions and answers are contained in Appendix 1 to this minute. 3 Leader’s Report The Leader presented his report to the Council. The Leader commented on: 2016 Olympics and Paralympics successes - celebrations Community Council Elections – nomination period Waste collections The following questions/comments were made: Councillor Rose - 2016 Olympics and Paralympic celebrations - Keeping Edinburgh Clean – increased recycling Councillor Burgess - Missed and overflowing bins - Scottish
    [Show full text]
  • Lothian NHS Board Waverley Gate 2-4 Waterloo Place Edinburgh EH1 3EG
    Lothian NHS Board Waverley Gate 2-4 Waterloo Place Edinburgh EH1 3EG Telephone: 0131 536 9000 www.nhslothian.scot.nhs.uk www.nhslothian.scot.nhs.uk Date: 05/04/2019 Your Ref: Our Ref: 3431 Enquiries to : Richard Mutch Extension: 35687 Direct Line: 0131 465 5687 [email protected] Dear FREEDOM OF INFORMATION – GP CATCHMENT I write in response to your request for information in relation to GP catchment areas within Lothian. I have been provided with information to help answer your request by the NHS Lothian Primary Care Contract Team. Question: Can you please provide an updated version of the Lothians GP catchment areas list as found at https://www.nhslothian.scot.nhs.uk/YourRights/FOI/RequestAndResponseRegister/2012/320 0.pdf Answer: Practice Practice Name wef Practice Boundary No 70075 Braids Medical 27/09/18 On the northern boundary – the railway line running Practice through Morningside Station. On the west – Colinton 6 Camus Avenue Road where it crosses the railway continuing into Edinburgh EH10 Colinton Mains Drive to the Tesco Roundabout, then 6QT continuing south south-east across country to the Dreghorn Link to the City By-Pass. On the south – cuts across country from the Dreghorn Link to Swanston Golf Course and around the south perimeter of Swanston Golf Course and Swanston village cutting across country in a south easterly direction to meet the Lothian Burn at Hillend Car Park and along the access road until it meets the Bigger Road (A702). Continuing south on the A702 until the triple junction where the A702 meets the A703 and Old Pentland Road, across country in a straight line, crossing the Edinburgh City Bypass (A720) passing the east end of Winton Loan and north by Morton House to Frogston Road West.
    [Show full text]
  • Libkirkapr12 Colour
    Magazine April 2012 No 611 ‘Our aim is to draw closer to God and to each other, so that, through us, He can make known to all people the joys and challenges of following Jesus’ Vision Statement April 20092012 Page 1 page page Alpha Course at Liberton 14 Messy Church 19 April Diary 16 Money Matters 10 Bible Readings for April 12 Neighbourhood Scheme 29 Cameron toll Chaplaincy 15 Nether Liberton History (part 2) 11 Change of Address form 29 New Neighbours? 19 Christian Aid Book Sale 9 Ogwini School, South Africa 13 Christian Aid Week 23 Our page 5 Church and Society Council Conference 8 Senior Citizens Club 9 Congregational News 9 Take time to Pray 2 Crèche Rota 15 The Soup Pot 23 Crossword 21 Useful ‘phone numbers 30 Crossword - March answer 29 Web addresses 30 Easter Services back cover Welcome Desk Rota 15 Elder’s Sunday Duties 18 Woodworkers wanted 19 Flowers 15 World Mission Council News 20 Fresh Start 12 Volunteers needed 30 Good Friday and Easter 13 Youth Report 4 Guild News 8 Adverts Heart and Soul 2012 14 Alan Johnston Plumbing 24 of giving personal perspective 6 Capricorn Florist 24 of giving - and Messy Church 7 Bluebird Care 27 Legacies 22 Brightcare 25 Libbis Café 22 DHP projects 23 Liberton Kirk Website 8 HCC Electrical 27 Liberton Names and addresses 31 John Cameron Blacksmith 26 Life and Work 22 Julie Bell Piano Care 28 May Diary 18 Lemon Squeezy 26 Minister’s letter 3 Toddler’s Group 28 Take Time to Pray Loving God, I want to trust you, but I’m scared of getting hurt.
    [Show full text]
  • Applicant Data
    POL LEVEL5 STREET NAME STREET TYPE BX02 OVERTON FARM ROAD CE20 GARDENS CE20 AIRDS CLOSE CE20 AITCHISONS CLOSE CE20 ALISONS CLOSE CE20 ALVA STREET CE20 ANDERSONS CLOSE CE20 ATHOLL CRESCENT CE20 ATHOLL PLACE CE20 ATHOLL CRESCENT LANE CE20 BANK STREET CE20 BARRACE STEPS CE20 BELFORD ROAD CE20 BISHOPS WALK CE20 BOSWELLS COURT CE20 BREAD STREET CE20 BREAD STREET LANE CE20 BRISTO PLACE CE20 BRODIES CLOSE CE20 BROWNS PLACE CE20 BUCHANANS COURT CE20 CAMBRIDGE STREET CE20 CAMBRIDGE STREET LANE CE20 CANDLEMAKER ROW CE20 CANNING STREET CE20 CANNING STREET LANE CE20 CASTLE ESPLANADE CE20 CASTLE TERRACE CE20 CASTLE WYND NORTH CE20 CASTLE WYND SOUTH CE20 CASTLE BARNES STEPS CE20 CASTLE BREWERY COURT CE20 CASTLEHILL CE20 CHAPEL WYND CE20 CHESTER STREET CE20 CHESTER STREET MEWS CE20 CHUCKIE PEND CE20 CLIFTON TERRACE CE20 COATES CRESCENT CE20 COATES GARDENS CE20 COATES PLACE CE20 CONFERENCE SQUARE CE20 CORDINERS LAND CE20 CORNWALL STREET CE20 COWGATE CE20 COWGATEHEAD CE20 DALRY ROAD CE20 DEVON GARDENS OFFICIAL CE20 DEVON PLACE CE20 DEWAR PLACE CE20 DEWAR PLACE LANE CE20 DOUGLAS CRESCENT CE20 DOUGLAS GARDENS CE20 DOUGLAS GARDENS MEWS CE20 DRUMSHEUGH GARDENS CE20 DRUMSHEUGH PLACE CE20 DUNBAR STREET CE20 DUNLOPS COURT CE20 EARL GREY STREET CE20 EAST FOUNTAINBRIDGE CE20 EDMONSTONES CLOSE CE20 EGLINTON CRESCENT CE20 FESTIVAL SQUARE CE20 FORREST HILL CE20 FORREST ROAD CE20 FOUNTAINBRIDGE CE20 GEORGE IV BRIDGE CE20 GILMOURS CLOSE CE20 GLADSTONES LAND CE20 GLENCAIRN CRESCENT CE20 GRANNYS GREEN STEPS CE20 GRASSMARKET CE20 GREYFRIARS PLACE CE20 GRINDLAY STREET CE20
    [Show full text]
  • SECOND PROPOSED PLANJUNE 2014 the Local Development Plan Sets out Policies and Proposals to Guide Development
    SECOND PROPOSED PLANJUNE 2014 The Local Development Plan sets out policies and proposals to guide development. The Action Programme sets out actions to deliver the Plan. The Schedule of Representations explains how engagement informed the Plan. The Habitats Regulations Appraisal assesses the Plan’s impact on internationally important bird habitats. The Transport Appraisal identifies transport actions to support the Plan. The Education Appraisal identifies new and expanded schools to support the Plan. The Equalities & Rights Impact Assessment checks what impact the Plan will have on people. The Environmental Report assesses the impact of the Plan and explains the selection of new housing sites. The Housing Land Study sets out the assumption on housing land availability which inform the Local Development Plan. See the documents and other information at: www.edinburgh.gov.uk/localdevelopmentplan Period for representations: 22 August - 3 October 2014 See page 144 for details. Published in 2011 Published in 2013 MAIN ISSUES REPORT OCTOBER 2011 Edinburgh Local Development Plan Second Proposed Plan June 2014 Contents Introduction 2 Appendix A Conservation Area Boundaries 120 Appendix B Shopping Centres 122 Part 1 Strategy and Proposals 5 Appendix C Glossary 127 1 Aims and Strategy 7 Appendix D CEC Land Ownership Schedule 134 2 A Plan to Protect and Enhance the Environment 9 Appendix E Index Of Policies 142 3 A Plan to Provide Jobs, Homes and Services in the Right Locations 18 4 A Plan That Can Deliver 39 5 A Plan for All Parts of the City 40 Part 2 Policies 74 1 Delivering the Strategy 76 2 Design Principles for New Development 80 3 Caring for the Environment 86 4 Employment and Economic Development 94 5 Housing and Community Facilities 99 6 Shopping and Leisure 104 7 Transport 111 8 Resources and Services 116 1 Edinburgh Local Development Plan Second Proposed Plan June 2014 Foreword Introduction Edinburgh is a successful, growing city.
    [Show full text]
  • Spring 2012 the Paddock
    Spring 2012 Spring The Paddock The Newsletter of Duddingston Village DUDDINGSTON FIELD CELEBRATES A BUSY FIRST 6 MONTHS Work on the field continues apace, with more than Lots of people have been to the field and planted 650 trees planted, paths mown, chickens installed, trees - fifty apple trees and over 600 woodland trees. surveys begun and seven events run successfully. So the woodland strip (along the top of the field) and Read more here and on page 4 and visit the field to the orchard (right in the middle, just above the see it for yourself. entrance from the village) are well established. Thanks to the Woodland Trust Scotland for trees, tree guards and a team to plant a good lot of them, as well as to the many people who’ve planted trees (and willow cuttings) over the past few months. Special thanks must go to Richard Inglis and John Drever who’ve planned and led the orchard work, buying trees, marking out the planting sites, showing people how to plant, pruning, preparing the rootstock bed, ordering and planting out the rootstocks - a lot of work to successfully achieve a substantial orchard. Thanks also to the many people who came on the Orchard Foundation Day and subsequent Saturdays to prepare rocky ground and plant the apple trees to give them a good start in life. And thanks also to our funders - Duddingston Village Conservation Society, Central Scotland Green Network and all the people who’ve donated to become Golden Apple members. OLYMPIC TORCH COMES TO DUDDINGSTON VILLAGE At 7.45am on Thursday 14th June the Olympic Torch will be taken through Duddingston Village en route from Holyrood to Musselburgh.
    [Show full text]
  • 0131 554 6244 1 Ferniehill Avenue, Edinburgh EH17
    1 2 1 Ferniehill Avenue, Edinburgh EH17 7AJ 7AJ EH17 Edinburgh Avenue, Ferniehill 1 0131 554 6244 554 0131 22 Bernard Street, Leith, Edinburgh, EH6 6PS T: 131 554 6244 • E: [email protected] bprsolicitors.co.uk A closing date for offers may be set and interested parties wishing the opportunity to offer are advised to note interest through their solicitors. Acceptance of any note of interest does not constitute an undertaking that the party will be given the opportunity to offer. Access for surveyors should be arranged with the selling agents. These particulars are given for guidance only and do not form part of any contract. Dimensions are approximate. A charming two bedroom end terraced villa pleasantly located with open aspects to both front and rear in the popular residential area of Gilmerton Excellent opportunity to acquire a charming two bedroom end terraced villa ACCOMMODATION (WIDEST POINTS) pleasantly located with open aspects to both front and rear in the popular residential area of Gilmerton close to local amenities and transport links. Hall Boasting a bright rear westerly aspect catching glimpses of the Pentland Hills and Lounge/Dining 15’11 x 12’ (4.85 x 3.66m) Blackford Hill, this appealing family home provides a light, generous interior with plentiful storage including a sizeable attic which may be suitable for conversion Kitchen/Breakfast 13’ x 9’2 (3.96 x 2.79m) subject to necessary permissions. In brief the accommodation comprises: entrance hall, generous lounge/diningroom with feature fireplace/gas fire and double doors Bedroom 1 12’10 x 12’ (3.91 x 3.66m) to the enclosed rear garden, fitted kitchen/breakfastroom, two double bedrooms with fitted wardrobes and bathroom with shower.
    [Show full text]
  • Roadworks & Events Report
    Roadworks & events report Effective from 12 March 2021 Links to further information Traffic Scotland - information on trunk roads including Edinburgh City Bypass Key SE Scotland trunk roads maintained by BEAR New information in this version Transport for Edinburgh - Lothian Buses, Edinburgh Trams and Cyclehire Scheme Spaces for People measures Underlined entries contain links to maps or further information Scottish Roadworks Register temporary traffic lights in use Follow Edintravel on Twitter for regular updates diversion in operation Planned roadworks and events affecting major routes have been approved by the Citywide Traffic Management Group (a partnership between City of Edinburgh Council Transport Officers, Lothian Buses and Police Scotland.) Entries are arranged by Ward and then by start date. See details of Ward boundaries Ward Street Location Contractor / works description Traffic Control Start Finish Various lane closures / contraflow arrangements. Speed limit reduced to 30mph along whole length between Barnton and Almond MAYBURY ROAD Between East Craigs and Barnton CALA / Barratt Homes development 08/01/20 Ongoing Maybury junctions. New signalised junctions in operation at site access roads. Between Silverknowes Parkway and City of Edinburgh Council - to provide space for safe Until further Almond SILVERKNOWES ROAD Road closed to all vehicles except cycles 30/04/20 Marine Drive walking and cycling notice City of Edinburgh Council - to provide space for safe Until further Almond CAMMO WALK Road closed except for residents' access,
    [Show full text]