63Rd OCC Meeting Minutes
Total Page:16
File Type:pdf, Size:1020Kb
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/1825 Jabalpur, dated:15.06.2018 To As per distribution list Sub: Minutes of 63rd meeting of Operation and Coordination Committee of MP. … The Minutes of 63rd meeting of the Operation and Coordination Committee of MP held on 26th April 2018 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email- [email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail- [email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail- [email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046, [email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected] 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M- 9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR). 22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected] 23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected]. 24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected] 25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] 26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected] 27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected] MINUTES OF 63rd MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 26th APRIL 2018 AT 11:00 AM AT CONFERENCE HALL, SLDC, MPPTCL, NAYAGAON, JABALPUR. The 63rd meeting of Operation & Coordination Committee of MP was held on 26th April 2018 at 11:00 AM at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur. The list of participants is enclosed at Annexure -1.0. Shri K.K.Parbhakar Chairman OCC & Chief Engineer SLDC welcomed all the guests and participants for 63rd OCCM. Chairman OCC stated that the Stated OCCM of MP is conducted bi-monthly, it is a platform where operational issues related to grid and all the entities are discussed and resolved amicably for safe & secure grid operation. Presently there are no major issues faced in grid operation due to development and strengthening of transmission network. He also stated that no feedback is received or no issues are raised in MP OCC by the entities connected to the Grid. Thereafter he requested all the entities that if they are facing any problems related to grid operation, it should have raised in the meeting for discussion. Further he informed the committee that on 20th April 2018, MERC has issued the Forecasting, Scheduling, DSM & Related matters of Wind & Solar Generating Stations Regulations 2018, where in the complete procedure and calculations for deviation & settlement for RE Generators (Wind & Solar) are defined/explained. Creation of separate pool account is also defined for RE Generators (Wind & Solar). Further he also informed the committee that Forecasting, Scheduling & DSM for RE generation connected on 33 KV is to be done by respective Discoms for which procedure is being prepared by SLDC as per the directives of MPERC Regulation. As per the existing practice of MPERC for DEZ by Discom, similarly for DSM of RE generators the capacity building, software development & creation of virtual pool account in the existing pool account has to be done by Discoms. He also stated that the Regulation is applicable w.e.f 20.04.18, hence Discoms will require forecasting data to issue DSM account and can get the initial forcasting data from SLDC if it is not available with the Discoms. Chairman OCC also informed the committee that one of the major issues to be addressed at present is the DC revision/ reducing the DC by thermal generators in last minute/real time due to coal shortage. He stated that intimation of DC revision due to coal shortage/tube leakage, delay in intimation to SLDC/MPPMCL creates difficulties in maintaining the load and generation balance resulting O/D. Looking to the present scenario where Hydel Generation is being scheduled as per Administrative and irrigational requirement of NVDA/WRD to fulfill the irrigation/water supply requirements in various regions and also no load shedding is allowed or being done, hence it is difficult to operate the grid in safe, secure and balanced manner with these restrictions. He informed the committee about the tube leakage incident at STPS#11, which was known to the officials at STPS one day prior taking the M/C Off-Bar but was intimated on last minute to SLDC/MPPMCL. The Chairman OCC requested MPPGCL & other thermal Power Stations to intimate SLDC/MPPMCL well in advance about DC revision/reduction in DC due to Coal Shortage, tube leakage, reasons well known in advance so that power can be arranged and planning can be done in advance to mitigate the demand & restrict O/D for safe and secure Grid Operation. Thereafter Chairman OCC apprised the committee & congratulated MPPGCL for Lit-Up of SSTPS Phase-II Unit-3. After brief deliberation of Chairman, he requested Member Secretary OCC to take up the agenda points. Shri R.A.Sharma Member Secretary OCC & Addl. Chief Engineer, SLDC welcomed all the guests and participants for 63rd OCCM and taken up agenda points which is narrated here under in nutshell : ITEM NO. 1 : CONFIRMATION OF MINUTES : The committee was informed that Minutes of 62nd meeting of Operation & Coordination Committee of MP held on 27th FEBRUARY 2018 at SLDC, MPPTCL, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/983 Jabalpur dated 04.04.2018. As NO comment have been received, therefore the committee has confirmed the minutes. Minutes of 63rd OCCM of MP 1 ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS FEB 2017 TO MAR 2018. 2.1. Frequency Particulars: The committee was apprised that during FEB 2018 the system frequency was below 49.90 Hz for 9.69% of time against 12.99 % of time during MAR 2018. The system frequency was above 50.05 Hz for 10.06 % of time during FEB 2018 against 7.72 % of time during MAR 2018. The system frequency was within the IEGC range of 49.90-50.05 Hz for 80.25 % of the time during FEB 2018 against 79.29% of time during MAR 2018. The average monthly frequency was 49.98 Hz during month of FEB 2018 and 49.97 Hz during month of MAR 2018.