Amendment in EC No. SEIAA/GUJ/EC/8(B)/68/2013 Dated 16Th April 2013
Total Page:16
File Type:pdf, Size:1020Kb
Application for EC Amendment – Phase V Godrej Garden City, Ahmedabad Form I Application for Prior Environment Clearance under S.O. 1533, dated 14th September, 2006 and further amendments for Amendment in EC No. SEIAA/GUJ/EC/8(b)/68/2013 dated 16th April 2013 Phase V - Godrej Garden City Jagatpur, Ahmedabad, Gujarat Proposed by Godrej Properties Limited Godrej One, 5th Floor Pirojshanagar, Eastern Express Highway Vikhroli (East), Mumbai - 400 079 February 2018 1 Application for EC Amendment – Phase V Godrej Garden City, Ahmedabad (I) Basic Information Sr. No Item Details 1. Name of the Project Amendment in existing Environmental Clearance of Phase V, Godrej Garden City, Ahmedabad 2. Serial No. of the Schedule 8(b) Townships and Area Development Projects 3. Proposed capacity/area/length/tonnage Built up as per existing EC – 280105.48 sq.m to be handled/command area/ lease Built up after amendment proposed – 277091.37 area/ number of wells to be drilled sq.m 4. New/Expansion/Modernization Modification of the building configurations mentioned in the EC letter Reason for amendment – Change in land profile due to implementation of TP Scheme 5. Existing capacity/ Area etc. Land area Land area as per existing EC – 55489.00 sq.m Land area (proposed Amendment) – 54389.00 sq.m Built up area constructed as on date 104343.00 sq.m as per the EC dated 16th Dec,2010 (Phase I) 304899.00 sq.m as per the EC dated 1st Nov, 2012 (Phase III) 127626.55 sq.m out of 280105.48 sq.m as per the EC dated 16th April, 2013 (Phase V) Refer Annex I for the ECs obtained in different phases of construction in the Township. Refer Annex II –Statement showing Building Construction as per the EC. 6. Category of Project i.e. ‘A’ or ‘B’ B 7. Does it attract the general condition? If No yes, please specify. 8. Does it attract the specific condition? If No yes, please specify. 9. Location Ahmedabad, Gujarat Plot/Survey/Khasra No. Sy.No. (Several) (Refer Annex III) Village Jagatpur Tehsil Daskroi District Ahmedabad State Gujarat February 2018 2 Application for EC Amendment – Phase V Godrej Garden City, Ahmedabad Sr. No Item Details 10. Nearest railway station/airport along Kalupur Railway Station – approx. 11.2 km* with distance in km. Chandlodiya Railway station – approx.4 km* Ahmedabad Airport - approx. 7 km* *Aerial distance 11. Nearest Town, City, District Within Ahmedabad Municipal Corporation Limits Headquarters along with the distance in Ahmedabad City – approx. 1 km* kms. *Aerial distance 12. Village Panchayats, ZillaParishad, Ahmedabad Municipal Corporation Municipal Corporation, Local body Sardar Patel Bhavan (complete postal addresses with Danapith, Ahmedabad - 380001 telephone nos. to be given) 13. Name of the applicant Godrej Properties Ltd. 14. Registered Address Godrej One, 5th Floor Pirojshanagar, Eastern Express Highway Vikhroli (East), Mumbai - 400 079 15. Address for correspondence: Name Mr. Chirag Akruwala Designation (Owner/Partner/CEO) Regional Head Address 2nd Floor, Rudra Path, Near Rajpath Club SG Highway, Ahmedabad Pin code 380 059 E-mail [email protected] Telephone 98792 00508 16. Details of alternative sites examined, if Not applicable any. Location of these sites should be shown on a toposheet 17. Interlinked Projects No 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission - February 2018 3 Application for EC Amendment – Phase V Godrej Garden City, Ahmedabad Sr. No Item Details 20. If no reason Not applicable 21. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any Government No Order/ Policy relevant/relating to the site? 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. February 2018 4 Application for EC Amendment – Phase V Godrej Garden City, Ahmedabad February 2018 5 Application for EC Amendment – Phase V Godrej Garden City, Ahmedabad (I) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary No The area of the township was already acquired and change in land use, land demarcated. The construction is happening in phased cover or topography manner. including increase in intensity of land us (with The application is for amending the building respect to local land use configuration given in the existing EC of Phase V. The plan) boundary of the land parcel where construction was earlier proposed is changed now due to the implementation of TP scheme, and the buildings are to be reoriented. 1.2 Clearance of existing land, No Not applicable vegetation and buildings? 1.3 Creation of new land uses? No Change in building orientation with no increase in already acquired area. 1.4 Pre-construction No Preconstruction investigation has been done investigations e.g. bore comprising water testing, soil testing and ambient air houses, soil testing? quality monitoring. 1.5 Construction works? Yes The details of changes proposed in Phase V is as given in Annex IV. 1.6 Demolition works? No Not Applicable 1.7 Temporary sites used for Yes Labour colonies for Approx. 300 labours will be construction works or constructed. housing of construction workers? 1.8 Above ground buildings, Yes 27 blocks with double basements will be constructed. structures or earthworks Earth removed for the basement will be used at the site including linear structures, itself for leveling, landscaping etc. As the proposed cut and fill or excavations construction area is approx. 27.7 ha, it can contain the entire amount of approx. 141536.5 cu.m soil to be excavated. February 2018 6 Application for EC Amendment – Phase V Godrej Garden City, Ahmedabad S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.9 Underground works No Not proposed. including mining or tunneling? 1.10 Reclamation works? No Not applicable 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and No Not applicable manufacturing processes? 1.14 Facilities for storage of Yes Temporary sheds have been constructed for storage of goods or materials? construction materials at the site. 1.15 Facilities for treatment or Yes Construction Phase: disposal of solid waste or Construction waste will be segregated and reused on liquid effluents? the project site. Substratum removed during foundation and excavation will be used for refilling at project site. Proper facility for storage of construction wastes is made at Project site. The sewage generating from the temporary toilets at the Project site will be treated in the existing STP at the project site. Care will be taken to ensure that the water used for construction purposes does not accumulate at the site. Operation Phase: The solid waste generated will be segregated. The biodegradable waste will be composted in OWC of the township and will be used as manure. The non- biodegradable waste will be sold to scrap dealers. Dry/inert waste will be disposed off to authorized municipal solid waste disposal site. A STP of 1000 kld is operational at the site. Two STPs of 250 kld and 100 kld are under construction. Another one of 1600 kld is under construction. For the proposed construction, STP of total 1200 kld capacity will be constructed to treat the sewage. The entire sewage of the township will be treated and reused for flushing and horticulture. February 2018 7 Application for EC Amendment – Phase V Godrej Garden City, Ahmedabad S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.16 Facilities for long term No Not applicable housing of operational workers? 1.17 New road, rail or sea traffic No Construction phase: during construction or Temporary traffic of approx. 50 trucks per day for operation? haulage of construction material. Operation phase: There will be increase in vehicular traffic in the area after the entire township is occupied. Traffic projections and impacts were studied and the report is submitted during the appraisal of I phase construction. 1.18 New road, rail, air Yes The access to the project site will be from the Sarkhej waterborne or other Gandhinagar Highway and feeder roads leading to the transport infrastructure project site are under development. Internal roads are including new or altered being constructed as part of the project plan. routes and stations, ports, airports etc.? Proposed Road Layout Map has already been submitted. 1.19 Closure or diversion of No Not applicable existing transport routes or infrastructure leading to As part of the proposed development, road changes in traffic infrastructure has been proposed which will enhance movements? the existing infrastructure and ease traffic flow around the Project site. 1.20 New or diverted No Not applicable transmission lines or pipelines? 1.21 Impoundment, damming, No Not applicable. No water body exists within the culverting, realignment or township. The site is almost a plain land. other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable 1.23 Abstraction or transfers of Yes Supply will be from Ahmedabad Municipal Corporation water from ground or surface waters? Construction phase: Requirement: Approx.