Approvir G Subdivision Irvoprovernent Agreement Anci Resolution No. 18

Total Page:16

File Type:pdf, Size:1020Kb

Approvir G Subdivision Irvoprovernent Agreement Anci Resolution No. 18 ITEM 4. 11 CYTY M IV lGER' S IZEPOFZT MAl( g1, 2020 CITY COIDNCIL REGULAR NIEETING ITEMI: APPROVl4l. OF P FtCEL M P 20- 02, DEDICATION OF PARCEL 5 TO TIiE CITI(, SUBDIVISI019 IMPRO dEMENT 4C9REEMENT, AIVD ) OI IT ESCROW IfVSTI lJCTIOIVS FOFZ IVOItTH CROSSROADS IISIIVESS CENTER FtECOMN1EfVD 1TIOIV: Adopt Itesolution Approving the iVorth Crossroads usiness Center Parcel Map 20- 02, Totaling Five ( 5) Lots, Accepting Dedication to the City of Parcel 5, and Approvir g Subdivision Irvoprovernent Agreement anci Related 7oint Escrowr Instructions SUMW1a4RY: The applicants, ASP/ RWM Properties, R& B Louise, LLC, and R& 6 Delta, LLC, collectively Reynolds & Brown, requests approval of Parcel Map 20- 02 ( Parcel Map) for the North Crossroads Business Center project, totaling five ( 5) lots. As required by the City' s subdivision ordinance, approval of the Parcel Map must also involve approval of a Subdivision Improvement Agreement ( SIA) to guarantee certain off- site and on- site improvements associated with the Parcel Map. The SIA requires Reynolds Brown to deposit cash to the City for the construction of some improvements with the City Capital Improvement Project ( CIP) for E. Louise Avenue CIP PS 18- 01. In addition, the SIA requires Reynolds & Brown to guarantee improvements with an Encroachment Permit ( EP) and two Deferred Frontage Improvement Agreements DFIAs), all to be approved in conjunction with the Parcel Map. BACICGROUND: On May 30, 2018, City of Lathrop Planning Commission adopted Resolution No. 18- 13 and Resolution IVo. 18- 14 adopting the Initial Study/ Mitigated Negative Declaration and approving Site Plan Review No. SPR- 18- 17 for the North Crossroads Business Center Project, respectively. On June 11, 2018, City of Lathrop City Council adopted Resolution No. 18- 4413 approving Tentative Parcel Map No. TPM- 18- 18 ( TPM) for the North Crossroads Business Center project. The plans and Consolidated Conditions of Approval associated with TPM- 18- 18 were approved on May 30, 2018. Reynolds & Brown requests approval of Parcel Map 20- 02 ( Parcel Map), included as Attachment B", for the North Crossroads Business Center project, totaling five ( 5) lots. As required by the City' s subdivision ordinance, approval of the Parcel Map must also involve approval of a Subdivision Improvement Agreement ( SI,4), included as Attachment C", to guarantee certain off- site and on- site improvements associated with the Parcel Map. The SIA requires Reynolds & Brown to deposit cash to the City for the construction of some improvements with the City Capital Improvement Project CIP) for E. Louise Avenue. CITY MANAGER' S REPORT PAGE 2 MAY 11, 2020 CITY COUNCIL REGULAR MEETING APPROVAL OF PARCEL MAP 20- 02, SIA, AND 70INT ESCROW INSTRUCTIONS FOR NORTH CROSSROADS BUSIfVESS CENTER AIVD ACCEPT PARCEL 5 In addition, the SIA requires Reynolds & Brown to guarantee improvements with an Encroachment Permit ( EP) and two Deferred Frontage Improvement Agreements DFIAs), all to be approved in conjunction with the Parcel Map. Reynolds & Brown Attachment " F". and the City have approved joint escrow instructions, included as Upon approval of the Parcel Map by Council, the Public Works Director will sign and record the DFIA' s. The City is completing the preparation of improvement plans for a capital improvement project to reconstruct the failing pavement on Louise Avenue between Harlan Road and Howland Road. Some of the required improvements by Reynolds and Brown would be in the same area as the pavement reconstruction project. Rather than have two construction projects occur at the same time, in the same place, City staff suggested the City install some of the improvements, at the cost of Reynolds and Brown. Pursuant to the SIA requirements, Reynolds & Brown will deposit cash to the City in the amount of $ 1, 403, 887. 80 in escrow to fund construction of a portion of the E. Louise improvements required by the Parcel Map to be built by the City CIP for Avenue. Some of the Reynolds & Brown improvements including construction of the medians, curb and gutter, pavement, deceleration lanes, traffic signal modifications, sidewalk, curb ramps, signing and striping were combined with the City CIP improvements to ensure a similar product for E. Louise Avenue as well as to align the timing of the construction between the City and Reynolds & Brown. Reynolds & Brown has obtained approved EP No. 2020- 008 from the City to guarantee certain improvements including fire hydrants and water service laterals and meters. An EP was required to ensure the construction of these improvements prior to the start of the City CIP as to not require Reynolds & Brown to cut into the newly paved roadway constructed by the City CIP. Reynolds & Brown has executed and will record two DFIAs with the City in escrow. The first DFIA guarantees landscape improvements for the medians and shoulder of E. Louise Avenue. These improvements will be deferred until the completion of the City CIP to ensure that the construction of the medians, sidewalk, and curb and gutter are completed prior to the installation of the landscaping. The second DFIA guarantees Reynolds & Brown' s contribution to 50% of the cost of undergrounding the overhead utilities on the north side of E. Louise Avenue at a later date. Parcel 5 of the Parcel Map has minimal benefit to Reynolds & Brown and will therefore be conveyed to the City with an Offer of Dedication in Fee, which is to be recorded in conjunction with the Parcel Map. Reynolds & Brown has offered dedication to the City Public Utility Easement ( PUE), Public Right of Way ( ROW) and Emergency Vehicle Access Easement ( EVAE) for the designated remainder of the Parcel Map. The PUE and ROW will accommodate the required right turn deceleration lane into the project for the eastbound E. Louise Avenue approach to Cambridge Drive. CITY MANAGER' S REPORT PAGE 3 MAY 11, 2020 CITY COUNCIL REGULAR MEETING APPROVAL OF PARCEL MAP 20- 02, SIA, AND 70INT ESCROW INSTRUCTIONS FOR NORTH CROSSROADS BUSINESS CENTER AND ACCEPT PARCEL 5 Reynolds & Brown has guaranteed completion of all public improvements on Parcel Map 20- 02 in accordance with the provisions of the SIA, as identified on the approved improvement plans, and has completed or guaranteed completion of all required documents and payment of all fees in accordance with the applicable Conditions of Approval. Upon City acceptance of the improvements to be constructed by Reynolds Brown as complete, a one- year warranty bond will be required to secure Reynolds Brown' s obligation to repair construction defects encountered during the one- year warranty bond period. The grading plans for the first building, to be occupied by Kraft- Heinz and to be located on Parcel 3, have been submitted and reviewed by Staff but the permits have yet to be issued. Staff has confirmed that all Conditions of Approval of the TPM required for approval of Parcel Map have been completed, including, without limitation, those Conditions of Approval that relate to the Subdivision Improvement Agreement. The City Engineer has confirmed that Parcel Map 20- 02 is substantially the same as it appeared on the TPM, is technically correct, and complies with the applicable requirements of the Subdivision Map Act and Lathrop Municipal Code, Chapter 16. Staff has determined that the funding of a Capital Facilities District ( CFD) by Reynolds Brown will not be required prior to the approval of the Parcel Map as most of the improvements are being reconstructed. Reynolds & Brown, in conjunction with City staff review, has provided the Parcel Map, the Subdivision Improvement Agreement, improvement plans, and all other required documents and fees necessary ( as discussed above and in the attached Resolution) prior to the City Council considering Parcel Map 20- 02 for approval and recordation. This includes the following documents and fees: Documents Status Council approval 1. Parcel Map 20- 02 with this item Council approval 2. Subdivision Improvement Agreement with this item Will receive in 3. Cash Deposit escrow 4. Encroachment Permit Approved 5. Geotechnical Report Completed Council approval 6. Joint Escrow Instructions for Recordation of Parcel Map 20- 02 with this item 7. Purchase and allocation of water and sewer to each To be completed Parcel in escrow 8. Submitted Certificate of Insurance Received CITY MANAGER' S REPORT PAGE 4 MAY 11, 2020 CITY COUNCIL REGULAR MEETING APPROVAL OF PARCEL MAP 20- 02, SIA, AND JOINT ESCROW INSTRUCTIONS FOR NORTH CROSSROADS BUSINESS CENTER AND ACCEPT PARCEL 5 9. Submitted Tax Letter Received 10. Submitted Guarantee of Title Received Plans Status 1. Traffic Signal ( Cambridge Drive & E. Louise Avenue) Approved 2. Offsite Improvement Approved 3. Offsite Landscape Approved 4. Street Light Approved Fees Status 1. Parcel Ma Plan Check Paid 2. Im rovement Plans- Plan Check and Ins ection Fees Paid REASON FOR RECOMMENDATION: Reynolds & Brown has furnished the City with the necessary documents to complete the processing of the Parcel Map and all required fees, as detailed more fully above and in the attached Resolution. North Crossroads Business Center Parcel Map 20- 02 conforms to the requirements of the Subdivision Map Act and Conditions of Approval. FISCAL IMPACT: There is no fiscal impact to the City by this action. City costs are covered by development fees. ATTACHMENTS: A. Resolution Approving the North Crossroads Business Center Parcel Map 20- 02, Totaling Five ( 5) Lots, Accepting Dedication to the City of Parcel 5, and Approving
Recommended publications
  • Standard Frequencies and Time Signals from NBS Stations WWV and WWVH
    UNITED STATES DEPARTMENT OF COMMERCE Frederick H. Mueller, Secretary NATIONAL BUREAU OF STANDARDS A. V. Astin, Director Standard Frequencies and Time Signals From NBS Stations WWV and WWVH National Bureau of Standards Miscellaneous Publication 236 Reprinted July 1, 1961 with corrections (First issued December 1, 1960) Detailed descriptions are given of six technical services broadcast by National Bureau of Standards radio stations WWV and WWVH. The services include 1, standard radio frequencies; 2, standard audio frequencies; 3, standard time intervals; 4, standard musical pitch; 5, time signals; and 6, radio propagation forecasts. Other domestic and foreign standard frequency and time signal broadcasts are tabulated. 1. Technical Services and Related Information The National Bureau of Standards’ radio sta- at 1900 UT (Universal Time, UT, is the same as tions WWV (in operation since 1923) and WWVH GMT and GCT). (since 1948) broadcast six widely used technical (b) Accuracy services: 1, Standard radio fiequencies; 2, stand- Since December 1, 1957, the standard radio ard audio frequencies ; 3, standard time intervals ; transmissions from stations WWV and WWVII 4, standard musical pitch; 5, time signals; 6, radio have been held as nearly constant as possible with propagation forecasts. respect to the atomic frequency standards which The radio stations are located as follows: WWV, constitute the United States Frequency Standard Beltsville, Maryland (Box 182, Route 2, Lanham, (USFS), maintained and operated by the Radio Marvland) : WWVH. Maui. Hawaii (Box 901. Standards Laboratory of the National Bureau of PunGene, Maui). Coordinatk of the stitions are.:‘ Standards. Carefully made atomic standards WWV (lat. 38’59’33’’ N, long.
    [Show full text]
  • 8 Alert Input Monitor
    Chapter 1: Introduction OMEGAPHONE® OMA-P1108 Voice Synthesized Monitoring & Alarm System User’s Manual IMPORTANT SAFETY INSTRUCTIONS Your OMA-P1108 has been carefully designed to give you years of safe, reliable performance. As with all electrical equipment, however, there are a few basic precautions you should take to avoid hurting yourself or damaging the unit: • Read the installation and operating instructions in this manual carefully. Be sure to save it for future reference. • Read and follow all warning and instruction labels on the product itself. •To protect the OMA-P1108 from overheating, make sure all openings on the unit are not blocked. Do not place on or near a heat source, such as a radiator or heat register. • Do not use your OMA-P1108 near water, or spill liquid of any kind into it. • Be certain that your power source matches the rating listed on the AC power transformer. If you’re not sure of the type of power supply to your facility, consult your dealer or local power company. • Do not allow anything to rest on the power cord. Do not locate this product where the cord will be abused by persons walking on it. • Do not overload wall outlets and extension cords, as this can result in the risk of fire or electric shock. •Never push objects of any kind into this product through ventilation holes as they may touch dangerous voltage points or short out parts that could result in a risk of fire or electric shock. •To reduce the risk of electric shock, do not disassemble this product, but return it to Omega Customer Service, or other approved repair facility, when any service or repair work is required.
    [Show full text]
  • Radio Navigational Aids
    RADIO NAVIGATIONAL AIDS Publication No. 117 2014 Edition Prepared and published by the NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY Springfield, VA © COPYRIGHT 2014 BY THE UNITED STATES GOVERNMENT NO COPYRIGHT CLAIMED UNDER TITLE 17 U.S.C. WARNING ON USE OF FLOATING AIDS TO NAVIGATION TO FIX A NAVIGATIONAL POSITION The aids to navigation depicted on charts comprise a system consisting of fixed and floating aids with varying degrees of reliability. Therefore, prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid. The buoy symbol is used to indicate the approximate position of the buoy body and the sinker which secures the buoy to the seabed. The approximate position is used because of practical limitations in positioning and maintaining buoys and their sinkers in precise geographical locations. These limitations include, but are not limited to, inherent imprecisions in position fixing methods, prevailing atmospheric and sea conditions, the slope of and the material making up the seabed, the fact that buoys are moored to sinkers by varying lengths of chain, and the fact that buoy and/or sinker positions are not under continuous surveillance but are normally checked only during periodic maintenance visits which often occur more than a year apart. The position of the buoy body can be expected to shift inside and outside the charting symbol due to the forces of nature. The mariner is also cautioned that buoys are liable to be carried away, shifted, capsized, sunk, etc. Lighted buoys may be extinguished or sound signals may not function as the result of ice or other natural causes, collisions, or other accidents.
    [Show full text]
  • STANDARD FREQUENCIES and TIME SIGNALS (Question ITU-R 106/7) (1992-1994-1995) Rec
    Rec. ITU-R TF.768-2 1 SYSTEMS FOR DISSEMINATION AND COMPARISON RECOMMENDATION ITU-R TF.768-2 STANDARD FREQUENCIES AND TIME SIGNALS (Question ITU-R 106/7) (1992-1994-1995) Rec. ITU-R TF.768-2 The ITU Radiocommunication Assembly, considering a) the continuing need in all parts of the world for readily available standard frequency and time reference signals that are internationally coordinated; b) the advantages offered by radio broadcasts of standard time and frequency signals in terms of wide coverage, ease and reliability of reception, achievable level of accuracy as received, and the wide availability of relatively inexpensive receiving equipment; c) that Article 33 of the Radio Regulations (RR) is considering the coordination of the establishment and operation of services of standard-frequency and time-signal dissemination on a worldwide basis; d) that a number of stations are now regularly emitting standard frequencies and time signals in the bands allocated by this Conference and that additional stations provide similar services using other frequency bands; e) that these services operate in accordance with Recommendation ITU-R TF.460 which establishes the internationally coordinated UTC time system; f) that other broadcasts exist which, although designed primarily for other functions such as navigation or communications, emit highly stabilized carrier frequencies and/or precise time signals that can be very useful in time and frequency applications, recommends 1 that, for applications requiring stable and accurate time and frequency reference signals that are traceable to the internationally coordinated UTC system, serious consideration be given to the use of one or more of the broadcast services listed and described in Annex 1; 2 that administrations responsible for the various broadcast services included in Annex 2 make every effort to update the information given whenever changes occur.
    [Show full text]
  • Time and Frequency Users' Manual
    ,>'.)*• r>rJfl HKra mitt* >\ « i If I * I IT I . Ip I * .aference nbs Publi- cations / % ^m \ NBS TECHNICAL NOTE 695 U.S. DEPARTMENT OF COMMERCE/National Bureau of Standards Time and Frequency Users' Manual 100 .U5753 No. 695 1977 NATIONAL BUREAU OF STANDARDS 1 The National Bureau of Standards was established by an act of Congress March 3, 1901. The Bureau's overall goal is to strengthen and advance the Nation's science and technology and facilitate their effective application for public benefit To this end, the Bureau conducts research and provides: (1) a basis for the Nation's physical measurement system, (2) scientific and technological services for industry and government, a technical (3) basis for equity in trade, and (4) technical services to pro- mote public safety. The Bureau consists of the Institute for Basic Standards, the Institute for Materials Research the Institute for Applied Technology, the Institute for Computer Sciences and Technology, the Office for Information Programs, and the Office of Experimental Technology Incentives Program. THE INSTITUTE FOR BASIC STANDARDS provides the central basis within the United States of a complete and consist- ent system of physical measurement; coordinates that system with measurement systems of other nations; and furnishes essen- tial services leading to accurate and uniform physical measurements throughout the Nation's scientific community, industry, and commerce. The Institute consists of the Office of Measurement Services, and the following center and divisions: Applied Mathematics
    [Show full text]
  • Report ITU-R SM.2451-0 (06/2019)
    Report ITU-R SM.2451-0 (06/2019) Assessment of impact of wireless power transmission for electric vehicle charging on radiocommunication services SM Series Spectrum management ii Rep. ITU-R SM.2451-0 Foreword The role of the Radiocommunication Sector is to ensure the rational, equitable, efficient and economical use of the radio- frequency spectrum by all radiocommunication services, including satellite services, and carry out studies without limit of frequency range on the basis of which Recommendations are adopted. The regulatory and policy functions of the Radiocommunication Sector are performed by World and Regional Radiocommunication Conferences and Radiocommunication Assemblies supported by Study Groups. Policy on Intellectual Property Right (IPR) ITU-R policy on IPR is described in the Common Patent Policy for ITU-T/ITU-R/ISO/IEC referenced in Resolution ITU- R 1. Forms to be used for the submission of patent statements and licensing declarations by patent holders are available from http://www.itu.int/ITU-R/go/patents/en where the Guidelines for Implementation of the Common Patent Policy for ITU-T/ITU-R/ISO/IEC and the ITU-R patent information database can also be found. Series of ITU-R Reports (Also available online at http://www.itu.int/publ/R-REP/en) Series Title BO Satellite delivery BR Recording for production, archival and play-out; film for television BS Broadcasting service (sound) BT Broadcasting service (television) F Fixed service M Mobile, radiodetermination, amateur and related satellite services P Radiowave propagation RA Radio astronomy RS Remote sensing systems S Fixed-satellite service SA Space applications and meteorology SF Frequency sharing and coordination between fixed-satellite and fixed service systems SM Spectrum management Note: This ITU-R Report was approved in English by the Study Group under the procedure detailed in Resolution ITU-R 1.
    [Show full text]
  • Honeywell RN507 & PRC507W Public Alert Atomic Clock Radio
    TABLE OF CONTENTS INTRODUCTION __ PRODUCT FEATURES __ BEFORE YOU BEGIN __ Honeywell BATTERY INSTALLATION __ PRODUCT OVERVIEW __ RN507 & PRC507W WEATHER RADIO __ CUSTOMIZING YOUR WEATHER RADIO __ Public Alert Atomic Clock Radio WWVB RADIO CONTROLLED TIME __ ATOMIC CLOCK __ PROJECTION (PRC507W Only) __ ALARM SETTING __ DIGITAL RADIO __ SNOOZE & BACKLIGHT __ PRECAUTIONS __ APPENDIX 1 __ APPENDIX 2 __ SPECIFICATIONS __ FCC STATEMENT __ DECLARATION OF CONFORMITY __ STANDARD WARRANTY INFORMATION __ (PCR507 shown) USER MANUAL Version Date: July 13, 2007 2 INTRODUCTION • FM radio station auto-tuning Thank you for selecting the Honeywell Public Alert Atomic Clock Radio. • Memory storage of 18 preset radio stations This product combines a Public Alert Weather Radio and an Atomic • Sleeping timer setting Projection Clock (PCR507W) with FM Radio. The Weather Radio • Radio alarm (National Weather Radio) operates at a NWR (National Weather Radio) Atomic Clock frequencies and can receive NOAA (National Oceanic and Atmospheric • Precise time and date set via RF signals from the US Atomic Association) messages advising or warning you about the hazardous Clock weather and other events within a 40-mile radius. • Indoor temperature The FM band range of the Atomic Clock with FM Radio is from 87.5 to • Projects atomic time and indoor temperature on to the ceiling or 108.1 MHz and (PCR507) projects precise atomic time and indoor the wall (PRC507W) temperature onto the wall or the ceiling. • Focus adjustment (PRC507W) In this package you will find: • Control image with 180° rotation or flip (PRC507W) • One Public Alert Clock Radio • Calendar displaying date with month and day in English, Spanish • One 9v AC/DC adapter or French • One User Manual • 12 or 24 hour time format Please keep this manual handy as you use your new item.
    [Show full text]
  • Enhanced View of Time Specification
    Enhanced View of Time Specification Version 1.1 May 2002 Copyright © 1999 Objective Interface Systems, Inc. Copyright © 2001 Object Management Group, Inc. The companies listed above have granted to the Object Management Group, Inc. (OMG) a nonexclusive, royalty-free, paid up, worldwide license to copy and distribute this document and to modify this document and distribute copies of the modified version. Each of the copyright holders listed above has agreed that no person shall be deemed to have infringed the copyright in the included material of any such copyright holder by reason of having used the specification set forth herein or having conformed any computer software to the specification. PATENT The attention of adopters is directed to the possibility that compliance with or adoption of OMG specifications may require use of an invention covered by patent rights. OMG shall not be responsible for identifying patents for which a license may be required by any OMG specification, or for conducting legal inquiries into the legal validity or scope of those patents that are brought to its attention. OMG specifications are prospective and advisory only. Prospective users are responsible for protecting themselves against liability for infringement of patents. NOTICE The information contained in this document is subject to change without notice. The material in this document details an Object Management Group specification in accordance with the license and notices set forth on this page. This document does not represent a commitment to implement any portion of this specification in any company's products. WHILE THE INFORMATION IN THIS PUBLICATION IS BELIEVED TO BE ACCURATE, THE OBJECT MANAGEMENT GROUP AND THE COMPANIES LISTED ABOVE MAKE NO WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, WITH REGARD TO THIS MATERIAL INCLUDING, BUT NOT LIMITED TO ANY WARRANTY OF TITLE OR OWNERSHIP, IMPLIED WARRANTY OF MERCHANTABILITY OR WARRANTY OF FITNESS FOR PARTICULAR PURPOSE OR USE.
    [Show full text]
  • Time and Frequency Users Manual
    A 11 10 3 07512T o NBS SPECIAL PUBLICATION 559 J U.S. DEPARTMENT OF COMMERCE / National Bureau of Standards Time and Frequency Users' Manual NATIONAL BUREAU OF STANDARDS The National Bureau of Standards' was established by an act of Congress on March 3, 1901. The Bureau's overall goal is to strengthen and advance the Nation's science and technology and facilitate their effective application for public benefit. To this end, the Bureau conducts research and provides: (1) a basis for the Nation's physical measurement system, (2) scientific and technological services for industry and government, (3) a technical basis for equity in trade, and (4) technical services to promote public safety. The Bureau's technical work is per- formed by the National Measurement Laboratory, the National Engineering Laboratory, and the Institute for Computer Sciences and Technology THE NATIONAL MEASUREMENT LABORATORY provides the national system of physical and chemical and materials measurement; coordinates the system with measurement systems of other nations and furnishes essential services leading to accurate and uniform physical and chemical measurement throughout the Nation's scientific community, industry, and commerce; conducts materials research leading to improved methods of measurement, standards, and data on the properties of materials needed by industry, commerce, educational institutions, and Government; provides advisory and research services to other Government agencies; develops, produces, and distributes Standard Reference Materials; and provides
    [Show full text]
  • Oracle Utilities Network Management System Operations Mobile Application Installation and Deployment Guide Release 2.5.0.0.4 F23539-04
    Oracle Utilities Network Management System Operations Mobile Application Installation and Deployment Guide Release 2.5.0.0.4 F23539-04 February 2021 Oracle Utilities Network Management System Operations Mobile Application Installation and Deployment Guide, Release 2.5.0.0.4 F23539-04 Copyright © 1991, 2021 Oracle and/or its affiliates. All rights reserved. This software and related documentation are provided under a license agreement containing restrictions on use and disclosure and are protected by intellectual property laws. Except as expressly permitted in your license agreement or allowed by law, you may not use, copy, reproduce, translate, broadcast, modify, license, transmit, distribute, exhibit, perform, publish, or display any part, in any form, or by any means. Reverse engineering, disassembly, or decompilation of this software, unless required by law for interoperability, is prohibited. The information contained herein is subject to change without notice and is not warranted to be error- free. If you find any errors, please report them to us in writing. If this is software or related documentation that is delivered to the U.S. Government or anyone licensing it on behalf of the U.S. Government, then the following notice is applicable: U.S. GOVERNMENT END USERS: Oracle programs (including any operating system, integrated software, any programs embedded, installed or activated on delivered hardware, and modifications of such programs) and Oracle computer documentation or other Oracle data delivered to or accessed by U.S. Government
    [Show full text]
  • Distribution of Standard Frequency and Time Signals
    Distribution of Standard Frequency and Time Signals Abstract-This paper reviews the present methods of distributing stan- tional frequency bands are given in Table 11. Many of these dard frequency and time signals (SFTS), which include the use of high-fre- stations participate in the international coordination of quency, low-frequency, and very-low-frequency radio signals, portable time and frequency and are identified in the tables. The clocks, satellites, and RF cables and Lines. The range of accuracies attained with most of these systems is included along with an indication of the sources signal emission times of the coordinatcd stations are within of error. Information is also included on the accuracy of signals generated by 1 millisecond of each other and within about 100 ms of frequency dividers and multipliers. UT2 ; their carrier frequencies are maintained as constant as Details regarding the techniques, the propagation media, and the equip possible with respect to atomic standards and at the offset ment used in the distribution systems described are not included. Also, the from nominal as announced each year by the Bureau Inter- generation of the signals is not discussed. national de I'Heure (BIH) [4]. The fractional frequency I. INTRODUCTION offset in 1966 was - 300 parts in IO'', and this value is to be used in 1967. HE DISTRIBUTION of standard frequency and The long and widespread experience with standard HF time signals (SFTS) with the highest accuracy over and time signals, and their present world-wide use, under- long distances has become increasingly important lines their importance to a large body of users.
    [Show full text]
  • Product Data: Operational Modal Analysis Type 7760, Batch
    PRODUCT DATA Operational Modal Analysis Type 7760 Batch Processing Option BZ‐8527 Operational Modal Analysis Type 7760 is the analysis tool for effective modal parameter estimation in cases where only the output is known. The software allows you to perform accurate modal analysis under operational conditions and in situations where the structure is impossible or difficult to excite using externally applied forces. Using PULSE™ Modal Test Consultant™ Type 7753 for geometry‐ driven data acquisition, then seamlessly transferring data to Operational Modal Analysis Type 7760 for analysis and validation, comprises an integrated, easy‐to‐use modal test and analysis system. Uses and Features Uses • Three patented frequency domain techniques: FDD, EFDD and • Modal identification using only measured responses – no CFDD hammer or shaker excitation required • Automatic identification and suppression of deterministic • Modal identification of structures under real operating signals using the EFDD and CFDD techniques conditions • Three unbiased time domain stochastic subspace identification • Estimation of modal parameters to be used for FE model (SSI) techniques: principal components (PC), unweighted correlation and updating, design verification, benchmarking, principal components (UPC) and canonical variate analysis (CVA) troubleshooting, quality control or structural health monitoring • Crystal‐clear stabilization diagrams to discriminate between •Integration of Modal Test Consultant Type 7753 and physical and computational modes Operational Modal
    [Show full text]