Suggested Local Projects This project list is comprised of suggested projects that resulted from meetings with Council Members and thousands of comments received from the public during three rounds of public meetings,
website comments, phone calls and e-mails. These are suggested projects and additional analysis is required to determine the feasibility, scope, budget and limits.
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 1 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 Ayr Street Roadway Construction
2 Fisher Road Roadway Construction
3 George Street Roadway Construction
4 Naomi Avenue Roadway Construction
5 Pear Street Roadway Construction
6 Meador Avenue Resurfacing
7 Thomasville Estates Court Resurfacing
8 Thomasville Estates Drive Resurfacing
9 Thomasville Estates Way Resurfacing
10 Atlanta Youth Academy School Zone Flashers
11 Blayton Lane (2117 and 2141) Flooding
12 Capitol Avenue Sidewalks/Signal Upgrade/Resurfacing/Other
13 Capitol Avenue and Hank Aaron Drive Street Car
14 Chosewood Park Parks/Rec Center Upgrade
15 Claire Drive Resurfacing
16 Constitution Rd (Jonesboro Road to Moreland Avenue) Resurfacing
17 Forrest Park Road ( Railroad Bridge to Constitution ) Sidewalks
18 Forrest Park Road at Thomasville Drive Resurfacing
19 Glenwood Avenue at Boulevard Sidewalks
20 Grant Park Parks/Rec Center Upgrade
21 Hank Aaron Drive Sidewalks/Signal Upgrade/Crosswalks/Lights
22 John Wesley Dobbs Elementary School (Jonesboro Road and Harper Road) Sidewalks
23 Jonesboro Road Resurfacing/Sidewalks
24 Jonesboro Road from Schoen Street Resurfacing
25 McDonough Avenue SE TSPLOST Project
26 Memorial Drive Extension (through Moreland Avenue SE) Resurfacing/Sidewalks/Signal Upgrades
27 Moreland Ave (McDonough Blvd to I285) Resurfacing
28 Moreland/Glenwood Avenue Sidewalks/Resurfacing
29 Mureslone/Jonesboro Road NPU-Z Signal Upgrade
30 Rachael Street Resurfacing
31 Rachael Street (2160 and 2162) Unpaved Road
32 Thomasville Heights Other: Vacant Lot Utilization 33 University Avenue Extension (McDonough Avenue SE to Moreland Avenue SE) Sidewalks/Resurfacing/Signal Upgrades
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 2 - Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 15th Street Extension Resurfacing/Sidewalks/Signal Upgrades
2 Auburn and Edgewood Resurfacing/Sidewalks
3 16th Street (Spring Street and West Peachtree) Resurfacing
4 Andrew Young International Blvd Resurfacing
5 Clifton Sidewalks
6 DeKalb Avenue and Krog Dangerous Intersection
7 DeKalb Avenue (extending Complete Street to Jackson) Resurfacing/Sidewalks
8 Howell Resurfacing
9 M.L. King and Centennial Olympic Park Drive SW Sidewalks
10 McLendon Avenue Sidewalks
11 Midtown Resurfacing/Signal Upgrade
12 NE Beltline Trail - Phase I Resurfacing/Sidewalks
13 Poncey-Highland Community Sidewalks/Signal Upgrade/Resurfacing
14 Ralph McGill Blvd (Georgia Power) Signal Upgrade 15 Summerhill Neighborhood Improvements
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 3 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 Baylor Street Roadway Construction
2 Flynn Street Roadway Construction
3 Hirsch Street NW Roadway Construction
4 Marktwo Place Roadway Construction
5 Spring Lane Roadway Construction
6 15th Street Extension Sidewalks/Signal Upgrade/Resurfacing
7 16th Street Resurfacing
8 Bankhead Avenue Resurfacing
9 Donald Lee Hollowell Parkway Sidewalks/ Street Lights
10 Juniper Street Resurfacing
11 Marietta Street (King Plow Center to Johnson Road) Resurfacing/Sidewalks
12 Sunset Avenue Sidewalks
13 Tech Parkway Resurfacing
14 West Lake and Boone Parks/Rec Center Upgrade 15 Willis Street Sidewalks
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 4 - Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 Brewster Street Roadway Construction
2 I-20 Bridge (Langhorn and I-20) Bridge
3 Atwood Street SW Resurfacing Resurfacing
4 CA Scott Recreation Center Parks/Rec Center Upgrade
5 City Hall Tower Government Building
6 Culberson Sidewalks
7 Culberson (Oak and RDA) Sidewalks/Street Lighting
8 Dragon Place (b/w Oak Street and Lucile Avenue) Remove 2-Sided Parking
9 Eggleston Sidewalks/Remove 2-Sided Parking
10 Epworth Street Resurfacing
11 Fire Station 7 Fire Station
12 Gordon and White Resurfacing, Bike Lanes
13 Gordon Place Sidewalks
14 Grady Place Sidewalks/Remove 2-Sided Parking
15 Greenwich Street Sidewalks
16 Historic West End (all residential streets) Resurfacing/Sidewalks
17 Holderness Street SW Resurfacing/Sidewalks
18 Hopkins Street SW Resurfacing
19 Howell Bike Lanes
20 I-20 East R/W ( Lucile and Peeples) Noise Barrier Noise Barrier
21 Langhorn Street SW Resurfacing Resurfacing/Sidewalks
22 Latham (Langhorn and Hopkins) Sidewalks/Street Lighting
23 Lawton Place and Lawton Street Sidewalks/Street Lighting
24 Lee and York (where many people cross to MARTA) Signals/Signage
25 Lee Street Complete Street, Sidewalks/Signal Upgrade/Resurfacing
26 Lucile (all residential streets perpendicular b/w Atwood and Langhorn) Sidewalks/Street Lighting
27 Lucile (Lawton and Dargan) Signage and calming Signage/Traffic Calming
28 Lucile Avenue Bridge
29 Matthews Sidewalks
30 MLK and Spring Street Sidewalks
31 Oak Street Sidewalks, Remove 2-Sided Parking
32 Oak Street (all residential streets perpendicular b/w Holderness and Langhorn) Sidewalks/Street Lighting
33 Oak Street (Lawton and West End Place) Signage/Traffic Calming
34 Oakland Nature Center Parks/Rec Center Upgrade
35 Oglethorpe (Azalia and Joseph E. Lowery) Sidewalks/Street Lighting
36 Oglethorpe (Lawton and Queen Street) Sidewalks/Street Lighting
37 Oglethorpe Sidewalks Sidewalks
38 Peeples Street Sidewalks
39 Precinct Zone 4 Sidewalks
40 Reverend James Orange Park Recreation Center Parks/Rec Center Upgrade
41 Rose Circle Resurfacing, Bike Lanes
42 West End Park Bike Lanes
43 White Street Sidewalks/Street Lighting 44 White Street (perpendicular to Beltline trail) Bridge
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 5 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 2nd Street Roadway Construction
2 Braeburn Drive Roadway Construction
3 George Street Roadway Construction
4 Narrow Street Roadway Construction
5 Northern Avenue Roadway Construction
6 Weatherby Street Roadway Construction
7 Glenaire Walk Resurfacing
8 Andrew Young International Boulevard Resurfacing
9 Auburn and Edgewood Resurfacing/Sidewalks
10 Central Park Place (Highland to McGill) Resurfacing
11 Clifton Sidewalks
12 Hosea Williams Drive Resurfacing
13 Lang Carson Recreation Center Parks/Rec Center Upgrade
14 Lowry Street Resurfacing/Sidewalks
15 Maynard Terrace Sidewalks/Lighting
16 Mollie Street 17 Moreland and Glenwood Sidewalks
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 6 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 Fire Station No. 19 Municipal Facilities
2 Fire Station No. 29 Municipal Facilities
3 Piedmont Road from 10th to Monroe (possible over Cheshire Bridge) Resurfacing
4 North Morningside from North Highland to Lanier Boulevard Resurfacing
5 Traffic Calming on Lenox Road Resurfacing
6 Traffic Calming on Johnson Road Resurfacing
7 Westminster Drive Roadway Construction
8 15th Street Extension Sidewalks/Signal Upgrade/Resurfacing
9 Ansley Park Sidewalks
10 Clifton Sidewalks
11 English Park Improvements
12 Monroe Drive Road Diet Road Diet
13 Morningside Sidewalks
14 NE Beltline Trail - Phase I Resurfacing/Sidewalks 15 Park Drive and Elkmont Sidewalks
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 7 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 Lee Circle Roadway Construction
2 Buckhead Trace Resurfacing
3 Camden Park Court Resurfacing
4 Carlton Road Resurfacing
5 Haven Oaks Court Resurfacing
6 Lovette Lane Resurfacing
7 E. Roxboro Road (Railroad bridge to W. Roxboro Road) Resurfacing
8 Lenox Road (Buford Highway to Peachtree Road) Resurfacing
9 Loridans Drive (Wieuca to Peachtree Dunwoody Road) Resurfacing
10 Old Ivy Road (Deadend to Wieuca Road) Resurfacing
11 Peachtree Dunwoody Road (Roxboro Road to City Limit) Resurfacing
12 Wieuca Road (Roxboro Road to Roswell Road) Resurfacing
13 N Ivey Road Resurfacing
14 Mountain Way Resurfacing
15 Hope Hill Elementary 112 Boulevard NE 30312 School Zone Flashers
16 Mt. Paran (Randal Mill and W. Conway) Signal Upgrades/Other
17 Phipps Boulevard Sidewalks/Signal Upgrade/Resurfacing
18 Roswell Road Sidewalks/Signal Upgrade/Resurfacing 19 West Wieuca Road (Loridans Drive to Lake Forrest Drive) Resurfacing
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 8 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 Beechwood Drive and Northside Parkway Signal Upgrade
2 Beechwood Drive NW Resurfacing
3 Beechwood Hills Court Resurfacing
4 Chastain Park Swimming Pool Repair and Improvements
5 Fire Station No. 26 Fire Station
6 Hillside Drive (near Chastain Park) Resurfacing
7 Mount Paran Road At I-41 (Turning Lane Addition) Resurfacing
8 Mount Paran Road at I-75 Signal Upgrade
9 Peachtree Battle Avenue Resurfacing
10 Roswell Road Sidewalks/Signal Upgrade/Resurfacing
11 Spring Valley Road (at very end in the cul-de-sac part) Pave Unpaved Road 12 Wieuca Road at Chastain Park Resurfacing/Sidewalks
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 9 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 6th Street Roadway Construction
2 Ford Street Roadway Construction
3 James Drive / 5th Street Roadway Construction
4 Marktwo Place Roadway Construction
5 6th Street Sidewalks
6 Berkeley Park Neighborhood Sidewalks
7 Bolton Road Safety Improvements
8 Defoors Ferry Road (Warren Road NW and Railroad Bridge) Sidewalks
9 Donald Lee Hollowell Parkway Sidewalks/Street Lights
10 Earnest Street Connect to street across RR tracks
11 Fire Station 23 Fire Station
12 H.E. Holmes to James Jackson Pkwy Sidewalks
13 Hightower Road and Hollywood Road Parks/Rec Center Upgrade/ Street Lights
14 James Jackson Parkway Street Lights
15 Jennie Drake Park Parks/Rec Center Upgrade
16 Precinct Zone 1 Sidewalks
17 Spink Street and Forest Avenue Resurfacing
18 Spring Circle NW Pave Unpaved Road 19 Waterworks Park Parks/Rec Center Upgrade
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 10 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 Bakers Ferry Road Decorative Street Lights
2 Beecher Street and Road Decorative Street Lights
3 Benjamin E. Mays Road Decorative Street Lights
4 Boulder Park Drive Decorative Street Lights
5 Brownlee Road Decorative Street Lights
6 Burton Road Decorative Street Lights
7 Collier Drive Decorative Street Lights
8 Fairburn Road Decorative Street Lights
9 Hamilton E. Holmes Drive Decorative Street Lights
10 Harlan Road Decorative Street Lights
11 Larchwood Street Decorative Street Lights
12 Linkwood Road Decorative Street Lights
13 Lynhurst Drive Decorative Street Lights
14 Peyton Road Decorative Street Lights
15 Ralph David Abernathy Drive Decorative Street Lights
16 Roger Avenue Decorative Street Lights
17 South Gordon Road Decorative Street Lights
18 Tuckawanna Drive Decorative Street Lights
19 Alvarado Terrace Resurfacing
20 Ardley Road Resurfacing
21 Barfield Resurfacing
22 Basil Way Resurfacing
23 Benjamin Court Resurfacing
24 Bobwhite Road Resurfacing
25 Brownlee Place Resurfacing
26 Camrose Way Resurfacing
27 Cativo Drive (possible patching) Resurfacing
28 Cedar Island Drive Resurfacing
29 Collier Court Resurfacing Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 10 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
30 Derry Avenue Resurfacing
31 Dogwood Court Resurfacing
32 East Kildare Avenue Resurfacing
33 Elmtree Drive Resurfacing
34 Emerald Avenue Resurfacing
35 Emerald Court Resurfacing
36 English Circle Resurfacing
37 Flagstone Drive Resurfacing
38 Florida Avenue Resurfacing
39 Hazelwood Road Resurfacing
40 Hope Court Resurfacing
41 Howell Terrace Resurfacing
42 Kenora Drive Resurfacing
43 Larchwood Street Resurfacing
44 Laurel Circle Resurfacing
45 Linkwood Drive from MLK to Collier Drive Resurfacing
46 Lynfield Drive Resurfacing
47 Manor Court Resurfacing
48 Mays Court Resurfacing
49 Mays Crossing Resurfacing
50 McKenzie Resurfacing
51 Mockingbird Lane Resurfacing
52 Oakcliff Road Resurfacing
53 Oriele Drive Resurfacing
54 Peyton Place from Peyton Road south to end of street (patching) Resurfacing
55 Plainsville Court Resurfacing
56 Plainsville Way Resurfacing
57 Redbud Lane Resurfacing
58 Rodney Drive (patching) Resurfacing Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 10 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
59 Rutgers Drive Resurfacing
60 Santa Monica Resurfacing
61 Stokes Avenue Resurfacing
62 Valleydale Drive Resurfacing
63 Veltre Place Resurfacing
64 Veltre Terrace Resurfacing
65 Waterford Road Resurfacing
66 West Kildare Avenue Resurfacing
67 Westwood Avenue Resurfacing
68 Willis Mill Road (entrance to bike trail) Resurfacing
69 Wisteria Lane Resurfacing
70 Beecher Street Sidewalks
71 Benjamin E. Mays Drive Sidewalks
72 Brownlee Road Sidewalks
73 Cative Drive Sidewalks
74 Howell Drive Sidewalks
75 Lasalle Way Street Lights
76 Harlan Road Other/Sewage
77 Annelaine Drive and Bobolink Circle Resurfacing
78 Fielding Lane Resurfacing
79 Flamingo Drive SW Resurfacing
80 Lynn Drive SW Resurfacing
81 Rebecca Drive SW Resurfacing
82 West End Park Resurfacing Resurfacing
83 Beecher Road Sidewalks
84 Boulder Park Sidewalks
85 South Gordon Street Sidewalks/Resurfacing
86 Adamsville Green and MLK Jr. Drive Signage/Sidewalks
87 Adamsville Signal Upgrade/Signage Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 10 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
88 Fairburn Road and Delmar Street Signal Upgrade/Signage 89 Larchwood Street SW Total street assessment
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 11 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 Blanton Avenue Roadway Construction
2 Carolyn Street Roadway Construction
3 Ewing Street Roadway Construction
4 Roswell Street Roadway Construction
5 Hampshire Walk Resurfacing
6 Hamstead Way Resurfacing
7 Landings South Drive Resurfacing
8 Liverpool Way Resurfacing
9 Portsmouth Way Resurfacing
10 Adams Park Recreation Center Parks/Rec Center Upgrade
11 Barge Road Sidewalks/Resurfacing
12 Beecher Road Sidewalks
13 Beecher Street and Benjamin E. Mays Sidewalks
14 Ben Hill Recreation Center Parks/Rec Center Upgrade
15 Benjamin E. Mays and Boulder Park Sidewalks
16 Campbellton Road (County Line Road to Fairburn Road) Sidewalks
17 County Line Road and Niskey Lake Road SW Pot Holes
18 County Line Road SW Signal Upgrade/Sidewalks
19 County Line Road SW (Campbellton to Niskey Lake) Sidewalks
20 Fairburn Road and Campbellton Road Sidewalks/Signal Upgrade/Resurfacing
21 Fairburn Road and Delmar Street Signal Upgrade/Signage
22 Fire Station 31 Fire Station
23 Herring Road Sidewalks
24 Hillside Baptist Sidewalks/Unpaved Road
25 Ingledale Drive SW Other / Drainage Pipe
26 King Arthur Road Other / Sewage
27 King's Forrest Community (Melvin and Fairburn) Resurfacing
28 Niskey Lake (Campbellton and Butner) Sidewalks 29 Wilson James Road SW Unpaved Road High Priority
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 12 Local Project Priorities - $5.6M Funding Available per District ID Projects Type
1 3rd Street Roadway Construction
2 Beatie Avenue Roadway Construction
3 Cleveland Circle Roadway Construction
4 Harden Road Roadway Construction
5 Sparta Street Roadway Construction
6 Terrace View Circle Roadway Construction
7 Tibbs Road Roadway Construction
8 3rd Avenue SW Sidewalks
9 Aiken and Upshaw Street Resurfacing
10 Allen Avenue Sidewalks
11 Ashwood Avenue (Pryor Road to Interstate) Sidewalks
12 Belgarde Place SE 30354 Resurfacing
13 Bonnie Lane SE Resurfacing
14 Bridge on Springdale Road (near 2611 Springdale Road) Other
15 Brookline Street Sidewalks
16 Campbellton Road (1830 to 1721) Sidewalks
17 Emma McMillican Park Erosion
18 Fire Station 20 Fire Station
19 Garden Park at 1479 Athens Avenue Erosion
20 Gideon Elementary School Sidewalks/Signal Upgrade/Resurfacing/School Zone Flashers
21 Glenrose Cir SW 30354 Resurfacing
22 Glenway Drive and Springdale Road Sidewalks
23 Grand Avenue SW Sidewalks
24 Hipp Street and Joyland Sidewalks
25 Jonesboro Road and Macedonia Road Sidewalks/Signal Upgrade/Resurfacing
26 Langford Park Parks/Rec Center Upgrade
27 Lee Street Sidewalks/Signal Upgrade/Resurfacing
28 Metropolitan and Perkerson Flooding
29 Metropolitan and Whitehall Flooding
30 Metropolitan Parkway Resurfacing
31 Metropolitan Parkway ( Dill Avenue to Northside Drive) Resurfacing
32 Oak Drive SE 30315 Resurfacing
33 Perkerson and Sylvan Road Sidewalks
34 Perkerson Park Parks/Rec Center Upgrade
35 Southwest Atlanta Grass Cutting and Trash Removal Other
36 Sylvan Road (Deckner to Murphy) Resurfacing
37 Sylvan Road SW 30310 Resurfacing
38 Villages at Oakshire (Oakshire Way, Ardwick Court, Litherland Court, Little H Resurfacing
39 Ward Drive SW 30354 Resurfacing
40 Waters Road SE 30354 Resurfacing
41 Waynes Court SE 30354 Resurfacing 42 Whitehall Resurfacing
Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council.