Suggested Local Projects This project list is comprised of suggested projects that resulted from meetings with Council Members and thousands of comments received from the public during three rounds of public meetings,

website comments, phone calls and e-mails. These are suggested projects and additional analysis is required to determine the feasibility, scope, budget and limits.

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 1 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 Ayr Street Roadway Construction

2 Fisher Road Roadway Construction

3 George Street Roadway Construction

4 Naomi Avenue Roadway Construction

5 Pear Street Roadway Construction

6 Meador Avenue Resurfacing

7 Thomasville Estates Court Resurfacing

8 Thomasville Estates Drive Resurfacing

9 Thomasville Estates Way Resurfacing

10 Atlanta Youth Academy School Zone Flashers

11 Blayton Lane (2117 and 2141) Flooding

12 Capitol Avenue Sidewalks/Signal Upgrade/Resurfacing/Other

13 Capitol Avenue and Hank Aaron Drive Street Car

14 Chosewood Park Parks/Rec Center Upgrade

15 Claire Drive Resurfacing

16 Constitution Rd (Jonesboro Road to Moreland Avenue) Resurfacing

17 Forrest Park Road ( Railroad Bridge to Constitution ) Sidewalks

18 Forrest Park Road at Thomasville Drive Resurfacing

19 Glenwood Avenue at Sidewalks

20 Grant Park Parks/Rec Center Upgrade

21 Hank Aaron Drive Sidewalks/Signal Upgrade/Crosswalks/Lights

22 John Wesley Dobbs Elementary School (Jonesboro Road and Harper Road) Sidewalks

23 Jonesboro Road Resurfacing/Sidewalks

24 Jonesboro Road from Schoen Street Resurfacing

25 McDonough Avenue SE TSPLOST Project

26 Memorial Drive Extension (through Moreland Avenue SE) Resurfacing/Sidewalks/Signal Upgrades

27 Moreland Ave (McDonough Blvd to I285) Resurfacing

28 Moreland/Glenwood Avenue Sidewalks/Resurfacing

29 Mureslone/Jonesboro Road NPU-Z Signal Upgrade

30 Rachael Street Resurfacing

31 Rachael Street (2160 and 2162) Unpaved Road

32 Thomasville Heights Other: Vacant Lot Utilization 33 University Avenue Extension (McDonough Avenue SE to Moreland Avenue SE) Sidewalks/Resurfacing/Signal Upgrades

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 2 - Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 15th Street Extension Resurfacing/Sidewalks/Signal Upgrades

2 Auburn and Edgewood Resurfacing/Sidewalks

3 16th Street (Spring Street and West Peachtree) Resurfacing

4 Andrew Young International Blvd Resurfacing

5 Clifton Sidewalks

6 DeKalb Avenue and Krog Dangerous Intersection

7 DeKalb Avenue (extending Complete Street to Jackson) Resurfacing/Sidewalks

8 Howell Resurfacing

9 M.L. King and Centennial Olympic Park Drive SW Sidewalks

10 McLendon Avenue Sidewalks

11 Midtown Resurfacing/Signal Upgrade

12 NE Beltline Trail - Phase I Resurfacing/Sidewalks

13 Poncey-Highland Community Sidewalks/Signal Upgrade/Resurfacing

14 Ralph McGill Blvd ( Power) Signal Upgrade 15 Summerhill Neighborhood Improvements

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 3 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 Baylor Street Roadway Construction

2 Flynn Street Roadway Construction

3 Hirsch Street NW Roadway Construction

4 Marktwo Place Roadway Construction

5 Spring Lane Roadway Construction

6 15th Street Extension Sidewalks/Signal Upgrade/Resurfacing

7 16th Street Resurfacing

8 Bankhead Avenue Resurfacing

9 Donald Lee Hollowell Parkway Sidewalks/ Street Lights

10 Juniper Street Resurfacing

11 Marietta Street (King Plow Center to Johnson Road) Resurfacing/Sidewalks

12 Sunset Avenue Sidewalks

13 Tech Parkway Resurfacing

14 West Lake and Boone Parks/Rec Center Upgrade 15 Willis Street Sidewalks

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 4 - Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 Brewster Street Roadway Construction

2 I-20 Bridge (Langhorn and I-20) Bridge

3 Atwood Street SW Resurfacing Resurfacing

4 CA Scott Recreation Center Parks/Rec Center Upgrade

5 City Hall Tower Government Building

6 Culberson Sidewalks

7 Culberson (Oak and RDA) Sidewalks/Street Lighting

8 Dragon Place (b/w Oak Street and Lucile Avenue) Remove 2-Sided Parking

9 Eggleston Sidewalks/Remove 2-Sided Parking

10 Epworth Street Resurfacing

11 Fire Station 7 Fire Station

12 Gordon and White Resurfacing, Bike Lanes

13 Gordon Place Sidewalks

14 Grady Place Sidewalks/Remove 2-Sided Parking

15 Greenwich Street Sidewalks

16 Historic West End (all residential streets) Resurfacing/Sidewalks

17 Holderness Street SW Resurfacing/Sidewalks

18 Hopkins Street SW Resurfacing

19 Howell Bike Lanes

20 I-20 East R/W ( Lucile and Peeples) Noise Barrier Noise Barrier

21 Langhorn Street SW Resurfacing Resurfacing/Sidewalks

22 Latham (Langhorn and Hopkins) Sidewalks/Street Lighting

23 Lawton Place and Lawton Street Sidewalks/Street Lighting

24 Lee and York (where many people cross to MARTA) Signals/Signage

25 Lee Street Complete Street, Sidewalks/Signal Upgrade/Resurfacing

26 Lucile (all residential streets perpendicular b/w Atwood and Langhorn) Sidewalks/Street Lighting

27 Lucile (Lawton and Dargan) Signage and calming Signage/Traffic Calming

28 Lucile Avenue Bridge

29 Matthews Sidewalks

30 MLK and Spring Street Sidewalks

31 Oak Street Sidewalks, Remove 2-Sided Parking

32 Oak Street (all residential streets perpendicular b/w Holderness and Langhorn) Sidewalks/Street Lighting

33 Oak Street (Lawton and West End Place) Signage/Traffic Calming

34 Oakland Nature Center Parks/Rec Center Upgrade

35 Oglethorpe (Azalia and Joseph E. Lowery) Sidewalks/Street Lighting

36 Oglethorpe (Lawton and Queen Street) Sidewalks/Street Lighting

37 Oglethorpe Sidewalks Sidewalks

38 Peeples Street Sidewalks

39 Precinct Zone 4 Sidewalks

40 Reverend James Orange Park Recreation Center Parks/Rec Center Upgrade

41 Rose Circle Resurfacing, Bike Lanes

42 West End Park Bike Lanes

43 White Street Sidewalks/Street Lighting 44 White Street (perpendicular to Beltline trail) Bridge

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 5 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 2nd Street Roadway Construction

2 Braeburn Drive Roadway Construction

3 George Street Roadway Construction

4 Narrow Street Roadway Construction

5 Northern Avenue Roadway Construction

6 Weatherby Street Roadway Construction

7 Glenaire Walk Resurfacing

8 Andrew Young International Boulevard Resurfacing

9 Auburn and Edgewood Resurfacing/Sidewalks

10 Central Park Place (Highland to McGill) Resurfacing

11 Clifton Sidewalks

12 Hosea Williams Drive Resurfacing

13 Lang Carson Recreation Center Parks/Rec Center Upgrade

14 Lowry Street Resurfacing/Sidewalks

15 Maynard Terrace Sidewalks/Lighting

16 Mollie Street 17 Moreland and Glenwood Sidewalks

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 6 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 Fire Station No. 19 Municipal Facilities

2 Fire Station No. 29 Municipal Facilities

3 Piedmont Road from 10th to Monroe (possible over Cheshire Bridge) Resurfacing

4 North Morningside from North Highland to Lanier Boulevard Resurfacing

5 Traffic Calming on Lenox Road Resurfacing

6 Traffic Calming on Johnson Road Resurfacing

7 Westminster Drive Roadway Construction

8 15th Street Extension Sidewalks/Signal Upgrade/Resurfacing

9 Sidewalks

10 Clifton Sidewalks

11 English Park Improvements

12 Monroe Drive Road Diet Road Diet

13 Morningside Sidewalks

14 NE Beltline Trail - Phase I Resurfacing/Sidewalks 15 Park Drive and Elkmont Sidewalks

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 7 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 Lee Circle Roadway Construction

2 Trace Resurfacing

3 Camden Park Court Resurfacing

4 Carlton Road Resurfacing

5 Haven Oaks Court Resurfacing

6 Lovette Lane Resurfacing

7 E. Roxboro Road (Railroad bridge to W. Roxboro Road) Resurfacing

8 Lenox Road ( to Peachtree Road) Resurfacing

9 Loridans Drive (Wieuca to Peachtree Dunwoody Road) Resurfacing

10 Old Ivy Road (Deadend to Wieuca Road) Resurfacing

11 Peachtree Dunwoody Road (Roxboro Road to City Limit) Resurfacing

12 Wieuca Road (Roxboro Road to Roswell Road) Resurfacing

13 N Ivey Road Resurfacing

14 Mountain Way Resurfacing

15 Hope Hill Elementary 112 Boulevard NE 30312 School Zone Flashers

16 Mt. Paran (Randal Mill and W. Conway) Signal Upgrades/Other

17 Phipps Boulevard Sidewalks/Signal Upgrade/Resurfacing

18 Roswell Road Sidewalks/Signal Upgrade/Resurfacing 19 West Wieuca Road (Loridans Drive to Lake Forrest Drive) Resurfacing

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 8 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 Beechwood Drive and Northside Parkway Signal Upgrade

2 Beechwood Drive NW Resurfacing

3 Beechwood Hills Court Resurfacing

4 Swimming Pool Repair and Improvements

5 Fire Station No. 26 Fire Station

6 Hillside Drive (near Chastain Park) Resurfacing

7 Mount Paran Road At I-41 (Turning Lane Addition) Resurfacing

8 Mount Paran Road at I-75 Signal Upgrade

9 Peachtree Battle Avenue Resurfacing

10 Roswell Road Sidewalks/Signal Upgrade/Resurfacing

11 Spring Valley Road (at very end in the cul-de-sac part) Pave Unpaved Road 12 Wieuca Road at Chastain Park Resurfacing/Sidewalks

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 9 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 6th Street Roadway Construction

2 Ford Street Roadway Construction

3 James Drive / 5th Street Roadway Construction

4 Marktwo Place Roadway Construction

5 6th Street Sidewalks

6 Neighborhood Sidewalks

7 Bolton Road Safety Improvements

8 Defoors Ferry Road (Warren Road NW and Railroad Bridge) Sidewalks

9 Donald Lee Hollowell Parkway Sidewalks/Street Lights

10 Earnest Street Connect to street across RR tracks

11 Fire Station 23 Fire Station

12 H.E. Holmes to James Jackson Pkwy Sidewalks

13 Hightower Road and Hollywood Road Parks/Rec Center Upgrade/ Street Lights

14 James Jackson Parkway Street Lights

15 Jennie Drake Park Parks/Rec Center Upgrade

16 Precinct Zone 1 Sidewalks

17 Spink Street and Forest Avenue Resurfacing

18 Spring Circle NW Pave Unpaved Road 19 Waterworks Park Parks/Rec Center Upgrade

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 10 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 Bakers Ferry Road Decorative Street Lights

2 Beecher Street and Road Decorative Street Lights

3 Benjamin E. Mays Road Decorative Street Lights

4 Boulder Park Drive Decorative Street Lights

5 Brownlee Road Decorative Street Lights

6 Burton Road Decorative Street Lights

7 Collier Drive Decorative Street Lights

8 Fairburn Road Decorative Street Lights

9 Hamilton E. Holmes Drive Decorative Street Lights

10 Harlan Road Decorative Street Lights

11 Larchwood Street Decorative Street Lights

12 Linkwood Road Decorative Street Lights

13 Lynhurst Drive Decorative Street Lights

14 Peyton Road Decorative Street Lights

15 Ralph David Abernathy Drive Decorative Street Lights

16 Roger Avenue Decorative Street Lights

17 South Gordon Road Decorative Street Lights

18 Tuckawanna Drive Decorative Street Lights

19 Alvarado Terrace Resurfacing

20 Ardley Road Resurfacing

21 Barfield Resurfacing

22 Basil Way Resurfacing

23 Benjamin Court Resurfacing

24 Bobwhite Road Resurfacing

25 Brownlee Place Resurfacing

26 Camrose Way Resurfacing

27 Cativo Drive (possible patching) Resurfacing

28 Cedar Island Drive Resurfacing

29 Collier Court Resurfacing Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 10 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

30 Derry Avenue Resurfacing

31 Dogwood Court Resurfacing

32 East Kildare Avenue Resurfacing

33 Elmtree Drive Resurfacing

34 Emerald Avenue Resurfacing

35 Emerald Court Resurfacing

36 English Circle Resurfacing

37 Flagstone Drive Resurfacing

38 Florida Avenue Resurfacing

39 Hazelwood Road Resurfacing

40 Hope Court Resurfacing

41 Howell Terrace Resurfacing

42 Kenora Drive Resurfacing

43 Larchwood Street Resurfacing

44 Laurel Circle Resurfacing

45 Linkwood Drive from MLK to Collier Drive Resurfacing

46 Lynfield Drive Resurfacing

47 Manor Court Resurfacing

48 Mays Court Resurfacing

49 Mays Crossing Resurfacing

50 McKenzie Resurfacing

51 Mockingbird Lane Resurfacing

52 Oakcliff Road Resurfacing

53 Oriele Drive Resurfacing

54 Peyton Place from Peyton Road south to end of street (patching) Resurfacing

55 Plainsville Court Resurfacing

56 Plainsville Way Resurfacing

57 Redbud Lane Resurfacing

58 Rodney Drive (patching) Resurfacing Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 10 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

59 Rutgers Drive Resurfacing

60 Santa Monica Resurfacing

61 Stokes Avenue Resurfacing

62 Valleydale Drive Resurfacing

63 Veltre Place Resurfacing

64 Veltre Terrace Resurfacing

65 Waterford Road Resurfacing

66 West Kildare Avenue Resurfacing

67 Westwood Avenue Resurfacing

68 Willis Mill Road (entrance to bike trail) Resurfacing

69 Wisteria Lane Resurfacing

70 Beecher Street Sidewalks

71 Benjamin E. Mays Drive Sidewalks

72 Brownlee Road Sidewalks

73 Cative Drive Sidewalks

74 Howell Drive Sidewalks

75 Lasalle Way Street Lights

76 Harlan Road Other/Sewage

77 Annelaine Drive and Bobolink Circle Resurfacing

78 Fielding Lane Resurfacing

79 Flamingo Drive SW Resurfacing

80 Lynn Drive SW Resurfacing

81 Rebecca Drive SW Resurfacing

82 West End Park Resurfacing Resurfacing

83 Beecher Road Sidewalks

84 Boulder Park Sidewalks

85 South Gordon Street Sidewalks/Resurfacing

86 Adamsville Green and MLK Jr. Drive Signage/Sidewalks

87 Adamsville Signal Upgrade/Signage Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 10 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

88 Fairburn Road and Delmar Street Signal Upgrade/Signage 89 Larchwood Street SW Total street assessment

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 11 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 Blanton Avenue Roadway Construction

2 Carolyn Street Roadway Construction

3 Ewing Street Roadway Construction

4 Roswell Street Roadway Construction

5 Hampshire Walk Resurfacing

6 Hamstead Way Resurfacing

7 Landings South Drive Resurfacing

8 Liverpool Way Resurfacing

9 Portsmouth Way Resurfacing

10 Adams Park Recreation Center Parks/Rec Center Upgrade

11 Barge Road Sidewalks/Resurfacing

12 Beecher Road Sidewalks

13 Beecher Street and Benjamin E. Mays Sidewalks

14 Ben Hill Recreation Center Parks/Rec Center Upgrade

15 Benjamin E. Mays and Boulder Park Sidewalks

16 Campbellton Road (County Line Road to Fairburn Road) Sidewalks

17 County Line Road and Niskey Lake Road SW Pot Holes

18 County Line Road SW Signal Upgrade/Sidewalks

19 County Line Road SW (Campbellton to Niskey Lake) Sidewalks

20 Fairburn Road and Campbellton Road Sidewalks/Signal Upgrade/Resurfacing

21 Fairburn Road and Delmar Street Signal Upgrade/Signage

22 Fire Station 31 Fire Station

23 Herring Road Sidewalks

24 Hillside Baptist Sidewalks/Unpaved Road

25 Ingledale Drive SW Other / Drainage Pipe

26 King Arthur Road Other / Sewage

27 King's Forrest Community (Melvin and Fairburn) Resurfacing

28 Niskey Lake (Campbellton and Butner) Sidewalks 29 Wilson James Road SW Unpaved Road High Priority

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council. City of Atlanta Department of Public Works 55 Trinity Avenue, SW, Suite 4700 Atlanta, GA 30303 District 12 Local Project Priorities - $5.6M Funding Available per District ID Projects Type

1 3rd Street Roadway Construction

2 Beatie Avenue Roadway Construction

3 Cleveland Circle Roadway Construction

4 Harden Road Roadway Construction

5 Sparta Street Roadway Construction

6 Terrace View Circle Roadway Construction

7 Tibbs Road Roadway Construction

8 3rd Avenue SW Sidewalks

9 Aiken and Upshaw Street Resurfacing

10 Allen Avenue Sidewalks

11 Ashwood Avenue (Pryor Road to Interstate) Sidewalks

12 Belgarde Place SE 30354 Resurfacing

13 Bonnie Lane SE Resurfacing

14 Bridge on Springdale Road (near 2611 Springdale Road) Other

15 Brookline Street Sidewalks

16 Campbellton Road (1830 to 1721) Sidewalks

17 Emma McMillican Park Erosion

18 Fire Station 20 Fire Station

19 Garden Park at 1479 Athens Avenue Erosion

20 Gideon Elementary School Sidewalks/Signal Upgrade/Resurfacing/School Zone Flashers

21 Glenrose Cir SW 30354 Resurfacing

22 Glenway Drive and Springdale Road Sidewalks

23 Grand Avenue SW Sidewalks

24 Hipp Street and Joyland Sidewalks

25 Jonesboro Road and Macedonia Road Sidewalks/Signal Upgrade/Resurfacing

26 Langford Park Parks/Rec Center Upgrade

27 Lee Street Sidewalks/Signal Upgrade/Resurfacing

28 Metropolitan and Perkerson Flooding

29 Metropolitan and Whitehall Flooding

30 Metropolitan Parkway Resurfacing

31 Metropolitan Parkway ( Dill Avenue to Northside Drive) Resurfacing

32 Oak Drive SE 30315 Resurfacing

33 Perkerson and Sylvan Road Sidewalks

34 Perkerson Park Parks/Rec Center Upgrade

35 Southwest Atlanta Grass Cutting and Trash Removal Other

36 Sylvan Road (Deckner to Murphy) Resurfacing

37 Sylvan Road SW 30310 Resurfacing

38 Villages at Oakshire (Oakshire Way, Ardwick Court, Litherland Court, Little H Resurfacing

39 Ward Drive SW 30354 Resurfacing

40 Waters Road SE 30354 Resurfacing

41 Waynes Court SE 30354 Resurfacing 42 Whitehall Resurfacing

Attached hereto is a DRAFT listing of potential projects which may be funded from bond proceeds to be issued pursuant to the March 2015 bond referendum election. This list is preliminary and has been compiled from a master listing of all needed infrastructure improvements.im This preliminary listing is being presented in DRAFT form for discussion purposes only and not as an indication of intention that such list will be the final list within the meaning of O.C.G.A. 36-81-3(d). The final projects will be considered and approved by the City Council.