As Mayor Pushes BRT for Metro, a Look at Cleveland and Eugene May Shed Light on System

Total Page:16

File Type:pdf, Size:1020Kb

As Mayor Pushes BRT for Metro, a Look at Cleveland and Eugene May Shed Light on System nashvillecitypaper.com August 27, 2012 As mayor pushes BRT for Metro, a look at Cleveland and Eugene may shed light on system In Ohio Cleveland proves that bus rapid transit can work — giving Nashville a reason to take note. By William Williams, [email protected] It‟s a recent Tuesday morning in downtown Cleveland. Business people are arriving to work, coffees in hand. Buses chug along. Pigeons are visible. The energy is palpable — a level somewhere between New York City and of Knoxville. Both vintage buildings and contemporary structures cast shadows on the hustle and bustle at street level as a Tennessee visitor to Ohio‟s most misunderstood — and occasionally maligned — city steps upon the boarding deck of the Public Square stop of the HealthLine, Cleveland‟s bus rapid transit (BRT) system. Within three minutes, a large yet sleek vehicle arrives — its look mimicking a 21st century light-rail car more than a conventional bus. The visitor boards, his maps in hand, ready to make the approximately 20-minute journey to the University Circle neighborhood. He will then return via the HealthLine to Public Square, his pleasant and surprisingly quick excursion (considering the nine-mile round-trip distance) undertaken not as a work commute or a simple trip from Point A to Point B, but as a chance to experience what Cleveland has accomplished with BRT. At the conclusion of his ride, he is impressed. He is envious. Cleveland has implemented an impressive bus rapid transit line. Will Nashville do likewise? It won‟t be as easy for Music City as it has been for Cleveland, which lends itself to a bus culture. The HealthLine runs along a much more building- and people-dense corridor than Nashville‟s proposed line (which would link Main Street, Broadway and West End Avenue). And many Clevelanders depend on buses. Comparatively, the city, with an approximately 26 percent poverty rate, is home to far more carless folks than Nashville, with a poverty rate of about 17 percent. Regardless, Nashville could learn from Cleveland, as the HealthLine has seen more than 10 million rider trips since it opened in October 2008. Given that most Americans are no more familiar with bus rapid transit than they are with, say, the life of the late Irish harpist Turlough O‟Carolan, BRT‟s success in transforming Euclid Avenue is noteworthy. “No one grew up saying, „I wish I could take the bus to work,‟ ” Joseph Calabrese, general manager of the Greater Cleveland Regional Transit Authority, said jokingly as he and this writer chatted. Nonetheless, Calabrese said, BRT has been largely embraced in Cleveland. The roughly $200 million system likely has minimized private vehicle usage and clearly has spurred urban infill development. As of 2011, about $4.3 billion in such development had been completed since the HealthLine began operations, according to a report in Cleveland‟s daily paper, The Plain Dealer. And of course BRT has been hugely helpful for those many Clevelanders without cars. Cleveland, like Nashville, considered adding a modern streetcar rail system instead of BRT. However, its $800 million price tag was daunting. “If my attitude had been „rail or nothing,‟ we would have had nothing,” Calabrese said. Instead, the city known for its rock ‟n‟ roll history has a BRT line that officials nationwide are studying. Calabrese has entertained transit pros from, among others, Boston and Chicago. Smaller cities can benefit, too, as Eugene, Ore., is proving, he added. Calabrese said he thinks BRT could be effective in Nashville. He has visited Music City numerous times — one of his sons once lived in Midtown — and said he has a basic feel for its urban core. But a key in garnering support and ridership, he stressed, is public perception. “The biggest hurdle is how you brand it,” Calabrese said. “We call BRT „better rapid transit,‟ a rail system on wheels.” Ari Maron has seen firsthand the positive impact the HealthLine has had on Euclid and its intersecting streets. His MRN Limited Partnership owns almost every building fronting East Fourth Street. BRT spurred Maron to reinvent the buildings with residential above retail. “There was no housing that you see there now,” he said. “The first floors were filled with wig shops, which were fronts for drug dealers. East Fourth and Prospect was known for prostitution. “It was not a place you would walk.” Much less sit, people-watch and enjoy a cup of coffee. Influenced by the HealthLine, MRN Limited Partnership has either under way or finished four projects (some of which involve multiple buildings) located on or near Euclid, with an estimated value of $300 million. “What happens in University Circle is directly related to what happens in Midtown and in downtown,” Maron said. “When the HealthLine opened, people thought of Euclid Avenue as a connecting corridor for the first time.” He noted that University Circle entities are adding about 1,000 jobs annually, and Case Western University, a neighborhood anchor, has accepted its largest freshman class in recent memory. Terry Schwarz, director of the Kent State University Cleveland Urban Design Collaborative, said the HealthLine has spurred a significant portion of the city‟s adaptive reuse and infill projects. “The HealthLine is the infrastructure that threads through [Euclid],” she said. Indeed, Maron said, Cleveland has “caught fire” thanks, in part, to BRT. “Holistically, people are rediscovering [Euclid and its side streets] as a wonderful place to live and work.” The HealthLine, Cleveland's bus rapid transit system (Courtesy Greater Cleveland RTA) In Oregon Eugene’s EmX system has exceeded both ridership and many personal expectations of public transit. By Craig Runyon, City Paper Correspondent My favorite part of the daily commute is the half-mile stretch along the Willamette River between Eugene and Springfield, Ore. I usually turn up the radio and stare at the water as the sun glistens off the little rapids and I rush past at 40 or 50 mph. I‟m not putting lives at risk though, because I‟m not driving. I‟m riding the area‟s bus rapid transit system. I ride EmX to work on average four out of five days a week. The bus ride is actually a small part of my commute. I have a 25-minute walk to the station and then ride for 10 minutes, and I prefer it to the alternatives. Full disclosure: I‟ve worked as a graphic designer for Lane Transit District, which serves the Eugene metropolitan area, since the beginning of the year, and I ride for free. Prior to my current job, I rode a traditional bus route until it was canceled. Then I got a Vespa and filled it up about every week and a half. In my eight months on the job at the transit district, I can count the times I‟ve filled up the scooter on one hand. EmX (pronounced M-X) debuted with a four-mile stretch connecting Eugene and Springfield in 2007, a year after I moved here. For the first 12 months, all passengers rode free and EmX carried 1.5 million riders, exceeding 20-year rider projections in its inaugural year. The EmX buses have infrared technology mounted above every door that counts riders as they get on and off the buses. In May, EmX celebrated carrying its 10 millionth customer. The transit district expanded its EmX service in January 2011, connecting a hospital and mall with the addition. Plans for a third addition are in the final stages of approval, but have faced opposition. The majority of EmX‟s riders are University of Oregon students and commuters, and the system has high public approval, according to a 2011 survey. The buses run every 10 minutes on weekdays from 7 a.m. to 7 p.m. and about every 15 minutes during off-peak hours and weekends. They are very dependable. Sometimes too dependable for my late-arriving tastes, as my 8:20 a.m. bus often pulls away from the station just as I‟m getting there. My wife and I moved to Eugene from the Washington, D.C., area for a change of lifestyle. In D.C. we relied on the subway and buses quite a lot and often found the system to be frustrating. The buses in particular were a source of aggravation because they were often overcrowded, rarely on schedule and many times got caught in traffic. EmX rarely gets snagged in traffic. It travels in dedicated lanes at key points and in normal traffic lanes at other times. Buses have wide double doors on both sides, and the artfully designed station platforms are raised a few feet off the street to decrease boarding times. The whole system works quite well, and I really enjoy my commute. Now if I could only make it to the station on time. .
Recommended publications
  • BRTOD – State of the Practice in the United States
    BRTOD – State of the Practice in the United States By: Andrew Degerstrom September 2018 Contents Introduction .............................................................................................1 Purpose of this Report .............................................................................1 Economic Development and Transit-Oriented Development ...................2 Definition of Bus Rapid Transit .................................................................2 Literature Review ..................................................................................3 BRT Economic Development Outcomes ...................................................3 Factors that Affect the Success of BRTOD Implementation .....................5 Case Studies ...........................................................................................7 Cleveland HealthLine ................................................................................7 Pittsburgh Martin Luther King, Jr. East Busway East Liberty Station ..... 11 Pittsburgh Uptown-Oakland BRT and the EcoInnovation District .......... 16 BRTOD at home, the rapid bus A Line and the METRO Gold Line .........20 Conclusion .............................................................................................23 References .............................................................................................24 Artist rendering of Pittsburgh's East Liberty neighborhood and the Martin Luther King, Jr. East Busway Introduction Purpose of this Report If Light Rail Transit (LRT)
    [Show full text]
  • Manual on Uniform Traffic Control Devices (MUTCD) What Is the MUTCD?
    National Committee on Uniform Traffic Control Devices Bus/BRT Applications Introduction • I am Steve Andrle from TRB standing in for Randy McCourt, DKS Associates and 2019 ITE International Vice President • I co-manage with Claire Randall15 TRB public transit standing committees. • I want to bring you up to date on planned bus- oriented improvements to the Manual on Uniform Traffic Control Devices (MUTCD) What is the MUTCD? • Manual on Uniform Traffic Control Devices (MUTCD) – Standards for roadway signs, signals, and markings • Authorized in 23 CFR, Part 655: It is an FHWA document. • National Committee on Uniform Traffic Control Devices (NCUTCD) develops content • Sponsored by 19 organizations including ITE, AASHTO, APTA and ATSSA (American Traffic Safety Services Association) Background • Bus rapid transit, busways, and other bus applications have expanded greatly since the last edition of the MUTCD in 2009 • The bus-related sections need to be updated • Much of the available research speaks to proposed systems, not actual experience • The NCUTCD felt it was a good time to survey actual systems to see what has worked, what didn’t work, and to identify gaps. National Survey • The NCUTCD established a task force with APTA and FTA • Working together they issued a survey in April of 2018. I am sure some of you received it. • The results will be released to the NCUTCD on June 20 – effectively now • I cannot give you any details until the NCUTCD releases the findings Survey Questions • Have you participated in design and/or operations of
    [Show full text]
  • Greater Cleveland Regional Transit Authority
    Greater Cleveland Regional Transit Authority Joe Calabrese - General Manager RTA Ridership by Mode ! 500 Buses - 75 % ! 60 Heavy Rail Vehicles - 10% ! 24 RTV’s (BRT) - 8% ! 48 Light Rail Vehicles - 6% ! Paratransit - 100 vehicles - 1% RTA Fleet GCRTA HealthLine Euclid Avenue Transformation Euclid Avenue History Euclid Avenue History Alternatives Analysis - late 1990’s ! Subway ! Light Rail ! Do Nothing (keep the #6 bus) ! Bus Rapid Transit (BRT) Mode Selection Criteria ! Capacity (30,000 + daily customers) ! Connectivity ! Funding possibilities (FTA) ! Cost - capital and operating ! Economic development potential " Renew Aging Infrastructure Vision for the “Silver Line” BRT ! “Rail Like” Image ! Fast ! Simple ! Safe ! First Class ! Help Revitalize Corridor Euclid Corridor Project ! 9.38 miles long ! 36 stations (from 100 bus stops) ! Travel time from 40 to 28 minutes ! Building face to building face ! Pedestrian and bicycle friendly ! Landscape/hardscape treatment ! Pubic Art - Integrated/stand-alone Exclusive Right of Way Funding Pie Charts FTA 80% ODOT 20% 2000 ODOT FTA 25% 50% City MPO RTA 2004 Ground Breaking October 2004 “Silver Line” Construction “Silver Line” Construction (3.5 years) “Silver Line” Construction “Silver Line” Construction “Silver Line” Construction “Rail Like” Image ! Reduced Travel Time " Multi-Door Boarding " Exclusive Right-of-Way " Traffic Signal Prioritization " Higher Travel Speeds " Level Boarding " Precision Docking " Rear Facing Wheel Chair Restraints " Off-Board Fare Collection “Rail Like” Image ! Hi-Frequency
    [Show full text]
  • Bus Rapid Transit (BRT) Toolbox: BRT Person Throughput-Vehicle Congestion Tradeoffs
    Bus Rapid Transit (BRT) Toolbox: BRT Person Throughput-Vehicle Congestion Tradeoffs Jingquan Li, Jacob Tsao, Ching-yao Chan, Kun Zhou, and Wei-Bin Zhang UCB-ITS-PRR-2015-02 California PATH University of California Berkeley March 11, 2015 Page 1 of 54 ADA Notice Individuals with sensory disabilities, this document is available in alternative formats. For information call (916) 654-6410, or TDD (916) 654-3880 or write STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Records and forms Management, 1120 N Street, MS- 89, Sacramento, CA 95814 TECHNICAL REPORT DOCUMENTATION PAGE TR0003 (REV. 10/98) 1. REPORT NUMBER 2. GOVERNMENT ASSOCIATION NUMBER 3. RECIPIENT’S CATALOG NUMBER CA 4. TITLE AND SUBTITLE 5. REPORT DATE December 2014 Bus Rapid Transit (BRT) Toolbox: BRT Person Throughput- 6. PERFORMING ORGANIZATION CODE Vehicle Congestion Tradeoffs 7. AUTHOR(S) 8. PERFORMING ORGANIZATION REPORT NO. Jingquan Li, Jacob Tsao, Ching-yao Chan, Kun Zhou, UCB-ITS-PRR-2015-02 and Wei-Bin Zhang 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. WORK UNIT NUMBER California PATH Program, University of California at Berkeley 1357 46th St., Richmond, CA 94804 11. CONTRACT OR GRANT NUMBER Institute of Transportation Studies, University of California at Irvine 4000 Anteater Instruction and Research Bldg., Irvine, CA 92697 12. SPONSORING AGENCY AND ADDRESS 13. TYPE OF REPORT AND PERIOD COVERED California Department of Transportation Division of Research and Innovation 14. SPONSORING AGENCY CODE P.O. Box 942873, MS 83 Sacramento, CA 94273-0001 15. SUPPLEMENTAL NOTES 16. ABSTRACT This report documents a research effort to understand the current practice and issues associated with Bus Rapid Transit (BRT) planning and deployment.
    [Show full text]
  • Ctfastrak Existing Condition
    Hartford Line TOD Action Plan Desire & Readiness Workshop: Town of Windsor Locks October 20, 2016 State Project No. 170-3396 1 Task 8 Agenda 1. Project Background and Overview 2. TOD Principles and Precedents 3. CTrail Hartford Line Station Area Assessment • TOD Desire & Readiness Criteria • Initial Observations from the Project Team 4. Interactive Workshop • Preliminary Areas of Focus • Instructions 2 Project Background Establishing a Point of Departure in Windsor Locks • Hartford Line TOD Action Plan • Town of Windsor Locks POCD Update • Main Street Property Acquisition and • Windsor Locks TOD Study Pre-Development (OPM) • Making it Happen • CRCOG Regional Complete Streets Policy and Action Plan (OPM) • Historic Train Station Reuse Study Windsor Locks Downtown • Capitol Region Master Plan Transportation Plan 2007 2008 2012 2013 2014 2015 2016 Ongoing/Forthcoming • Incentive Housing Downtown TIF Zone Study District Master Plan • Capital Region POCD Town of Windsor Locks EA/EIE for NHHS Rail Program POCD 3 Project Background Initial Thoughts from the Project Team: Key Issues to Advance TOD in Windsor Locks Reinvigorate downtown/Main Street Activate and maximize development as a destination potential of catalytic sites in the station area . Address lasting impacts of urban . Target sites and recommended sequencing renewal, and change the mindset of Main have been identified, but there are Street as a pass through outstanding questions: . Find a balance between maintaining • What can be done to make sites more traffic flow and creating a pedestrian- attractive to potential developers? and bicycle-friendly downtown • Are there opportunities to assemble a critical mass of sites to enable a larger . Consider developing a downtown development proposition? parking strategy 4 Source: Windsor Locks TOD Study Project Background Funding through FTA Pilot Program for TOD Planning .
    [Show full text]
  • Greater Cleveland Regional Transit Authority
    Greater Cleveland Regional Transit Authority Joe Calabrese – General Manager Greater Cleveland RTA Overview . Service Area 59 municipalities 500 square miles Population of 1.5 million . Customers Served 200,000 on a typical weekday 1 RTA Overview . Services Modes 500 Buses 100 Paratransit Vans 20 Job Access Vans 60 Heavy Rail Vehicles 48 Light Rail Vehicles 24 RTV’s - (HealthLine BRT) 2 RTA Fleet 3 GCRTA HealthLine Euclid Avenue Transformation Euclid Avenue History 4 Euclid Avenue History Euclid Avenue History . Streetcars disappeared in 1954 . # 6 Bus Route put in service Great Service with Low Image . Alternative Analysis Subway or Light Rail Do Nothing (keep the #6 bus) Bus Rapid Transit (BRT) 5 Mode Selection Criteria . Capacity (30,000 + daily customers) . Connectivity . Funding possibilities (FTA) . Cost Capital Operating . Economic development potential Vision for the “Silver Line” . “Rail-Like” Image . Fast . Simple . Safe . First Class . Promote Economic Development 6 Euclid Corridor Project – 9.38 Miles . 36 stations . Travel time from 28 to 40 minutes . Building face to building face . Pedestrian friendly with bike lanes . Landscape/hardscape treatment 1,500 trees with irrigation . Integrated/stand-alone public art 7 Ground Breaking October 2004 8 Funding Pie Charts - $200 Million FTA 80% ODOT 20% 2000 ODOT FTA 25% 50% City MPO RTA 2004 Exclusive Right of Way 9 10 11 “Rail-Like” Characteristics . Quicker Travel Times Exclusive Right-of-Way Higher Travel Speed Limit Traffic Signal Prioritization Precision Docking Level Boarding “Stations” Off Board Fare Collection 12 “Rail-Like” Service and Image . Hi-Frequency Service 24x7 Peak every 5 minutes Off-Peak every 8 to 15 minutes .
    [Show full text]
  • Bus Rapid Transit (BRT) and Light Rail Transit
    Bus Rapid Transit (BRT) and Light Rail Transit (LRT) Performance Characteristics Stations Mixed Traffic Lanes* Service Characteristics Newest Corridor End‐to‐End Travel Departures Every 'X' Travel Speed (MPH) City Corridor Segment Open length (mi) # Spacing (mi) Miles % Time Minutes BRT Systems Boston Silver Line Washington Street ‐ SL5 2002 2.40 13 0.18 1.03 42.93% 19 7 7.58 Oakland San Pablo Rapid ‐ 72R 2003 14.79 52 0.28 14.79 100.00% 60 12 14.79 Albuquerque The Red Line (766) 2004 11.00 17 0.65 10.32 93.79% 44 18 15.00 Kansas City Main Street ‐ MAX "Orange Line" 2005 8.95 22 0.41 4.29 47.92% 40 10 13.42 Eugene Green Line 2007 3.98 10 0.40 1.59 40.00% 29 10 8.23 New York Bx12 SBS (Fordham Road ‐ Pelham Pkwy) 2008 9.00 18 0.50 5.20 57.73% 52 3 10.38 Cleveland HealthLine 2008 6.80 39 0.17 2.33 34.19% 38 8 10.74 Snohomish County Swift BRT ‐ Blue Line 2009 16.72 31 0.54 6.77 40.52% 43 12 23.33 Eugene Gateway Line 2011 7.76 14 0.55 2.59 33.33% 29 10 16.05 Kansas City Troost Avenue ‐ "Green Line" 2011 12.93 22 0.59 12.93 100.00% 50 10 15.51 New York M34 SBS (34th Street) 2011 2.00 13 0.15 2.00 100.00% 23 9 5.22 Stockton Route #44 ‐ Airport Corridor 2011 5.50 8 0.69 5.50 100.00% 23 20 14.35 Stockton Route #43 ‐ Hammer Corridor 2012 5.30 14 0.38 5.30 100.00% 28 12 11.35 Alexandria ‐ Arlington Metroway 2014 6.80 15 0.45 6.12 89.95% 24 12 17.00 Fort Collins Mason Corridor 2014 4.97 12 0.41 1.99 40.00% 24 10 12.43 San Bernardino sbX ‐ "Green Line" 2014 15.70 16 0.98 9.86 62.79% 56 10 16.82 Minneapolis A Line 2016 9.90 20 0.50 9.90 100.00% 28 10 21.21 Minneapolis Red Line 2013 13.00 5 2.60 2.00 15.38% 55 15 14.18 Chapel Hill N‐S Corridor Proposed 8.20 16 0.51 1.34 16.34% 30 7.5 16.40 LRT Systems St.
    [Show full text]
  • Regional Bus Rapid Transit Feasiblity Study
    TABLE OF CONTENTS 1 INTRODUCTION ....................................................................................................................................................................................................... 1 2 MODES AND TRENDS THAT FACILITATE BRT ........................................................................................................................................................ 2 2.1 Microtransit ................................................................................................................................................................................................ 2 2.2 Shared Mobility .......................................................................................................................................................................................... 2 2.3 Mobility Hubs ............................................................................................................................................................................................. 3 2.4 Curbside Management .............................................................................................................................................................................. 3 3 VEHICLES THAT SUPPORT BRT OPERATIONS ....................................................................................................................................................... 4 3.1 Automated Vehicles .................................................................................................................................................................................
    [Show full text]
  • East-West Corridor High Capacity Transit Plan Rapid Transit Evaluation Results
    East-West Corridor High Capacity Transit Plan Rapid Transit Evaluation Results About the Corridor The AECOM consultant team conducted a high-level analysis of commuter rail, light rail transit (LRT), streetcar and bus rapid transit (BRT) to determine the most appropriate mode for the East- West Corridor. Based on the corridor fit, ridership capacity, cost per mile to build/operate and available right-of-way, BRT will move forward for more detailed analysis. This fact sheet provides, in more detail, how BRT and LRT compared and why BRT was determined to be the best fit. BRT with LRT Screening Results Below are the similarities and differences between bus rapid transit (BRT) and light rail transit (LRT). Features Bus Rapid Transit (BRT) Light Rail Transit (LRT) Service Frequency Frequent service during peak hrs. (5–15 min.) Frequent service during peak hrs. (5–15 min.) Typical Corridor Length 5–25 mi. 10–20 mi. Range of Operating Speed 25–55 MPH 30–55 MPH Right-of-Way Dedicated lanes and/or mixed traffic Dedicated lanes with overhead electrical systems Typical Station Spacing ½ and one mile apart One mile apart, outside of downtowns Level boarding at high-quality stations Level boarding at high-quality stations Vehicle Types 40- or 60-ft. buses that have multiple doors 1–3 car trains; low floor vehicles Technology Traffic signal priority Traffic signal priority Real-time passenger info Real-time passenger info Off-board fare payment Off-board fare payment Typical Operating Cost per Hr. $100–$200 $200–$400 Typical Capital Cost per Mi. $2.5 million–$20 million $140 million+ Ridership Capacity by Mode Best Poor Current East-West Corridor Ridership (6.9k–8.7k riders) Modern Streetcar Light Rail Transit (1.5k–6k riders) (20k–90k riders) Bus Rapid Transit (4k–15k riders) Commuter Rail (3k–20k riders) Ridership Mode Capacity by 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 The chart above demonstrates that BRT and commuter rail both have the needed capacity to meet ridership needs.
    [Show full text]
  • Building a Better Bus Rapid Transit System with Transit Signal Priority
    WHITE PAPER GPS-enabled Platform Building a better Bus Rapid Transit system with Transit Signal Priority As urbanization and pressure on public transit Combining the flexibility of CASE STUDY: systems in cities around the world intensifies, buses with the efficiency Bus Rapid Transit (BRT) is becoming an ALBUQUERQUE, NM increasingly attractive answer to questions of of rail, Bus Rapid Transit This whitepaper examains how smart passenger mobility. systems make smart use of BRT systems often employ Transit Combining the flexibility of buses with the technology, infrastructure and Signal Priority solutions to reduce efficiency of rail, BRT systems make smart delays at intersections and main- transit operations to create a use of technology, infrastructure and transit tain schedules. operations to create a faster, more reliable and faster, more reliable and more more convenient public transport service for convenient public transport It’s this reliability which is the hall- the most in-demand routes. These are regularly mark of successful BRT and BRT- implemented in areas where congestion service for the most in- lite systems, and reliable on-time and other factors have led to bus services demand routes. performance which attracts riders. struggling to serve the needs of commuters No place has done this better than and other riders. Because it is far less Albuquerque, New Mexico where expensive to build and operate than rail, BRT the new Albuquerque Rapid Tran- works particularly well in growing mid-sized cities where standard bus services are struggling sit (ART) route use TSP to make to meet demand, but there is still insufficient population density to justify the investment-levels operations more efficient.
    [Show full text]
  • Best Practices for Engaging Anchor Institutions and Neighborhoods
    Capitol Region Council of Governments Building Corridors of Opportunity: Best Practices for Engaging Anchor Institutions and Neighborhoods Final Report December 1, 2016 Acknowledgements Building Corridors of Opportunity: Best Practices for Engaging Anchor Institutions and Neighborhoods, Final Report was prepared with financial support from the Hartford Foundation for Public Giving. The report was prepared for the Capitol Region Council of Governments by the consulting firm of HR&A Advisors, Inc. Building Corridors of Opportunity, Final Report 2 Table of Contents Executive Summary.........................................................05 Case Studies....................................................................19 Cleveland Healthline...............................................29 East Liberty Revitalization......................................42 Cortex Innovation Community................................52 Maryland TOD Initiative.........................................63 Urban Essex Coalition for Smart Growth............72 Emerald Express (EmX)...........................................82 Appendix..........................................................................90 Building Corridors of Opportunity, Final Report 3 Executive Summary CTfastrak is a bus rapid transit (BRT) service that began operation in 2015, running from downtown Hartford to downtown New Britain, Connecticut. • With a dedicated right-of-way, frequent service, pre-boarding payment system, and specially designed buses, it is one of the highest-rated systems
    [Show full text]
  • 24% 41% 1 in 5
    ART ALBUQUERQUE RAPID TRANSIT BUS RAPID TRANSIT (BRT) Bus Rapid Transit has shown that it can facilitate development and Improving transportation options is vital to Albuquerque’s future quality community growth, creating places where people want to live, work and of life and economic development. Albuquerque Rapid Transit (ART) offers play with a neighborly focus, mix of uses, and pedestrian priority. quick, simple, and safe first-class travel along with economic benefits. Transit-oriented development has proven to be a catalyst for new investment and businesses and supportive of existing corridor businesses, including restaurants, retail, and entertainment. ART would also provide opportunities for improved streetscape and walkability, attracting more people to live along the corridor. ELEMENTS OF BRT • Dedicated road, lane or • Pre-boarding ticketing mixed traffic route • Level boarding • Frequent service • Stops from ¼ to ½ mile or • Priority signals at more apart intersections Conceptual Design VISUALIZATION PURPOSE ONLY PROJECT BENEFITS Faster and more reliable service WITHIN 1/2 MILE OF CENTRAL AVENUE: • 15% improvement in travel time • 20-25% improved on-time performance 24% 41% 1 in 5 • Improved safety and security of all employment of all ABQ Ride households have Demand ridership income below • 5.3 million riders in 2014 — nearly 15,000 per day and 41% of the poverty level total number of ABQ RIDE passengers • 50% estimated growth of ridership in next 5 years (based on preliminary FTA STOPS model output) • ART would connect with
    [Show full text]