© [Regd. No. TN/CCN/467/2012-14. GOVERNMENT OF [R. Dis. No. 197/2009. 2019 [Price : Rs. 3.20 Paise. TAMIL NADU GOVERNMENT GAZETTE

PUBLISHED BY AUTHORITY

No. 24] CHENNAI, WEDNESDAY, JUNE 12, 2019 Vaikasi 29, Vikari, Thiruvalluvar Aandu–2050 Part VI—Section 3(b) Notifications issued by Quasi - Government bodies and Public Sector undertakings.

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

CONTENTS

Pages. TAMIL NADU TRANSMISSION CORPORATION GENERAL CONSTRUCTION CIRCLE/SALEM 30-31 Erection of proposed EHT Line to meet out the Additional Demand for the year 2018-19 and Subsequent Years. Published as per Sections 164 and 168 of Electricity Act (2003) ...... 42-47 UNIVERSITY AUTHORITIES BHARATHIDASAN UNIVERSITY PALKALAIPERUR, TIRUCHIRAPPALLI-620 024 Election to the Senate ...... 47-48

DTP—VI-3(b) (24)—1 [ 41 ] 42 TAMIL NADU GOVERNMENT GAZETTE [Part VI—Sec.3(b)

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

TAMIL NADU TRANSMISSION CORPORATION GENERAL CONSTRUCTION CIRCLE/SALEM Erection of proposed EHT Line to meet out the Additional Demand for the year 2018-19 and Subsequent Years. Published as per Sections 164 and 168 of Electricity Act (2003) (Lr.No.SE/GCC/SLM/AEE/GL/HD/F.Press/D.809/2019.) No.VI-3(b)/15/2019.

It is hereby notifi ed that the following transmission line is proposed to be constructed during the year 2018-2019 and subsequent year for which sanction has been accorded by the TANTRANSCO for augmenting the power supply.

Authority Estimate (Per.) FB Sl. cost in TANTRANSCO No Details of EHT lines Lakhs Salient features Benefi ts Proceedings Rs. No. (1) (2) (3) (4) (5) (6) 1 Erection of 110 KV DC line on DC No.71, 468.370 For a route length of 7.0 To improve the towers by making LILO of the existing dt.24.04.2018 Kms passing through transmission 110 KV Pudansanthai – Namagiripet Pudansanthai, namagiripet, network. feeder at the proposed Mangalapuram Mangalapuram and nearby 110 KV SS. Villages. 2 Erection of 230 KV SC line on DC No.50, 3936.68 For a route length of 46.00 To improve the tower with zebra conductor from dt.03.08.2018. Kms passing through transmission 400/230 KV SS to the Thiruvalam, Sathumadurai network proposed Sathumadurai 230 KV SS and nearby Villages. 3 Erection of 230 KV SC line on DC No.50, 6247.34 For a route length To improve the tower with zebra conductor from dt.03.08.2018. of 73 Kms passing transmission Vinnamangalam 230 KV SS to through Vinnamangalam, network proposed Sathumadurai 230 KV SS Sathumadurai and nearby Villages. 4 Erection of 110 KV SC line on DC No.50, 2022.045 For a route length of 1.00 To improve the tower with panther conductor from dt.03.08.2018 Kms passing through transmission proposed Sathumadurai 230 KV SS to Kilpallipattu, Sathumadurai network Kilpallipattu 110 KV SS and nearby Villages. 5 Erection of 110 KV SC line on DC No.50, For a route length of 1.00 To improve the tower with panther conductor from dt.03.08.2018 Kms passing through transmission proposed Sathumadurai 230 KV SS to Thorapadi, Sathumadurai network Thorapadi 110 KV SS. and nearby Villages. 6 Erection of 110 KV SC line on DC No.50, For a route length of 1.00 To improve the tower with panther conductor from dt.03.08.2018 Kms passing through transmission proposed Sathumadurai 230 KV SS to Sathumadurai and nearby network Sathumadurai 110 KV SS. Villages.

7 Erection of 110 KV SC line on DC No.50, For a route length of 22.00 To improve the tower with panther conductor from dt.03.08.2018 Kms passing through transmission proposed Sathumadurai 230 KV SS to Sathumadurai and nearby network. 110 KV SS. Villages. 8 Erection of 110 KV SC line on DC No.50, For a route length of 9.5 To improve the tower with panther conductor from dt.03.08.2018 Kms passing through transmission proposed Sathumadurai 230 KV SS to Sathumadurai and nearby network 110 KV SS. Villages. June 12, 2019] TAMIL NADU GOVERNMENT GAZETTE 43

Authority Estimate (Per.) FB Sl. cost in TANTRANSCO No Details of EHT lines Lakhs Salient features Benefi ts Proceedings Rs. No. (1) (2) (3) (4) (5) (6) 9 Erection of 110 KV DC line on DC No.149, 529.840 For a route length of 8.00 To improve the tower for making LILO in the existing dt.27.09.2018 Kms passing through Arani, transmission 110 KV Arani – , feeder Kaveripakkam, Kalavai and network at the proposed 110 KV SS at Kalavai nearby Villages. 10 Erection of 230 KV 4 circuit line on No.161, 591.21 For a route length of To improve the multi circuit tower with stringing of dt.23.10.2018. 3.395 Kms passing through transmission 110 KV SC line on one of arm with Uddanapally and nearby network panther conductor from Uddanapally Villages. 110 KV SS to Loc.100 (Irudhalam) 11 Stringing of 110 KV SC line on existing No.161, 66.00 For a route length of To improve the 110 KV Hosur – Kempatty DC tower dt.23.10.2018. 9.205 Kms passing through transmission with panther conductor Hosur and Kempatty and network nearby Villages. 12 Erection of 230 KV DC line on DC No.03, 818.32 For a route length of To improve the towers with zebra conductor from dt.10.01.2019. 8 Kms passing through transmission the proposed Nallur 230 KV SS for K.R.Thoppur, Pugular and network making LILO of 230 KV K.R.Thoppur – nearby Villages. Pugular feeder 13 Erection of 230 KV DC line on DC No.03, 6137.40 For a route length of To improve the towers with zebra conductor from dt.10.01.2019. 60 Kms passing through transmission the proposed Nallur 230 KV SS for K.Paramathi, Valayapatty network making LILO of 230 KV K.Paramathi - and nearby Villages. Valayapatty feeder 14 Erection of 110 KV DC line on DC No.03, 1324.60 For a route length of To improve the towers with panther conductor for dt.10.01.2019. 20 Kms passing through transmission making LILO of 110 KV Tiruchengode – Tiruchengode and nearby network BKB II feeder at the proposed Nallur Villages. 230 KV SS 15 Conversion of the existing 110 KV No.03, 1407.7 For a route length of To improve the SC line on SC towers with Leopard dt.10.01.2019. 24.06 Kms passing through transmission conductor of the Nallur spur line of Pudhanchandai, Namakkal, network 110 KV Pudhanchandai – Namakkal – Thatchankurichy and Thatchankurichy feeder in to 110 KV nearby Villages. SC line on DC towers with panther conductor 16 Stringing of 110 KV SC line with No.03, 82.80 For a route length of To improve the panther conductor on the free arm dt.10.01.2019. 8 Kms passing through transmission of the existing DC towers of 110 Pudhanchandai, Namakkal, network Pudhansanthai – Namakkal feeder Nallur and nearby Villages. from tapping location of Nallur spur line towards Pudhansanthai 230 KV SS 17 Erection of 110 KV SC line on DC No.03, 233.96 For a route length of To improve the towers up to Pudhansanthai 230 KV dt.10.01.2019. 4 Kms passing through transmission SS from Loc.No.01 of Pudhansanthai – Pudhansanthai and nearby network Namakkal feeder Villages.

DTP—VI-3(b) (24)—1a 44 TAMIL NADU GOVERNMENT GAZETTE [Part VI—Sec.3(b)

Authority Estimate (Per.) FB Sl. cost in TANTRANSCO No Details of EHT lines Lakhs Salient features Benefi ts Proceedings Rs. No. (1) (2) (3) (4) (5) (6) 18 Erection of 110 KV DC line on DC No.03, 397.38 For a route length of To improve the towers with panther conductor for dt.10.01.2019. 6 Kms passing through transmission making LILO of Nallur spur line of 110 Pudhanchandai, Namakkal, network Pudhansanthai – Namakkal feeder at Elanagar and nearby the existing Elanagar 110 KV SS Villages.

19 Erection of 110 KV SC line on DC No.03, 29.25 For a route length of To improve the towers with panther conductor from dt.10.01.2019. 0.5 Kms passing through transmission the proposed 230 KV SS to the existing Nallur and nearby Villages. network Nallur 110 KV SS 20 Erection of 110 KV DC line on DC No.175, 993.450 For a route length of To improve the towers with panther conductor for dt.15.12.2018. 15 Kms passing through transmission a distance of 15.0 Kms for making K.R.Thoppur and nearby network LILO of the existing 110 KV Villages. K.R.Thoppur – Barrage II feeder at the proposed Adaiyur 110 KV SS.

The Notifi cation is published for General Information of the Public. If any objection regarding the above schemes this may be appealed to the undersigned within two months from the date of issue of this publication as per Section 164 and 168 of the Electricity Act, 2003.

E. G. GNANA BETHSHEBA, Salem-14, Superintending Engineer, 6th June 2019. General Construction Circle.

îI›ï£´ I¡ªî£ìó¬ñŠ¹‚ èöè‹ ªð£¶ 膴ñ£ù õ†ì‹ - «êô‹ ÜPM‚¬è

(Lr.No.SE/GCC/SLM/AEE/GL/HD/F.Press/D.809/2019.) 2018-2019 ñŸÁ‹ Ü´ˆî ݇´èO™ GÁõ Þ¼‚°‹ I¡ð£¬îèœ ðŸPò ÞšõP‚¬è 2003-‹ ݇´ I¡ê£ó ê†ìŠ HK¾ 164 ñŸÁ‹ 168¡ W› ªð£¶ñ‚èO¡ 𣘬õ‚è£è ªõOJìŠð´Aø¶. Ã´î™ I¡ ܬñŠ¬ð G¬ø¾ ªêŒõîŸè£è¾‹ I¡ Ü¿ˆîˆ¬î Yó£‚辋 I¡ Þ¬öŠ¬ð °¬øŠðîŸè£è¾‹ W›è‡ì ÞìƒèO™ I¡ð£¬îè¬÷ 2018-2019Ý‹ ݇´ ñŸÁ‹ Ü´ˆî ݇´èO™ GÁ¾õîŸè£è îI›ï£´ I¡ê£ó õ£Kò‹ / îI›ï£´ I¡ªî£ìó¬ñŠ¹‚ èöè‹ åŠ¹î™ õöƒA»œ÷¶.

ªñ£ˆî I¡õ£Kò õ ñFŠd´ àòó¿ˆî I¡ð£¬î Mõó‹ G¬ô(FB) º‚Aò Ü‹êƒèœ ðò¡èœ â‡. Þô†ê‹ ݬí â‡. Ï.

(1) (2) (3) (4) (5) (6)

1. ñƒè÷¹ó‹ 110 «èM ¶¬í I¡ â‡.71 468.370 7.00 A e Éó‹ ñƒè÷¹ó‹ I¡ ªî£ì˜ G¬ôò‹ GÁ¾õ Þó†¬ì : 110 «èM ¶¬í I¡ ܬñŠ¬ð ²ŸÁ I¡ ð£¬î¬ò Þó†¬ì ²ŸÁ‚ 24.04.2018 G¬ôòˆFL¼‰¶ ¹î¡ ê‰¬î «ñ‹ð´ˆî «è£¹óƒèO™ àœ ªõOŠð£¬îò£è - ï£ñAKŠ«ð†¬ì dì˜ õ¬ó ðò¡ð´‹. ãŸèù«õ àœ÷ 110 A «õ£ ¹î¡ ñŸÁ‹ ܼA½œ÷ Aó£ñƒèœ ꉬî - ï£ñAKŠ«ð†¬ì dìK™ õNò£è ܬñˆî™ è‹H ܬñˆî™ June 12, 2019] TAMIL NADU GOVERNMENT GAZETTE 45

ªñ£ˆî I¡õ£Kò õ ñFŠd´ àòó¿ˆî I¡ð£¬î Mõó‹ G¬ô(FB) º‚Aò Ü‹êƒèœ ðò¡èœ â‡. Þô†ê‹ ݬí â‡. Ï.

(1) (2) (3) (4) (5) (6)

2. ꣈¶ñ¶¬ó 230 «èM ¶¬í I¡ â‡.50 3936.68 46 A e Éó‹ ꣈¶ñ¶¬ó I¡ ªî£ì˜ G¬ôò‹ GÁ¾õ F¼õô‹ : 230 «èM ¶¬í I¡ ܬñŠ¬ð 400/230 A «õ£ ¶¬í I¡ 03.08.2018 G¬ôòˆF™ Þ¼‰¶ F¼õô‹ «ñ‹ð´ˆî G¬ôòˆFL¼‰¶ 埬ø ²ŸÁ õ¬ó ñŸÁ‹ ܼA½œ÷ ðò¡ð´‹. I¡ ð£¬î¬ò Þó†¬ì ²ŸÁ I¡ Aó£ñƒèœ õNò£è ܬñˆî™ «è£¹óƒèO™ àœ ªõOŠð£¬îò£è «ð‰î˜ è‹H ܬñˆî™

3. ꣈¶ñ¶¬ó 230 «èM ¶¬í I¡ â‡.50 6247.34 73 A e Éó‹ ꣈¶ñ¶¬ó 230 I¡ ªî£ì˜ G¬ôòˆFL¼‰¶ M‡íñƒè÷‹  : «èM ¶¬í I¡ G¬ôòˆF™ ܬñŠ¬ð 230 A «õ£ ¶¬í I¡ G¬ôò‹ õ¬ó 03.08.2018 Þ¼‰¶ M‡íñƒè÷‹ õ¬ó «ñ‹ð´ˆî àœ÷ 埬ø ²ŸÁ I¡ ð£¬î¬ò ñŸÁ‹ ܼA½œ÷ Aó£ñƒèœ ðò¡ð´‹. Þó†¬ì ²ŸÁ I¡ «è£¹óƒèO™ õNò£è ܬñˆî™ «ð‰î˜ è‹H ܬñˆî™

4. ꣈¶ñ¶¬ó 230 «èM ¶¬í I¡ â‡.50 2022.045 1.00 A e Éó‹ ꣈¶ñ¶¬ó I¡ ªî£ì˜ G¬ôòˆFL¼‰¶ W›ðœOŠð†´  : 230 «èM ¶¬í I¡ ܬñŠ¬ð 110 A «õ£ ¶¬í I¡ G¬ôò‹ 03.08.2018 G¬ôòˆF™ Þ¼‰¶ «ñ‹ð´ˆî õ¬ó 埬ø ²ŸÁ I¡ ð£¬î¬ò W›ðœOŠð†´ õ¬ó ñŸÁ‹ ðò¡ð´‹. Þó†¬ì ²ŸÁ I¡ «è£¹óƒèO™ ܼA½œ÷ Aó£ñƒèœ «ð‰î˜ è‹H ܬñˆî™ õNò£è ܬñˆî™

5. ꣈¶ñ¶¬ó 230 «èM ¶¬í I¡ â‡.50 1.00 A e Éó‹ ꣈¶ñ¶¬ó I¡ ªî£ì˜ G¬ôòˆFL¼‰¶ ªî£óŠð£® 110  : 230 «èM ¶¬í I¡ ܬñŠ¬ð A «õ£ ¶¬í I¡ G¬ôò‹ õ¬ó 03.08.2018 G¬ôòˆF™ Þ¼‰¶ «ñ‹ð´ˆî àœ÷ 埬ø ²ŸÁ I¡ ð£¬î¬ò ꣈¶ñ¶¬ó õ¬ó ñŸÁ‹ ðò¡ð´‹. Þó†¬ì ²ŸÁ I¡ «è£¹óƒèO™ ܼA½œ÷ Aó£ñƒèœ «ð‰î˜ è‹H ܬñˆî™ õNò£è ܬñˆî™

6. ꣈¶ñ¶¬ó 230 «èM ¶¬í I¡ â‡.50 1.00 A e Éó‹ ꣈¶ñ¶¬ó I¡ ªî£ì˜ G¬ôòˆFL¼‰¶ ꣈¶ñ¶¬ó 110  : 230 «èM ¶¬í I¡ ܬñŠ¬ð A «õ£ ¶¬í I¡ G¬ôò‹ õ¬ó 03.08.2018 G¬ôòˆF™ Þ¼‰¶ «ñ‹ð´ˆî àœ÷ 埬ø ²ŸÁ I¡ ð£¬î¬ò ꣈¶ñ¶¬ó 110 «èM õ¬ó ðò¡ð´‹. Þó†¬ì ²ŸÁ I¡ «è£¹óƒèO™ ñŸÁ‹ ܼA½œ÷ Aó£ñƒèœ «ð‰î˜ è‹H ܬñˆî™ õNò£è ܬñˆî™ 7. ꣈¶ñ¶¬ó 230 «èM ¶¬í I¡ â‡.50 22.00 A e Éó‹ ꣈¶ñ¶¬ó I¡ ªî£ì˜ G¬ôòˆFL¼‰¶ ܬí‚膴 110  : 230 «èM ¶¬í I¡ ܬñŠ¬ð A «õ£ ¶¬í I¡ G¬ôò‹ õ¬ó 03.08.2018 G¬ôòˆF™ Þ¼‰¶ «ñ‹ð´ˆî àœ÷ 埬ø ²ŸÁ I¡ ð£¬î¬ò ܬí‚膴 õ¬ó ñŸÁ‹ ðò¡ð´‹. Þó†¬ì ²ŸÁ I¡ «è£¹óƒèO™ ܼA½œ÷ Aó£ñƒèœ «ð‰î˜ è‹H ܬñˆî™ õNò£è ܬñˆî™ 8. ꣈¶ñ¶¬ó 230 «èM ¶¬í I¡ â‡.50 22.00 A e Éó‹ ꣈¶ñ¶¬ó I¡ ªî£ì˜ G¬ôòˆFL¼‰¶ «õÖ˜ 110 A  : 230 «èM ¶¬í I¡ ܬñŠ¬ð «õ£ ¶¬í I¡ G¬ôò‹ õ¬ó 03.08.2018 G¬ôòˆF™ Þ¼‰¶ «õÖ˜ «ñ‹ð´ˆî àœ÷ 埬ø ²ŸÁ I¡ ð£¬î¬ò õ¬ó ñŸÁ‹ ܼA½œ÷ ðò¡ð´‹. Þó†¬ì ²ŸÁ I¡ «è£¹óƒèO™ Aó£ñƒèœ õNò£è ܬñˆî™ «ð‰î˜ è‹H ܬñˆî™ 9. àœ ªõOŠð£¬îò£è ãŸèù«õ â‡.149 529.840 8.00 A e Éó‹ ÝóE 110 I¡ ªî£ì˜ àœ÷ ÝóE- 裫õKð£‚è‹ ï£œ : «èM ¶¬í I¡ G¬ôòˆF™ ܬñŠ¬ð dìK™ ܬñò Þ¼‚°‹ èô¬õ 110 27.09.2018 Þ¼‰¶ 裫õKð£‚è‹ «ñ‹ð´ˆî «èM ¶¬í I¡ G¬ôòˆFŸ° 110 dì˜ õ¬ó ñŸÁ‹ èô¬õ ðò¡ð´‹. «èM Þó†¬ì ²ŸÁ I¡ ð£¬î¬ò ܼA½œ÷ Aó£ñƒèœ Þó†¬ì ²ŸÁ I¡ «è£¹óƒèO™ õNò£è ܬñˆî™ GÁ¾î™ 46 TAMIL NADU GOVERNMENT GAZETTE [Part VI—Sec.3(b)

ªñ£ˆî I¡õ£Kò õ ñFŠd´ àòó¿ˆî I¡ð£¬î Mõó‹ G¬ô(FB) º‚Aò Ü‹êƒèœ ðò¡èœ â‡. Þô†ê‹ ݬí â‡. Ï.

(1) (2) (3) (4) (5) (6)

10 ñ™® ꘂAΆ ìõ˜ ( 4 ꘂAΆ â‡.161 591.21 3.395 A e Éó‹ I¡ ªî£ì˜ ìõ˜) 3.395 A.e ÉóˆFŸ° 110  : àˆîíŠðœO 110 «èM ܬñŠ¬ð «èM 埬ø ²ŸP™ «ð‰î˜ è‹H¬ò 23.10.2018 ¶¬í I¡ G¬ôòˆF™ «ñ‹ð´ˆî àˆîíŠðœO 110 «èM ¶¬í I¡ Þ¼‰¶ Þ¼î÷‹ õ¬ó ñŸÁ‹ ðò¡ð´‹. G¬ôòˆFL¼‰¶ «è£¹ó â‡.100 ܼA½œ÷ Aó£ñƒèœ (Þ¼î÷‹) ñ™® ꘂAΆ ݘI™ õNò£è ܬñˆî™ è‹H¬ò ܬñˆî™

11 110 «èM 埬ø ²ŸÁ I¡ â‡.161 66.00 9.205 A e Éó‹ æŘ 110 I¡ ªî£ì˜ ð£¬îJ™ ãŸèù«õ àœ÷ 110 «èM  : «èM ¶¬í I¡ G¬ôòˆF™ ܬñŠ¬ð æŘ - ªè‹ð†® Þó†¬ì ²ŸÁ I¡ 23.10.2018 Þ¼‰¶ Þ¼î÷‹ õ¬ó ñŸÁ‹ «ñ‹ð´ˆî «è£óƒèO™ «ð‰î˜ è‹H ܬñˆî™ ܼA½œ÷ Aó£ñƒèœ ðò¡ð´‹. õNò£è ܬñˆî™

12 230 «èM «è.ݘ «î£ŠÌ˜ â‡.03 818.32 8.00 A e Éó‹ «è.ݘ I¡ ªî£ì˜ dìKL¼‰¶ - ¹èÙ˜ dìK™  : «î£ŠÌ˜ 230 «èM ¶¬í ܬñŠ¬ð ܬñòM¼‚°‹ ï™Ö˜ 230 «èM 10.01.2019 I¡ G¬ôòˆFL¼‰¶ «ñ‹ð´ˆî ¶¬í I¡ G¬ôòˆFŸ° àœ ¹èÙ˜ õ¬ó ñŸÁ‹ ï™Ö˜ ðò¡ð´‹ ªõOŠð£¬îò£è 230 «èM Þó†¬ì ܼA½œ÷ Aó£ñƒèœ ²ŸÁ I¡ ð£¬î¬ò Þó†¬ì ²ŸÁ õNò£è ܬñˆî™ I¡ «è£¹óƒèO™ pŠó£ è‹H ܬñˆî™

13 230 «èM «è.ðóñˆF dìKL¼‰¶ - â‡.03 6137.40 60.00 A e Éó‹ «è.ðóñˆF I¡ ªî£ì˜ õ¬÷òŠð†® dìK™ ܬñòM¼‚°‹  : 230 «èM ¶¬í I¡ ܬñŠ¬ð ï™Ö˜ 230 «èM ¶¬í I¡ 10.01.2019 G¬ôòˆF™ Þ¼‰¶ «ñ‹ð´ˆî G¬ôòˆFŸ° àœ ªõOŠð£¬î¬ò õ¬÷òŠð†® õ¬ó ï™Ö˜ ðò¡ð´‹ Þó†¬ì ²ŸÁ I¡ «è£¹óƒèO™ ñŸÁ‹ ܼA½œ÷ Aó£ñƒèœ pŠó£ è‹H ܬñˆî™ õNò£è ܬñˆî™

14 230 «èM F¼„ªêƒ«è£´ â‡.03 1324.60 20.00 A e Éó‹ I¡ ªî£ì˜ dìKL¼‰¶ - H«èH - 2 dìK™  : F¼„ªêƒ«è£´ 230 «èM ܬñŠ¬ð ܬñòM¼‚°‹ ï™Ö˜ 230 «èM 10.01.2019 ¶¬í I¡ G¬ôò‹, ï™Ö˜ «ñ‹ð´ˆî ¶¬í I¡ G¬ôòˆFŸ°110 ñŸÁ‹ ܼA½œ÷ Aó£ñƒèœ ðò¡ð´‹ «èM Þó†¬ì ²ŸÁ I¡ ð£¬î¬ò õNò£è ܬñˆî™ Þó†¬ì ²ŸÁ I¡ «è£¹óƒèO™ àœ ªõOŠð£¬îò£è «ð‰î˜ è‹H ܬñˆî™

15 110 «èM ï™Ö˜ v𘠬ôQ™ â‡.03 1407.7 24.06 A e Éó‹ ï™Ö˜ 110 I¡ ªî£ì˜ ¹î¡ê‰¬î - ï£ñ‚è™ î„꣡°P„C  : «èM ¶¬í I¡ G¬ôòˆF™ ܬñŠ¬ð d켂° ãŸèù«õ àœ÷ 埬ø 10.01.2019 Þ¼‰¶ ¹î¡ê‰¬î õ¬ó «ñ‹ð´ˆî ²ŸÁ I¡ ð£¬î¬ò 埬ø ²ŸÁ ï£ñ‚è™, î„꣡°P„C ðò¡ð´‹ I¡ «è£¹óƒèO™ àœ÷ «ð‰î˜ ñŸÁ‹ ܼA½œ÷ Aó£ñƒèœ è‹H¬ò ñ£ŸP «ð‰î˜ è‹H¬ò õNò£è ܬñˆî™ ܬñˆî™

16 ãŸèù«õ àœ÷ 110 «èM Þó†¬ì â‡.03 82.80 8.00 A e Éó‹ ï™Ö˜ 110 I¡ ªî£ì˜ ²ŸÁ I¡ «è£¹óƒèO™ àœ÷  : «èM ¶¬í I¡ G¬ôòˆF™ ܬñŠ¬ð ¹î¡ê‰¬î - ï£ñ‚è™ dìKL¼‰¶ 10.01.2019 Þ¼‰¶ ¹î¡ê‰¬î õ¬ó, «ñ‹ð´ˆî ï™Ö˜ v𘠬ô¡ «ï£‚A ï™Ö˜ ñŸÁ‹ ܼA½œ÷ ðò¡ð´‹ ¹î¡ê‰¬î 230 «èM ¶¬í I¡ Aó£ñƒèœ õNò£è ܬñˆî™ G¬ôò‹ õ¬ó 110 «èM 埬ø ²ŸÁ I¡ ð£¬îJ™ «ð‰î˜ è‹H¬ò ªè£‡´ Šg arm-™ ܬñˆî™ June 12, 2019] TAMIL NADU GOVERNMENT GAZETTE 47

ªñ£ˆî I¡õ£Kò õ ñFŠd´ àòó¿ˆî I¡ð£¬î Mõó‹ G¬ô(FB) º‚Aò Ü‹êƒèœ ðò¡èœ â‡. Þô†ê‹ ݬí â‡. Ï.

(1) (2) (3) (4) (5) (6)

17 ¹î¡ê‰¬î - ï£ñ‚è™ dì˜ «è£¹ó â‡.03 233.96 4.00 A e Éó‹ ¹î¡ê‰¬î I¡ ªî£ì˜ ⇠01 L¼‰¶ 110 «èM 埬ø  : 110 «èM ¶¬í I¡ ܬñŠ¬ð ²ŸÁ I¡ ð£¬îJ™ ¹î¡ê‰¬î 10.01.2019 G¬ôò‹ ñŸÁ‹ ܼA½œ÷ «ñ‹ð´ˆî 230 «èM ¶¬í I¡ G¬ôò‹ Aó£ñƒèœ õNò£è ܬñˆî™ ðò¡ð´‹ õ¬ó Þó†¬ì ²ŸÁ I¡ ð£¬îJ™ GÁ¾î™

18 ãŸèù«õ àœ÷ Þ÷ïè˜ 110 «èM â‡.03 397.38 6.00 A e Éó‹ Þ÷ïè˜ I¡ ªî£ì˜ ¶¬í I¡ G¬ôòˆFŸ° àœ ï£œ : 110 «èM ¶¬í I¡ ܬñŠ¬ð ªõOŠð£¬îò£è ï™Ö˜ vð˜ 10.01.2019 G¬ôòˆF™ Þ¼‰¶ ï™Ö˜ «ñ‹ð´ˆî ¬ôQ™ àœ÷ ¹î¡ê‰¬î - õ¬ó ¹î¡ê‰¬î, ï£ñ‚è™ ðò¡ð´‹ ï£ñ‚è™ dìK™ 110 «èM Þó†¬ì ñŸÁ‹ ܼA½œ÷ Aó£ñƒèœ ²ŸÁ I¡ ð£¬î¬ò Þó†¬ì ²ŸÁ õNò£è ܬñˆî™ I¡ «è£¹óƒèO™ «ð‰î˜ è‹H ªè£‡´ ܬñˆî™

19 ãŸèù«õ àœ÷ ï™Ö˜ 110 «èM â‡.03 29.25 0.5 A e Éó‹ ï™Ö˜ 110 I¡ ªî£ì˜ ¶¬í I¡ G¬ôòˆFL¼‰¶ : 10.01.2019 «èM ¶¬í I¡ G¬ôò‹ ܬñŠ¬ð ¹Fî£è GÁõŠð´‹ 230 «èM ñŸÁ‹ ܼA½œ÷ Aó£ñƒèœ «ñ‹ð´ˆî ¶¬í I¡ G¬ôòˆFŸ° 110 õNò£è ܬñˆî™ ðò¡ð´‹ «èM 埬ø ²ŸÁ I¡ ð£¬îJ™ Þó†¬ì ²ŸÁ I¡ «è£¹óƒèO™ «ð‰î˜ è‹H ªè£‡´ ܬñˆî™

20 ãŸèù«õ àœ÷ ï™Ö˜ 110 «èM â‡.175 993.450 15.00 A e Éó‹ ï™Ö˜ 110 I¡ ªî£ì˜ «è.ݘ «î£ŠÌ˜ «ð«óx - 2 ™  : «èM ¶¬í I¡ G¬ôòˆF™ ܬñŠ¬ð ܬñòM¼‚°‹ ݬìΘ 110 15.12.2018 Þ¼‰¶ «è.ݘ «î£ŠÌ˜ õ¬ó «ñ‹ð´ˆî «èM ¶¬í I¡ G¬ôòˆFŸ° ñŸÁ‹ ܼA½œ÷ Aó£ñƒèœ ðò¡ð´‹ àœ - ªõOŠð£¬îò£è 110 «èM õNò£è ܬñˆî™ Þó†¬ì ²ŸÁ I¡ ð£¬î¬ò Þó†¬ì ²ŸÁ I¡ «è£¹óƒèO™ «ð‰î˜ è‹H ªè£‡´ ܬñˆî™

«ñŸè£íŠð†ì F†ìƒèœ ðŸP ã«î‹ º¬øf´èœ Þ¼‰î£™ M¼Šð‹ àœ÷õ˜èœ ÞšõP‚¬è ªõOJ†ì ï£OL¼‰¶ Þó‡´ ñ£îˆFŸ°œ W«ö ¬èªò£ŠðI†ì ÜFè£KJì‹ 2003Ý‹ ݇´ I¡ê£ó ê†ìŠHK¾ 164 ñŸÁ‹ 168¡ ð® º¬øJì «õ‡ìŠð´Aø¶.

E. G. GNANA BETHSHEBA, «êô‹-14, «ñŸð£˜¬õ ªð£Pò£÷˜, 2019 ü¨¡ 6. ªð£¶ 膴ñ£ù õ†ì‹.

UNIVERSITY AUTHORITIES BHARATHIDASAN UNIVERSITY PALKALAIPERUR, TIRUCHIRAPPALLI-620 024.

Election to the Senate (Ref. No. 27095/A1/2018.) No.VI-3(b)/16/2019. Class II - Other Members - sub-sec. (a) (4) of Section 20 under Chapter III of the Bharathidasan University Act, 1981 - Two Members elected by Registered Graduates in each revenue district within the University area from among themselves. ‘ . Election to the senate of the Bharathidasan University to elect two members by the Registered Graduates from among themselves in each revenue district of 1. Tiruchirappalli, 2. Thanjavur, 3. Pudukkottai, 4. Karur, 5. Perambalur, 48 TAMIL NADU GOVERNMENT GAZETTE [Part VI—Sec.3(b)

6. Nagapattinam, 7. Thiruvarur and 8. Ariyalur Districts within the University area for the vacancies, will be held as per the schedule given below:

E S

01. Notifi cation of Vacancy 17-06-2019 (Monday) 02. Last date and Hour for fi ling the nominations 5.00 p.m. on 03-07-2019 (Wednesday) 03. Date and Hour for Scrutiny of nominations at 5.30 p.m. on 03-07-2019 (Wednesday) 04. Date and Hour for the publication of valid list of nominations 03-07-2019 (after scrutiny is over) (Wednesday) 05. Last date and hour for the Withdrawal of Candidature 10-07-2019 up to 3.00 p.m. on (Wednesday) 06. Announcement of the fi nal list of valid nominations 10-07-2019 at 4.00 p.m on (Wednesday) 07. Despatch of Ballot Papers 17-07-2019 (Wednesday) 08. Date and Time of Poll from 10.00 a.m. to 3.00 p.m. on 01-08-2019 (Thursday) 09. Place of Polling Bharathidasan University Palkalaiperur, Tiruchirappalli-24 10. Counting of Votes from 3.30 p.m. on 01-08-2019 (Thursday) 11. Announcement of result Immediately after counting is over.

D. G. GOPINATH, Palkalaiperur, Registrar and Returning Offi cer. Tiruchirappalli-620 024, 7th June 2019.