Fixing Country Rail Pilot Projects August 2016
Total Page:16
File Type:pdf, Size:1020Kb
Murwillumbah Boggabilla Mungindi Weemelah North Star Wallangarra Pokataroo 5 Merrywinebone Brewarrina Inverell 1. Rail Siding Extension – Walgett 5. Reinstatement of a 2.8km Bourke 1 Burren Junction section of Moree to Inverell railway line NSW Government Funding: up to $1.5M Narrabri Barraba • Reduced shunting and faster train loading. NSW Government Funding: up to $2M Gwabegar Armidale • Projected saving of $6 per tonne in freight • Shifts 250,000 tonnes of grain and costs to port. 6,400 cargo boxes of cotton and pulses from road to rail. Coonamble • Projected savings of $25/tonne in freight costs from Moree to Port 10 of Newcastle. Cobar Werris Creek Warren Coolah 2. Rail Siding Extension – Hillston Merriwa Broken Hill Tottenham Narromine Muswellbrook NSW Government Funding: up to $3M Dubbo • Reduced shunting and faster train loading. • Projected saving of $6 per tonne in freight costs to port. Newcastle Charbon Roto Pelton Parkes 6. Reinstatement of the Lake Cargelligo Bogan Gate Orange Maimuru to Demondrille Eugowra Wallerawang Hillston railway line 2 Naradhan Burcher Lithgow NSW Government Funding: up to $5M • Will provide a connection to the Main Rankins Grenfell Oberon Springs South Line, improving rail network Sydney access for grain producers, mining and Macarthur containerised transport industries. • Cheaper and more efficient transport 3. Rail Siding Extension – 3 for producers. Stockinbingal Boorowa Barellan Griffith Crookwell Hay Temora 6 Moss 8 Wollongong BalranaldNSW Government Funding: up to $1.5M Vale • Reduced shunting and faster train loading. Narrandera Cootamundra 7 Planning and design works • Projected saving of $4 per tonne in freight Kywong Junee Bomaderry NSW Government Funding: up to $1M costs to port. Boree Planning and design work for: Creek 9 7. Installation of a new turnout at The Rock Canberra 4 the centre of Dunmore Loop at Deniliquin Shellharbour. Batlow ACT Rand 8. Installation of a new turnout at 4. Rail siding upgrade at the Captains Flat Unanderra. Tocumwal Canberra RailwayHolbrook Freight 9. New crossing loop near Tarago. Mulwala Tumbarumba Terminal (Fyshwick) 10. Reinstatement of the non-operational Corowa line from West Tamworth to Westdale. NSW GovernmentAlbury Funding: up to $1M • Restarts freight services between Canberra and Port Botany. Key • Shifts export containers to rail (300 Rail Network Owner B-Doubles per annum to start). Australian Rail Track Corporation Country Regional Network Bombala RailCorp metropolitan network Other Indicates rail is non-operational.