Form 1, Godrej Garden City Phase III

Form I

Application for

Amendment in Conditions related to Water Source and Rainwater Harvesting Plan mentioned in the Issued Environmental Clearance (EC Letter SEIAA/GUJ/EC/8(b)/308/2012 Dtd. 01.11.2012)

of

Godrej Garden City, Phase III Behind , Jagatpur, Ahmedabad - 382470

by

Godrej Properties Ltd. 2nd Floor Rudrapath, Near Rajpath Club, SG Highway, Ahmedabad 380059.Tel: +91 79 29097175

April, 2019

April, 2019 Page 1 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

(I) Basic Information

Sr. No Item Details 1. Name of the Project Amendment in conditions related to water source and rainwater harvesting plan mentioned in the existing Environmental Clearance of Phase III, Godrej Garden City, Ahmedabad. The issued EC letter is uploaded.

2. Serial No. of the Schedule 8(b) Townships and Area Development Projects

3. Proposed capacity/area/length/tonnage Built up area as per EC – 304899 m2 to be handled/command area/ lease area/ number of wells to be drilled

4. New/Expansion/Modernization Amendment in EC condition regarding water source

5. Existing capacity/ Area etc. Land area :89,030.16 sq.m Built up Area as per EC – 304899 m2

6. Category of Project i.e. ‘A’ or ‘B’ B1

7. Does it attract the general condition? If No yes, please specify.

8. Does it attract the specific condition? If No yes, please specify.

9. Location Ahmedabad, Plot/Survey/Khasra No. SyNo.15,16,17,18,19,20,21,22,23,24,29/p,28,27,30,31, 32,33,34/p Village Jagatpur Tehsil Daskroi District Ahmedabad State Gujarat 10. Nearest railway station/airport along Railway Station – approx. 11.2 km* with distance in km. Railway station – approx.4 km* Ahmedabad Airport - approx. 7 km*

*Aerial distance

11. Nearest Town, City, District Within Ahmedabad Municipal Corporation Limits Headquarters along with the distance in Ahmedabad City – approx. 1 km* kms. *Aerial distance

12. Village Panchayats, Zilla Parishad, Ahmedabad Municipal Corporation Municipal Corporation, Local body Sardar Patel Bhavan

April, 2019 Page 2 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

Sr. No Item Details (complete postal addresses with Danapith, Ahmedabad - 380001 telephone nos. to be given)

13. Name of the applicant Godrej Properties Ltd.

14. Registered Address 2nd Floor Rudrapath, Near Rajpath Club, SG Highway, Ahmedabad 380059.Tel: +91 79 29097175 15. Address for correspondence:

Name Mr. Chirag Akruwala

Designation (Owner/Partner/CEO) Regional Head

Address 2nd Floor, Rudra Path, Near Rajpath Club SG Highway, Ahmedabad

Pin code 380 059

E-mail [email protected]

Telephone 98792 00508

16. Details of alternative sites examined, if Not applicable any. Location of these sites should be shown on a toposheet

17. Interlinked Projects No

18. Whether separate application of No interlinked project has been submitted?

19. If yes, date of submission -

20. If no reason Not applicable

21. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991?

April, 2019 Page 3 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

Sr. No Item Details 22. Whether there is any Government No Order/ Policy relevant/relating to the site?

23. Forest land involved (hectares) Nil

24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project.

I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: 18.04.19 Signature of the Applicant

Place: Ahmedabad

Note: 1. The projects involving clearance under Coastal Regulation Zone Notification,1991 shall submit with the application a CRZ map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. CRZ (at the stage of TOR) and the recommendations of the state Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the CRZ Notification,1991 for the activities to be located in the CRZ.

2. The projects to be located within 10km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by the Chief Wildlife Warden showing these features vis-à-vis the project location and the recommendations or comments or the Chief Wildlife Warden thereon (at the stage of EC)

April, 2019 Page 4 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR /Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorised signatory only. The authorized signatory should also submit a document in support of his claim of being an authorised signatory for the specific project.

(I) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary No No change change in land use, land cover or topography including increase in intensity of land us (with respect to local land use plan)

1.2 Clearance of existing land, No Not Applicable vegetation and buildings?

1.3 Creation of new land uses? No Not Applicable

1.4 Pre-construction No Not Applicable investigations e.g. bore houses, soil testing?

1.5 Construction works? No Not Applicable

1.6 Demolition works? No Not Applicable

1.7 Temporary sites used for No Not Applicable construction works or housing of construction workers?

1.8 Above ground buildings, No Not Applicable structures or earthworks

April, 2019 Page 5 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data including linear structures, cut and fill or excavations

1.9 Underground works No Not Applicable including mining or tunneling? 1.10 Reclamation works? No Not Applicable

1.11 Dredging? No Not Applicable

1.12 Offshore structures? No Not Applicable

1.13 Production and No Not Applicable manufacturing processes?

1.14 Facilities for storage of No Not Applicable goods or materials?

1.15 Facilities for treatment or No No change, as earlier submitted. disposal of solid waste or liquid effluents?

1.16 Facilities for long term No Not Applicable housing of operational workers?

1.17 New road, rail or sea traffic No Not Applicable during construction or operation? 1.18 New road, rail, air No Not Applicable waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.?

1.19 Closure or diversion of No Not Applicable existing transport routes or infrastructure leading to changes in traffic movements?

April, 2019 Page 6 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.20 New or diverted No Not Applicable transmission lines or pipelines?

1.21 Impoundment, damming, No Not Applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers?

1.22 Stream crossings? No Not Applicable

1.23 Abstraction or transfers of Yes Total water requirement during operation of the phase water from ground or is 2419 KLD, out of which 1210 KLD of fresh water surface waters? required shall be met through abstraction of ground water as AMC water supply is delayed.. Copy of application made to CGWA with present status of application is uploaded as additional document.

1209 KLD shall be met through recycling/ treatment of water through STPs as installed on the project site.

1.24 Changes in water bodies or No Not Applicable the land surface affecting drainage or run-off?

1.25 Transport of personnel or No Not Applicable materials for construction, operation or decommissioning? 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works?

1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment?

1.28 Influx of people to an area in No Not Applicable either temporarily or permanently?

April, 2019 Page 7 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.29 Introduction of alien No Not Applicable species?

1.30 Loss of native species or No Not Applicable genetic diversity?

1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Details thereof (with approximate Information/checklist quantities /rates, wherever S.No. Yes/No confirmation possible) with source of information data 2.1 Land especially undeveloped or No No change, as earlier submitted. agricultural land (ha) 2.2 Water (expected source & Yes Water Expected Source: Ground Water competing users) unit: KLD Fresh water requirement : 1210 KLD 2.3 Minerals (MT) No Not Applicable

2.4 Construction material – stone, No Not applicable aggregates, sand / soil (expected source – MT) 2.5 Forests and timber (source – No Not Applicable MT) 2.6 Energy including electricity and No No change, as earlier submitted. fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources No Not Applicable (use appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

April, 2019 Page 8 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

Details thereof (with approximate Information/Checklist quantities/rates, wherever Yes/No S.No. confirmation possible) with source of information data 3.1 Use of substances or materials, No Not Applicable which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna and water supplies)

3.2 Changes in occurrence of No Not Applicable disease or affect disease vectors (e.g. insect or water borne diseases)

3.3 Affect the welfare of people e.g. No Not Applicable by changing living conditions?

3.4 Vulnerable groups of people No Not Applicable who could be affected by the project e.g. hospital patients, children, the elderly etc.

3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details there of (with approximate Information/Checklist quantities/rates, wherever Sr.No. Yes/No confirmation possible) with source of information data 4.1 Spoil, overburden or mine No Not Applicable wastes 4.2 Municipal waste (domestic and No No change, as earlier submitted. or commercial wastes)

4.3 Hazardous wastes (as per No No change, as earlier submitted. Hazardous Waste Management Rules)

4.4 Other industrial process wastes No Not Applicable

4.5 Surplus product No Not Applicable

April, 2019 Page 9 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

Details there of (with approximate Information/Checklist quantities/rates, wherever Sr.No. Yes/No confirmation possible) with source of information data

4.6 Sewage sludge or other sludge No No change, as earlier submitted. from effluent treatment 4.7 Construction or demolition No No change, as earlier submitted. wastes

4.8 Redundant machinery or No Not applicable. equipment

4.9 Contaminated soils or other No Not applicable. materials

4.10 Agricultural wastes No Not applicable.

4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approximate Information/Checklist quantities/rates, wherever Sr. No. Yes/No confirmation possible) with source of information data 5.1 Emissions from combustion of Yes No change, as earlier submitted. fossil fuels from stationary or mobile source 5.2 Emissions from production No Not applicable. processes

5.3 Emissions from materials No Not applicable handling including storage or transport

5.4 Emissions from construction No activities including plant and Not Applicable. equipment

5.5 Dust or odours from handling No Not Applicable of materials including

April, 2019 Page 10 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

Details thereof (with approximate Information/Checklist quantities/rates, wherever Sr. No. Yes/No confirmation possible) with source of information data construction materials, sewage and waste

5.6 Emissions from incineration of No Not applicable. waste

5.7 Emissions from burning of No Not applicable. waste in open air (e.g. slash materials, construction debris)

5.8 Emissions from any other No Not applicable. sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approximate quantities/rates, wherever Information/Checklist Sr. No. Yes/No possible) with source of confirmation information data with source of information data 6.1 From operation of equipment No Not Applicable e.g. engines, ventilation plant, crushers 6.2 From industrial or similar No Not applicable. processes

6.3 From construction or No Not Applicable demolition 6.4 From blasting or piling No Not applicable.

6.5 From construction or No Not Applicable operational traffic

6.6 From lighting or cooling No Not Applicable. systems

6.7 From any other sources No Not Applicable.

April, 2019 Page 11 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approximate Information/Checklist quantities/rates, wherever S.No. Yes/No confirmation possible) with source of information data 7.1 From handling, storage, use or No No change, as earlier submitted. spillage of hazardous materials

7.2 From discharge of sewage or No No change, as earlier submitted. other effluents to water or the land (expected mode and place of discharge)

7.3 By deposition of pollutants No Not Applicable. emitted to air into the land or into water

7.4 From any other sources No Not applicable.

7.5 Is there a risk of long term No Not applicable. buildup of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approximate Information/Checklist quantities/rates, wherever S.No. Yes/No confirmation possible) with source of information data 8.1 From explosions, spillages, fires No Not applicable. etc. from storage, handling, use or production of hazardous substances

8.2 From any other causes No Not applicable.

April, 2019 Page 12 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

Details thereof (with approximate Information/Checklist quantities/rates, wherever S.No. Yes/No confirmation possible) with source of information data 8.3 Could the project be affected by No Project is in Earthquake Zone III. The design of natural disasters causing the building is as per the IS 1893: Part (1) 2002 environmental damage (e.g. Criteria for earth quake resistance design of floods, earthquakes, landslides, structures Part 1 general Provisions and cloudburst etc.)? Buildings.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate Sr. Information/Checklist quantities/rates, wherever Yes/No No. confirmation possible) with source of information data 9.1 Lead to development of No No change, as earlier submitted. supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.:

 Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)  housing development  extractive industries  supply industries  other

9.2 Lead to after-use of the site, No Not applicable. which could have an impact on the environment 9.3 Set a precedent for later No Not Applicable developments

9.4 Have cumulative effects due to Yes The project is conceptualized as a township with proximity to other existing or all associated amenities, commercial and retail activities, educational facilities etc. The area has

April, 2019 Page 13 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

Details thereof (with approximate Sr. Information/Checklist quantities/rates, wherever Yes/No No. confirmation possible) with source of information data planned projects with similar already started developing because of this effects project and similar ones in the vicinity. Growth of commerce in terms of primary, secondary and tertiary employment facilities of the locals are already seen in the nearby areas.

(II) Environmental Sensitivity

Aerial distance (within 15 Name/ Sr.No. Areas km.)Proposed project location Identity boundary 1 Areas protected under - Dada Hari Vav (Stepwell at Adalaj) - About 7 international conventions, km* on the North national or local legislation for – About 9 km* on South East their ecological, landscape, Roja - About 12 km* on South cultural or other related value. Ashram - About 4.5 km* on South East

*Aerial distances

2 Areas which are important or - - About 4 km* to East sensitive for ecological Gota Talav - About 1.5 km* to South West reasons - Wetlands, - About 12 km* to South watercourses or other water bodies, coastal zone, *Aerial distances biospheres, mountains, forests.

3 Areas used by protected, No Not applicable. important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration.

4 Inland, coastal, marine or No Not applicable. underground waters

5 State, National boundaries No Not applicable.

April, 2019 Page 14 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

Aerial distance (within 15 Name/ Sr.No. Areas km.)Proposed project location Identity boundary 6 Routes or facilities used by Sarkhej Highway - 2 km* from site. the public for access to recreation or other tourist, *Aerial distances pilgrim areas

7 Defense installations - Ahmedabad Cantonment is about 8 km* on the south east.

*Aerial distances

8 Densely populated or built-up - The site is located at about 5 km* from area Ahmedabad City area and about 13 km* from Gandhinagar.

*Aerial distances

9 Areas occupied by sensitive - Sola Hospital- About 5.1 km* to South man-made land uses CIMS hospital - About 6.6 km* to South (hospitals, schools, places of Nirma University - About 1.2 km* to North worship, community facilities) Swami Narayan Gurukul - About 1.8 km* to North West ISCON Temple - About 7.5 km* to South

*Aerial distances

10 Areas containing important, - Project site is in Daskroi Taluka which falls under high quality or scarce “Overexploited Category” as per CGWA data resources (ground water source. resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

11 Areas already subjected to No Not applicable. pollution or environmental damage. (those where existing legal environmental standards are exceeded)

12 Areas susceptible to natural - The area is susceptible to earthquakes and is in hazard which could cause Seismic Zone III. All the existing and buildings are the project to present designed as per IS 1893: Part (1) 2002 Criteria for environmental problems earth quake resistance design of structures Part 1 (earthquakes, subsidence, general Provisions and Buildings.

April, 2019 Page 15 of 16

Form 1, Godrej Garden City Phase III Ahmedabad

Aerial distance (within 15 Name/ Sr.No. Areas km.)Proposed project location Identity boundary landslides, erosion, flooding or extreme or adverse climatic conditions)

April, 2019 Page 16 of 16