Winter, 2005 Jim Donald the Project Altogether
Total Page:16
File Type:pdf, Size:1020Kb
It is now up to CDFG to do a full Rotenone Use Denied Environmental Impact Statement or drop Winter, 2005 Jim Donald the project altogether. An EIS could take Volume 20, Issue 1 two years to complete, and the results On August 30, 2005 a federal judge in would go before the same judge who might Sacramento issued an injunction against reject it again. As we go to press, CDFG the use of rotenone in Silver King Creek, a has decided to drop the project, citing For the preservation creek in the Carson Iceberg Wilderness. funding issues. However, they have been This came after he issued a temporary known to reverse course in the past and of the scenic, restraining order a week earlier to halt this could appeal to a higher court, an unlikely recreational, and project on the eve it was to begin. California scenario, but one that requires vigilance on historic use of Hope Department of Fish and Game had been our part. planning to use rotenone to kill more Valley and Alpine aggressive species so that the endangered This is a good ruling in light of so many County’s eastern Paiute Cutthroat Trout could be established attacks on the environment by the current Sierra slope. on 11 miles of this creek and it’s upper administration. There is enough emphasis tributaries. and force in the judge’s words that it may carry over to future poisoning projects. “The Friends” supported this lawsuit and While The Friends support species Board of Directors was present for the ruling. Plaintiffs reintroduction, we do not support the use of contended that the use of this poison was poisons to do it. As the judge noted “the Debbi Waldear flawed in concept, based on poor science Paiute Cutthroat Trout appears to be President and would not work. The probability that the surviving, at least for now, in parts of the benthic macro-invertebrates would never same watershed and in other watersheds.” John Barr fully recover and the chance that a rare or Yvone Chen endemic species might be eliminated was Jim Donald the crux of plaintiffs’ contentions. Hope Valley Work Day Gay Havens Arguments also presented noted that the Debbie Waldear Barbara Howard use of rotenone in a wilderness sullied the concepts by which these areas were June 4th was the date of our Hope Valley created and negated users expectations of workday. Projects included willow planting a pristine, unspoiled area. along the Carson River, trash pick-up at legal and illegal campsites, and fence The judge said, “You have what is a stark mending. This year much of the old finality, an execution in a very special place barbwire that is lying around the valley was in our treasured mountains.” He added that collected and hauled off to the Minden “irreparable harm” would be done and dump. A great deal of work was “unimpaired reference” would be lost. He accomplished during the mere four-hour continued, “Life would end for a period of workday. After completing their tasks the time.” volunteers enjoyed lunch on the river while listening to the annual Friends of Hope He was critical of the Environmental Valley general membership meeting. Assessment done by the Forest Service. He stated that poor methodology and An additional day was used to complete insufficient data did not show what was projects at fishing piers for the disabled present in the stream, nor did it consider near Picket’s Junction. A hardy group of that rare or endemics might be present. He locals removed silt from the platforms and praised plaintiffs’ experts noting that they built up the sides of the piers with rock and were of “singular expertise” regarding the dirt. Spring high waters damaged much study of benthos, while CDFG and FS damage to this area. studies were missing data and were done by people who were not as well versed in Thank you to all that helped. Plan to join in this special niche of science. the fun next year about the same time. Assemblyman Laird Investigates The Trail F of HV Newsletter Page 2 Collaboration Leviathan Mine Tour Debbie Waldear Jim Donald Collaboration is the name of the game when it comes to Leviathan mine is an EPA superfund site located on the taking care of Sierra Nevada’s natural resources. The east slope of the Sierra in Alpine County. It was a sulfur Park Cattle Company Ranch and the Friends of Hope mine that was worked during the 1950’s to provide sulfur Valley teamed up to protect meadowlands in Hope for the extraction of copper in Yerington NV, some 75 Valley. miles southeast. The site is 250 acres in total area, while the open pit is some 50 acres including the defining In the past this acreage - now managed by the Forest ridgelines. It discharges acid mine drainage (AMD), not Service and the California Fish and Game Department - only from the pit but from the overburden which was was ranch land. Owned by several Carson Valley pushed into a tributary creek as large scale mining ranching families, the meadows were used for grazing, operations began. This AMD can total up to 12 million requiring the installation and maintenance of fences and gallons per year depending on winter precipitation. gates. There were few undeveloped roads and little devastating impact from off-road vehicles. The On August 23, 2005, two FOHV board members toured meadows were sacred lands under the ranchers’ the site. Laura Lueders, Alpine County Watershed stewardship. Coordinator, who did an excellent job putting together a group with representatives from local environmental Much of the fencing is dilapidated; new dirt roads have organizations, government, watershed group, and appeared, created by individuals who drive across the Washoe Tribe whose land the AMD flows through, meadows. Damage done to this ecological system by organized this informative tour. Leading the tour were this illegal usage requires years to reverse, if ever. Kevin Mayer and Vicki Rosen of the EPA’s San “The Friends” and the Park Cattle Company joined Francisco office and several onsite project manager’s forces and installed new gates in a critical area of the representatives. Water percolating into the site picks up valley. The gates, purchased by “the Friends” and sulfur, which creates sulfuric acid that then, dissolves erected by a Park Cattle Company rancher, will permit metallic elements in the ground. Iron, Arsenic, Nickel, access to the company’s holding pens for its employees, Chromium, Copper, Aluminum and Zinc are found both and create parking for individuals who are in Hope as suspended solids and dissolved sulfate salts. This Valley to experience its splendor - on foot. soup flowed into Leviathan Creek, which becomes Bryant Creek and then flows into the East Carson River. Now Leviathan Creek has been diverted through a concrete channel to prevent it from picking up contaminants, and 3 primary and several secondary ponds have been built along with an innovative treatment facility on Aspen Creek below the overburden. Lime is added to the primary ponds, the pH is raised, and contaminants precipitate out. Metallic salts remain however, at reduced level (but still, at minimum, exceeding state standards by a factor of 10), and this process is repeated at the lower ponds. The water, now at normal pH for the area, is discharged into Leviathan Creek, and this once lifeless creek again supports trout and benthic macro-invertebrates. EPA hopes now to Debbie Waldear and John begin treatment year round. Previously, winter runoff Barr help rancher with gates had been held in the ponds and treated quickly during the short summers here at nearly 7000’. You Can Help This newsletter summarizes some of the issues we are addressing, but there are many more ahead. The larger our membership, the stronger our voice. Please help us by passing this newsletter on to a friend who might be interested in helping to protect and preserve the eastern slope of the Sierra and invite them to join us. Your membership renewal form is enclosed. An extra membership form has been added to the end of this newsletter. Imagine the impact of The Friends, supported by each one of us - and a friend. F of HV Newsletter Page 3 At the Aspen Creek overburden site, a 2 stage bacterial on the road until south of the Forestdale Divide. Lastly, process is being used to remove the AMD. Aerobic and we propose improving the Deer Valley corridor to Hwy 4 anaerobic bacteria act in concert to eliminate the sulfur, which would give snowmobiles access Bear Valley from thus neutralizing the pH. This innovative system was Blue Lakes and, indeed, all the way from Lake Tahoe developed at the University of Nevada, Reno. given enough fuel. Balancing this would be the closure of two canyons near Forestdale Divide to snowmobiles. These are experimental processes. Water quality still does not meet federal or state standards. It does The Forest Service has received monies from the Alpine eliminate gross discharge, will improve environmental County Resources Advisory Committee to begin working and human health, and buy time for the selection of a on a winter recreation plan. We ask that you help by more effective remedy. submitting comments to Gary Schiff – District Ranger, Carson Ranger District, Humboldt -Toiyabe National The URL for more information is Forest, 1536 S. Carson St., Carson City, NV 89703. Or http://www.epa.gov/region09/wast/sfund follow links for send them to us via our website or to our PO box on the “Cleanup” to “Cleanup Sites in California”. masthead and we’ll make sure they get there.