Fixing Country Rail Pilot Projects August 2016

Fixing Country Rail Pilot Projects August 2016

Murwillumbah Boggabilla Mungindi Weemelah North Star Wallangarra Pokataroo 5 Merrywinebone Brewarrina Inverell 1. Rail Siding Extension – Walgett 5. Reinstatement of a 2.8km Bourke 1 Burren Junction section of Moree to Inverell railway line NSW Government Funding: up to $1.5M Narrabri Barraba • Reduced shunting and faster train loading. NSW Government Funding: up to $2M Gwabegar Armidale • Projected saving of $6 per tonne in freight • Shifts 250,000 tonnes of grain and costs to port. 6,400 cargo boxes of cotton and pulses from road to rail. Coonamble • Projected savings of $25/tonne in freight costs from Moree to Port 10 of Newcastle. Cobar Werris Creek Warren Coolah 2. Rail Siding Extension – Hillston Merriwa Broken Hill Tottenham Narromine Muswellbrook NSW Government Funding: up to $3M Dubbo • Reduced shunting and faster train loading. • Projected saving of $6 per tonne in freight costs to port. Newcastle Charbon Roto Pelton Parkes 6. Reinstatement of the Lake Cargelligo Bogan Gate Orange Maimuru to Demondrille Eugowra Wallerawang Hillston railway line 2 Naradhan Burcher Lithgow NSW Government Funding: up to $5M • Will provide a connection to the Main Rankins Grenfell Oberon Springs South Line, improving rail network Sydney access for grain producers, mining and Macarthur containerised transport industries. • Cheaper and more efficient transport 3. Rail Siding Extension – 3 for producers. Stockinbingal Boorowa Barellan Griffith Crookwell Hay Temora 6 Moss 8 Wollongong BalranaldNSW Government Funding: up to $1.5M Vale • Reduced shunting and faster train loading. Narrandera Cootamundra 7 Planning and design works • Projected saving of $4 per tonne in freight Kywong Junee Bomaderry NSW Government Funding: up to $1M costs to port. Boree Planning and design work for: Creek 9 7. Installation of a new turnout at The Rock Canberra 4 the centre of Dunmore Loop at Deniliquin Shellharbour. Batlow ACT Rand 8. Installation of a new turnout at 4. Rail siding upgrade at the Captains Flat Unanderra. Tocumwal Canberra RailwayHolbrook Freight 9. New crossing loop near Tarago. Mulwala Tumbarumba Terminal (Fyshwick) 10. Reinstatement of the non-operational Corowa line from West Tamworth to Westdale. NSW GovernmentAlbury Funding: up to $1M • Restarts freight services between Canberra and Port Botany. Key • Shifts export containers to rail (300 Rail Network Owner B-Doubles per annum to start). Australian Rail Track Corporation Country Regional Network Bombala RailCorp metropolitan network Other Indicates rail is non-operational.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us