Form I Application for Amendment in Conditions Related to Water Source
Total Page:16
File Type:pdf, Size:1020Kb
Form 1, Godrej Garden City Phase III Ahmedabad Form I Application for Amendment in Conditions related to Water Source and Rainwater Harvesting Plan mentioned in the Issued Environmental Clearance (EC Letter SEIAA/GUJ/EC/8(b)/308/2012 Dtd. 01.11.2012) of Godrej Garden City, Phase III Behind Nirma University, Jagatpur, Ahmedabad - 382470 by Godrej Properties Ltd. 2nd Floor Rudrapath, Near Rajpath Club, SG Highway, Ahmedabad 380059.Tel: +91 79 29097175 April, 2019 April, 2019 Page 1 of 16 Form 1, Godrej Garden City Phase III Ahmedabad (I) Basic Information Sr. No Item Details 1. Name of the Project Amendment in conditions related to water source and rainwater harvesting plan mentioned in the existing Environmental Clearance of Phase III, Godrej Garden City, Ahmedabad. The issued EC letter is uploaded. 2. Serial No. of the Schedule 8(b) Townships and Area Development Projects 3. Proposed capacity/area/length/tonnage Built up area as per EC – 304899 m2 to be handled/command area/ lease area/ number of wells to be drilled 4. New/Expansion/Modernization Amendment in EC condition regarding water source 5. Existing capacity/ Area etc. Land area :89,030.16 sq.m Built up Area as per EC – 304899 m2 6. Category of Project i.e. ‘A’ or ‘B’ B1 7. Does it attract the general condition? If No yes, please specify. 8. Does it attract the specific condition? If No yes, please specify. 9. Location Ahmedabad, Gujarat Plot/Survey/Khasra No. SyNo.15,16,17,18,19,20,21,22,23,24,29/p,28,27,30,31, 32,33,34/p Village Jagatpur Tehsil Daskroi District Ahmedabad State Gujarat 10. Nearest railway station/airport along Kalupur Railway Station – approx. 11.2 km* with distance in km. Chandlodiya Railway station – approx.4 km* Ahmedabad Airport - approx. 7 km* *Aerial distance 11. Nearest Town, City, District Within Ahmedabad Municipal Corporation Limits Headquarters along with the distance in Ahmedabad City – approx. 1 km* kms. *Aerial distance 12. Village Panchayats, Zilla Parishad, Ahmedabad Municipal Corporation Municipal Corporation, Local body Sardar Patel Bhavan April, 2019 Page 2 of 16 Form 1, Godrej Garden City Phase III Ahmedabad Sr. No Item Details (complete postal addresses with Danapith, Ahmedabad - 380001 telephone nos. to be given) 13. Name of the applicant Godrej Properties Ltd. 14. Registered Address 2nd Floor Rudrapath, Near Rajpath Club, SG Highway, Ahmedabad 380059.Tel: +91 79 29097175 15. Address for correspondence: Name Mr. Chirag Akruwala Designation (Owner/Partner/CEO) Regional Head Address 2nd Floor, Rudra Path, Near Rajpath Club SG Highway, Ahmedabad Pin code 380 059 E-mail [email protected] Telephone 98792 00508 16. Details of alternative sites examined, if Not applicable any. Location of these sites should be shown on a toposheet 17. Interlinked Projects No 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission - 20. If no reason Not applicable 21. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? April, 2019 Page 3 of 16 Form 1, Godrej Garden City Phase III Ahmedabad Sr. No Item Details 22. Whether there is any Government No Order/ Policy relevant/relating to the site? 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date: 18.04.19 Signature of the Applicant Place: Ahmedabad Note: 1. The projects involving clearance under Coastal Regulation Zone Notification,1991 shall submit with the application a CRZ map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. CRZ (at the stage of TOR) and the recommendations of the state Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the CRZ Notification,1991 for the activities to be located in the CRZ. 2. The projects to be located within 10km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by the Chief Wildlife Warden showing these features vis-à-vis the project location and the recommendations or comments or the Chief Wildlife Warden thereon (at the stage of EC) April, 2019 Page 4 of 16 Form 1, Godrej Garden City Phase III Ahmedabad 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR /Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorised signatory only. The authorized signatory should also submit a document in support of his claim of being an authorised signatory for the specific project. (I) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary No No change change in land use, land cover or topography including increase in intensity of land us (with respect to local land use plan) 1.2 Clearance of existing land, No Not Applicable vegetation and buildings? 1.3 Creation of new land uses? No Not Applicable 1.4 Pre-construction No Not Applicable investigations e.g. bore houses, soil testing? 1.5 Construction works? No Not Applicable 1.6 Demolition works? No Not Applicable 1.7 Temporary sites used for No Not Applicable construction works or housing of construction workers? 1.8 Above ground buildings, No Not Applicable structures or earthworks April, 2019 Page 5 of 16 Form 1, Godrej Garden City Phase III Ahmedabad S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data including linear structures, cut and fill or excavations 1.9 Underground works No Not Applicable including mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and No Not Applicable manufacturing processes? 1.14 Facilities for storage of No Not Applicable goods or materials? 1.15 Facilities for treatment or No No change, as earlier submitted. disposal of solid waste or liquid effluents? 1.16 Facilities for long term No Not Applicable housing of operational workers? 1.17 New road, rail or sea traffic No Not Applicable during construction or operation? 1.18 New road, rail, air No Not Applicable waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of No Not Applicable existing transport routes or infrastructure leading to changes in traffic movements? April, 2019 Page 6 of 16 Form 1, Godrej Garden City Phase III Ahmedabad S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.20 New or diverted No Not Applicable transmission lines or pipelines? 1.21 Impoundment, damming, No Not Applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not Applicable 1.23 Abstraction or transfers of Yes Total water requirement during operation of the phase water from ground or is 2419 KLD, out of which 1210 KLD of fresh water surface waters? required shall be met through abstraction of ground water as AMC water supply is delayed.. Copy of application made to CGWA with present status of application is uploaded as additional document. 1209 KLD shall be met through recycling/ treatment of water through STPs as installed on the project site. 1.24 Changes in water bodies or No Not Applicable the land surface affecting drainage or run-off? 1.25 Transport of personnel or No Not Applicable materials for construction, operation or decommissioning? 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in No Not Applicable either temporarily or permanently? April, 2019 Page 7 of 16 Form 1, Godrej Garden City Phase III Ahmedabad S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.29 Introduction of alien No Not Applicable species? 1.30 Loss of native species or No Not Applicable genetic diversity? 1.31 Any other actions? No Not Applicable 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate Information/checklist quantities /rates, wherever S.No. Yes/No confirmation possible) with source of information data 2.1 Land especially undeveloped or No No change, as earlier submitted.