MKR DISTILLERIES PVT. LTD. 68/A Netaji Subhas Road; Budge Budge; Dist
Total Page:16
File Type:pdf, Size:1020Kb
at P.S: Nodakhali, P.O: Bawali, District: 24 Parganas (South), West Bengal SUBMITTED TO MINISTRY OF ENVIRONMENT & FORESTS, GOVT. OF INDIA Project Proponent MKR DISTILLERIES PVT. LTD. 68/A Netaji Subhas Road; Budge Budge; Dist. 24 Parganas (South); Kolkata-700 137 MKR Distilleries Proposed Grain based Extra Neutral Alcohol Production Plant at P.S: FORM - 1 Private Limited Nodakhali, P.O: Bawali , District: 24 Parganas (South), West Bengal FORM 1 (I) BASIC INFORMATION S. No. Item Detail 1. Name of the projects/s MKR DISTILLERIES PRIVATE LIMITED 2. S. No. in the schedule 5(g) Category-A (All Cane juice / non-molasses based distilleries ≥ 30 kld) 3. Proposed capacity/ area /length/tonnage/ to/be Grain based Extra Neutral handled/ command area/ lease area/ number of Alcohol : capacity 60,000 LPD wells to be drilled 2 MW capacity Captive Power Plant Area : Total area required for proposed plant - 7 acres. Land owned by Promoters. Number of wells to be drilled: 2 (two) 4. New/ Expansion/Modernization New 5. Existing Capacity/ Area etc. NA 6. Category of Projects i.e. ‘A’ or ‘B’ A 7. Does it attract the general condition? If yes, No please specify. 8. Does it attract the general condition? If yes, No please specify. 9. Location Latitude: 22˚ 24′ 7.8″ N Longitude: 88˚ 12′ 11.4″ E Plot/survey/Khasra No. J L No. 59 Village P.S : Nodakhali Tehsil P.O : Bawali -743384 District 24 Parganas (South) State West Bengal 10. Nearest railway Station/airport along with Budge Budge Rly Stn.: 10 km distance in kms. Netaji Subash International Airport : 37 km 11. Nearest Town, city, District Headquarters along Town: Budge Budge : 8 km with distance in kms. City: Kolkata : 25 km Dist. HQ: Alipore Sadar : 20 km 12. Village Panchayat, Zilla Parishad, Municipal Chakmanik Panchayat Samiti Corporation, Local body (complete postal Vill: Chakmanik, P.O. Bowali, addresses with telephone nos. to be given) South 24 Parganas Block: Budge Budge II Phone: (033) 2868 1195 Page - 1 MKR Distilleries Proposed Grain based Extra Neutral Alcohol Production Plant at P.S: FORM - 1 Private Limited Nodakhali, P.O: Bawali , District: 24 Parganas (South), West Bengal 13. Name of the applicant Mr. Mihir Kumar Roy 14. Registered Address M/s MKR Distilleries Pvt. Ltd. 68/A Netaji Subhas Road, Budge Budge, 24 Parganas (South), Kolkata - 700137 15. Address for correspondence : Name Mr. Mihir Kumar Roy Designation (Owner/Partner/CEO) Chairman cum Managing Director Address M/s MKR Distilleries Pvt. Ltd. 68/A Netaji Subhas Road, Budge Budge, 24 Parganas (South) Pin Code 700137 E-mail [email protected] Telephone No. (033) 2470 3898 / 2498 6127 Fax No. (033) 2470 1522 16. Details of Alternative Sites examined, if any. No alternate site was considered Location of these sites should be shown on a topo sheet. 17. Interlinked Projects Nil 18. Whether separate application of interlinked NA project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any Government Order/Policy No relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending against No the project and/or land in which the projects is proposed to be set up? (a) Name of the Court (b) Case No. (c) Orders/ directions of the court, if any and its relevance with the proposed project. * Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.) Page - 2 MKR Distilleries Proposed Grain based Extra Neutral Alcohol Production Plant at P.S: FORM - 1 Private Limited Nodakhali, P.O: Bawali , District: 24 Parganas (South), West Bengal (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies etc.) Details thereof (with approximate quantities / S. No. Information / Checklist confirmation Yes/No rates, wherever possible) with source of information data A piece of vacant land measuring 7 acres is already under the possession of the Permanent or temporary change in land use, owner. The land is generally land cover or topography including increase flat and does not come under 1.1 Yes in intensity of land use (with respect to local flood zone. It does not have land use plan) any human settlement. Said plot of land will be reformed / developed from its existing land use. Site clearing and preparation Clearance of existing land, vegetation and activities will involve removal 1.2 Yes buildings? of scanty vegetation as available on the plot. Proposed project will be developed following a Yes planned land-use plan. A 1.3 Creation of new land uses? positive change in the land use due to the proposed project is expected. Pre-construction investigations e.g. bore 1.4 Yes Soil testing will be carried out. houses, soil testing? The civil works for the construction and development of the proposed project include 1.5 Construction works? Yes earthworks; construction of factory sheds, storage sheds / godowns; utilities; internal roads and parking areas etc. 1.6 Demolition works? No - Though local workers will be used for the construction Temporary sites used for construction works activity some temporary 1.7 Yes or housing of construction workers? accommodation for a few outstation workers will be made within the project site. Above ground buildings, structures or Yes Construction of buildings, 1.8 earthworks including linear structures, cut factory sheds, roads, utilities Page - 3 MKR Distilleries Proposed Grain based Extra Neutral Alcohol Production Plant at P.S: FORM - 1 Private Limited Nodakhali, P.O: Bawali , District: 24 Parganas (South), West Bengal and fill or excavations etc. Excavation and filling will be carried out for the above mentioned structures and for installation of plants and equipment. Underground works including mining or 1.9 No - tunneling? 1.10 Reclamation works? No - 1.11 Dredging? No - 1.12 Offshore structures? No - 1.13 Production and manufacturing processes? Yes Please refer Feasibility Report. All construction materials will be handled through site store within the project boundary. 1.14 Facilities for storage of goods or materials? Yes Proper storage facilities will be provided for storage of various process inputs and outputs. Wastewater: Process wastewater will be treated in an effluent treatment plant. Treated effluent meeting the relevant standard will be used in non-critical purposes, thereby achieving zero discharge concept. Domestic effluents after treatment in septic tank would be disposed off through soak pit. Solid Waste: Facilities for treatment or disposal of solid 1.15 Solid waste in the form of waste or liquid effluents? Distillers’ Dried Grains and Solubles (DDGS) that will be generated from the process will be sold as by-product. Septic tank sludge will be disposed off-site in consultation with the concerned local authority. Sludge from the ETP will be used for land filling purposes. Ash from the boiler will be sold to local brick manufacturers. Page - 4 MKR Distilleries Proposed Grain based Extra Neutral Alcohol Production Plant at P.S: FORM - 1 Private Limited Nodakhali, P.O: Bawali , District: 24 Parganas (South), West Bengal Most of the workers employed Facilities for long term housing of 1.16 No shall be from the operational workers? neighborhood. 1.17 New road, rail or sea traffic during No The site is well connected by construction or operation? road and rail systems. All these systems will be used during construction and operation phases. New road, rail, air waterborne or other transport infrastructure including new or - 1.18 No altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in No - traffic movements? New or diverted transmission lines or 1.20 No pipelines? Impoundment, damming, culverting, 1.21 realignment or other changes to the No - hydrology of watercourses or aquifers? 1.22 Stream crossings? No - Ground water drawn through tube wells (that would be Abstraction or transfers of water from 1.23 Yes installed within the plant ground or surface waters? premises) will be used as source of water. Changes in water bodies or the land surface 1.24 No - affecting drainage or run-off? The plant location has proper road and rail linkages. Budge Budge Railway Station is situated around 10 km north from the project site. NH-117 is Transport of personnel or materials for passing around 7.7 km in the 1.25 construction, operation or Yes eastern side of the project site. decommissioning? These systems will be used for transportation of materials, equipment and personnel during construction and operation phases. Long-term dismantling or decommissioning 1.26 No - or restoration works? Ongoing activity during decommissioning 1.27 which could have an impact on the No - environment? About 75 permanent employees Influx of people to an area either 1.28 Yes will be recruited for the temporarily or permanently? proposed project in relation to Page - 5 MKR Distilleries Proposed Grain based Extra Neutral Alcohol Production Plant at P.S: FORM - 1 Private Limited Nodakhali, P.O: Bawali , District: 24 Parganas (South), West Bengal activities of different units and sections. Only endemic/native species 1.29 Introduction of alien species? No would be planted for Green belt development There would be no loss of endemic species genetics 1.30 Loss of native species or genetic diversity? No diversity due to the proposed project.