Impact of Arterial OPW Drainage Maintenance

Total Page:16

File Type:pdf, Size:1020Kb

Impact of Arterial OPW Drainage Maintenance Natura Sites Assessment Report ------------------------------------------------------------------------------------------------------------------------------------------------------ Report for the Ecological Assessment of the Significance of Impacts of proposed scheduled Arterial Drainage Scheme channel and embankment maintenance works on SACs & SPAs. Version 4.3 December 2008 Tait Business Centre, Dominic Street, Limerick City, Ireland. t. +353 61 313519, f. +353 61 414315 e. [email protected] w. www.ecofact.ie OPW Natura Sites Assessment Report ____________________________________________________________________________________________ Report for the Ecological Assessment of the Significance of Impacts of proposed scheduled Arterial Drainage Scheme channel and embankment maintenance works on SACs & SPAs. William O’Connor PhD, MSc, CBiol, CEnv, MIBiol, MIEEM, MIFM Daireann McDonnell, MSc, MIEEM Ecofact Environmental Consultants Ltd., Tait Business Centre, Dominic Street, Limerick City. t. +353 61 419477 f. +353 61 414315 e. [email protected] w. www.ecofact.ie Citation: O’Connor, W., & McDonnell, D. (2008) Report for the Ecological Assessment of the Significance of Impacts of proposed scheduled Arterial Drainage Scheme channel and embankment maintenance works on SACs & SPAs. A Report to the Environment Section of the Office of Public Works. Cover photo: Weed cutting boat operating on the lower reaches of the Cregg River, Lough Corrib SAC. © Office of Public Works, 2008 ___________________________________________________________________________________ www.ecofact.ie Page | 2 OPW Natura Sites Assessment Report ____________________________________________________________________________________________ SUMMARY This report is the output of a project entitled ‘Ecological Impact Assessment of the Significance of Impacts of Proposed Scheduled Arterial Drainage Scheme Channel and Embankment Maintenance Works on Special Areas of Conservation (SACs) and Special Protection Areas (SPAs)’. The assessment concerns the 2008 Arterial Drainage Maintenance Programme within Natura 2000 Sites. The key aim of the report was to assess whether the proposed works would be likely to have a significant adverse effect on the respective conservation sites, or individual protected flora and fauna species. The assessment was based on an initial desk based screening assessment prepared for each affected site by the Environment Section of OPW, and a subsequent desk and partial field-based appraisal carried out by ECOFACT. The current study has concluded that the current strategic approach being developed by OPW to assess the ecological impact of drainage maintenance works is insufficient due to the complexity of channel types, habitats and species potentially affected by these works. However, the significant improvements that have been made in the environmental performance of the OPW in recent years are acknowledged. Likewise, the significant enhancement works being undertaken by OPW on Irish Rivers in association with the Central Fisheries Board is also noted. However, the current assessment must return the conclusion of the likelihood of significant adverse effects on the respective designated sites due to lack of information at present to reach an alternative conclusion. Recommendations on future assessments are made; in particular the requirement for advance ecological surveys on all affected river corridors is highlighted. This would allow the implementation of site specific mitigation measures to protect the integrity of these internationally important conservation sites. TABLE OF CONTENTS 1 INTRODUCTION ....................................................................................................................... 6 1.1 PROJECT OVERVIEW ....................................................................................................................... 6 1.2 INTRODUCTION TO ARTERIAL DRAINAGE SCHEMES & ARTERIAL DRAINAGE MAINTENANCE .......................... 8 1.2.1 History of the OPW ........................................................................................................... 8 1.2.2 History of Arterial Drainage Schemes ............................................................................... 8 1.2.3 Functions of Arterial Drainage Schemes ........................................................................... 9 1.2.4 Ecological Impact of the Arterial Drainage Schemes ...................................................... 10 1.2.4 Arterial Drainage Maintenance Works ........................................................................... 10 1.3 INTRODUCTION TO THE CURRENT ECOLOGICAL ASSESSMENT PROJECT .................................................... 13 1.3.1 General overview ............................................................................................................ 13 1.3.2 Special Areas of Conservation (SACs) & Special Protection Areas (SPAs) ....................... 15 1.3.3 OPW Categories for Conservation Aspects ..................................................................... 16 2 METHODOLOGY ..................................................................................................................... 18 2.1 DESK STUDY OF AFFECTED SITES ...................................................................................................... 18 2.2 REVIEW OF OPW DESK BASED ASSESSMENTS .................................................................................... 18 2.3 FIELD SURVEY .............................................................................................................................. 18 2.4 EVALUATION OF OPW ASSESSMENTS .............................................................................................. 19 2.5 CONSULTATION ........................................................................................................................... 20 3 DESK STUDY ASSESSMENT ...................................................................................................... 22 3.1 DESCRIPTIONS OF NATURA SITES SELECTED BY OPW .......................................................................... 22 3.1.2 Charleville Wood SAC ...................................................................................................... 23 ___________________________________________________________________________________ www.ecofact.ie Page | 3 OPW Natura Sites Assessment Report ____________________________________________________________________________________________ 3.1.1 Lough Ennell SAC/SPA ..................................................................................................... 24 3.1.3 Lough Owel SAC/SPA ...................................................................................................... 24 3.1.4 Ballyteigue Burrow SAC/SPA ........................................................................................... 25 3.1.5 Ryewater Valley SAC ....................................................................................................... 26 3.1.6 Split Hills and Long Hill SAC ............................................................................................. 26 3.1.7 River Boyne & Blackwater SAC ........................................................................................ 27 3.1.8 Ballymore Fen SAC .......................................................................................................... 28 3.1.9 Moneybeg & Clare Island SAC ......................................................................................... 28 3.1.10 Mount Hevey Bog SAC .................................................................................................... 28 3.1.11 Lough Derravaragh SPA .................................................................................................. 29 3.1.12 Lough Kinale & Derragh SPA ........................................................................................... 30 3.1.13 Stabannan-Braganstown SPA ......................................................................................... 30 3.1.14 Curraghchase Woods SAC ............................................................................................... 31 3.1.15 Barroughter Bog SAC ...................................................................................................... 31 3.1.16 Derrycrag Wood Nature Reserve SAC ............................................................................. 31 3.1.17 Tory Hill SAC .................................................................................................................... 32 3.1.18 Castlemaine Harbour SAC/SPA ....................................................................................... 32 3.1.19 Lower Shannon River SAC ............................................................................................... 33 3.1.20 Bandon River SAC ............................................................................................................ 34 3.1.21 Askeaton Fen Complex SAC ............................................................................................. 35 2.1.22 Slieve Aughty SPA ........................................................................................................... 36 3.1.23 River Cashen Estuary SPA ............................................................................................... 36 3.1.24 Lough Derg SAC/SPA ....................................................................................................... 36 3.1.25 Rivers Shannon and Fergus
Recommended publications
  • Knockvicar, Co. Roscommon Unique ID: 265482 Stage 1: Desktop Review
    Location: Knockvicar, Co. Roscommon Unique ID: 265482 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 187391 Northing: 305847 River / Catchment / Sub-catchment Boyle River / Shannon Type of Flooding / Flood Risk Fluvial non-tidal Fluvial tidal Coastal (identify all that apply) Stage 1: Desktop Review River Flow Path 1.1 Flood History The River Boyle flows from west to east through Lough Key and on to (include review of Knockvicar. The R285 which is the main road through Knockvicar crosses Floodmaps.ie) the Boyle at Knocknvicar. Flood Event Records There are no records of flood events on floodmaps.ie for this location. PFRA database comments (in italics): 1.2 Relevant information on OPW comments flooding issues from Not designated APSR as failed to reach predictive analysis threshold. OPW and LA staff LA comments STW at risk(private) PO flooded Roads. Same as Cootehall – Boyle River Part of Shannon problem/solution Meeting / discussion summary comments: OPW comments • Not included in Boyle scheme. • Flood risk from Lough Key. LA comments • The road to the north west of Knockvicar floods. • There is a playground that floods, and • A restaurant and new development may be at risk. Flood Risk Review Report – UoM 25 26 Knockvicar V0_A 1 1.4 PFRA Data 1.4.1 PFRA hazard PFRA mapping available in GIS layer: Yes No mapping PFRA mapping included on FRR map: Yes No 1.4.2 Summary of Type FRI score Principal Receptors (if available) Receptors not considered as part of the PFRA process. FRI score not calculated in PFRA.
    [Show full text]
  • THE RIVERS SHANNON and ERNE Region Guide Belleek LOWER LOUGH ERNE
    THE RIVERS SHANNON AND ERNE Region guide Belleek LOWER LOUGH ERNE Approx time No. of locks Belleek 5 hr 1 Enniskillen Enniskillen 1 hr 0 Bellanaleck 9 hr 30 min 1 Bellanaleck 1 hr 0 Carrybridge UPPER LOUGH Carrybridge 2 hr 30 min 0 ERNE Inishfendra 2 hr 15 min 2 Ballyconnell 4 hr 12 hr 15 min 3 17 Inishfendra Ballinamore 6 hr 12 Ballyconnell Leitrim 45 min 45 min 0 0 L OUGH Y Intersection of River Shannon and branch to Lough Key A 30 min 30 min 0 0 ALLEN W Belturbet Ballinamore R E Carrick-on-Shannon T 3 hr 1 A Drumshanbo W N E Dromod 15 min Lough Key E R 0 O N Leitrim S H A N N Roosky 2 hr 10 hr 50 min 1 3 Tarmonbarry 1 hr 35 min 1 Boyle CARRICKON Lanesborough 4 hr 0 SHANNON Athlone 2 hr 15 min 1 Clonmacnoise 1 hr 0 8 hr 2 Shannonbridge 1 hr 45 min 0 Banagher Dromod 3 hr 1 Maximum speed allowed Portumna 5 on canals in km/h N 30 min 0 Roosky O N N Terryglass 2 hr 0 A There are no speed limits on rivers H 0 Tarmonbarry S Dromineer 45 min 4 hr 0 and in loughs, although please slow Garrykennedy 15 min 0 down as you pass moored boats, 0 Lanesborough Middle of Lough Derg 30 min 0 marinas, fishermen and in narrow Killaloe channels where your wash can cause damage to the bank and wildlife. Approx time No. of locks Pass oncoming boats on L OUGH Leitrim 1 hr 45 min 1 hr 45 min 3 3 REE Drumshanbo the right-hand side Approx time No.
    [Show full text]
  • ISFC Annual Report 1999
    1999 Salmon, Sea Trout . 3 Location Map for Awards Presentation in Doyle Burlington Brown Trout (Lake) . 4 Brown Trout (River) . 5 Bream . 6 Pike (Lake), Pike (River) . 8 Carp . 10 Eel, Roach/Bream Hybrid . 11 Rudd/Bream Hybrid, Perch . .12 Tench . 13 Bass . 14 Coalfish, Cod, Conger Eel, Dab, Greater Spotted Dogfish . 15 Lesser Spotted Dogfish, Spur Dogfish . 16 Flounder, Garfish, Grey Gurnard . 17 Red Gurnard, Tub Gurnard, Ling . 18 Mackerel . 19 Grey Mullet, Plaice . 20 ONTENTS Pollack, Pouting . 21 Blonde Ray, Homelyn Ray, Painted Ray . 22 Sting Ray, Three Bearded Rockling, Twaite Shad . 24 C Blue Shark . 25 Tope, Torsk, Ballan Wrasse, Cuckoo Wrasse . 26 New Records, Ten Species Award, Ten Pin Awards, Special Award for Juveniles, The Minister’s Award, . .27 Revised Specimen Weight/New Class, Special Notice, Limitation on Number of Claims, Exclusion from Specimen Status, Weighing of Fish, Metrification . 28 Common Skate, Captors Addresses, Distribution of Specimen Awards . .29 Acknowledgements, Presentation of Awards 1998, Fund Raising . 30 Accounts, Donations . 31 Use of the information contained in this report for press articles Balance Sheet . 32 and publicity is encouraged. It may be quoted without charge, Irish Record Fish Listing . 33 provided the source is acknowledged. Schedule of Specimen Weights (Revised) . 35 The report is copyright and prior permission to reproduce the Rules . 37 data for any other purpose other than reasonable review or Weighing Scale Certification – List of Centres . .40 analysis must be obtained in writing from the Irish Specimen Fish “Read it Carefully” by Des Brennan . 42 Committee. “Maybe we’ll stay at home this year!” by Derek Evans .
    [Show full text]
  • Flood Analysis of the Clare River Catchment Considering Traditional Factors and Climate Change
    Flood Analysis of the Clare River Catchment Considering Traditional Factors and Climate Change AUTHOR Pierce Faherty G00073632 A Thesis Submitted in Part Fulfilment for the Award of M.Sc. Environmental Systems, at the College of Engineering, Galway Mayo Institute of Technology, Ireland Submitted to the Galway Mayo Institute of Technology, September 2010 .... ITUTE Of TECHNOLOGY DECLARATION OF ORIGINALITY September 2010 The substance of this thesis is the original work of the author and due reference and acknowledgement has been made, when necessary, to the work of others. No part of this thesis has been accepted for any degree and is not concurrently submitted for any other award. I declare that this thesis is my original work except where otherwise stated. Pierce Faherty Sean Moloney Date: 1 7 - 01" 10__ Abstract The main objective of this thesis on flooding was to produce a detailed report on flooding with specific reference to the Clare River catchment. Past flooding in the Clare River catchment was assessed with specific reference to the November 2009 flood event. A Geographic Information System was used to produce a graphical representation of the spatial distribution of the November 2009 flood. Flood risk is prominent within the Clare River catchment especially in the region of Claregalway. The recent flooding events of November 2009 produced significant fluvial flooding from the Clare River. This resulted in considerable flood damage to property. There were also hidden costs such as the economic impact of the closing of the N17 until floodwater subsided. Land use and channel conditions are traditional factors that have long been recognised for their effect on flooding processes.
    [Show full text]
  • A Preliminary Report on Areas of Scientific Interest in County Offaly
    An Foras CONSERVATION AND AMENITY Forbartha ADVISORY SERVICE Teoranta The National Institute for Physical Planning and Construction Research PRELIMINARY REPORT ON AREAS OF SCIENTIFIC INTEREST IN n C)TTNTY C)FFAT V L ig i6 n Lynne Farrell December, 1972 i n Teach hairttn Bothar Waterloo Ath Cllath 4 Telefan 6 4211 St. Martin's House Waterloo Road Dublin 4 J J 7 7 Li An Foras CONSERVATION AND AMENITY Forbartha ADVISORY SERVICE Teoranta The National Institute for Physical Planning and 7 Construction J Research PRELIMINARY REPORT ON AREAS OF SCIENTIFIC INTEREST IN COTTNTY (FFAT.Y 11 Lynne Farrell December, 1972 7 Li i s Teachhairtin J Bother Waterloo Ath Math 4 Teiefcn 64211 St. Martin's House Waterloo Road Dublin 4 w 7 LJ CONTENTS SECTION PAGE NO. Preface 1 B Vulnerability of Habitats 3. C General Introduction 6. D Explanation of Criteria Used in 9. Rating Areas and Deciding on Their Priority E Table Summarising the Sites 11. Visited J Detailed Reports on the Sites 16. Table Summarising the Priority of 119. the Sites and Recommendations for Their Protection J 7 U FOREWORD L1 7 jJ This report is based on data abstracted from the filesof the Conservation and Amenity Advisory Section, Planning Division, An Foras Forbartha; from J published and unpublished sources; and from several periods of fieldwork undertaken during August 1971 and September - November 1972.It is a J preliminary survey upon which, it is hoped, further research willbe based. The help of Miss Scannell of the National Herbarium, FatherMoore of U.C.D. Botany Department, Dr.
    [Show full text]
  • 66C502f95e5b4c37b6f248c34de
    1616 Legend ClareClare RiverRiver AquaticAquatic PointsPoints 4444 7474 4646 4848 4747 4242 4848 4343 7373 4545 4343 7373 4949 4040 5454 5050 3939 5454 4141 3939 5353 5151 CrusheenyCrusheeny 5252 BridgeBridge 5757 5555 5656 7272 5959 5858 0 50 100 6464 6161 3737 Kilometers 6666 6464 7171 8888 Client 7171 6767 6060 6565 3838 7070 6565 6262 6969 6868 6363 Project Clare River (Claregalway) Flood Relief Scheme Title Aquatic points Figure 11.411.4 Lyrr Building, IDA Business & Technology Park, Mervue, Galway, Ireland T +353 91 400200 F +353 91 400299 E [email protected] W rpsgroup.com/ireland Issue Details Drawn by: FC Project No. MGE0262 Checked by: BnC File Ref. Approved by: WM MGE0262MI0019F01 Scale: NTS Drawing No. Rev. Date: Nov 2012 MI0019 F01 Notes 1. This drawing is the property of RPS Group Ltd. It is a confidential document and must not be copied, used, or its contents divulged without prior written consent. 2. All levels are referred to Ordnance Datum, Malin Head. 3. Ordnance Survey Ireland Licence EN 0005011 ©Ordnance Survey Ireland and Government of Ireland. 3535 3131 Legend 55 ClareClare RiverRiver AquaticAquatic PointsPoints 3737 n8n8 n9n9 n8n8 n7n7 n11n11 n10n10 3838 0 50 100 Kilometers Client 3535 3131 3434 3232 Project 3636 Clare River (Claregalway) 3636 3030 Flood Relief Scheme 2929 Title 3333 3333 Aquatic points 2828 Figure 11.511.5 Lyrr Building, IDA Business & Technology Park, Mervue, Galway, Ireland T +353 91 400200 F +353 91 400299 E [email protected] W rpsgroup.com/ireland Issue Details Drawn by: FC Project No. MGE0262 Checked by: BnC File Ref.
    [Show full text]
  • 2002 County Louth Castlebellingham-Kilsaran
    Tidy Towns 2002 "Caring for our environment" Centre : CASTLEBELLINGHAM-KILSARAN County : LOUTH Category : B Results Date of Adjudication : 13-07-2002 Maximum Mark Awarded Mark Awarded Mark 2002 2001 Overall Developmental Approach 50 38 37 The Built Environment 40 28 28 Landscaping 40 30 30 Wildlife and Natural Amenities 30 19 19 Litter Control 40 30 31 Tidiness 20 15 14 Residential Areas 30 25 24 Roads, Streets and Back Areas 40 30 29 General Impression 10 6 6 TOTAL MARK 300 221 218 Castlebellingham-Kilsaran, County Louth OVERALL DEVELOPMENT APPROACH This village has really taken on a life of its own since the removal of the traffic. It was wonderfully quiet and provides a pleasant existence for its inhabitants. A lot of plans and work throughout the villages was evident – well done. THE BUILT ENVIRONMENT There are a great number of historic buildings in the village and these are displayed well. St. Marys Church and graveyard are well kept. The mature planting around the Crowing Cock and the School really hold their own in a year when the damp weather has not helped the flowering annuals. The entrance to the Castle and the historic area around the Church looked well. Heaveys in the main street displayed some nice sign writing. J Byrnes has a fine traditional shopfront – it is a pity that many of these are being lost around the country. Foleys displays wonderful thatch and makes a nice stopping off point for both visitors and villagers alike. Can any use be found for the old grain store as it is a fine building and should not be allowed to fall into disrepair? Consideration should be given to the replacement of some of the plastic signage over some of the shops when the time comes to replace them.
    [Show full text]
  • Integrating Policies for Ireland's Inland Waterways
    T HE H ERITAGE C OUNCIL Proposing Policies and Priorities for the National Heritage I NTEGRATING P OLICIES FOR I RELAND’ S I NLAND W ATERWAYS August 2005 © An Chomhairle Oidhreachta /The Heritage Council 2005 All rights reserved. Published by the Heritage Council Designed and Produced by B. Magee Design Photographs courtesy of Ruth Delany Heritage Boat Association Heritage Council Irish Image Collection ISSN 1393 – 6808 The Heritage Council of Ireland Series ISBN 1 901137 77 5 75 CONTENTS FOREWORD . 6 ABBREVIATIONS . 7 EXECUTIVE SUMMARY . 8 SUMMARY OF RECOMMENDATIONS . 9 1 INTRODUCTION . 12 2 INLAND WATERWAYS HERITAGE – DEFINITION AND IMPORTANCE . 14 3 OVERALL AIM . 14 4 BACKGROUND . 15 5 MANAGEMENT OF THE WATERWAYS RESOURCE . 16 6 FUNDING . .18 7 THE CORRIDOR STUDY CONCEPT- DEVELOPMENT CONTROL AND OPPORTUNITIES . 19 8 HERITAGE – CONSERVATION, ENHANCEMENT AND ENJOYMENT . 21 9 USER MANAGEMENT . 27 10 PROMOTION AND MARKETING . 29 11 EXPANSION OF THE WATERWAYS SYSTEM . 30 12 COMPLETION OF WORKS IN PROGRESS . 31 13 FURTHER WORKS . 34 14 LONG-TERM WORKS WITH NATURAL HERITAGE IMPLICATIONS . 39 15 DERELICT WATERWAYS AS IMPORTANT HERITAGE SITES . 41 BAINISTIOCHT AR OIDHREACHT UISCEBHEALAÍ INTÍRE ÉIREANN . 45 The inland waterways and their corridors should be managed in an integrated broad-based way, conserving their built and archaeological heritage features, and protecting their landscape and biodiversity. Recognising that the inland waterways are a unique part of our heritage, but which today “are fulfilling a new role not envisaged for them originally, we aim to enhance the enjoyment and appreciation of them as living heritage both for this generation and for future generations.
    [Show full text]
  • Foyle Area and Tributaries Catchment Status Report 2017 Conservation and Assessment of Fish Populations and Aquatic Habitats
    LOUGHS AGENCY OF THE FOYLE CARLINGFORD AND IRISH LIGHTS COMMISSION Foyle Area and Tributaries Catchment Status Report 2017 Conservation and assessment of fish populations and aquatic habitats Art Niven & Emmett Clarkin August 2018 Conservation actions and assessments on fish populations and aquatic habitats are presented for 2017. The status reports have been designed to facilitate quick reference to contemporary information. Additional information can be found in associated publications and in previous status reports available on the Loughs Agency website www.loughs-agency.org [Type a quote from COPYRIGHT © 2018 LOUGHS AGENCY OF THE FOYLE CARLINGFORD AND IRISH LIGHTS COMMISSION Headquarters 22, Victoria Road Derry~Londonderry BT47 2AB Northern Ireland Tel: +44(0)28 71 342100 Fax: +44(0)28 71 342720 [email protected] www.loughs-agency.org Regional Office Dundalk Street Carlingford Co Louth Republic of Ireland Tel+353(0)42 938 3888 Fax+353(0)42 938 3888 [email protected] www.loughs-agency.org Report Reference LA/CSR/F/18 Written and Prepared by Art Niven & Emmett Clarkin For further information contact [email protected] Page 2 of 46 COPYRIGHT © 2018 LOUGHS AGENCY OF THE FOYLE CARLINGFORD AND IRISH LIGHTS COMMISSION DOCUMENT CONTROL Name of Document Foyle Area and Tributaries Catchment Status Report 2017 Author (s): Art Niven & Emmett Clarkin Authorised Officer: John McCartney Description of Content: Conservation and assessment of fish populations Approved by: John McCartney Date of Approval: 31/08/18 Assigned review period: 12 months Date of next review: 31/07/19 Document Code LA/CSR/F/18 No. TOC Text List of tables Table of Figures Appendices This documents comprises X X X X Version Control Table Version No.
    [Show full text]
  • Irish Wildlife Manuals No. 103, the Irish Bat Monitoring Programme
    N A T I O N A L P A R K S A N D W I L D L I F E S ERVICE THE IRISH BAT MONITORING PROGRAMME 2015-2017 Tina Aughney, Niamh Roche and Steve Langton I R I S H W I L D L I F E M ANUAL S 103 Front cover, small photographs from top row: Coastal heath, Howth Head, Co. Dublin, Maurice Eakin; Red Squirrel Sciurus vulgaris, Eddie Dunne, NPWS Image Library; Marsh Fritillary Euphydryas aurinia, Brian Nelson; Puffin Fratercula arctica, Mike Brown, NPWS Image Library; Long Range and Upper Lake, Killarney National Park, NPWS Image Library; Limestone pavement, Bricklieve Mountains, Co. Sligo, Andy Bleasdale; Meadow Saffron Colchicum autumnale, Lorcan Scott; Barn Owl Tyto alba, Mike Brown, NPWS Image Library; A deep water fly trap anemone Phelliactis sp., Yvonne Leahy; Violet Crystalwort Riccia huebeneriana, Robert Thompson. Main photograph: Soprano Pipistrelle Pipistrellus pygmaeus, Tina Aughney. The Irish Bat Monitoring Programme 2015-2017 Tina Aughney, Niamh Roche and Steve Langton Keywords: Bats, Monitoring, Indicators, Population trends, Survey methods. Citation: Aughney, T., Roche, N. & Langton, S. (2018) The Irish Bat Monitoring Programme 2015-2017. Irish Wildlife Manuals, No. 103. National Parks and Wildlife Service, Department of Culture Heritage and the Gaeltacht, Ireland The NPWS Project Officer for this report was: Dr Ferdia Marnell; [email protected] Irish Wildlife Manuals Series Editors: David Tierney, Brian Nelson & Áine O Connor ISSN 1393 – 6670 An tSeirbhís Páirceanna Náisiúnta agus Fiadhúlra 2018 National Parks and Wildlife Service 2018 An Roinn Cultúir, Oidhreachta agus Gaeltachta, 90 Sráid an Rí Thuaidh, Margadh na Feirme, Baile Átha Cliath 7, D07N7CV Department of Culture, Heritage and the Gaeltacht, 90 North King Street, Smithfield, Dublin 7, D07 N7CV Contents Contents ................................................................................................................................................................
    [Show full text]
  • EREP 2015 Annual Report
    EREP 2015 Annual Report Inland Fisheries Ireland & the Office of Public Works Environmental River Enhancement Programme 2 Acknowledgments The assistance and support of OPW staff, of all grades, from each of the three Drainage Maintenance Regions is gratefully appreciated. The support provided by regional IFI officers, in respect of site inspections and follow up visits and assistance with electrofishing surveys is also acknowledged. Overland access was kindly provided by landowners in a range of channels and across a range of OPW drainage schemes. Project Personnel Members of the EREP team include: Dr. James King Dr. Karen Delanty Brian Coghlan The report includes Ordnance Survey Ireland data reproduced under OSi Copyright Permit No. MP 007508. Unauthorised reproduction infringes Ordnance Survey Ireland and Government of Ireland copyright. © Ordnance Survey Ireland, 2016. 3 Environmental River Enhancement Programme Annual Report 2015 Table of Contents 1. Introduction .......................................................................................................... 6 2. EREP Capital Works Overview: 2015 ...................................................................... 7 3. Auditing Programme – Implementation of Enhanced Maintenance procedures ... 13 3.1 General .............................................................................................................. 13 3.2 Distribution of scoring – overall scores and distribution among the performance categories .........................................................................................................
    [Show full text]
  • AN INTRODUCTION to the ARCHITECTURAL HERITAGE of COUNTY DONEGAL
    AN INTRODUCTION TO THE ARCHITECTURAL HERITAGE of COUNTY DONEGAL AN INTRODUCTION TO THE ARCHITECTURAL HERITAGE of COUNTY DONEGAL COUNTY DONEGAL Mount Errigal viewed from Dunlewey. Foreword County Donegal has a rich architectural seventeenth-century Plantation of Ulster that heritage that covers a wide range of structures became a model of town planning throughout from country houses, churches and public the north of Ireland. Donegal’s legacy of buildings to vernacular houses and farm religious buildings is also of particular buildings. While impressive buildings are significance, which ranges from numerous readily appreciated for their architectural and early ecclesiastical sites, such as the important historical value, more modest structures are place of pilgrimage at Lough Derg, to the often overlooked and potentially lost without striking modern churches designed by Liam record. In the course of making the National McCormick. Inventory of Architectural Heritage (NIAH) The NIAH survey was carried out in phases survey of County Donegal, a large variety of between 2008 and 2011 and includes more building types has been identified and than 3,000 individual structures. The purpose recorded. In rural areas these include structures of the survey is to identify a representative as diverse as bridges, mills, thatched houses, selection of the architectural heritage of barns and outbuildings, gate piers and water Donegal, of which this Introduction highlights pumps; while in towns there are houses, only a small portion. The Inventory should not shopfronts and street furniture. be regarded as exhaustive and, over time, other A maritime county, Donegal also has a rich buildings and structures of merit may come to built heritage relating to the coast: piers, light.
    [Show full text]