SHARAN VENTURE LLP

Form 1, Form 1(A) and Proposed ToR for Residential Project Moje: Tragad, Taluka: Ghatlodiya, District: , .

DECEMBER 2016

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

CONTENTS

1 SCOPING ...... 4

1.1 FORM – 1 ...... 4 1.2 FORM – 1(A) ...... 16

PAGE 2

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

LIST OF ANNEXURES

Annexure 1: Toposheet ...... 27

Annexure 2: Soil Analysis Report ...... 28

Annexure 3: Source of Water Supply, Sewer line connection and Solid Waste Management Permission Letter ...... 29

Annexure 4: NA documents, Land Possession document (7/12), TP scheme map and location of project on it, Zoning Certificate, Agreement between land owner and developer ...... 30

Annexure 5: Satellite Map...... 35

Annexure 6: Land Use Map...... 36

Annexure 7: Site Layout Plan ...... 37

Annexure 8: Water Balance and Water Balance Diagram ...... 38

Annexure 9: Storm Water Management Plan ...... 39

Annexure 10: Parking Details ...... 40

Annexure 11: Fire & Safety...... 41

Annexure 12: Environmental Management Plan ...... 42

PAGE 3

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

1 SCOPING

1.1 FORM – 1

The scoping for the project has been done based on FORM 1, as per EIA Notification, dated September 14, 2006 amended as on date. The scoping details are as follows:

I. Basic Information

S. Item Details No. 1 Name of the Project/s Proposed Residential Project 2 S. No. in the Schedule 8(a) Proposed capacity / area / length / Plot area – 5,038.00 m2 3 tonnage to be handled/ command area Built up area –21,682.12 m2 / lease area / no. of wells to be drilled 4 New / Expansion / Modernization New 5 Existing Capacity / Area etc. Not applicable 6 Category of Project (A or B) ‘B’ Does it attract the general conditions? 7 No If yes, please specify. Does it attract specific condition? If 8 No yes, please specify Location Tragad, Ahmedabad Sur. No. 284/1, F.P. No. 222, O.P. No. 222, Plot Survey / Khasra No. Draft D.T.P.S. No. 69 (-Tragad-Zundal) 9 Village Moje:Tragad Tehsil / Taluka / Mandal Ghatlodiya District Ahmedabad State Gujarat Railway Station is ~5.8 Km by road in Nearest railway station / airport / 10 SSE direction along with distance in km. Ahmedabad Airport is~8.1 Km in SE direction. Nearest town, city, district Proposed project developed in Ahmedabad Municipal 11 headquarters along with distances in Corporation kms Village Panchayat, Zilla Parishad, Municipal Corporation, Local Body Ahmedabad Municipal Corporation 12 (complete postal address with Danapith, Ahmedabad - 380001 telephone nos. to be given) r Name of the applicant Sharan Venture LLP Sharan Venture LLP 14 Registered address 359, SO-BO Center, South , Ahmedabad - 380058 Address for correspondence 15 Name Mr. Rajeshbhai Bambhroliya Designation Partner

PAGE 4

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

S. Item Details No. 2/2 Vaikunth Complex, Raspan Cross Road, New Address Colony Road, Nikol, Ahmedabad - 382350 Pin Code 382350

E-mail [email protected]

Telephone no. +91 9825411504 Fax no. - Details of alternative sites examined, if Location of Site shown on Topo sheet is given in 16 any. Location of these sites should be Annexure 1 shown on the Toposheet 17 Interlinked Projects No Whether separate application of 18 interlinked project has been No submitted? 19 If yes, date of submission - 20 If no, reason Individual project Whether the proposal involves approval / clearance under: if yes, details of the same and their status to 21 be given: No The Forest (Conservation) Act, 1980 The Wildlife (Protection) Act, 1972 The C.R.Z Notification, 1991 Whether there is any Government 22 order / policy, relevant / relating to the No site 23 Forest-land involved (ha.) No Whether there is any litigation pending against the project and / or land in which the project is proposed to be set up? 24 Name of the Court No litigation pending Case No. Order / directions of the Court, if any and its relevance with the proposed project

II. Activity 1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) with Confirmation /No source of information data

Permanent or temporary change in The project will partially change in land use, land 1.1 Yes land use, land cover or topography cover or topography with respect to local land use.

PAGE 5

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) with Confirmation /No source of information data including increase in intensity of land The project will be developed as per Ahmedabad use (with respect to local land use Municipal Corporation approved plan. The project plan) will be developed as a Residential Project.

Clearance of existing land, vegetation There are no trees existing at site 1.2 No and buildings?

The project is developed as Residential as per 1.3 Creation of new land uses? Yes Ahmedabad Municipal Corporation Pre-construction investigations e.g. The soil was tested before construction. The soil 1.4 Yes bore houses, soil testing? report is attached vide Annexure 2 There will be construction of Residential Flats with 1.5 Construction works? Yes One level of Basement for Parking. (Total – 149 Flats) 1.6 Demolition works? No Not applicable Temporary sites used for construction Labors will hired from nearby local market. So 1.7 works or housing of construction No temporary sites will not require. workers? Above ground buildings, structures or There is a construction of G + 7 floors and One 1.8 earthworks including linear structures, Yes level of Basement cut and fill or excavations Underground works including mining One level of basement 1.9 Yes or tunneling? 1.10 Reclamation works? No Not applicable 1.11 Dredging? No Not applicable Production and manufacturing Not applicable 1.13 No processes? Construction Phase : It is envisaged that common warehouses / stockyards would be constructed to enable centrally Facilities for storage of goods or coordinated bulk storage of construction materials. 1.14 Yes materials? This would ensure planned movement within the project site during transport of materials thereby optimizing the construction material transport related trips. Solid Wastes: Solid waste generated in Project area will be mainly of domestic nature. The 30 kg/day (Construction Phase) and 0.5 Tone/day (Operation phase) of solid wastes generated will Facilities for treatment or disposal of 1.15 Yes be segregated into biodegradable and non- solid waste or liquid effluents? biodegradable wastes and collected in separate bins. The biodegradable waste will be collected in Green bins and will be disposed nearby municipal bins. Non-biodegradable (Recyclable) waste will

PAGE 6

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) with Confirmation /No source of information data be collected in White bins and sold to Vendors as per Municipal Solid Waste (Management and Handling) Rules, 2000. Waste from such bins will be collected separately on daily basis. Liquid Effluent: Wastewater generated (73.67 KLD) phase will be disposed into AMC sewer line. Facilities for long-term housing of Construction workers will be hired from near local 1.16 No operational workers? market. So housing facility will not be required. New road, rail or sea traffic during Not applicable 1.17 No construction or operation? New road, rail, air waterborne or other Not applicable transport infrastructure including new 1.18 No or altered routes and stations, ports, airports etc? Closure or diversion of existing Not applicable transport routes or infrastructure 1.19 No leading to changes in traffic movements? New or diverted transmission lines or Not applicable 1.20 No pipelines? Impoundment, damming, culverting, Not Applicable 1.21 realignment or other changes to the No hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable Abstraction or transfers of water from Not applicable 1.23 Yes ground or surface waters?  Construction Phase: During construction phase fresh water requirement 16.25 KLD will be met through tankers Changes in water bodies or the land  Operation Phase: 1.24 No surface affecting drainage or run-off? During operational phase fresh water requirement of 94.10 KLD will be met through Ahmedabad Municipal Corporation. Permission letter is attached vide Annexure 3

Transport of personnel or materials for Transport of personnel and materials will be 1.25 construction, operation or Yes required for both construction and operation decommissioning? phases. Long-term dismantling or Not applicable 1.26 No decommissioning or restoration works? Ongoing activity during Not applicable 1.27 decommissioning which could have an No impact on the environment? 1.28 Influx of people to an area either Yes Construction Phase:

PAGE 7

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) with Confirmation /No source of information data temporarily or permanently? About 150 workers will be transported to the site. Construction material will be brought to site in bulk. Operation Phase: About 671 residents will stay inside project premises. About 100 Visitors will influx during operation phase. 1.29 Introduction of alien species? No Not applicable Loss of native species or genetic Not applicable 1.30 No diversity? 1.31 Any other actions? No Not applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Details thereof (with approximate quantities / S. Information/Checklist Yes rates, wherever possible) with source of No. confirmation /No information data Presently the land is undeveloped. NA documents Land especially undeveloped or 2.1 No ,land possession documents, 7/12, Partplan and agricultural land (ha) zoning certificate are attached vide Annexure 4 Water demand will be as follows: Construction Phase: Maximum Quantity: 16.25 KLD Water (expected source & competing 2.2 Yes Source : Tankers users) unit: KLD Operational Phase: Maximum Fresh water Quantity: 94.10 KLD Source: Ahmedabad Municipal Corporation 2.3 Minerals (MT) No Not Applicable Construction materials such as stone, cement, sand, bricks, aggregate, glass, decorative stones, wood, paints, tiles, electrical, sanitary and plumbing fixtures, etc. will be used. All the above materials are purchased from local markets and nearest approved quarries. They will be Construction material stone, transported to site as and when required. They will 2.4 aggregates, sand / soil (expected Yes be stored temporarily at site. source, MT) Approximate Quantity: SN Material Quantity 1. Steel (MT) 1450 2. Cement (Bags) 91400 Stone Aggregate 3. (m3) 9600 4. Sand (m3) 1050 5. Bricks (m3) 550

PAGE 8

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

Details thereof (with approximate quantities / S. Information/Checklist Yes rates, wherever possible) with source of No. confirmation /No information data

6. Glass (m2) 2300 Fly Ash Based 7. Products (m3) 1500

2.5 Forests and timber (source, MT) No Not Applicable Source: Torrent Power Energy including electricity and fuels Expected Demand: 800 KVA 2.6 (source, competing users) unit: fuel Yes D.G Sets: 1 x 125 KVA in case of power failure (MT), energy (MW) (dedicated to fire only) Fuel: HSD, 25 l/hr Any other natural resources (use 2.7 No Not Applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approximate Information / Checklist Yes S. No. quantities / rates, wherever possible) confirmation /No with source of information data Use of substances or materials, which are hazardous (as per MSIHC rules) to 3.1 Yes Only HSD will be stored at site for D.G Sets. human health or the environment (flora, fauna, and water supplies) Suitable drainage and waste management measures will be adopted during both Changes in occurrence of disease or construction and operational phase, which will 3.2 affect disease vectors (e.g. insect or No restrict stagnation of water or accumulation of water borne diseases) waste. This will effectively restrict the growth and reproduction of disease vectors.

Affect the welfare of people e.g. by 3.3 Yes It will increase the standard of living of people changing living conditions?

Vulnerable groups of people who could be affected by the project e.g. 3.4 No Not Applicable hospital patients, children, the elderly etc., 3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) confirmation /No with source of information data Excavated surplus earth will be refilled to 4.1 Soil, overburden or mine wastes Yes maintain desirable slope in the project premise. The top soil will be used in Green belt because

PAGE 9

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) confirmation /No with source of information data of its high humus content. The municipal solid wastes generated during operation phase will consist of

Food Waste, kitchen refuse, Organic flowers, dried leaves, paper, Waste fruits, etc.

Plastic, tapes, wrappers, cardboard, packaging Inorganic material, thermocol, Waste aluminium foils, glass, Municipal waste (domestic and or ceramic, rubber, tins, etc. 4.2 Yes commercial wastes) Solid waste storage locations will be incorporated in the design itself. Adequate independent collection bins for waste will be provided as per Municipal Solid Waste (Management and Handling) Rules, 2008. The waste will be segregated and collected daily. The approximate quantity of solid wastes generated will be approximately 0.5 Tone/Day. Recyclable waste will be given to recyclers. The biodegradable waste will be disposed off in municipal bins. Only used oil (Category 5.1) will be generated Hazardous wastes (as per Hazardous 4.3 Yes and collected and will be handed over to Waste Management Rules) authorized recyclers. 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable Sewage sludge or other sludge from 4.6 No Not Applicable effluent treatment The construction waste consists of construction debris along with cement bags, steel in bits and pieces, insulating and packaging materials, etc. 4.7 Construction or demolition wastes Yes Empty cement bags, waste paper and cardboard, etc are sold to recyclers. Unusable steel scrap is also collected at site and sold to recyclers. 4.8 Redundant machinery or equipment No Not Applicable 4.9 Contaminated soils or other materials No Not Applicable 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No Not Applicable

PAGE 10

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

5. Release of pollutants or any hazardous, toxic or noxious substances to air(kg/hr)

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) confirmation /No with source of information data Emissions from combustion of fossil Emission from combustion of fossil fuels from 5.1 fuels from stationary or mobile Yes mobile sources only. E.g. Cars, bikes, etc. sources 5.2 Emissions from production processes No Not Applicable At the time of transportation, dust may be generated but it will be restricted to the Emissions from materials handling 5.3 Yes construction phase and to the construction site including storage or transport only. For minimizing the dust transfer, a 5 m tall peripheral barrier will be provided. At the time of transportation & construction, Emissions from construction activities 5.4 Yes dust may be generated. Water sprinkling will be including plant and equipment carried out in that case, to minimize the dust. Construction Phase: Dust could be generated during construction activity. Water sprinkling will be carried out to minimize dust. During the construction phase, Dust or odours from handling of sewage will be disposed in Septic tank and 5.5 materials including construction Yes soak pit. Temporary solid waste storage will materials, sewage and waste also be provided at site with covered lids. Operation Phase: During the operational phase, sewage will be collected and disposed into AMC sewer line. 5.6 Emissions from incineration of waste No Not Applicable Emissions from burning of waste in 5.7 open air (e.g. slash materials, No Not Applicable construction debris) 5.8 Emissions from any other sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) confirmation /No with source of information data During construction, the machineries used for construction will be of high quality and efficiency. These quality standards will ensure lesser noise and air emissions. From operation of equipment e.g. 6.1 Yes Hence, care will be taken to minimize noise engines, ventilation plant, crushers impacts due to construction machinery. Apart from this, the construction activities which are likely to generate noise will be restricted to daytime only. 6.2 From industrial or similar processes No Not applicable

PAGE 11

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) confirmation /No with source of information data Due to various construction activities, there may 6.3 From construction or demolition Yes be short-term noise impacts in the immediate vicinity of the project site. 6.4 From blasting or piling No Not applicable During the construction phase, noise may be generated due to construction activity but it will From construction or operational 6.5 Yes be for short term only. traffic During the operational phase, minor noise will be generated due to traffic. 6.6 From lighting or cooling systems No Not applicable. 6.7 From any other sources No Not applicable.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) confirmation /No with source of information data

From handling, storage, use or 7.1 No Not Applicable spillage of hazardous materials

From discharge of sewage or other effluents to water or the land The wastewater will be collected and disposed 7.2 No (expected mode and place of into AMC sewer line. discharge) By deposition of pollutants emitted to 7.3 No Not Applicable air into the land or into water 7.4 From any other sources No Not Applicable Is there a risk of long term buildup of 7.5 pollutants in the environment from No Not Applicable these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) confirmation /No with source of information data From explosions, spillages, fires etc 8.1 from storage, handling, use or No Not Applicable production of hazardous substances During Construction phase(for further construction) there may be possibilities of accidents, fall from height, from scaffold and 8.2 From any other causes Yes temporary stairs, Cut or Burn injuries during cutting and welding activities, and electrocution during electrical fitting works.

PAGE 12

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

Details thereof (with approximate Information/Checklist Yes S. No. quantities / rates, wherever possible) confirmation /No with source of information data During operation phase may be possibility of accidents due to electrical fire hazard may occur. Project area is categorized in the seismic zone Could the project be affected by III, which is classified as having a moderate natural disasters causing environmental 8.3 Yes seismic intensity. The structure design is as per damage e.g. floods, earthquakes, Codes to negate the threat of environmental landslides, cloudburst etc)? and other damages.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate Information/Checklist Yes S. No. quantities/ rates, wherever possible) with confirmation /No source of information data

Lead to development of supporting Facilities, ancillary development or development stimulated by the project which could have impact on the The project site falls within AMC, therefore, any 9.1 environment e.g.: supporting Yes further development of infrastructure will not be infrastructure (roads, power supply, needed. waste or waste water treatment, etc.) housing development extractive industries supply industries, (other) Lead to after-use of the site, which Negligible increase in traffic and there will be 9.2 could have an impact on the Yes positive impact on socio- economic environment environment. The project will lead to development of flats, 9.3 Set a precedent for later developments Yes which will improve living standard in locality. Have cumulative effects due to 9.4 proximity to other existing or planned Yes As Above projects with similar effects

III. Environmental Sensitivity

S. Name / Aerial Distance (within 15 km) of the Areas No. Identity proposed project location boundary

Areas protected under international Not applicable conventions, national or local 1 legislation for their ecological, No landscape, cultural or other related value Areas which are important or Sabarmati river is ~5.3 km in SE direction sensitive for ecological reasons - 2 Yes Wetlands, watercourses or other water bodies, coastal zone,

PAGE 13

PROPOSED RESIDENTIAL PROJECT AT SHARAN VENTURE LLP TRAGAD, AHMEDABAD,GUJARAT SCOPING – FORM 1

S. Name / Aerial Distance (within 15 km) of the Areas No. Identity proposed project location boundary

biospheres, mountains, forests

Areas used by protected, important Not applicable or sensitive species of flora or fauna 3 No for breeding, nesting, foraging, resting, over wintering, migration Inland, coastal, marine or Not applicable 4 No underground waters 5 State, National boundaries No Not applicable Ahmedabad Airport is ~8.1 Km in SE direction Routes or facilities used by the Sabarmati Railway Station is ~ 5.8 Km in SSE 6 public for access to recreation or Yes direction other tourist, pilgrim areas SP Ring Road ~0.9 km in N direction 7 Defense installations No Not applicable 8 Densely populated or built-up area Yes Ahmedabad City

Areas occupied by sensitive man- Satyamev Hospital is ~1.6 Km in ESE direction

made land uses (hospitals, schools, 9 Yes places of worship, community Nirma University is ~1.9 km in WNW direction facilities) Areas containing important, high Not applicable quality or scarce resources (ground 10 water resources, surface resources, No forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution GIDC is ~10.5 Km in SE direction or environmental damage. (Those 11 Yes where existing legal environmental standards are exceeded) Areas susceptible to natural hazard Project area is categorized in the seismic zone III, which could cause the project to which is classified as having a moderate seismic present environmental problems intensity. The structure Design is as per Codes to 12 (earthquakes, subsidence, Yes negate the threat of environmental and other landslides, erosion, flooding or damages. extreme or adverse climatic conditions)