POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/1825 Jabalpur, dated:15.06.2018

To

As per distribution list

Sub: Minutes of 63rd meeting of Operation and Coordination Committee of MP. …

The Minutes of 63rd meeting of the Operation and Coordination Committee of MP held on

26th April 2018 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur Distribution List

1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email- [email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, . 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, , email- [email protected].

6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected]

7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail- [email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail- [email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, ,Bhopal, Fax No-0755-2423046, [email protected]

20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected]

21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M- 9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR).

22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : , Distt : (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected].

24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] 26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old , Distt. , Email – [email protected] 27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected]

28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected] MINUTES OF 63rd MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 26th APRIL 2018 AT 11:00 AM AT CONFERENCE HALL, SLDC, MPPTCL, NAYAGAON, JABALPUR.

The 63rd meeting of Operation & Coordination Committee of MP was held on 26th April 2018 at 11:00 AM at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur. The list of participants is enclosed at Annexure -1.0.

Shri K.K.Parbhakar Chairman OCC & Chief Engineer SLDC welcomed all the guests and participants for 63rd OCCM. Chairman OCC stated that the Stated OCCM of MP is conducted bi-monthly, it is a platform where operational issues related to grid and all the entities are discussed and resolved amicably for safe & secure grid operation. Presently there are no major issues faced in grid operation due to development and strengthening of transmission network. He also stated that no feedback is received or no issues are raised in MP OCC by the entities connected to the Grid. Thereafter he requested all the entities that if they are facing any problems related to grid operation, it should have raised in the meeting for discussion.

Further he informed the committee that on 20th April 2018, MERC has issued the Forecasting, Scheduling, DSM & Related matters of Wind & Solar Generating Stations Regulations 2018, where in the complete procedure and calculations for deviation & settlement for RE Generators (Wind & Solar) are defined/explained. Creation of separate pool account is also defined for RE Generators (Wind & Solar). Further he also informed the committee that Forecasting, Scheduling & DSM for RE generation connected on 33 KV is to be done by respective Discoms for which procedure is being prepared by SLDC as per the directives of MPERC Regulation. As per the existing practice of MPERC for DEZ by Discom, similarly for DSM of RE generators the capacity building, software development & creation of virtual pool account in the existing pool account has to be done by Discoms. He also stated that the Regulation is applicable w.e.f 20.04.18, hence Discoms will require forecasting data to issue DSM account and can get the initial forcasting data from SLDC if it is not available with the Discoms.

Chairman OCC also informed the committee that one of the major issues to be addressed at present is the DC revision/ reducing the DC by thermal generators in last minute/real time due to coal shortage. He stated that intimation of DC revision due to coal shortage/tube leakage, delay in intimation to SLDC/MPPMCL creates difficulties in maintaining the load and generation balance resulting O/D. Looking to the present scenario where Hydel Generation is being scheduled as per Administrative and irrigational requirement of NVDA/WRD to fulfill the irrigation/water supply requirements in various regions and also no load shedding is allowed or being done, hence it is difficult to operate the grid in safe, secure and balanced manner with these restrictions. He informed the committee about the tube leakage incident at STPS#11, which was known to the officials at STPS one day prior taking the M/C Off-Bar but was intimated on last minute to SLDC/MPPMCL. The Chairman OCC requested MPPGCL & other thermal Power Stations to intimate SLDC/MPPMCL well in advance about DC revision/reduction in DC due to Coal Shortage, tube leakage, reasons well known in advance so that power can be arranged and planning can be done in advance to mitigate the demand & restrict O/D for safe and secure Grid Operation. Thereafter Chairman OCC apprised the committee & congratulated MPPGCL for Lit-Up of SSTPS Phase-II Unit-3. After brief deliberation of Chairman, he requested Member Secretary OCC to take up the agenda points.

Shri R.A.Sharma Member Secretary OCC & Addl. Chief Engineer, SLDC welcomed all the guests and participants for 63rd OCCM and taken up agenda points which is narrated here under in nutshell :

ITEM NO. 1 : CONFIRMATION OF MINUTES : The committee was informed that Minutes of 62nd meeting of Operation & Coordination Committee of MP held on 27th FEBRUARY 2018 at SLDC, MPPTCL, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/983 Jabalpur dated 04.04.2018. As NO comment have been received, therefore the committee has confirmed the minutes.

Minutes of 63rd OCCM of MP 1

ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS FEB 2017 TO MAR 2018.

2.1. Frequency Particulars: The committee was apprised that during FEB 2018 the system frequency was below 49.90 Hz for 9.69% of time against 12.99 % of time during MAR 2018. The system frequency was above 50.05 Hz for 10.06 % of time during FEB 2018 against 7.72 % of time during MAR 2018. The system frequency was within the IEGC range of 49.90-50.05 Hz for 80.25 % of the time during FEB 2018 against 79.29% of time during MAR 2018. The average monthly frequency was 49.98 Hz during month of FEB 2018 and 49.97 Hz during month of MAR 2018. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of FEB 2018 and MAR 2018 are enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:

Minimum Maximum Instantaneous Instantaneous Average Integrated integrated Month Minimum Maximum frequency frequency over an frequency over an Frequency Frequency hour hour FEB 2018 49.98 Hz 49.86 Hz 50.06 Hz 49.70 Hz 50.20 Hz MAR 2018 49.97 Hz 49.85 Hz 50.08 Hz 49.66 Hz 50.20 Hz

Member Secretary stated that the Instantaneous Minimum Frequency for the month of Feb-18 & Mar-18 was 49.70 Hz & 49.66 Hz respectively, which is quite low and is a matter of concern for safe secure & reliable grid operation. He stated that the primary response of the Generators shall be ensured by Generators as these frequency particulars are generally governed by Primary Response.

2.2 Operational Matters

2.2.1 Operational Discipline : The committee was intimated regarding frequency profile for the months FEB 2018 and MAR 2018 is as given below for discussion by the committee : % of time % of time frequency No. of times % of time Frequency within the Average monthly frequency Month Frequency Below permissible range of frequency dipped below above 50. 05 Hz 49.90 Hz 49.90-50.05 Hz. 49.20 Hz FEB 2018 9.69% 10.06% 80.25% 49.98 Hz 0 MAR 2018 12.99% 7.72% 79.29% 49.97 Hz 0

2.2.2 Voltage Profile: Members were apprised regarding voltage profile for the months the months FEB 2018 and MAR 2018 i.e. the maximum and minimum voltage as recorded at important 400 KV s/s in MP Grid: -

FEB 2018 MAR 2018 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Name of Observed Observed Observed Observed Sr. 400 KV Volt Voltage No. Substation Voltage ag Voltage Date Date Date Date KV e KV KV KV

Minutes of 63rd OCCM of MP 2

1 Indore 421 11.02.18 400 01.02.18 418 19.03.18 397 26.03.18 2 Itarsi 423 14.02.18 400 02.02.18 414 28.03.18 395 09.03.18 3 Bina 420 11.02.18 398 03.02.18 415 14.03.18 397 28.03.18 4 Gwalior 417 12.02.18 390 05.02.18 414 20.03.18 392.5 28.03.18 5 Nagda 423 14.02.18 402 01.02.18 421 03.03.18 400 26.03.18 6 Satpura 427 11.02.18 406 03.02.18 425 23.03.18 408.6 23.03.18 7 Birsinghpur 424 12.02.18 404 03.02.18 424 19.03.18 408 08.03.18 8 ISP 426 20.02.18 409 01.02.18 426 20.03.18 409 05.03.18 9 Bhopal 424 11.02.18 402 01.02.18 419 05.03.18 398 21.03.18 10 Ashta 425 11.02.18 400 01.02.18 423 02.03.18 404 24.03.18 11 422 11.02.18 403 01.02.18 421 05.03.18 404 26.03.18 423 11.02.18 403 22.02.18 424 05.03.18 408 08.03.18 12 Singhaji The committee was informed that during the month of Feb-18 & March-18 the voltage profile was well within limits. It is also mentioned that during the monsoon season reactive power absorption expected from Generators to maintain voltage within limits, hence its is desired that MPPGCL, NHDC & JP Bina may provide reactive support.

2.2.3 Status of Capacitor Banks in sub-transmission system: The updated information of the status of capacitor banks in sub-transmission system as on 31th MAR 2018 as submitted by DISCOMs , was discussed as detailed below:

Capacitor bank Capacitor Capacitor bank Require Requiremen Capacitor Balance installed in good Banks healthy installed but ment of t against banks already capacitor condition (No) but not in defective & are repair non- covered under banks to be service due to repairable (No) against repairable ADB T-V covered in DISCOM control ckt each capacitor other problem unit (No) banks schemes

600 1200 1500 600 1200 1500 600 1200 1500 No of 100 600 1200 600 1200 600 1500 KVAR KVAR KVAR KVA KVA KVA KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR R R R Units required EZ 394 139 39 32 13 1 36 18 1 23 ------CZ 5 688 722 0 0 0 1 0 0 3 0 0 0 0 0 0

WZ 636 548 683 0 5 4 20 12 16 169 2 8 - - - 3

The Dscom representative were requested to ensure healthiness of capacitor bank in order to maintain quality power supply. Further Central Discom representative were requested to arrange inspection of capacitor bank at Sabalgarh area before ensuing Rabi season in order to cocksure the healthiness of capacitor banks looking to low voltage problem. The representative of EZ was requested to expedite the repair work of defective capacitor banks. The members were requested that the submission of H.T shunt capacitors in the WRPC prescribed format enclosed as Annexure 2.2.3 as per this office letter no 07-05/RPC-14/2811 dated 18.11.2017, on 7th of every month may be ensured so that same may be forwarded to WRPC for onward submission to Hon’ble CERC. The members discussed the matter & noted.

Minutes of 63rd OCCM of MP 3 2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 31.03.2018 as submitted by MPPTCL is given below:-

Voltage Capacitor bank Capacity Added Capacitor banks TOTAL Capacitor Bank Class installed as on after Last OCC already covered CAPACITY AS Installed but 31.01.18(MVAR) Meeting (MVAR) under ADB T-V ON 31.03.18 defective & are not (MVAR) repairable (No & MVAR) 220 KV 100.00 0.00 - 100.00 All in Service 132 KV 1238.00 0.00 - 1238.00 33 KV 5104.50 168.00 - 5272.50 Total 6442.50 0.00 - 6610.50 The members discussed the matter & noted.

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 31.03.2018 as submitted by MPPTCL was apprised to the members as detailed below:-

The members discussed the matter & noted.

2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The committee was updated regarding the various ongoing Transmission Schemes completed during the financial year 2017-2018 (up to MAR 2018) and plan for completion of various ongoing Transmission Schemes for the Year 2017-2018 is enclosed asAnnexure 2.2.5(i) and 2.2.5(ii) respectively. The members noted the metter.

2.2.6 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: Frequency did not touch 49.20 Hz during FEB 2018 and MAR 2018. There was no df/dt operation during the same period.

(ii) Defective u/f, df/dt relays: MPPTCL has informed that all the df/dt relays are in operation, where the U/F relays are not available, the numerical relays programmed for under frequency operation. Df/dt relay at 220 KV Sagar, 220 KV Chhatarpur & 132 KV S/s Chapda is being replaced shortly, except this all U/F stages are in good/healthy condition. The members discussed the matter.

2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33 KV feeders:

(i) Details of DISCOM wise Power supply given to various domestic categories during the period February 2018 and March 2018 was apprised to the committee..

(iii) Group Allocation to Newly Commissioned existing EHV substations:- - The Member Secretary OCC informed the committee that the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been:-

Minutes of 63rd OCCM of MP 4 SN DISCOM Region No of 33 KV feeders for which groups to be allocated 01 Jabalpur 0 02 Sagar 0 EAST 03 Rewa 0 04 Total 0 05 Indore 12 06 WEST Ujjain 04 07 Total 16 08 Bhopal 14 09 CENTRAL Gwalior 18 10 Total 32 TOTAL Grand Total 48

Discoms were requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting.

It is pointed out that in 62nd OCCM representative from Central Discom informed that 5 no. 33 KV feeders (i.e., 33 KV Dord, Banbar, Chinor, Karhiya & Gharsondi) have been group allocated. Similarly, representative from West Discom informed the committee that 05 no. 33 KV feeders have been group allocated. However, the order copy of the above mentioned 05 no. 33 KV feeders of Central & West Discom each has not been received to P&D and SLDC. Therefore, these feeders are not considered to be group allocated till date. The representative of Discoms informed that the order copy shall be provided. The members discussed the matter & noted

ITEM NO. 3 : OPERATIONAL PLANNNING:

3.1 Generating Units under planned outage and proposed maintenance programme: The annual maintenance /outages of thermal generating units of MPPGCL during April 2018 to May 18 is Nil as intimated by ED(O&M:Gen.), MPPGCL, Jabalpur.

3.2 Proposed shutdown programme of Transmission lines / Transformers: The proposed shutdown of transmission elements for the period 01.03.2018 to 31.05.2018 submitted by MPPTCL is enclosed as Annexure-3.2. The members have noted the points.

3.3 Long Outages of transmission elements and protections: The status submitted by MPPGCL /MPPTCL are given below:- Sr. Line/Transformer/ etc Outage date Reason Response from Utility No under long Outage 12.5 MVA, 132/66/33 KV On completion of useful life Transformer failed on X’mer, CGL make Sr. No. transformer is decommissioned vide 1. 19.05.2016 19.05.2016 as intimated 23615 at 132 KV S/s ce (p&d) order no 04-02/PSP-65- by T&C, MPPTCL. Pichhore B/880 dtd 23/04/2018. 12.5MVA X mer, BBL Make On completion of useful life 2. (Sr. No.-1428/3) at 132 KV Not intimated X’mer failed transformer is decommissioned vide S/s Chapda.

Minutes of 63rd OCCM of MP 5 ce (p&d) order no 04-02/PSP-65- B/880 dtd 23/04/2018. MPPTCL informed that the transformer has been declared failed 40 MVA, 132/33 KV CGL and being replaced by 20 MVA Tripped on differential 3. make X’mer, Sr. No. T- 22.06.2017 X’mer. Representative from indication. 8362-3 at 220kv s/s Ujjain. MPPTCL informed the committee that the X’mer will be replace by end of may2018. X’mer taken out from service since 14-07-16 On completion of useful life 16 MVA, 132/11KV EMCO due to aging and no transformer is decommissioned vide 4 X’mer at 132 KV S/s 14.07.16 11KV network at S/S ce (p&d) order no 04-02/PSP-65- . (unserviceable as B/880 dtd 23/04/2018... 132/11KV Capacity). 7.5MVA 132/11KV Out of service due to On completion of useful life transformer is decommissioned vide 5 X’mer at 132 KV S/s - non availability of ce (p&d) order no 04-02/PSP-65- Suwasra 11KV network B/880 dtd 23/04/2018.. In 62nd OCC MPPTCL informed the committee that the transformer is being replaced by new X’mer by end 315MVA, 400/220,BHEL Differential, Buchholz 6 15.01.2018 of May 2018. Representative from X’mer-I at 400kv S/s Bina and PRV indications MPPTCL informed the committee that new X’mer will be charged on 01.05.2018.

MPPTCL informed the committee 315MVA, 400/220 X’mer-II 7 14.02.2018 Differential, Buchholz. that the X’mer will be brought in at 400kv S/s Bina. service by July 2018.

Representative from MPPTCL 40MVA 132/33KV ECE Tripped on informed the committee that the 8. at 132 KV S/s 24.02.2018 Differential X’mer will be replaced by 16 MVA Lakhnadon. indications X’mer, which has been released and will be replaced by May 2018.

MPPGCL informed that the unit is 9 STPS Unit #9-GT 24.08.2017 GT Burnt likely to be synchronize very soon.

MPPGCL informed that the Work 400 KV Generator Breaker completed on 23.12.17. The GT will 10. 24.08.2017 Fire in Bushing of GT of Unit # 9 of Satpura be brought in service with the unit#9 by 30.04.2018. 11 UAT-B, U#11, STPS, Sarni Feb-18 - Work has been completed. MPPGCL informed the committee 500 MVA, 400/220 KV X’mer tripped at 21:55 that the work is under progress and 12 19.04.2018 X’mer at STPS. Hrs. due to LA Burst. the X’mer is expected to be taken in service in 15 days.

400 KV Transfer Bus MPPGCL is requested to indicate 13 13.12.17 Nitrogen Leakage Coupler at SGTPS the reason for not indicating the

Minutes of 63rd OCCM of MP 6 outage timely to SLDC. MPPGCL informed the committee that the visit of company engineer is being arranged for rectification.

The members were requested that whenever any transmission element/ EHV element under outage, which has not been intimated/included under aforesaid outage list, should be invariably intimated to SLDC. All entities are requested to ensure the same. The members have noted the points.

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF FEBRUARY 2018 AND MARCH 2018:

The details of actual generation, Schedule from Central Sector, demand etc. were tabled for discussion:

Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL & NHDC Hydel Units. Annex. 4.2 Power Supply Position.

Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs. The matter has been discussed & noted.

ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF FEBRUARY 2018 AND MARCH 2018: The Grid Disturbances and Grid Incidents in MP during these months as indicated in Annexure 5 were apprised to the committee. The matter has been discussed

ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:-

6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The present status regarding schedule and commissioning of reactors / transmission elements were discussed as detailed below:- S.No. 400 KV S/s Size Implementing Expected Date of Commissioning MVAR Agency as intimated in last OCC In 62nd OCC NHDC informed that committee that the reactor has been received and will be commissioned by March 2018. Representative from ISP informed the committee that the reactor Bus Reactor : 1. 125 MVAR NHDC has been installed and the inspection ISP by the engineer from CEA has been done, the report of which is still awaited. Hence it is expected that the reactor will be taken in service by end of May 2018. Line Reactor MPPGCL informed that the price bid 2. on 400 kV Satpura–ISP 50 MVAR MPPGCL has to be opened and the reactor will line at STPS be commissioned by December 2018. Work will be carried out under PSDF as intimated by MPPGCLin 62nd OCC Bus Reactor at 125 MPPGCL informed the committee that 3. MPPGCL SSTPS MVAR the reactor is under procurement and will be commissioned by December 2018.

Minutes of 63rd OCCM of MP 7 6.2 Load Dropping Scheme at 400 KV substations to handle emergency condition: - It was apprised to the committee that on dtd. 17.04.2018 at 12:15 hrs 315 MVA 400/220 KV ICT No.-II at 400 KV substation (PG) Gwalior tripped and caught fire. The fire was rapidly spread nearby area. Therefore 315 MVA 400/220 KV ICT No-I was also hand tripped at 13:32 hrs. to safeguard the ICT. Thereafter the loading of 315 MVA ICT No.III rushed dangerous level of 390 MW. The contingency arrangements were made to handle the emergency situation immediately as detailed below: - 1. The load of 220 KV Mehgaon substation shifted to Auriya supply of NR BY by opening of 220 KV Malanpur-Mehgaon and 132 KV Malanpur-Mehgaon lines. The load of Mehgaon, Bhind, Ron, Lahar, Seondha, Gormi, Porsa, Ambha met from Auraiya supply. 2. 220 KV supply extended to Datia substation from 400 KV substation Bina . This supply also extended up to 220 KV substation Mahalgaon . 220 KV Gwalior (PG) Mahalgaon circuit were kept off. 3. The load of Sheyopur & Sabalgarh substations were fed from 400 KV substation Bina (PG). The 132 KV link from Motizeel substation to Sabalgarh substation kept off. 4. The load of Guna, Ashoknagar and 220 KV substation Bina were fed from 220 KV Sagar supply. This supply was also kept parallel with Vidisha supply. 5. The 220 KV Malanpur and Morena substation were made available supply from 315 MVA 400/220 KV ICTNO.I at Gwalior (PG). At around 22.00Hrs ICT No I at PG Gwalior restored and supply arrangement made as per original scheme except at Mehgaon S/S . Further on dtd. 18.04.2018, the emergency situation again arise at Gwalior area as 315 MVA ICT No.II which was under breakdown and the PG Gwalior has requested for availing emergency shutdown on ICT No.I as Tan Delta of B-Ph. 220 KV bushing was found high and the same bushing of the ICT required to be replaced immediately. To manage the emergency condition again contingency arrangements were made to handle the load of Gwalior Region. As the shut down was requested for three days on continuous basis therefore extra arrangement felt needed in order to ensure uninterrupted supply to Gwalior area, therefore following arrangements were made. i. 220 KV Bina had been fed from Bhopal supply through 220 KV Vidisha and Ganjbosoda feeder. The 220 KV Bina interconnector No. I & II kept off. ii. 220 KV Sagar supply was extended to Datia substation through split bus arrangement at 400 KV substation Bina. The Ashoknagar and Guna substation were also kept on Sagar supply. iii. The supply of 400 KV substation Bina extended to Mehalgaon substation. Thus Mehalgaon substation was made available, Bina supply as well as Sagar supply (through Datia substation). 6. The load of 220 KV Mehgaon substation was already on Auriya supply and 220 KV Malanpur-Mehgaon and 132 KV Malanpur-Mehgaon lines were off. The load of Mehgaon, Bhind, Ron, Lahar, Seondha, Gormi, Pursa, Amba met from Auraiya supply. i. The load of Sheopur , Sabalgarh substations were fed from 400 KV substation Bina (PG) . The 132 KV link from Motizeel substation to Sabalgarh substations were kept off. ii. The 220 KV Malanpur and Morena substation were made available supply from 315 MVA 400/220 KV ICTNO.I at Gwalior (PG). Nevertheless, the MP Demand was minimum at time of incidence, therefore situation could be possible to control. Obviously, in case of high Demand

Minutes of 63rd OCCM of MP 8 period, such situation may adversely affect the system and it may not have possible to maintain uninterrupted supply during such situation.

In view of above it was elaborated that it becomes necessary that in every 400 KV substation, load dropping scheme invariably made functional so that in case of any emergency situation under N-1 condition, the loading on ICT should not crossed dangerous level. It is therefore, MPPTCL is requested to review the load dropping schemes and furnish details of scheme available with all important substations at least upto 400 KV level. However, if load dropping scheme have not been made, so far, it is requested to formulate suitable load dropping scheme to handle sudden emergency as elaborated above in Gwalior area. Member Secretary OCC stated that in spite of such critical contingency the system was managed without interrupting any area, by the combined efforts of SLDC/MPPTCL/WRLDC and congratulated all the concerned entities for the same. He further stated that during such alert condition the system is difficult to manage and a proper load drop scheme shall be implemented. Hence it is requested to MPPTCL to review the existing load drop scheme and to implement new load drop scheme as per requirement as per undated network and submit to SLDC

6.3 Frequent Tripping Of 132 KV VSTPS- Waidhan Ckt –I & II:- The committee was informed that on 11.04.2018 following lines tripped at 21:10 Hrs :- 1. 132 KV VSTPS- Waidhan Ckt-I (through auxiliary bus at Waidhan substation feeding to Morwa substation). 2. 132 KV VSTPS-Waidhan Ckt-II. 3. 132 KV Morwa –Jayant Ckt- I & II .

The supply was resumed from Annupur substation, this caused 23 minutes interruption to Waidhan, 20 minutes to Rajmilan substation and 26 minutes interruption to Morwa s/s & Jayant feeders. It is mentioned that when 132 KV Morwa-Jayant Ckt-II charged, after 3 minutes this line again tripped alongwith 132 KV Morwa-Rajmilan and 132 KV Annupur-Rajmilan Ckt. This caused 22 minutes interruption to Morwa substation and 27 minutes interruption to Jayant feeders .

It was pointed out that 132 KV VSTPS –Waidhan Ckt-I &II along with other EHV lines radiating from Waidhan / Morwa substation are being tripped frequently during recent past , resulting interruption to mines area. The frequent interruption to mines area is not desirable. The details of trippings on EHV elements at Waidhan Morwa area are annexed. The EHT M& I representative was requested to look into the matter and asked to arrange thorough.

It was also pointed out that whenever any line from Waidhan substation got tripped, tripping on other EHV lines radiating from Waidhan / Morwa substation are also taking place. As Waidhan substation is adjacent to Vindhayachal Super Power Station, therefore multiple tripping on EHV elements at these area is not desirable, looking to system security and reliability of integrated system. The (T&C) representative was requested that relay coordination at Morwa / Waidhan and Rajmilan substations may please be examined and remedial action may kindly be ensured. Further frequent tripping at Morwa/ Waidhan area

Minutes of 63rd OCCM of MP 9 may please be analyzed and report thereon may please be provided so that same may be appraised to WRLDC Mumbai. The tripping details were also apprised as Annexure-6.3. The (T&C) representative has informed that there is some relay coordination issue with VSTS. Therefore it was also decided that the matter shall be put up before state level relay setting review group of wrpc.

6.4 Formation of State Level Relay setting group- Review and Coordination of relay setting in state of MP:- The committee was apprised that s decided in 128th Protection Committee meeting of WRPC held on 06th & 07th Dec. 2016 , relay review group for state of MP has been constituted vide this officer letter No.07-05/RPC-14/596 Jabalpur dtd 22.05.2017. All entities have been requested to provide relay settings of all important nodes & all other nodes where relay settings are required to be examined considering protection issues. As desired by WRLDC important nodes like Indore PG, Bhopal etc. required to be examined first, which have huge effect on reliability and security of Grid.

It was infoThe first meeting of State Level Relay Setting Group convened on 18th August 2017 at SLDC for review the existing relay settings of critical state network and state network incidental to ISTS and to provide necessary interface between utilities/entities.

All the members were requested to make arrangement to furnish details of relay settings of all important nodes, so that same may be communicated to all members and existing setting of critical nodes could be reviewed & corrective measures may be taken. Attention was also invited to members that SLDC have made multiple correspondences in this regard, however except MPPGCL, no any other utility has provided the desired data. It is accordingly desired that the data may please be provided immediately to SLDC.

During discussions, it was envisaged that relay setting of ISPs, OSP nodes required to be examined first, as in recent past, frequent undesirable trappings were observed due to probable mismatch of relay coordination issue. Accordingly, ISP, OSP representatives were requested to provide relay setting of ISP, OSP nodes so that same could be validated by the committee in the next meeting. The consolidated relay setting data has not been received by the entities. The desired data may kindly be submitted in the meeting by all the entities. It has now been decided that the meeting of the State Level Relay Setting Group of MP shall be organized on 10th May 2018 to discuss relay coordination issue at Omkareshware and Damoh node therefore MPPTCL. NHDC, PGCIL may furnish the desired details of relay settings provided at these nodes so that the matter may be discussed on 15th May 2018 and needed action on the matter may be initiated.

6.5 Procedure for availing outage on ISTS EHV elements and OCC approval thereof: - The committee was briefed that as per standard procedure of WRPC, all EHV elements which have been listed under the list of important grid elements of Western Region, the outages for such elements required OCCM approval. All such proposed outages of interstate and 400 KV transmission elements of next months should be got approved in the OCCM of WRPC in the current month. All the constituents of WR shall inform to the WRPC for readiness for availing outage of transmission elements on D-3 basis. Further, as decided non-

Minutes of 63rd OCCM of MP 10 OCCM outages should be discouraged. Only under exceptional cases, the request for transmission outage after issue of OCCM minutes must be posted through email for concurrence of WRPC Member at least three days in advance.

The matter has also been discussed in various OCC meetings of MP and it is observed that the standard procedure for availing outages on interstate and 400 KV elements is not followed by the utilities. It is observed that routine maintenance shutdown proposal and the shutdown proposal of construction activities are being sent to SLDC on D-3 basis, whereas such proposal should have been incorporated in OCCM proposal. Such practice should be strictly avoided. It is worthwhile to mention here that WRPC /WRLDC are reluctant to entertain non-OCCM outages for maintenance / construction activities. Only emergency outages are considered on D-3 basis. It is therefore desired that all utilities may please ensure that all maintenance/ construction activities may be planned well in advance and such proposal should have invariably incorporated in OCCM proposal. It is also mentioned that due to any reason if any OCC approved outage could not be availed, in that case such proposed outages could be rescheduled and approval of WRPC/WRLDC could be obtained. However, no any outages could be considered which has not been incorporated in OCCM proposal. It was pointed out that the aforesaid instruction be complied by EHT-Const wing also as WRLDC/WRPC is reluctant to accord approval on D-3 basis for construction activities. The Committee may discuss the matter. T&C, EHT-Maintenance and EHT-Construction, MPPTCL was requested to submit the compiled shut down list to be submitted timely to SLDC for submission in WRPC OCCM.

6.6 Integration of Satna-Satna (PG) Inter-connector After LILO of 220 KV Satna-Chhatarpur Line From Satna (PG) S/s:- The committee was apprised that the 220 KV Satna-Chhatarpur line which was initially radiating from Satna S/s, now has been LILO at 400 KV Satna (PG). Thereafter, 220 KV Satna (PG)- Chhatarpur line and 220 KV Satna-Satna(PG) Inter connector are integrated in the system. It is also mentioned that 220 KV Satna-Katni line as a stop gap arrangement, is being utilized as 220 KV Satna- Satna(PG) Inter-connector-III. Now after integration of Satna-Satna (PG) Inter connector consequent of LILO of Satna-Chhatarpur line, 220 KV Satna-Katni line required to be restored as per approved configuration. It is also mentioned that newly connected Satna-Satna(PG) Inter connector is carrying less than half load in comparison to other three no. inter connector. After conversion of Satna-Satna Inter connector No.3 as 220 KV Satna-Katni line, only 2 & half carrying capacity will be available between Satna- Satna( PG). Looking to prevailed load pattern reduced capacity inter connector will create over loading problem. On dtd. 28.11.2017 at 12:54 Hrs, loading recorded between inter connector Satna-Satna(PG) are indicated below-

220 KV Satna-Satna (PG) Ckt.I - 141 MW (approximate line length is about 1 KM) 220 KV Satna-Satna (PG) CktI.II - 139 MW (approximate line length is about 1 KM) 220 KV Satna-Satna (PG) Ckt-III - 129 MW (approximate line length is about 1 KM) (This Ckt. No.III shall be converted as 220 KV Satna-Katni line.) 220 KV Satna-Satna (PG) Ckt-.IV - 56 MW (approximate line length is about 4 KM)

Minutes of 63rd OCCM of MP 11

Considering loading of EHV elements at Satna-Rewa area, it would not be appropriate to run one inter connector with half capacity. It is therefore felt that some modifications are required in 220 KV Satna-Satna inter connectors. It may please be verified whether newly constructed Satna-Satna(PG) ckt. (having half load capacity as inter connector due to higher line length) could be utilized for connecting Satna(PG) - Katni line, so that existing arrangement of 220 KV Satna-Satna(PG) Ckt. III could be continued and uniform loading on all 3 Nos. inter connector could be ensured. The committee was informed that the matter have been discussed during 59th meeting of OCCM, however the fruitful response from MPPTCL still have not been received. It is therefore desired that the matter may be discussed and suitable result on the matter may be evolved so that system constrained at Satna area may be addressed. Representative from MPPTCL informed the committee that it is being proposed to connect one of the interconnectors from Satna PGCIL to 220 KV S/s Kotar which will relieve the loading of other interconnectors, but it is under discussion/planning stage and will be intimated to all the concerned entities once the proposal is approved.

6.7 Delay In Submission of Documents For First Time Charging of Elements:- Procedure for interconnection of new transmission elements is briefly narrated as mentioned hereunder:- • Intimation by Transmission Licensee to RLDC / SLDC(Annexure A1-A5): 10 days prior to anticipated date of first time charging. • Acknowledgement and comments of RLDC/ SLDC to Tr. Licensee ( Format-II): Within 3 days. • Submission of request for first time charging by Tr. Licensee to RLDC//SLDC (Annexure B1-B5): 3 days prior to anticipated date of first time charging. • RLDC shall issue Provisional Charging Approval for first time charging to licensee and in case of interregional element RLDC to issue consent/ request to NLDC for IR lines. In case of intrastate line charging approval shall be conveyed by SLDC: (within 2 days). • Licensee to submit dummy SEM reading to RLDC to ensure that the Meter processing Software is able to read the SEM data from the new meters. • Licensee to take Operational Code from RLDC /SLDC Control Room for switching operations. The code shall be issued keeping view of grid reliability. • Transmission Licensee submit Post Charging documents (Annexure C1 to C4). • RLDC/ N LDC shall verify the post charging documents and issue certificate for interstate / Interregional lines / ISTS lines. • The respective testing department shall furnish regarding measures taken to take care new element interconnection for protection co-ordination for adjacent s/s and accordingly undertaking shall be provided. It is requested that licensee / utilities were requested to strictly adhere with time schedule for documentation of first time charging of new transmission elements of all interstate line and all EHV elements 400kv and above. The matter was discussed in the meeting.

Minutes of 63rd OCCM of MP 12

6.8 Delay In Conveying Information of Tripping /Disturbance At Sarni End:- it was informed to the committee that 220 KV Sarni –Handia line tripped at 17:10 hrs on 15.04.2018 from Sarni Power House. The line could be normalized at 18:07 hrs on 15.04.2018 after 57 minutes of tripping. The abnormal delay in normalization of the line was due to delay in conveying the tripping details to Handia substation as well as to MP SLDC.

The indications of aforesaid lines were received at SLDC after repeated pursuance by SLDC. It is pointed out that generally observed that whenever tripping/disturbance took place at Sarni Power House, the details are not conveyed timely, resulting delay in process of normalization. Thus, outage of lines is increased unnecessarily and hampers grid security.

It is requested that the concerned officials may please be instructed suitably that whenever any tripping or disturbance occurred on EHV elements, the same should be conveyed with relay indications and all relevant details to SLDC within reasonable time slot so that remedial action could be taken in due course of time and could be avoided undesired delay in restoration of EHV elements. As prolong outage of EHV elements also involved commercial issue therefore MPPTCL / MPPGCL and all utilities are requested to ensure timely restoration of tripped EHV elements. Member Secretary OCC requested MPPGCL to instruct the site officials accordingly for fast restoration of the system.

6.9 PROVISION OF SYNCHRONISATION FACILITY AT EHV SUB-STATIONS OF MPPTCL:- As per Grid Code, the synchronization facility should be available at all the Power Stations, 400 KV Sub-stations and 220 KV Sub-stations and 132 KV sub-stations in the path of black start. In last OCC meeting MPPTCL representative informed the committee that order for 69 no. synchronization trolleys has been placed and 1 no. synchronization trolley has been delivered for checking and testing purpose at 220KV S/S . In last 59th OCCM MPPTCL informed the committee that the status will be intimated shortly to SLDC. The status of installation and commissioning of synchronization trolleys at different substations to be submitted by the MPPTCL. Further MPPTCL is also requested to submit the list of Sub-stations where the synchronization trolley has been installed/installation work of synchronization trolley has been completed. The matter was discussed in the meeting.

6.10 TEN DAILY RESERVIOR OPERATION TABLE OF MPPGCL:- In the meeting held in Regional Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table from WRD and NVDA for their operation of their hydro generators. In last 54th to 59th, OCCMs, request has been made to MPPGCL for furnishing the same to SLDC. The Tan Daily programme of hydel power stations is necessary for planning of Load Generation Balance.

Minutes of 63rd OCCM of MP 13 MPPGCL has not submitted the ten Daily Reservoir Operation Table of all the power stations of MPPGCL for the year 2017-18. It is requested that MPPGCL shall submit the Ten Daily Reservoir Table of all hydel power stations in coordination with NVDA and WRD for optimum utilisation of available water in the reservoirs during real time operation. The matter was discussed in the meeting & members had noted the point.

6.11 MONITORING OF SCHEMES FUNDED FROM PSDF :- It was decided in the 6th meeting of NPC held on 19th December 2016 at Bengaluru, that all the RPCs in the monthly OCC meetings may follow up with the utilities to expedite the completion of schemes by giving due priority. The implementation of most of the schemes are based on the recommendation of the enquiry committee on grid disturbance of July 2012 headed by Chairperson, CEA. Therefore timely implementation of these schemes would enhance the grid security and reliability. Accordingly the details of grant sanctioned from PSDF for the schemes of MP is enclosed at Annexure- 6.11A. The status of implementation of above schemes (physical as well as financial progress) may please be reviewed and the entities are requested to expedite implementation of the schemes. The utilities were advised to furnish the information in the format enclosed at Annexure – 6.11B by first week of every month on regular basis to Member Convener, PSDF project monitoring group (AGM, NLDC, POSOCO) with a copy to NPC, WRPC division and SLDC. The status of the same is being monitored by WRPC in OCC meeting of WRPC every month.

It is observed that MPPTCL and MPPGCL are not submitting the requisite information to SLDC in first week of every month for onward transmission to WRPC. It is therefore requested that concerned official may please instructed to submit the same regularly to SLDC within time. The matter was discussed in the meeting.

6.12 Charging of 132 KV Chhegaon- Circuit without obtaining real time code from Sub-SLDC:- On dtd. 27.03.2018, at around 20:28 Hrs., 132 KV Chhegaon-Nepanagr Ckt – I & II tripped from both end. Thereafter at 20:34 Hrs.,132 KV Chhegaon – Nepanagar Ckt – I was charged from Nepanagar end but circuit did not hold and again tripped. Further 132 KV Chhegaon – Nepanagar Ckt – II was charged at 20:33 Hrs.

The committee was informed that the complete incident was reported late to Sub-SLDC Indore i.e., at 20:38 Hrs. Further it is also intimated that the complete switching operations (i.e., trial charging of 132 KV Chhegaon – Nepanagr Ckt – II at 20:34 Hrs. and charging of 132 KV Chhegaon – Nepanagar Ckt – II at 20:33 Hrs.) without obtaining the code & intimating sub-SLDC Indore. The switching operation of transmission elements without obtaining code and intimation to SLDC is not desirable for safe, secure and smooth operation of integrated grid and also violation of IEGC section 1.5, 5.6.2(b) and MPEGC clause 1.14. Such violation was also noticed in past also were charged without obtaining real time code from SLDC/sub-SLDC. The same was also informed vide this office letter no. EE/Sub-LDC/381 dtd-28.03.18.

Minutes of 63rd OCCM of MP 14 It is therefore mpptcl representative was requested that the substation officials may be instructed to strictly comply to the Grid Code to ensure safety of the integrated system and to avoid such occurrences in future All the entities of the grid was requested to perform any switching operation under intimation to SLDC.

6.13 POWER SYSTEM STABILIZER (PSS) IN AVR TUNING OF GENERATOR AND ITS RESPONSE PLOT:-The committee was informed that in 129th Protection Committee Meeting of WRPC, it has been decided that all generators would furnish PSS settings and step-test response plot of time Vs terminal voltage in excel sheets to WRLDC/ WRPC. As a sequel to above, MPSLDC vide various e- mail communication all generators under our periphery were .requested to provide PSS settings and the step test response plot of time Vs terminal voltage in excel sheet to WRLDC/ WRPC. Inspite of repeated pursuance, the details of SGTPS Birsinghpur Power House only receipt, no any other generators have provided the desired information. However, SGTPS has also not provided desired graph plot in excel sheet. The above data /plot required to be provided to WRLDC/ WRPC on urgent basis, it is therefore desired that all generators may provide the same so that the same may be forwarded to WRLDC/ WRPC. The generators were requested for esuring the compliance of Protection Committee Meeting may kindly be ensured. The matter was discussed in the meeting.

6.14 RGMO/FGMO compliance by generators in the region:- It is to intimated that as per IEGC 5.2(f), RGMO/FGMO is mandatory for all thermal Units above 200MW & Hydro Units above 10MW for grid security and reliable grid operation. Further vide 5th amendment to IEGC dtd-12.04.2017, it has been provided in clause-5.2(h) that “ RLDCs/SLDCs shall not schedule the generating station or unit(s) thereof beyond ex-bus generation corresponding to 100% of the installed capacity of the generating station or unit(s) thereof and that the generating station shall not resort to Valve Wide Open operation of units” so that primary response is ensured. Representative from MPPGCL informed the committee that the required data will be submitted at the earliest.

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS :

Black Start mock drill of Hydel stations of MPPGCL:- During 2017-18 the black start mock drill successfully carried out at Bargi and Pench Hydel power station on dtd 23.05.2017 and 06.06.2017 respectively. The Black Start Mock drill exercise at Gandhi Sagar Power station was also carried out on dtd 30.05.2017 but synchronization of islanded system with national grid was not successfully done due to problem in bus coupler breaker at Gandhi sagar Power Station. Black Start Mock Drill at Birsinghpur HPS, Tons HPS & ISP HPS was successfully carried out on 17.10.2017, 23.01.2018 & 10.02.2018 respectively. MPPGCL may apprise the same in the meeting. The Joint Black Start Mock Drill of Pench & Bargi was successfully conducted on 11.04.2018.

Minutes of 63rd OCCM of MP 15 The black start mock drill exercise of other power stations was proposed to be held in April 2018 but to non-availability of Bus Coupler Breaker at OSP the Mock Drill date cannot be finalized. The OSP HPS may kindly inform the status of Bus Coupler Breaker so that at the earliest Mock Drill exercise may be organized. Representative from OSP informed the committee that the purchase of Bus Coupler Breaker is under process and the tender is being awarded. The matter was discussed in the meeting.

ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES:

8.1 Status of AMR system installed at SLDC:

SLDC representative informed the Committee about the status of data received through AMR system in the month of March 2018. He informed that the complete data of 589 meters was received through AMR system and data of 35 Nos meters (Monthly- 24 & Partial – 11) was not received through AMR system, the availability of data was around 94%. He also informed that status of data received through AMR system is invariably sent to all concerned offices including SE(T&C) offices through email for furnishing the missing data alongwith monthly JMR data latest by 4th of every month. Further, the following points are discussed and resolved as under:-

1. SLDC representative requested the CE(T&C) office to take up the matter with M/s Secure Meters Ltd for resolving the site related issues of the 35 Nos meters not read during the month of March 2018. Details are shown in enclosed Annexure-8.1.i. CE(T&C) office have assured to take up the matter with M/s Secure Meters Ltd. for resolving the issues related with 35 Nos. meters not read during the month of March’2018.

2. SLDC representative informed that around 138 Nos. ABT meters are installed at the interface points of newly commissioned substation / Xmers / HT consumers / OACs, after repeated pursuance with M/s Secure Meters Ltd only 72 Nos meters are successfully integrated with AMR system of SLDC and balance 66 Nos meters are yet to be integrated with AMR system. He requested the CE(T&C) Office to advice M/s Secure Meters Ltd. and field offices for integrating the balance ABT meters (66 Nos) and also requested to include the new meters installed at the interface points under AMC contract of M/s Secure Meters Ltd. The list of 66 Nos. meters required to be integrated with AMR system is shown in Annexure-8.1.ii. CE (T&C) office have assured to take up the matter with site officials and M/s Secure Meters Ltd. for integrating the balance 66 meters with AMR System. Further, CE(T&C) office has assured to take up the matter with CE(Procurement) office for including the new meters installed at the interface points under AMC contract.

3. SLDC representative informed that as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of meter) Regulation 2010, the interface meter are required to be tested at least once in five years. He also requested CE(T&C) office to advice the concerning officials to verify the monthly JMR data for its correctness before sending to SLDC. CE(T&C) office have assured that instructions will be issued to Site Officials for testing of meters and verifications of JMR.

4. SLDC representative informed that CE(T&C) office is requested to issue instructions to all circle offices for furnishing the JMR data in standard format enclosed herewith as Annexure- III to SLDC on email id- [email protected].

Minutes of 63rd OCCM of MP 16

8.2 AMR facility for the ABT meters installed at MPPGCL :

SLDC representative informed that MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points and all the meters were successfully integrated with AMR server. He also informed that ABT meter data of 44 Nos meters were not received through AMR system in the month of March 2018, the status of data received through AMR system was also emailed to GCC, MPPGCL on 21th April 2018. He requested MPPGCL to take up the matter with site officials and M/s Secure Meters Ltd. to resolve the problems related with non readability of meters integrated successfully and provide AMC of AMR facility to M/s Secure Meters Ltd. so that complete data is received by SLDC. MPPGCL assured to take up the matter with site officials and M/s Secure Meters Ltd.

SLDC representative also requested to MPPGCL to instruct the Gandhi Sagar HPS & Silpara HPS officials for considering the ABT meters with AMR facility as main meters and furnish the JMR data accordingly. MPPGCL have assured to take up the matter with Gandhi Sagar and Silpara HPS.

SLDC representative also requested MPPGCL to furnish the meter master of ABT meters installed at the interface points as main, check and standby meters alongwith modem and SIM details. MPPGCL assured to furnish the same.

SLDC representative informed that in case of Thermal Power Stations of MPPGCL, the injection recorded by the ABT meters installed at the outgoing feeders generally do not match with the generation recorded at Generator end. He requested MPPGCL to advise the site officials for monthly checking / verification of feeder wise data with Generator and Station Xmer wise data and testing / calibration of meters installed at the Power Stations as per CEA regulations. MPPGCL have assured to issue instructions to site officials.

8.3 Non receipt of monthly injection data (JMR) of newly commissioned Wind & Solar Power Project for issuance of monthly State Energy Account :

SLDC representative informed that the concerned SE(O&M)’s do not furnish the monthly injection data of following newly commissioned Wind & Solar Power Project connected at 33KV level. However, SLDC is incorporating the injection data recorded in ABT meter in SEA, but, verification of data of the following REGs could not be done. i) 15MW Solar Power Project of M/s Simcom Pvt. Ltd. (Simcom(1MW), Eastman(4MW) & Made Easy(10MW) connected at 220KV Ganjbasoda. –SE(O&M) Vidisha. ii) 6 MW Biomass Power Project of M/s Ramnik Power & Alloy connected at 33KV Wara Seoni substation - SE(O&M) Chhindwara. iii) 30MW Baggase Power Project M/s Narmada Sugar Mills connected at 132KV Pondar substation - SE(O&M) Narsinghpur. iv) 30MW Baggase Power Project of M/s Narmada Sugar Mills connected at 132KV Ponder substation - SE(O&M) Narsinghpur.

SLDC representative requested DDC, Bhopal & Jabalpur to take up the matter with their Commercial Sections for issuance of directives to concerned SE(O&M)’s for furnishing the wind & solar generation JMR data by 3rd or 4th of every month. DCC’s have assured to take up the matter with their Commercial Sections.

SLDC representative informed that instructions have already been issued to Renewable Energy Generators not integrated with AMR server of SLDC and connected at 33KV level for

Minutes of 63rd OCCM of MP 17 providing separate modem & SIM for data downloading at SLDC remotely. He requested the Discoms to coordinate with Renewable Energy Generators (REG’s) for installation of separate modem & SIMs and integrating with AMR Server for data downloading at SLDC.

SLDC representative informed that JMR injection data of the following wind & solar generators connected at 132KV level and above is not furnished by the concerned EE(T), MPPTCL, SLDC consider the data received through AMR or through MRI by site official in monthy SEA, but verification of data of the following REGs could not be done. i) 42MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 220KV Badnagar substation through 132KV Ckt. ii) 21MW Wind Power Project of M/s Sarjan Realities Ltd. connected at 220KV Badnagar substation through 132KV Ckt. iii) 11.5MW MSW Plant of M/s Essel Power Ltd., Marhotal, Jabalpur connected at 132KV Marhotal substation through 132KV Ckt. iv) 50 MW Kukru Wind Power Project connected at 132KV Gudgaon substation through 132KV Ckt. v) 49.5 MW Betul Wind Power Project connected at 132KV Gudgaon substation through 132KV Ckt. vi) 51MW ReNew Clean Solar Power Project connected at 132KV Kotiya substation through 132KV Ckt.

He requested CE(T&C) office to issue necessary directives to field offices for furnishing the JMR data of the above RE Projects. CE(T&C) office have assured to issue instructions to field offices for furnishing the JMR data of above mentioned RE Projects connected at 132KV level and above.

ITEM NO. 9: SCADA and E&T RELATED ISSUES:

9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS-

It was informed during the meeting that integration of telemetry of around twelve Sub stations (132KV Biora, 132 KV Chanera S/s,132KV Mungaoli S/s, 132KV Manjhgawa S/s,132 kv Malhargrah, 132 KV kurawar & 132KV . 132 KV Chourai, 132 KV Mandla,132 KV Raghograh, 132 KV Isagrah, 132 KV Pratappura ,132 KV Maneri, 132 KV Dabra.) with SLDC SCADA is pending. It was also informed the process connection of 220 KV Shahdol (220 KV side) analog telemetry is still pending.

Further, telemetry of Birsingpur HPS and Zinna HPS is also not available and same needs to be provided by MPPGCL.

It was also informed by SLDC that most of the RTUs commissioned recently is not working properly and functioning intermittently. It was also brought to the notice of OCC that MPERC vide Letter dated 09-08-2017 has directed to ensure proper functioning of RTUs.

In response, MPPTCL representative assured to look into it and arrange commissioning of telemetry of balance RTUs as well as arrangement for round the clock smooth functioning of these newly commissioned RTUs. Regarding telemetry of Birsinghpur HPS and Zinna HPS representative of MPPGCL told that the procurement of RTU is in approval stage.

Minutes of 63rd OCCM of MP 18 9.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS

The present status of telemetry discrepancy including upgradation requirement was discussed in detail enclosed herewith as Annexure-9.2. The list of following important locations where RTU upgradation is required to accommodate renewable feeders/other feeders/transformers was discussed in detail:-

Sl Name of Substation Name of feeders/transformers required to be No. whose RTU is required to included in telemetry be upgraded 1.Wrong telemetry of 400/220 KV Xmer CB status (Both Sides), Bus Coupler CB status, Station Xmer 5A & 5B CB status,Gen-1 CB status, 220 KV Panagar CB status, Gen- 2 CB status. 01 400 KV Birsingpur TPS 2. Wrong values of 220 KV Bus-II Voltage & frequency. 3.Non availability of telemetry of 220/33 KV Xmer. These discrepancies are persisting since long time

Telemetered values of 1.Generating Transformer 6,7,8,9 MW,MVAR, 2.400 Satpura-Astha I & II Line Reactors, 3. 220 KV Bus I & II Voltage & frequency, 4.CB Status of 220KV Satpura- Sarni -1,2, 220 KV 02 400 KV Satpura TPS Satpura-Itarsi 2,3 & 4, 220 KV Satpura-Handia, Station Xmer I, II & III. 5.Wrong CB status of GT 6, & 220 KV Transfer Bus Coupler & 220 KV Bus Tie. 6.SOE to be verified. Station Transformer 5A & 5B CB & 132/33 KV transformer 03 220 KV ATPS CB. Values of Generating Unit 1 & 2 jumps to zero for a short 04 Singhaji TPS duration. 05 Pench HPS & Deolond HPS Telemetry not available since long time.

06 220 KV Tons Telemetered values of following feeders is wrong:- 1. 220 KV Tons-Sirmour 2. 220 KV Tons-Rewa 3. 220 KV Tons-Satna 4. 220 KV Tons-Kotar

Above discrepancy is pending since more than year. In Last OCCM it was ensured by MPPGCL that the same shall be rectified within a week but no action has been taken till now.

CB status of 220 KV Tons-Rewa II.

Rajghat HPS Wrong CB status of Gen-3 07 Telemetered values of 400 KV Nagda MVAR is 10 times of 08 400 KV ISP actual value. 220KV Birsingpur S/s The telemetry of 220KV IC-3 & 4 feeder is not available 09 since last one year.

Minutes of 63rd OCCM of MP 19 Breaker status of 400 KV Bus Coupler, 315 KVA Xmer II 10 400 KV Chhegaon (Primary) & 160 MVA Xmer III (primary) 1.CB status of 220 KV bus coupler, 132 KV Rampur 11 220 KV Rewa S/s Naikin. 12 220KV Anuppur S/s 1.132KV TRF 2 telemetry not available. 2.Wrong CB status of 220 KV Amarkantak-II, 220 KV Amarkantak-I, 160 MVA Xmer II, 132 KV Kotma-I, 132 KV Kotma II, 132 KV Shahdol, 40 MVA Xmer. 13 132KV Kotma S/s 1.132KV Anuppur feeder II telemetry not available. 2. Wrong CB status of 132 KV Anuppur-1 & 2. 14 220 KV Seoni i.Wrong CB status of 160 MVA Xmer II (Secondary side) ii.Wrong value of 220 KV Bus II Voltage iii. Wrong value of 220 KV Seoni-Seoni(PG)-1. 15 220 KV Sabalgarh Telemetry of 132 KV Motijheel not available.

16 400 KV Bhopal 80 MVAR Reactor I & II Main CB 18 132 KV Khategaon Wrong values of 132 KV Tap (Handia – Kannod)

19 400 KV Astha (i)400/220 ICT-1 MW Value is wrong. (ii)400 KV Satpura-II CB status & Line Reactor MVAR. (iii) 400 KV Bus Coupler CB Status (iv)220 KV Shajapur-II CB Status (v) SOE to be verified. 20 220 KV SHAHDOL Complete 220 KV YARD Analog value not available.

SLDC further informed that the status of telemetry is being monitored by MPERC through MIS report and hence telemetry is required to be maintained properly with highest possible availability.

It was also informed by SLDC that lot of inconvenience in grid management is observed due to above discrepancy and hence upgradation of above mentioned RTU is to be taken up on top most priority for which MPPGCL and MPPTCL agreed.

9.3 Extension of RGMO/FGMO signal to SLDC/WRLDC :-

SLDC informed that as per IEGC 5.2(f), RGMO/FGMO is mandatory for all thermal units above 200 MW and hydro units above 10 MW. Further considering the high penetration of renewable to grid and also the Government target to achieve 175 GW, it is essential to monitor operation of RGMO/FGMO at SLDC/RLDC for ensuring grid security and compliance of regulation. Subsequently SLDC vide letter no. 07-05/RPC-27/3739 dated 18-01-2017, letter No. SE/LD:E&T/693 dated 23-01-2017, letter No. SE/LD:E&T/34 dated 13-04-2017, letter No. SE/LD:E&T/143 dtd.26-05-17, , letter No. SE/LD:E&T/309 dtd.19-07-17, letter No. SE/LD:E&T/980 dtd.14.03.18 requested MPPGCL/NHDC for integration of telemetry of RGMO/FGMO in RTU installed at power station and forward the object address configured in RTU so that same may also be configured in SLDC SCADA and RGMO/FGMO status may be displayed in SCADA system. The matter was again taken up vide this office UO No.38 dated 21/08/2017. However, extension of RGMO/FGMO signal of following generating units is still to be extended to SLDC SCADA system:- S.No. Name of Generating Station Unit.No. 1 Satpura TPS 6,7,8,9 2 SGTPS 1,2,3,4

Minutes of 63rd OCCM of MP 20 3 BARGI HPS 1,2 4 PENCH HPS 1,2

In addition to above, the RGMO/FGMO status of Tons HPS is showing incorrect.

SLDC requested to expedite the extention of telemetry of RGMO/FGMO of above generators for which MPPGCL engineers told that extension of RGMO/FGMO signal of Bargi HPS shall be completed by June 18 and confirmed that balance shall be completed shortly.

9.4 Non Availability/ Unreilable telemetry of Hydel Power Stations :-

SLDC informed that the telemetry of Bansagar III, Tons, Pench, Bargi, Bansagar II is very unreliable & frequent long outage with abnormal delay in restoration of same is observed. The RTU availability of MPPGCL HPS is as detailed here under :-

Name of HPS Present Status Availability Availability in in Feb-18 March-18 Pench Out since last one year 0 % 0% Bansagar-III Out since last 10 months 0 % 0% Bansagar-II Intermittent 37% 39% Madikheda Intermittent 63% 58% Rajghat Intermittent 90% 85% Gandhisagar Intermittent 24% 75% Bargi Intermittent 92% 95% Tons Intermittent 96% 98% Birsingpur HPS Telemetry not provided to SLDC. Zinna HPS

It was also informed that as per CERC communication regulation 2017, availability of telemetry is required to be ensured more than 99.9% however as indicated above the telemetry availability of Hydel Power Stations is very low.

SLDC vide letter SE/LD:E&T/38 dtd.12.04.18 requested MPPGCL to provide the contact details of officers at each power house looking after telemetry work & also provide the list of spares (PLCC/RTU/MFM etc.)

MPPGCL representative agreed to resolve the above issue at the earliest.

9.5 NON AVAILABLITY OF SOE AT SLDC SCADA SYSTEM

SLDC informed that the problem in receipt of SOE from field is observed. WRLDC vide letters dtd. 03.05.17 & 15.05.17 intimated that SOE of grid disturbance at 220 KV S/s Mahalgaon & 400 KV S/s Indore is not received in Back-up LDC SCADA/Sub-LDC SCADA system respectively. SLDC is carrying out data validation of various substations periodically & it is observed that SOE from various substations like 400 KV S/s Satpura, 400 KV S/s Astha, 220 KV S/s Damoh, 220 KV Itarsi, 220 KV Barwaha, 220 KV Chhindwara, 220 KV Pandhurna, 220 KV Sabalgarh, 220 KV Shivpuri, 220 KV S/s Tikamgarh, 220 KV S/s Mahalgaon, 220 KV S/s Hoshangabad, 220 KV Shujalpur, 220 KV S/s Badod was not received at SLDC SCADA system. Subsequently SLDC vide letter SE/LD:E&T/200 dtd. 14-06-17 requested MPPTCL to arrange simulation testing for SOE of all RTUs.

Receiving of SOE is very essential for analysis & investigation of major tripping in the grid. SLDC requested MPPTCL to arrange simulation testing for SOE of all RTU’s in coordination with SLDC

Minutes of 63rd OCCM of MP 21 SCADA/Back Up SLDC/Sub LDC SCADA system & also issue necessary instructions to sort out the issues for ensuring proper receipt of SOE in SLDC SCADA system for which MPPTCL and MPPGCL agreed

9.6 INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :-

It has been observed that the telemetry of Singhaji TPS, 400KV Pithampur,132 KV Chhindwara, 220KV Sirmore, 220 KV Tons HPS, 220Kv Sidhi,220 KV Rewa, Madikheda HPS, 132 KV Khapaswami ,220 KV Pithampur I & II , 132 KV Morwa, 220 KV Sabalgarh, 132 KV Sheopur Kalan, Madikheda HPS, 132 KV Pondar is intermittent due to heavy noise in the communication channel. Further these noisy channels interrupt the functioning of FEP at the SLDC/Back Up LDC/Sub LDC which leads to inconvenience in system operation & control.

It is to mention that as per CERC communication regulation 2017, availability of telemetry is required to be ensured more then 99.9%. However, presently, availability of most of the RTUs is less then 50%. MPPGCL and MPPTCL is required to initiate necessary action to ensure availability as per CERC regulation.

MPPTCL/MPPGCL is thus requested to arrange for alignment of PLCC Channel & identify/replace the outdoor equipments which inject the noise in the channel/system for which MPPTCL representative agreed.

9.7 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS

The long outage of telemetry of following S/s is discussed in detail: - Sl No. Name of Sub Station Out from /Remark

01 132KV Morwa S/s More than one and half Year.

02 132KV Beohari S/s Out from more than one year

03 132 KV Waidhan S/s Out from last 5 months

04 Pench HPS Out from more than a year

05 Bansagar III HPS Out from ten months.

MPERC vide Letter dated 09-08-2017 has directed to submit reason for long outage for RTU & also directed to ensure proper functioning of RTUs.

MPPTCL, MPPGCL are requested to sort out rectification of above RTU/data channel on top most priority.

MPPTCL, MPPGCL officials confirmed to look into the matter to sort out/ rectification of above RTU/data channel. MPPGCL and MPPTCL informed that the action regarding restoration of telemetry of above sub stations /power stations shall be taken up on top most priority.

9.8 Telemetry of railway TSS Sub Stations: -

It was informed by railway representative that telemetry of twenty railway traction substation shall be commissioned by Sep18. It was also informed by railway representative that action to arrange telemetry of

Minutes of 63rd OCCM of MP 22 balance 18 No. traction sub stations shall be arranged by central railway . SLDC requested railway authorities to expedite the commissioning of telemetry of railway traction sub stations.

9.9 INFORMATION REQUIRED FOR PMU ANALYTICS UNDER URTDSM PROJECT:- Under the “Unified Real Time Dynamic State Measurement” URTDSM Project, the analytics applications has been installed at SLDC MP for which the relay setting details are required for its configuration from all the sub-stations where PMU’s are installed and its adjacent sub-stations (list of S/s enclosed as Annexure-9.9.1). The format for submitting the required details is enclosed as Annexure-9.9.2. The matter was discussed & the representative informed the committee that the details will be submitted shortly.

ITEM NO 10 : DATE AND VENUE OF NEXT OCC MEETING :

The date and venue of 64th Operation and Coordination Committee meeting of MP shall be intimated separately.

***********

Minutes of 63rd OCCM of MP 23 Minutes of 63rd OCCM of MP 24 Minutes of 63rd OCCM of MP 25 Minutes of 63rd OCCM of MP 26 FREQUENCY PARTICULARS

S. No. Particulars Feb-18 Mar-18

1 INTEGRATED OVER AN-HOUR

Between 01.00 Between 06.00 hrs 1.1 Maximum Frequency 50.06 Hz hrs & 02.00 Hrs 50.08 Hz & 07.00 Hrs on on 12.02.18 31.03.18

Between 10.00 Between 10.00 hrs 1.2 Minimum Frequency 49.86 Hz hrs & 11.00 Hrs 49.85 Hz & 11.00 Hrs on on 28.02.18 09.03.18

1.3 Average Frequency 49.98 Hz 49.97 Hz

2 INSTANTANEOUS FREQUENCY AT 13.02.30 AT 13.03:20 HRS 2.1 Maximum Frequency 50.2 Hz HRS ON 50.2 Hz ON 21.03.18 17.02.18 AT 06.43:30 AT 21.19:30. HRS 2.2 Minimum Frequency 49.7 Hz HRS ON 49.68 Hz ON 14.03.18 17.02.18 3 Percentage of time when frequency was :-

%age of time when frequency was Feb-18 Mar-18

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 9.69 12.99

3.7 Between 49.9 Hz and 50.05 Hz 80.25 79.29

3.8 Between 50.05 Hz AND 51.5 Hz 10.06 7.72

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

Minutes of 63rd OCCM of MP 27 ANNEXUR-2.2.5(i) M.P POWER TRANSMISSION COMPANY LIMITED TRANSMISSION WORKS COMPLETED DURING 2017-18 (UP TO 31.03.2018) I EHV TRANSMISSION LINES S. TYPE OF ROUTE CIRCUIT DATE OF DATE OF No. NAME OF THE TRANSMISSION LINE / CIR CUITS LENGTH KMS. COMPLETION COMMI- (FINANCED BY) SSIONING A. 400 KV TRANSMISSION LINES NIL 0 0 B. 220 KV TRANSMISSION LINES (a).220Kv DCDS line for inter-connection of 400Kv S/s Betul with 1 DCDS 1.88 3.76 July'2017 21.07.2017 220Kv S/s Betul (2x1.88) (ADB-III Saving) LILO of 2nd circuit of Damoh (MPPTCL) - Sagar 220KV line at 2 DCDS 0.59 1.184 Aug'2017 28.08.2017 Damoh (PGCIL) 400 kV Sub-station Damoh (2x0.592) LILO of 2nd ckt. Of Itarsi(MPPTCL) - Hoshangabad 220Kv line at 3 DCDS 0.06 0.12 Aug'2017 09.08.2017 Itarsi(PGCIL) 400 KV S/s. (2X0.060) LILO of one circuit of Satna (MPPTCL) - Chhatarpur 220KV line at 4 DCDS 1.96 3.92 Oct'17 05.10.2017 Satna (PGCIL) 400 kV Sub-station (2x1.96) (PGCIL DOWN) LILO of 2nd ckt. Of Bansagar - Satna 220Kv line at Kotar 220 KV 5 S/s. (4x3.321+2x2.462)(ADB-III Saving) LILO arrangement DCDS 4.70 17.848 Oct'17 16.10.2017 4x0.035+2x0.959 completed 220kV DCDS line for LILO of one ckt of 220kV DCDS Indore - 6 DCDS 0.20 0.396 Oct'17 30.10.2017 Indore-II(Jaitpura) line at Mangliya (2x0.198) (PFC-III) LILO of one circuit of Malanpur - Mehgaon at 400Kv S/s CWRTL 7 DCDS 7.40 14.792 Jan'18 16.01.2018 (Adani) (2x7.396) (ADB-III Saving) LILO of 2nd ckt. Of Birsinghpur - Amarkantak 220kV line at Shahdol 220 8 DCDS 5.80 22.796 Feb'2018 06.02.2018 KV S/s. (4X5.6+ 2x0.198) ADB-III Saving Part line : Morena 400kV CWRTL Adani Group - Morena 9 220 (Jarerua) (2x24.685cktkm) charged on 31.03.2018) DCDS 24.685 49.370 March'2018 31.03.2018 (ADB-III Saving) C. 132 KV TRANSMISSION LINES 132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line (2x33.191) 1 (JICA) (Note: 18.40cktkm One ckt charged by tapping DCDS 33.19 47.982 June'17 06.06.2017 arrangement on 30.03.2015) 2 2nd Ckt of 132 kv Badnagar - Gautampura line (1x23.24)(JICA) 2ND CKT 23.24 23.24 June'17 30.06.2017 132 kv DCSS line from220Kv S/s Chichli - 132Kv Karapgaon 3 DCSS 31.06 31.058 June'17 18.06.207 (1x31.058)(PFC-II) 132Kv DCSS line from proposed 132Kv s/s Tamot to Sagar Yarn 4 plant of M/s Sagar Manufacturer (P) Ltd.(1x3.1) (contributory DCSS 3.10 3.1 June'17 30.06.2017 work) 132Kv DCSS line from 220kV s/s Pithampur for supply of 5MVA to 5 DCSS 2.42 2.421 June'17 29.06.2017 M/s SRF Ltd.(1x2.421) (contribution work) 2nd 6 2nd Ckt of 132 kv Pithampur - Betama line (1x14) (JICA) 14.00 14 July'2017 02.07.2017 ckt.km. 132Kv DCSS line from 220Kv S/s Rajgarh to 132Kv S/s 7 DCSS 67.79 67.79 Aug'2017 09.08.2017 (1x67.790) (PFC-III) 132Kv DCDS line for extension of 132Kv line from Manliya(132) - 8 DCDS 0.74 1.472 Aug'2017 05.08.2017 Mangliya (220) (2x0.736) (PFC-III) LILO of 132KV Gwalior- Dabra/Karera line at Chinour (132KV 9 DCDS 13.68 27.364 Aug'2017 04.08.2017 DCSS Dabra- Chinour line) (2X13.682) (ADB-III) 10 132KV DCSS Sabalgarh - Kelaras line (1x19.655) (ADB-III) DCSS 19.66 19.655 Aug'2017 14.08.2017

11 132 kv Sagar-Rahatgarh DCSS line (1x54.790) (PFC-II) 54.79 54.79 Sept'2017 28.09.2017

Minutes of 63rd OCCM of MP 28 12 132 KV DCSS - line (1x33.74)(REC) 33.74 33.74 Sept'2017 21.09.2017 132Kv DCSS 2 phase 2wire line from 132Kv s/s Umreth to RTS 13 13.62 13.623 Sept'2017 05.09.2017 Parasiya (1x13.623) (Contributory) 132kV DCSS line from 220kV S/s Kothiya to 51 MW Solar Power 14 Project of M/s Re New Clean Energy Pvt.Ltd. District Ashoknagar. 18.90 18.9 Sept'2017 29.09.2017 (Contributory) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Bankhedi for PS 15 DCSS 7.9 7.9 Oct'17 11.10.2017 to RTS Bankhedi (1x7.9) (Contribution) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan for PS 16 to TSS Majhgawan(1x0.19) (Note: 1x0.190 charged on DCSS 0.19 0.19 Oct'17 24.10.2017 24.10.2017) (Contribu) 17 132kv DCSS -Khirkiya line (1x30.42) (ADB-Saving) DCSS 30.42 30.42 Nov'2017 14.11.2017 LILO of 132kv Nagda - Ratadiya line at Unhel 132KV Sub-station 18 DCDS 1.24 2.488 Nov'2017 18.11.2017 (2x1.244) (ADB-Saving) LILO of 132Kv Vidisha- Bairasiya line at salamatpurr (2x0.162) 19 DCDS 0.16 0.324 Nov'2017 29.11.2017 (ADB-III) 132kv DCSS line from Kolaras - Mada line (1x20.293) (ADB-III 20 DCSS 20.293 20.293 Dec'2017 24.12.2017 (Saving) 132 kv DCSS line from 132Kv S/s Kymore-132Kv S/s Barhi 21 DCSS 32.393 32.393 Dec'2017 30.12.2017 (1x32.393) (PFC-II) 132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad 22 DCSS 32.97 32.97 Dec'2017 23.12.2017 (1x32.970) (PFC-II) 132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) (1st ckt. 1x9.025 1st ckt. 23 DCDS 9.025 9.03 Dec'2017 charged on 14.12.2017) (ADB-III) 14.12.2017 LILO of Gadarwara - Bankhedi SC line for Pondar Substation 24 DCSS 1.995 2.00 Dec'2017 06.12.2017 (1x1.995) 132Kv DCSS 2 phase 2wire line from proposed 220Kv s/s 25 Narsinghpur 5MVA PS to RTS Narsinghpur (1x7.325) DCSS 7.325 7.325 Dec'2017 15.12.2017 (Contributory work) 132kV DCSS 2 phase 2wire line from 132kV s/s Mansakra for PS 26 DCSS 1.704 1.704 Dec'2017 30.12.2017 to RTS Sihora road (1x1.704) (contributory work) 132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh 27 DCSS 27.20 27.198 Jan'18 22.01.2018 (1x27.198) PFC-II 132 kV line from to upcoming plant of M/s Ultra tech 28 DCSS 5.64 5.644 Jan'18 25.01.2018 Cement village Tonki Tehsil Manawar District 132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) (1st ckt. 1x9.025 29 2nd ckt 9.049 Feb'2018 21.02.2018 charged on 14.12.2017) (Iind ckt. Charged on 21.02.2018)(ADB-III) 30 132kv DCSS line Bhonra - Kapasi (1x22.569) (ADB-III Saving) DCSS 22.569 22.569 Feb'2018 09.02.2018 2nd ckt. Stringing of 132kV Shivpuri - Kolaras line (34.262) (ADB-III 31 2nd ckt 34.262 34.262 Feb'2018 26.02.2018 Saving) 2nd ckt.stringing of 132kV Sagar - Sagar interconnection 32 2nd ckt 8.77 8.77 Mar'2018 28.03.2018 (8.77) (ADB-III Saving)

33 132kv DCSS Chhegaon -Singot line (1x58) (ADB-III Saving) DCSS 57.853 57.853 Mar'2018 30.03.2018

34 2nd ckt. 132kV Pithampur - Jamli line (JICA) (1x20) 2nd ckt 21 21 Mar'2018 28.03.2018

35 2nd ckt. 132kV Pithampur - Bagdi line (JICA) (1x21.794) 2rd ckt 21.79 21.794 Mar'2018 27.03.2018

36 132 kv DCSS - line (JICA) (1x16.145) DCSS 16.145 16.145 Mar'2018 27.03.2018

2nd ckt. of 132kV Malanpur - Morar line (28.708) (ADB-III 37 2nd ckt 28.708 28.708 Mar'2018 31.03.2018 Saving) 2nd circuiting of 132kV Jhabua - DCSS line 38 DCSS 25.9 25.9 Mar'2018 25.03.2018 (GEC)

132kV DCSS line from 220kS/s Barwaha - water pumping 39 station 1 & 2 NVDA at village Sirley Tehsil Barwaha Dist. DCSS 1.76 1.76 Mar'2018 08.03.2018 (1x1.76) (Contrbution suprvision only)

Minutes of 63rd OCCM of MP 29 II. EHV SUB - STATIONS VOLTAG No.OF EFFECTIV DATE OF DATE OF S. E X-mer E NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY) COMPL- COMMI- No. RATIO & Cap. CAPACITY ETION SSIONING (KV) (MVA) MVA A. 400 KV SUBSTATIONS Chhegaon 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Khandwa) 1 400/220 1x315 315 Nov'2017 17.11.2017 (ADB-III) B. 220 KV SUBSTATIONS a. 220 KV NEW SUBSTATIONS 1 220/132 KV S/s Mangliya with 1x160MVA (PFC-III) 220/132 1x160 160 Oct'17 30.10.2017 Upgradation of Shahdol 132Kv S/s to 220kv with 1x160MVA 05.12.2017 2 ADB-III (Saving) 220/132 1x160 160 Dec'2017 (132kV side) C. 132 KV SUBSTATIONS a. 132KV NEW SUBSTATIONS 1 Kelaras 132kv s/s with 1x63 MVA (ADB-III) 132/33 1x63 63 Aug'2017 14.08.2017 Jobat 132kv s/s with 1x50 MVA (REC-I) 2 Note: initial 50MVA X-mer charged but replaced by 40MVA 132/33 1x50 40 Sept'2017 26.09.2017 X-mer after failed on 22.11.17

3 Salamatpur 132kv s/s with 1x40 MVA (ADB-III) 132/33 1x40 40 Nov'2017 30.11.2017 4 Karapgaon 132kv s/s (Distt- Narsinghpur) (PFC-II) 132/33 1x40 40 Dec'2017 29.12.2017 5 Unhel 132kv s/s with 1x50 MVA (ADB-III(Saving) 132/33 1x50 50 Dec'2017 15.12.2017 6 Mada 132kv s/s with 1x50 MVA (ADB-III Saving) 132/33 1x50 50 Dec'2017 24.12.2017 7 Barahi 132kv s/s (Distt. Katni) PFC-II 132/33 1x40 40 Jan'18 20.01.2018 05.01.2018 8 Agrod 132kv s/s 1x40 MVA ADB-III 132/33 1x40 40 Jan'18 (from 33kV) 9 Intkhedi 132kv s/s 1x63 MVA ADB-III 132/33 1x63 63 Jan'18 08.01.2018 21.02.2018 10 Chhayan 132kv s/s1x40 MVA ADB-III 132/33 1x40 40 Feb'2018 (from 33 kV)

11 Kapasi 132kv s/s with 1x50 MVA (ADB-III Saving) 132/33 1x50 50 Feb'2018 09.02.2018 12 Singot 132kv s/s with 1x50 MVA (ADB-III Saving) 132/33 1x50 50 Mar'2018 30.03.2018

Minutes of 63rd OCCM of MP 30 ANNEX-2.2.5.ii EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.03.2018 FUNDING PROGRESS S. No. NAME OF THE TRANSMISSION LINE AGENCY IN % A. 400 KV TRANSMISSION LINES 400kV DCDS (Quad moose) line from Shri Singaji TPS (stage-II) - Pithampur 1 UBI 49% (2x69.968+ 2x68.626) 2 400kV DCDS (Quad moose) line from Pithampur - (2x70) UBI 41% 3 LILO of 400kV Seoni - Bhilai SC line at 400kV S/s Balaghat/Kirnapur (2x3.375) ADB-III 8% LILO of both ckt. Of 400kV Nagda to Rajgarh line at 400kV S/s Badnawar 4 ADB-III 36% (4x8.163) 5 400 kV DCDS line from Nagda 400 kV S/s to Mandsaur 400 kV S/s GEC 7% 400 kV DCDS line for LILO of one ckt of Satna(PGCIL) - Bina(PGCIL) 400 kV at 6 GEC 4% Sagar 400 kV S/s 7 400 kV DCDS line from Ashta 400 kV S/s to Ujjain 400 kV S/s GEC 3% 8 400 kV DCDS line from Indore (PGCIL) 765 kV S/s to Ujjain 400 kV S/s GEC 24% 9 400 kV DCDS line from Nagda 400 kV S/s to Ujjain 400 kV S/s GEC 5% B. 220 KV TRANSMISSION LINES 1 2nd Ckt of 220kv Satna - Chhatarpur line (152) JICA-I 20% LILO of both Ckt of Indore-II (jaitpura) - Ujjain 220kV line at Indore (PGCIL) 765 kV 2 UBI 17% S/S (4x6.012) LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) 3 ADB-III 3% (2x32.782) 4 220Kv DCDS line from Pithampur-Depalpur line (2X31) ADB-III 37% 220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s 5 ADB-III 12% Badnawar (2x1+4x8) 6 220Kv DCDS Julwaniya- Kukshi (2X58) ADB-III 16% 7 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) ADB-III 15% 8 220kV DCDS Khandwa(400 PGCIL) - Chhanera line(2x39.322) ADB-III Saving 32% LILO of both ckt of Badod-Kota/Modak 220kV line at 220Kv S/s Suwasara 9 ADB-III Saving 67% (4x4.382) 10 LILO of 2nd ckt Nagda - Neemuch 220kV line at 220Kv S/s Daloda (2x12.2) ADB-III Saving 40% (b).LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) (Note: 11 ADB-III Saving 37% Betul220 & Betul400 I/C line 3.76 cktkm. charged on 21.07.2017) 220Kv DCDS Morena(400KV S/s CWRTL Adani Group) - Sabalgarh DCDS line & lilo of Morena 400KV S/s (Adani) to Sabalgarh at Morena 220Kv s/s (2X92 + 2x0.5) 12 ADB-III Saving 72% (Note: Morena 400kV CWRTL Adani Group - Morena 220 (Jarerua) (2x24.685cktkm) charged on 31.03.2018) 13 220kV DCDS line from Julwaniya 400kV S/s in 220kV S/s GEC 22% 14 220kV DCDS line from Badnawar 220kV S/s - Kanwan 220kV S/s GEC 7% 15 220kV DCDS line from Kanwan 220kV S/s - Dhar 220kV S/s GEC 8% 220kV DCDS line from Mandsaure(Sitamau) 400kV S/s - Maruti Shakti Pool 220kV 16 GEC 4% S/s 17 220kV DCDS line from Betul 220kV S/s - Gudgaon 220kV S/s GEC 34% 18 220kV DCDS line from Neemuch 220kV S/s to Ratangarh 400kV S/s GEC 4% 19 220kV interconnector between Sailana 400kV S/s & Ratlam switching 220kV S/s GEC 28% 20 2nd circuiting of Ratlam switching - Dalod 220kV DCSS line GEC 24% 220Kv DCDS line from 220kV Pooling S/s RUMS at Goojarkhedi, Suwasara (For 59% interconnection of Solar PV Plant of RUMS) (2X43.426) 21 a) 220kV line from 220kV S/s RUMS at Gujarkhedi, Suwasara to tap point RUMS charged on (2x8.813) 23.05.2017 b) Tap point to 400 kV S/s Sitamau (2x34.613) 49% 220kV DCDS Barsitadesh (220kV Pooling S/s) - 400kV Grid S/s PGCIL line 22 RUMS 75% (2X0.917)

23 220kV DCDS Ramnagar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X2.572) RUMS 60%

24 220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line) (2X0.917) RUMS 5% Minutes of 63rd OCCM of MP 31 132 KV TRANSMISSION LINES 1 132 kv DCSS Dewas-Barotha line (1x23) JICA 73% 2 132kv DCSS Gautampur -Depalpur line (1x19) JICA 42% 3 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) JICA 37% 4 132kv Mugaliya Chaap - Sehore DCSS line (1x24) JICA 52% 5 132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s(1x53.209) JICA 61% 6 LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20) JICA 49% 7 132 kv DCSS Guna-Eshagarh line (1x72) JICA 32% LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS line at 132 KV S/s 8 UBI 0% Morwan (2x1) 9 132 kv Sirmour - Katra DCDS line (2x37.67) UBI 18% LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 10 Transco 40% 220 KV S/s Gwalior II) (2x2x7.87) 11 132 kv DCSS Dewas-Agrod line (1x20.76) ADB-III 42% 12 132 kv DCSS Khurai- Khimlasa line (1x20.937) ADB-III 20% LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s Mungaoli (4x7.8+2x0.7) 13 ADB-III 99% Note: (4x7.8ckt.km line charged on 30.12.2015 by tapping ) 14 132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower) ADB-III 83% 15 132 kv DCSS Panagar - Patan line (1x22.749) ADB-III 7% 16 132 kv DCSS Badnagar - Chhayan Line (1x31) ADB-III 39% 17 132 kv DCSS Dhar - Teesgaon line (1x15.35) ADB-III 16% 18 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s (2x7.4) ADB-III 5% 19 132 kv DCSS Udaipura - Silvani line (1x25.8) ADB-III 38% 20 132 kv DCSS Narsinghpur - Devnagar (1x23) ADB-III 18% 21 132 kv DCSS Karakbel - Belkheda (1x24.445) ADB-III 13% 22 132 kv DCDS Narsinghpur - Karakbel line (2x23) ADB-III 25% LILO of 2ND CIRCUIT OF 132KV Gwalior- Pichhore at 132Kv S/s Dabra (2X0.108) 23 (ADB-III) (balance work) (Note: LILO at Chinour 27.364 cktkm charged on ADB-III 97% 04.08.2017) LILO of one ckt.(Balaghat-Katangi ckt) Of 132 kV Balaghat - Seoni/Katangi line at 24 ADB-III 14% 132 kV S/s Waraseoni (2x4.7) LILO of both ckt. Of 132 kV Balaghat - Bhanegaon line at Balaghat/Kirnapur 25 ADB-III 85% 400kV S/s.(2x0.774 + 4x1.216) 26 132kV DCSS Sagar - Rehli line (1x40) ADB-III Saving 13% LILO of one ckt of 132kv Neemuch - Mandsore line at Budha 132KV Sub-station 27 ADB-saving 56% (2x22.077) LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Bhanpura 28 ADB-saving 27% 220KV S/s (4x14) LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Suwasara 29 ADB-saving 52% 220KV S/s (2x3) 30 132kv DCSS Mugaliyachhap - Bilkishganj line (1x17.274) ADB-saving 47% 31 132kv DCDS Rajgarh - Khujner/Sindaota line (2x26.499+ 4x1.457) ADB-saving 44% 32 132kv DCSS Betul-Bisnoor/Masod line (1x35.245) ADB-saving 32% 33 LILO of one ckt of Vidisha - Gairatganj line at 132kV (2x18.221) ADB-saving 76% 34 132kv DCDS line Guna-Bhonra (2x21.394) ADB-saving 31%

Minutes of 63rd OCCM of MP 32 35 132kv DCSS line Chhindwara-Saori line (1x31.60) ADB-saving 68% 36 132kv DCSS Damoh-Patera line (1x38) ADB-saving 15% 132kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt. 37 ADB-saving 62% Sanc.no.0187dtd.05.09.2016) 38 132kV MACT (Bhopal) - Mugaliachhap line (2x30.368) REC 58% 39 132kV DCDS line from Sendhwa 220 kV S/s - Pansemal 132kV line GEC 5% 132kV interconnector between Kanwan 220 kV S/s & Kanwan 132kV S/s 40 GEC 14% (2x13.115) 41 132kV DCDS line from Kanwan 220 kV S/s - Teesgaon 132kV line GEC 22% 42 2nd ckt of 132kV Rajgarh(Dhar)220 kV S/s - Petlawad 132kV line GEC 14% 132kV interconnector between Gudgaon 220 kV S/s & Gudgaon 132kV S/s (LILO 43 GEC 7% of 132kV Betul - Gudgaon at 220kV S/s Gudgaon) (2x9.825) 132kV DCDS interconnector between Sailana 400kV S/s & Sailana 132kV S/s 44 GEC 17% (2x18.344) 45 132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 + 1x46.866) JICA-II 37% 132Kv DCSS line from GWSTPP to upcoming Make up Water Pump House river 46 Contrib. 41% Narmada (Line-II)(1x24.152) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Shahpura(JBP) for 5MVA PS to 47 Contrib. 13% RTS Bhitoni (1x5.968) 48 132Kv DCSS line from 400Kv s/s Katni - RTS Patwara (1x19.417) RTS 82% 132Kv DCSS 2 phase 2wire line from 220Kv s/s Maihar for PS to TSS 49 Contrib. 82% Bhadanpur(1x13.1) 132Kv DCSS 2 phase 2wire line from 220Kv s/s KOtar for PS to RTS 50 Contrib. 58% kaima1x26.938) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan for PS to TSS 51 Contrib. 93% Majhgawan(1x0.19) (Note: 1x0.190 charged on 24.10.2017) 52 132Kv DCSS 2 phase 2wire line from 132Kv s/s Rewa for PS to TSS Rewa(1x0.4) Contrib. 82% 132Kv DCDS 2 phase 4wire line from 220Kv s/s Ashoknagar for PS to 132kV RTS 53 Contrib. 91% Ashoknagar (2x4.474) 54 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) Contrib. 48% 132Kv DCDS line from 132Kv s/s Morwa for Power supply of 21.6MVA in pfase 55 Contrib. 68% manner on 132kV for RTS Singroli (1x1.809) 56 2nd ckt of 132Kv 2ph 2 wire line from 220Kv s/s Bina - RTSA Mungaoli RVNL Contrib. 99% 132Kv DCSS line from 220kV s/s Rajgarh(Biora) - Birampura Pumping station (Supervision 57 94% Distt- Rajgarh of water Resources Department. (1x7.796) only) 132Kv DCSS line from 132Kv s/s Chhegaon - 50MW Soalar Power Project of M/s (Supervision 58 Sky Power Solar South-East Asia-One Pvt'Ltd At vill. Chhirbel/Khajuri, Khandwa 100% only) (1x11.226) 132kV DCSS line from 132kV Balwada - water pumping station No.2 of NVDA at (Supervision 59 98% village Mukhtyara (1x2.401) only)

Minutes of 63rd OCCM of MP 33 S. FUNDING PROGRESS NAME OF THE SUBSTATION No. AGENCY IN % A. 400 KV SUBSTATIONS 400 KV sub-station Balaghat/Kirnapur with 2x100MVA 400/220 kv x-MER+ 1X40 1 ADB-III 78% MVA X-mer 2 400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer ADB-III 79% 3 400 KV sub-station Sagar with 2x315MVA 400/220 KV X-mer GEC 2% 4 Bhopal (Sukhi ) 400/220 kv s/s Addl. 315 MVA X-mer ADB-III 74% B. a 220 KV SUBSTATIONS 1 Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA ADB-III 2% 2 Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA ADB-III 9% 3 Adampur 220/33kv S/s 2x50MVA ADB-III 8% 4 Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA ADB-III 11% Upgradation of Chhanera 132Kv S/s to 220kv with 2x160MVA +1x50MVA 132KV 5 ADB-III Saving 53% X-mer 6 220/132kV S/s Suwasara (2x160MVA + 1x50) ADB-III Saving 60% 7 220 kV Indore N/Z (Upgradation) with 2x160MVA UBI 9% 8 220/132kV S/s Sailana (2x160MVA + 1x63) GEC 3% 9 220/132kV S/s Jaora (Upgradation) (2x160MVA + 1x40) GEC 10% 10 220/132kV S/s Sendhwa (Upgradation) (1x160MVA + 1x63) GEC 7% 11 220/132kV S/s Kanwan (Upgradation) (1x160MVA + 1x63) GEC 1% 12 33/220 Kv Pooling Sub-station at Barsitadesh 3x100MVA RUMS-I 75% 13 33/220kV Pooling Sub-station at Ramnagar 3x100 RUMS-I 52% 1st (24.05.2017, 14 220/33Kv Pooling Sub-station at Suwasara (Gujarkhedi) 3x100 RUMS-I 2nd (12.08.2017) & 3RD (27.03.2018) C. 132 KV SUBSTATIONS (a) NEW SUBSTATIONS 1 Biston 132kv s/s1x40 MVA ADB-III 9% 2 Teesgaon 132kv s/s 1x40MVA ADB-III 10% 3 Waraseoni 132kv s/s1x40 MVA (Dist- Balaghat) ADB-III 15% 4 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) ADB-III 35% 5 Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur) ADB-III 6% 6 Khimlasa 132kv s/s 1x40 MVA ADB-III 3% 7 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) ADB-III 17% 8 Narsinghgarh 132kv s/s with 1x40 MVA ADB-III 7% 9 Silvani 132kv s/s with 1x40 MVA ADB-III 12% 10 Udaipura 132kv s/s with 1x40 MVA ADB-III 65% 11 Bilkishganj 132kv s/s with 1x50 MVA ADB-III Saving 46% 12 Khujner/Sindaota 132kv s/s with 1x50 MVA ADB-III Saving 39% 13 Bisnoor/Masod 132kv s/s with 1x50 MVA ADB-III Saving 16% 14 Rehli 132kv s/s with 1x50 MVA ADB-III Saving 27% 15 Patera 132kv s/s with 1x50 MVA ADB-III Saving 58% 16 Budha 132kV S/s with 1x50MVA ADB-III Saving 56% 17 Saori 132kV S/s with 1x50MVA ADB-III Saving 3% 18 Satna-II 132kV S/s with 2x50MVA ADB-III Saving 20% 19 Shahpura 132kv s/s with 1x40 MVA () JICA-II 25% contribution 20 IT Park Badwai 132kv s/s with 1x63 MVA (Bhopal) 11% work

Minutes of 63rd OCCM of MP 34 Discoms wise Average Supply Hours

East Zone Central Zone PARTICULARS Feb-18 Mar-18 Feb-18 Mar-18

Commissinary HQ 23:52 23:54 23:45 23:49

District HQ 23:51 23:51 23:47 23:51

Tehsil HQ 23:48 23:48 23:38 23:42

Rural -Mixed 23:29 23:32 23:10 23:15

Rural -DLF 23:29 23:32 23:25 23:23

Rural -Irrigation 9:58 9:58 9:47 9:48

West Zone MP PARTICULARS Feb-18 Mar-18 Feb-18 Mar-18

Commissinary HQ 23:45 23:45 23:48 23:50

District HQ 23:56 23:56 23:52 23:52

Tehsil HQ 23:46 23:51 23:44 23:47

Rural -3Phase 23:31 23:45 23:21 23:25

Rural -1Phase 23:35 23:42 23:30 23:32

Total Rural 9:47 9:51 9:51 9:52

Minutes of 63rd OCCM of MP 35 Annexure-2.3.(ii) LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated) JABALPUR REGION

Date of commission-ing of Date of commission-ing of Name of EHV Substation Name of 33KV feeder feeder bay feeder

220KV NIL 132KV NIL REWA REGION

Date of commission-ing of Date of commission-ing of Name of EHV Substation Name of 33KV feeder feeder bay feeder 220KV NIL 132KV NIL SAGAR REGION

Date of commission-ing of Date of commission-ing of Name of EHV Substation Name of 33KV feeder feeder bay feeder 220KV NIL 132KV NIL INDORE REGION

Date of commission-ing of Date of commission-ing of Name of EHV Substation Name of 33KV feeder feeder bay feeder

400KV

33KV AKVN-I 21.06.2016 07.02.2017 400KV Julwaniya 33KV AKVN-II 21.06.2016 07.02.2017 220KV NIL 132KV 132KV 33KV Panther-I 14.03.2014 14.03.2014 132KV Raukhedi 33KV Exep.Panther-III 09.07.2015 09.07.2015 33KV Khandwa Oil 132KV Chhegaon-Makhan (Previously known as -- 18.11.2016 Chichgaon) 132KV Khandwa 33KV Amalpura 30.01.2011 19.08.2016 33KV Shri Durga 03.04.2017 08.12.2017 132KV Pansemal Khandwari 33KV Bhargaon 16.11.2017 18.11.2017 33KV No.-I 26.05.2016 22.12.2016 33KV Bijalpur No.-II 26.05.2016 22.12.2016 132KV Betma 33KV IT Park No.-I 04.07.2015 11.03.2017 33KV IT Park No.-II 04.07.2015 11.03.2017 UJJAIN REGION Date of commission-ing of Date of commission-ing of Name of EHV Substation Name of 33KV feeder feeder bay feeder 220KV NIL 132KV 33KV Mokdi 15.03.2017 18.10.2017 132KV Khachrod 33KV Kanwas 15.03.2017 16.12.2017 132KV Makdon 33KV Rupakhedi 15.11.2017 10.01.2018 132KV Ghonsla 33KV Dhabla Gori 04.04.2016 12.07.2017 BHOPAL REGION

Minutes of 63rd OCCM of MP 36 Annexure-2.3.(ii) Date of commission-ing of Date of commission-ing of Name of EHV Substation Name of 33KV feeder feeder bay feeder 220KV 33 KV Simcon Solar 220 KV Ganjbasoda 18.11.2016 -- Power 132 KV 132 KV Bareli 33 KV Boras 19.02.2014 -- 132 KV Gopalpur 33 KV AE, PHE 27.02.2015 -- 132 KV Amrawad- Khurd 33 KV Katara Hills-II 01.06.2016 -- 33 KV Obedullaganj 05.05.2016 02.02.2017 132 KV Tamot 33 KV AKVN-1 05.05.2016 05.10.2016 33 KV AKVN-2 05.05.2016 05.10.2016 33 KV AKVN-1 29.12.2015 02.07.2016 132 KV Bagroda 33 KV AKVN-2 29.12.2015 24.02.2016 33 KV Aligarh Kotra 28.08.2017 20.12.2017 132 KV Lateri 33 KV Madankhedi 27.06.2017 05.01.2018 33 KV Dewanganj 04.12.2017 04.12.2017 132 KV Salamatpur 33 KV Aamkheda 04.12.2014 04.12.2017 132 KV Entkhedi, Bhopal 33 KV Entkhedi 10.01.2018 10.01.2018 GWALIOR REGION Date of commission-ing of Date of commission-ing of Name of EHV Substation Name of 33KV feeder feeder bay feeder 220 KV 220 KV Sagalgarh 33 KV Mangrol 30.05.2014 -- 33 KV DIG Nayagaon 220 KV Gwalior-II 13.11.2017 13.11.2017 (CRPF) 132 KV 132 KV Datia 33 KV Karapura 17.05.2014 -- 132 KV Ron 33 KV Mangarh 21.11.2013 -- 132KV Gohad 33kV Gohad 03.12.2015 11.07.2016 33kV Ater 22.10.2016 24.10.2016 132KV Pratappura 33kV Pratappura 22.10.2016 23.12.2016 132KV Vijaypur 33kV Dord 22.08.2011 29.07.2016 33kV Banbar 05.08.2017 06.08.2017 33kV Chinor 05.08.2017 06.08.2017 132KV Chinor 33kV Karhiya 05.08.2017 06.08.2017 33kV Gharsondi 05.08.2017 10.08.2017 33kV Dimani 18.07.2017 18.07.2017 132KV Badagaon 33kV Khadiyahar 05.08.2017 05.08.2017 33kV Ajnodha 29.12.2017 29.12.2017 132KV Kailaras 33kV Dipera 14.08.2017 02.01.2018 132KV Bairad 33kV Bairad 23.12.2017 24.12.2017 132KV Mada 33kV Mada 24.12.2017 25.12.2017

Minutes of 63rd OCCM of MP 37 Annexure-3.2

Planned shutdown of transmisison element for the duration 01-05-18 TO 30-06-18,

Sr. From To Basis KV Transformers / Reactor /Bays Reason No Date Time Date Time (Daily/ A- 400 KV TRANSFORMERS For CT replacement , attending oil leakage , 1 400 315MVA X-MER NO-03 at 400KV S/s Bhopal 04-Jun-18 09:00 14-Jun-18 17:00 Continue transformer painting work

2 400 315MVA X-MER I&II at 400KV S/s Bhopal 18-Jun-18 09:00 19-Jun-18 17:00 Continue FOR CT replacement and bay maintenance work

3 400 315MVA X-MER I&II at 400KV S/s Bhopal 20-Jun-18 09:00 21-Jun-18 17:00 Continue FOR CT replacement and bay maintenance work

4 400 315MVA ICT -III at 400KV S/s Indore 14-Jun-18 09:00 15-Jun-18 18:00 continue for 220KV C.T Replacement work

5 400 315MVA ICT -II at 400KV S/s Indore 19-Jun-18 09:00 20-Jun-18 18:00 continue for 220KV C.T Replacement work

B- 400 KV REACTORS 400KV 125 MVAR Bus Recator at 400KV S/s 1 400 15-May-18 07:00 15-May-18 18:00 11:00 For Insulation Disc Replacement Work Nagda

80MVAR REACTOR NO -01 at 400KV S/s 2 400 14-May-18 09:00 24-May-18 17:00 Continue For scheduled maintenance work Bhopal

400/220kv 125 MVAR BHEL REACTOR at For Recommisioning of reactor conservator by M/S 3 400 10-May-18 10.00 12-May-18 18.00 56.00 400KV S/s Katni BHEL

400/220kv 125 MVAR BHEL REACTOR at 4 400 04-Jun-18 10.00 06-Jun-18 18.00 56.00 For attending air cell and oil leakage problem 400KV S/s Katni

5 400 BUS REACTORS BAY at 400KV S/s Ashta 05-Jun-18 09:00 05-Jun-18 18:00 DAILY For bay maintenance and testing work

6 400 50 MVAr BUS Reactor at 400KV S/s Bina 04-Jun-18 08:00 04-Jun-18 17:00 Daily For pre monsoon maintenance work

C- 400 KV FEEDER & BAYS OF 400 KV- S/S- 400KV TBC bay, 315 MVA X'MER-I bay Make- To attend problem in 400KV main bus-II 1 400 CGL & 400KV MAIN BUS-II (400KV Julwaniya 15-May-18 09.00 15-May-18 18.00 Daily pantograph isolator of 400KV TBC bay and 315mva S/s) X'mer-I bay make-CGL.

2 400 400KV Main Bus-I at 400KV S/S Nagda 07-May-18 07:00 09-May-18 18:00 Continue For Insulation Disc String Replacement Work

3 400 400KV Main Bus-II at 400KV S/S Nagda 14-May-18 07:00 16-May-18 18:00 Continue For Insulation Disc String Replacement Work

400KV Nagda-Rajghar-II Line at 400KV S/S 4 400 14-May-18 07:00 14-May-18 18:00 Daily For Insulation Disc Replacement Work Nagda

Minutes of 63rd OCCM of MP 38 Sr. From To Basis KV Transformers / Reactor /Bays Reason No Date Time Date Time (Daily/

400KV Nagda-Rajghar-II Line at 400KV S/S 5 400 15-May-18 07:00 16-May-18 18:00 Continue For Insulation Disc Replacement Work Nagda

6 400 400KV Nagda - Rajghar-I line 06-Jun-18 08:00 06-Jun-18 18:00 Daily For Wave Trap Clamp Repleacment Work

7 400 400KV Nagda - Rajghar-II line 08-Jun-18 08:00 08-Jun-18 18:00 Daily For Wave Trap Clamp Repleacment Work

8 400 400 BDTCL-1 02-May-18 09:00 02-May-18 17:00 Daily For scheduled miantenance work

9 400 400 BDTCL-2 03-May-18 09:00 03-May-18 17:00 Daily For scheduled miantenance work

10 400 TIE CB 400KV BDTCL-2 X-MER-2 04-May-18 09:00 04-May-18 17:00 Daily For scheduled miantenance work

11 400 TIE CB 400KV BDTCL-1 X-MER-1 07-May-18 09:00 07-May-18 17:00 Daily For scheduled miantenance work

12 400 TIE CB ITARSI -1 X-MER-3 08-May-18 09:00 08-May-18 17:00 Daily For scheduled miantenance work

13 400 TIE CB ITARSI -2 BINA-2 09-May-18 09:00 09-May-18 17:00 Daily For scheduled miantenance work

14 400 400 BDTCL-1 CB 23-Jun-18 09:00 30-Jun-18 17:00 Continue For CB and CT replacement work

For ICT II will be on TBC for 400KV CVT 15 400 400 KV Bus-I at 400KV S/s Indore 01-Jun-18 09:00 02-Jun-18 18:00 continue Replacement work

For Asoj II will be on TBC for 400 KV CVT 16 400 400 KV Bus-II at 400KV S/s Indore 04-Jun-18 09:00 05-Jun-18 18:00 continue Replacement work

17 400 400KV Indore-Nagda 07-Jun-18 09:00 08-Jun-18 18:00 continue for 400 KV CVT Replacement work

18 400 400 KV Main Bus II at 400KV S/s Indore 11-Jun-18 09:00 13-Jun-18 18:00 continue for 400 KV PG Isolator of ISP I Replacement work

Minutes of 63rd OCCM of MP 39 Sr. From To Basis KV Transformers / Reactor /Bays Reason No Date Time Date Time (Daily/

19 400 400KV Indore-ISP-I 11-Jun-18 09:00 13-Jun-18 18:00 continue for 400 KV PG Isolator of ISP I Replacement work

20 400 400 KV ISP II at 400KV S/s Indore 22-May-18 09:00 25-May-18 18:00 Continue ISP II on TBC for Replacement of 400 KV C.B

21 400 400 KV ISP II at 400KV S/s Indore 26-May-18 09:00 26-May-18 18:00 Daily ISP II off for testing & Commissioning of New C.B

22 400 400 KV Main Bus I at 400KV S/s Indore 28-May-18 09:00 29-May-18 18:00 Continue For 400 KV PG Isolator of ISP II Replacement work

23 400 400 KV ISP-II at 400KV S/s Indore 28-May-18 09:00 29-May-18 18:00 Continue For 400 KV PG Isolator of ISP II Replacement work

For 400 KV PG Isolator of Buscoupler Replacement 24 400 400 KV Main Bus II at 400KV S/s Indore 30-May-18 09:00 31-May-18 18:00 Continue work

For 400 KV PG Isolator of Buscoupler Replacement 25 400 400 KV buscoupler at 400KV S/s Indore 30-May-18 09:00 31-May-18 18:00 Continue work

26 400 BUS TIE BAY at 400KV S/s Ashta 06-Jun-18 09:00 06-Jun-18 18:00 Daily For bay maintenance & testing work

27 400 BUS COUPLER BAY at 400KV S/s Ashta 07-Jun-18 09:00 07-Jun-18 18:00 Daily For bay maintenance & testing work

28 400 MAIN BUS-1 & CVT NO.-1 at 400KV S/s Ashta 08-Jun-18 09:00 08-Jun-18 18:00 Daily For bay maintenance & testing work

29 400 MAIN BUS-2 & CVT NO.-2 at 400KV S/s Ashta 11-Jun-18 09:00 11-Jun-18 18:00 Daily For bay maintenance & testing work

30 400 AUX.BUS at 400KV S/s Ashta 12-Jun-18 09:00 12-Jun-18 18:00 Daily For bay maintenance & testing work

31 400 400 KV Bhopal Ckt-I at 400KV S/s Bina 11-Jun-18 08:00 11-Jun-18 17:00 Daily For pre monsoon maintenance work

32 400 400 KV Bhopal Ckt-II at 400KV S/s Bina 14-Jun-18 08:00 14-Jun-18 17:00 Daily For pre monsoon maintenance work

Minutes of 63rd OCCM of MP 40 Sr. From To Basis KV Transformers / Reactor /Bays Reason No Date Time Date Time (Daily/

33 400 400 KV BPSCL (J.P.) at 400KV S/s Bina 15-Jun-18 08:00 15-Jun-18 17:00 Daily For pre monsoon maintenance work

D- 220 KV FEEDER & BAYS-

1 220 220KV PGCIL-I ( at 220KV S/s Shujalpur ) 01-May-18 10:00 01-May-18 17:00 Daily For pre monsoon maintenance work

2 220 220KV PGCIL-II ( at 220KV S/s Shujalpur ) 02-May-18 10:00 02-May-18 17:00 Daily For pre monsoon maintenance work

Chhegaon- Omkareshwar (400kV Chhegaon 3 220 10-May-18 10:00 10-May-18 17:00 Daily For pre monsoon maintenance work S/s)

4 220 Chhegaon-SSTPH Ckt-I (400kV Chhegaon S/s) 12-May-18 10:00 12-May-18 17:00 Daily For pre monsoon maintenance work

5 220 Chhegaon-SSTPH Ckt-II (400kV Chhegaon S/s) 15-May-18 10:00 15-May-18 17:00 Daily For pre monsoon maintenance work

Bus Transfer 6 220 18-May-18 10:00 18-May-18 17:00 Daily For pre monsoon maintenance work (400kV Chhegaon S/s )

7 220 Bus-Tie (400kV Chhegaon S/s) 22-May-18 10:00 22-May-18 17:00 Daily For pre monsoon maintenance work

220KV INTERCONNECTOR -I 8 220 02-May-18 09:00 02-May-18 17:00 Daily For pre monsoon maintenance work (400KV Julwaniya S/s)

220KV INTERCONNECTOR -II (400KV 9 220 03-May-18 09:00 03-May-18 17:00 Daily For pre monsoon maintenance work Julwaniya S/s)

10 220 220KV BUS TIE (400KV Julwaniya S/s) 07-May-18 09:00 07-May-18 17:00 Daily For pre monsoon maintenance work

220KV TRANSFER BUS COUPLER (400KV 11 220 08-May-18 09:00 08-May-18 17:00 Daily For pre monsoon maintenance work Julwaniya S/s)

220KV JULWANIYA-NIMRANI (400KV Julwaniya 12 220 11-May-18 09:00 11-May-18 17:00 Daily For pre monsoon maintenance work S/s)

220KV JULWANIYA-OMKARESHWAR (400KV 13 220 12-May-18 09:00 12-May-18 17:00 Daily For pre monsoon maintenance work Julwaniya S/s)

14 220 220KV Chhindwara -PGCIL-I 05-Jun-18 09:00 05-Jun-18 16:00 Daily For pre monsoon maintenance work

15 220 220KV Chhindwara -PGCIL-II 06-Jun-18 09:00 06-Jun-18 16:00 Daily For pre monsoon maintenance work

16 220 220KV Pandhurna Kalmeahwar 07-Jun-18 09:00 07-Jun-18 16:00 Daily For pre monsoon maintenance work

Minutes of 63rd OCCM of MP 41 Sr. From To Basis KV Transformers / Reactor /Bays Reason No Date Time Date Time (Daily/

17 220 220KV Seoni -PGCIL-I 05-Jun-18 09:00 05-Jun-18 16:00 Daily For pre monsoon maintenance work

18 220 220KV Seoni -PGCIL-II 06-Jun-18 09:00 06-Jun-18 16:00 Daily For pre monsoon maintenance work

19 220 220KV- Bina- I at 220KV s/s sagar 09-May-18 09:00 09-May-18 17:00 Daily For pre monsoon maintenance work

20 220 220KV- Bina- II at 220KV s/s sagar 10-May-18 09:00 10-May-18 17:00 Daily For pre monsoon maintenance work

21 220 220KV PGCIL-I at 220KV s/s sagar 07-May-18 09:00 07-May-18 17:00 Daily For pre monsoon maintenance work

22 220 220KV PGCIL-II AT 220kv s/s sagar 08-May-18 09:00 08-May-18 17:00 Daily For pre monsoon maintenance work

23 220 22KV Traction -I at 220kv s/s sagar 14-May-18 09:00 14-May-18 17:00 Daily For pre monsoon maintenance work

24 220 22KV Traction -II at 220kv s/s sagar 15-May-18 09:00 15-May-18 17:00 Daily For pre monsoon maintenance work

25 220 PGCIL-I at 220kv s/s Damoh 19-May-18 09:00 19-May-18 17:00 Daily For pre monsoon maintenance work

26 220 PGCIL-II at 220kv s/s Damoh 25-May-18 09:00 25-May-18 17:00 Daily For pre monsoon maintenance work

27 220 PGCIL-III at 220kv s/s Damoh 28-May-18 09:00 28-May-18 17:00 Daily For pre monsoon maintenance work

28 220 220KV SAGAR-BINA - 1 04-Jun-18 10:00 04-Jun-18 17:00 Daily For pre monsoon maintenance work

29 220 220KV SAGAR-BINA - 2 05-Jun-18 10:00 05-Jun-18 17:00 Daily For pre monsoon maintenance work

30 220 220KV SAGAR-PGCIL DAMOH - 1 06-Jun-18 10:00 06-Jun-18 17:00 Daily For pre monsoon maintenance work

31 220 220KV SAGAR-PGCIL DAMOH - 2 07-Jun-18 10:00 07-Jun-18 17:00 Daily For pre monsoon maintenance work

32 220 220KV DAMOH-KATNI 02-Jun-18 10:00 02-Jun-18 17:00 Daily For pre monsoon maintenance work

33 220 220KV DAMOH-400KV PGCIL DAMOH - 1 05-Jun-18 10:00 05-Jun-18 17:00 Daily For pre monsoon maintenance work

Minutes of 63rd OCCM of MP 42 Sr. From To Basis KV Transformers / Reactor /Bays Reason No Date Time Date Time (Daily/

34 220 220KV DAMOH-400KV PGCIL DAMOH - 2 09-Jun-18 10:00 09-Jun-18 17:00 Daily For pre monsoon maintenance work

35 220 220KV DAMOH-400KV PGCIL DAMOH - 3 11-Jun-18 10:00 11-Jun-18 17:00 Daily For pre monsoon maintenance work

36 220 220KV DAMOH-TIKAMGARH 15-Jun-18 10:00 15-Jun-18 17:00 Daily For pre monsoon maintenance work

37 220 220KV DAMOH-TRACTION -1 26-Jun-18 10:00 26-Jun-18 17:00 Daily For pre monsoon maintenance work

38 220 220KV DAMOH-TRACTION -2 28-Jun-18 10:00 28-Jun-18 17:00 Daily For pre monsoon maintenance work

160 MVA X-mer Make Areva at 220KV S/s 39 220 06-Jun-18 09:00 07-Jun-18 18:00 Daily For Transformer painting work Sabalgarh

40 220 160 MVA-I at 220KV S/s Mehgaon 15-May-18 09:00 15-May-18 17:00 Daily For pre monsoon maintenance work

41 220 160 MVA-II at 220KV S/s Mehgaon 16-May-18 09:00 16-May-18 17:00 Daily For pre monsoon maintenance work

42 220 160MVA X-mer-I At 220KV s/s DATIA 26-Jun-18 09:00 26-Jun-18 17:00 Daily For pre monsoon maintenance work

43 220 160MVA X-mer-I At 220KV s/s Mehgaon 15-Jun-18 09:00 15-Jun-18 17:00 Daily For pre monsoon maintenance work

44 220 160MVA X-mer-II At 220KV s/s DATIA 30-Jun-18 09:00 30-Jun-18 17:00 Daily For pre monsoon maintenance work

45 220 160MVA X-mer-II At 220KV s/s Mehgaon 16-Jun-18 09:00 16-Jun-18 17:00 Daily For pre monsoon maintenance work

46 220 220KV Datia-Bina 22-May-18 09:00 22-May-18 17:00 Daily For pre monsoon maintenance work

47 220 220KV Main Bus-I at 220KV S/s Shivpuri 11-Jun-18 10:00 11-Jun-18 17:00 Daily For pre monsoon maintenance work

48 220 220KV Main Bus-II at 220KV S/s Shivpuri 13-Jun-18 10:00 16-Jun-18 17:00 Daily For pre monsoon maintenance work

49 220 220KV Mehgaon-Auraiya 08-May-18 09:00 08-May-18 17:00 Daily For pre monsoon maintenance work

50 220 220KV Mehgaon-Malanpur 07-May-18 09:00 07-May-18 17:00 Daily For pre monsoon maintenance work

Minutes of 63rd OCCM of MP 43 Sr. From To Basis KV Transformers / Reactor /Bays Reason No Date Time Date Time (Daily/

51 220 220KV Morena-Malanpur-I 02-May-18 09:00 02-May-18 17:00 Daily For pre monsoon maintenance work

52 220 220KV Morena-Malanpur-II 03-May-18 09:00 03-May-18 17:00 Daily For pre monsoon maintenance work

53 220 220KV Shivpuri-Bina MPPTCL 09-May-18 09:00 09-May-18 17:00 Daily For pre monsoon maintenance work

54 220 220KV Shivpuri-Bina PGCIL 07-May-18 09:00 07-May-18 17:00 Daily For pre monsoon maintenance work

55 220 220KV Shivpuri-Sabalgarh-I 11-May-18 09:00 11-May-18 17:00 Daily For pre monsoon maintenance work

56 220 220KV Shivpuri-Sabalgarh-II 14-May-18 09:00 14-May-18 17:00 Daily For pre monsoon maintenance work

57 220 220KV Mehgaon --Malanpur 07-Jun-18 09:00 07-Jun-18 17:00 Daily For pre monsoon maintenance work

58 220 220KV Datia- Bina 22-Jun-18 09:00 22-Jun-18 17:00 Daily For pre monsoon maintenance work

For 220 KV Isolator replacement work under PSDF 59 220 220KV Mahalgaon - Bina 17-May-18 10:00 17-May-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 60 220 220KV Mahalgaon - Bina 18-May-18 10:00 18-May-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 61 220 220KV Mahalgaon - Bina 27-Jun-18 09:00 27-Jun-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 62 220 220KV Mahalgaon - Bina 28-Jun-18 09:00 28-Jun-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 63 220 220KV Mahalgaon - Datia 22-May-18 10:00 22-May-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 64 220 220KV Mahalgaon - Datia 23-May-18 10:00 23-May-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 65 220 220KV Mahalgaon - Datia 20-Jun-18 09:00 20-Jun-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 66 220 220KV Mahalgaon - Datia 21-Jun-18 09:00 21-Jun-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 67 220 220KV Mahalgaon - PGCIL-I 09-May-18 10:00 09-May-18 17:00 Daily Scheme

Minutes of 63rd OCCM of MP 44 Sr. From To Basis KV Transformers / Reactor /Bays Reason No Date Time Date Time (Daily/ For 220 KV Isolator replacement work under PSDF 68 220 220KV Mahalgaon - PGCIL-I 10-May-18 10:00 10-May-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 69 220 220KV Mahalgaon - PGCIL-I 06-Jun-18 09:00 06-Jun-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 70 220 220KV Mahalgaon - PGCIL-I 07-Jun-18 09:00 07-Jun-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 71 220 220KV Mahalgaon - PGCIL-II 15-May-18 10:00 15-May-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 72 220 220KV Mahalgaon - PGCIL-II 16-May-18 10:00 16-May-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 73 220 220KV Mahalgaon - PGCIL-II 13-Jun-18 09:00 13-Jun-18 17:00 Daily Scheme

For 220 KV Isolator replacement work under PSDF 74 220 220KV Mahalgaon - PGCIL-II 14-Jun-18 09:00 14-Jun-18 17:00 Daily Scheme

75 220 220KV Mehgaon-Auraiya 08-Jun-18 09:00 08-Jun-18 17:00 Daily For pre monsoon maintenance work

76 220 220KV ICT-I (220KV SUKHA) 16-May-18 09:00 16-May-18 17:00 Daily For bay maintnance work.

77 220 220KV ICT-II (220KV SUKHA) 17-May-18 09:00 17-May-18 17:00 Daily For bay maintnance work.

78 220 220KV Main Bus I at 400KV S/s Indore 01-May-18 09:00 05-May-18 18:00 Continue For replacement of Bus I Isolator

79 220 220KV TBC at 400KV S/s Indore 01-May-18 09:00 01-May-18 18:00 Daily For replacement of Bus I Isolator

For replacement of Bus I Isolator (Load will be on 80 220 220KV Dewas at 400KV S/s Indore 02-May-18 09:00 02-May-18 18:00 Daily TBC)

81 220 220KV Badnagar at 400KV S/s Indore 03-May-18 09:00 05-May-18 18:00 Continue For replacement of3 Nos. C.T & 1 No. Bus-I Isolator

For replacement of Bus I Isolator (Load will be on 82 220 220KV Barwaha II at 400KV S/s Indore 05-May-18 09:00 05-May-18 18:00 Daily TBC)

83 220 220KV Bus II at 400KV S/s Indore 07-May-18 09:00 11-May-18 18:00 Continue For replacement of Bus-II Isolator

84 220 220KV TBC at 400KV S/s Indore 07-May-18 09:00 07-May-18 18:00 Daily For replacement of Bus-II Isolator

Minutes of 63rd OCCM of MP 45 Sr. From To Basis KV Transformers / Reactor /Bays Reason No Date Time Date Time (Daily/

85 220 220KV Jetpura I at 400KV S/s Indore 08-May-18 09:00 09-May-18 18:00 Continue For replacement of Bus-II Isolator & 3Nos. C.T

For replacement of Bus-II Isolator (Load will be on 86 220 220KV Jetpura II at 400KV S/s Indore 10-May-18 09:00 11-May-18 18:00 Daily TBC)

For replacement of Bus-II Isolator (Load will be on 87 220 220KV S/Z II at 400KV S/s Indore 11-May-18 09:00 11-May-18 18:00 Continue TBC)

88 220 220KV Main BuS I at 400KV S/s Indore 14-May-18 09:00 19-May-18 18:00 Continue For replacement of Bus-I Isolator

For replacement of Bus-I Isolator (Load will be on 89 220 220KV S/Z I at 400KV S/s Indore 14-May-18 09:00 14-May-18 18:00 Daily TBC)

For replacement of Bus-I Isolator (Load will be on 90 220 220KV S/Z II at 400KV S/s Indore 15-May-18 09:00 15-May-18 18:00 Daily TBC)

For replacement of Bus-I Isolator (Load will be on 91 220 220KV Jetpura I at 400KV S/s Indore 16-May-18 09:00 16-May-18 18:00 Daily TBC)

For replacement of Bus-I Isolator (Load will be on 92 220 220KV Jetpura II at 400KV S/s Indore 17-May-18 09:00 17-May-18 18:00 Daily TBC)

For replacement of Bus-I Isolator (Load will be on 93 220 220KV Barwaha I at 400KV S/s Indore 18-May-18 09:00 18-May-18 18:00 Daily TBC)

For replacement of Bus-I Isolator (Load will be on 94 220 220KV Pithampur at 400KV S/s Indore 19-May-18 09:00 19-May-18 18:00 Daily TBC)

160MVA X-MER - I (AREVA) at 400KV S/s 95 220 08-May-18 09:00 08-May-18 18:00 Daily For pre monsoon maintenance work Ashta

160MVA X-MER - II (BHEL) at 400KV S/s 96 220 09-May-18 09:00 09-May-18 18:00 Daily For pre monsoon maintenance work Ashta

97 220 100MVA X-MER - II (CGL) at 400KV S/s Ashta 10-May-18 09:00 10-May-18 18:00 Daily For pre monsoon maintenance work

220KV INDORE (JETPURA) CKT-1 at 400KV S/s 98 220 11-May-18 09:00 11-May-18 18:00 Daily For pre monsoon maintenance work Ashta

220KV INDORE (JETPURA) CKT-2 at 400KV S/s 99 220 14-May-18 09:00 14-May-18 18:00 Daily For pre monsoon maintenance work Ashta

100 220 220KV DEWAS CKT-1 at 400KV S/s Ashta 15-May-18 09:00 15-May-18 18:00 Daily For pre monsoon maintenance work

101 220 220KV DEWAS CKT-2 at 400KV S/s Ashta 16-May-18 09:00 16-May-18 18:00 Daily For pre monsoon maintenance work

Minutes of 63rd OCCM of MP 46 Sr. From To Basis KV Transformers / Reactor /Bays Reason No Date Time Date Time (Daily/

102 220 BHOPAL at 400KV S/s Ashta 17-May-18 09:00 17-May-18 18:00 Daily For pre monsoon maintenance work

103 220 MUNGALLIYA CHHAP at 400KV S/s Ashta 18-May-18 09:00 18-May-18 18:00 Daily For pre monsoon maintenance work

104 220 SHAJAPUR CKT-1 at 400KV S/s Ashta 19-May-18 09:00 19-May-18 18:00 Daily For pre monsoon maintenance work

105 220 SHAJAPUR CKT-2 at 400KV S/s Ashta 21-May-18 09:00 21-May-18 18:00 Daily For pre monsoon maintenance work

106 220 BUS COUPLER at 400KV S/s Ashta 22-May-18 09:00 22-May-18 18:00 Daily For pre monsoon maintenance work

107 220 BUS TIE at 400KV S/s Ashta 23-May-18 09:00 23-May-18 18:00 Daily For pre monsoon maintenance work

108 220 24-May-18 09:00 24-May-18 18:00 Daily For pre monsoon maintenance work

109 220 22OKV MAIN BUS NO. -1 at 400KV S/s Ashta 25-May-18 09:00 25-May-18 18:00 Daily For pre monsoon maintenance work

110 220 26-May-18 09:00 26-May-18 18:00 Daily For pre monsoon maintenance work

111 220 28-May-18 09:00 28-May-18 18:00 Daily For pre monsoon maintenance work

112 220 22OKV MAIN BUS NO. -2 at 400KV S/s Ashta 29-May-18 09:00 29-May-18 18:00 Daily For pre monsoon maintenance work

113 220 30-May-18 09:00 30-May-18 18:00 Daily For pre monsoon maintenance work

114 220 220KV Bina- Guna 18-Jun-18 08:00 18-Jun-18 17:00 Daily For pre monsoon maintenance work

115 220 220KV Bina-Ashoknagar 19-Jun-18 08:00 19-Jun-18 17:00 Daily For pre monsoon maintenance work

220KV Bina-I (Inter connected) at 400KV S/s 116 220 20-Jun-18 08:00 20-Jun-18 17:00 Daily For pre monsoon maintenance work Bina

220KV Bina-II(Inter connected) at 400KV S/s 117 220 21-Jun-18 08:00 21-Jun-18 17:00 Daily For pre monsoon maintenance work Bina

Minutes of 63rd OCCM of MP 47 Unitwise / Stationwise Genration in MU A. Thermal Ann 4.1 Capacity Stn. Name UNIT No. MW Feb-18 Mar-18 5 210 137.58 151.94 PH III 210 137.58 151.94

AMARKAN TOT 210 137.58 151.94 6 200 68.59 123.79 7 210 45.36 88.01 PH II 410 113.95 211.80 8 210 62.23 119.87 9 210 0.00 0.00 PH III 420 62.23 119.87 SATPURA 10 250 150.42 185.22 11 250 158.92 180.87 PH IV 500 309.34 366.09 TOT 1330 485.52 697.76 1 210 114.57 130.60 2 210 85.44 116.32 PH I 420 200.01 246.92 3 210 115.92 126.25 4 210 98.23 118.53 PH II 420 214.16 244.78 5 500 319.68 307.13 SANJAY GANDHI PH III 500 319.68 307.13 TOT 1340 733.84 798.83 1 600 299.94 260.13 2 600 222.75 228.60

SSTPS PH1 1200 522.69 488.73 MPPGCL THERMAL 4080 1879.63 2137.26 Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015. B. Hydel Station Name Capacity MW Feb-18 Mar-18 GANDHISAGAR 115.0 63.39 60.39 R.P.SAGAR 172.0 62.87 40.35 J.SAGAR 99.0 39.49 26.20 CHAMBAL 386.0 165.75 126.93 M.P.CHAMBAL 193.0 82.87 63.47 PENCH 160.0 6.30 4.89 M.P.PENCH 107.0 4.20 3.26 BARGI 90.0 4.74 6.09 TONS 315.0 28.68 28.11 BIRSINGHPUR 20.0 0.00 0.00 B.SGR(DEOLONDH) 60.0 0.00 0.00 B.SGR(SILPARA) 30.0 3.13 3.38 RAJGHAT 45.0 9.63 0.00 M.P.RAJGHAT 22.5 4.81 0.00 B.SGR(JINHA) 20.0 7.01 6.19 MADIKHEDA 60.0 2.23 0.00 TOTAL HYDEL 1186.0 227.44 175.60 MPPGCL Hydel 915.0 125.08 109.06 MPSEB HYDEL Share 917.5 137.66 110.50

C. NHDC (Ex-Bus) Station Name Capacity MW Feb-18 Mar-18 Indira Sagar Hydel Project 1000 38.51 31.27 Omkareshwar Hydel Project 520 14.82 14.62

Minutes of 63rd OCCM of MP 48 ENERGY BALANCE SHEET Year : 2017 - 18 All figures in Million Unit S No. Source Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Total A. M.P. Availability 1 Thermal 1034.52 1374.20 922.84 823.71 1282.62 1291.48 1294.29 1350.14 1657.17 1851.49 1736.88 1961.34 16580.69 2 Hydel 138.81 65.34 111.66 135.12 90.17 70.87 167.18 147.00 175.99 177.60 131.97 109.08 1520.81 3 Total 1173.34 1439.54 1034.51 958.83 1372.80 1362.34 1461.47 1497.14 1833.16 2029.09 1868.86 2070.41 18101.49 B. Exchange with other States / Systems 1 Indira Sagar 129.51 156.20 150.63 68.70 18.97 101.94 35.38 52.42 29.61 35.04 35.91 28.39 842.72 2 Omkareshwar 65.48 77.85 77.46 41.31 24.01 56.48 20.58 22.96 10.60 15.75 14.82 14.62 441.91 3 MPPMCL Schedule from Central Sector of WR 1833.79 1792.95 1558.13 1599.06 1745.85 1752.78 2046.04 1862.07 1858.44 1812.41 1514.30 1862.58 21238.41 4 MPPMCL Schedule from Central Sector ER 19.03 18.18 12.01 9.83 35.49 29.17 42.39 46.88 42.57 29.31 17.02 31.15 333.05 5 Total MPPMCL Schedule from Central Sector (WR+ER) 1852.82 1811.13 1570.14 1608.89 1781.35 1781.95 2088.43 1908.95 1901.01 1841.73 1531.33 1893.74 21571.46 6 Deviation Energy of (WR+ER) -31.86 -26.91 -38.23 -6.99 11.43 66.52 63.84 17.32 -12.96 -14.67 -14.46 -44.64 -31.60 7 Schedule From DVC ER 194.38 208.97 112.45 128.21 175.36 160.34 151.31 155.18 175.75 145.10 126.26 0.00 1733.31 8 Schedule From Sugen 0.00 0.00 0.00 0.00 0.19 12.94 11.04 5.71 4.99 5.31 3.36 0.86 44.40 9 LANCO Amk 196.56 178.13 122.84 113.23 77.35 87.18 124.11 140.94 197.24 200.70 180.37 154.86 1773.51 10 SASAN 1014.14 899.33 838.39 965.33 836.99 918.72 920.70 981.34 956.89 1020.78 877.91 1004.86 11235.39 11 ESSAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12 J P Nigri 327.32 332.81 304.49 146.14 322.43 248.89 339.66 319.26 231.99 271.15 227.27 223.22 3294.62 13 MB Power 80.31 140.94 117.90 131.21 199.79 165.90 113.14 203.65 165.07 152.88 168.46 219.64 1858.89 14 JHABUA Power 9.94 23.88 6.85 0.00 28.08 33.72 43.09 76.38 53.40 76.19 31.80 57.95 441.28 15 Other Open Access Schedule other than MPPMCL Incl. Seci -129.92 -138.00 -129.55 -81.03 -76.42 -38.08 -37.68 -48.90 -106.81 -89.46 -123.32 -100.99 -1100.17 16 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18 Schedule from Sardar Sarovar 67.97 59.81 151.66 12.69 15.99 24.85 47.43 56.83 44.02 28.48 9.79 -0.72 518.78 19 SCH to Railway from RGPPL_ebid 154.54 149.12 157.11 163.53 159.41 155.50 162.14 154.53 162.11 161.60 148.23 158.88 1886.68 20 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21 Schedule from Rihand+Matatila 6.47 9.44 10.06 12.01 13.47 15.47 20.85 8.59 12.20 14.00 12.20 9.46 144.23 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA 22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CSPDCCL dtd. 18.09.2012 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.09.2012 Including Short term purchase against MTOA 24 Additional Power Purchase 0.22 7.22 7.97 10.28 22.18 63.75 261.07 116.87 28.02 64.34 10.15 5.63 597.71 25 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26 Banking of Energy -168.43 -7.60 -23.96 -235.96 -355.19 -334.61 111.71 982.80 898.28 422.21 85.16 -247.51 1126.91 27 Sale of Power -321.90 -670.25 -592.09 -341.76 -205.62 -189.34 -33.15 -45.31 -107.83 -100.97 -244.08 -632.14 -3484.45 28 Total MP Schedule (Including Railway) 3284.41 3004.91 2654.27 2632.78 2995.37 3107.17 4323.84 5016.82 4616.34 4214.04 3044.88 2747.72 41642.55 29 Total MP Drawal (Including Railway) 3252.55 2978.01 2616.04 2625.79 3006.80 3173.69 4387.69 5034.14 4603.38 4199.36 3030.41 2703.09 41610.95 30 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 0.04 0.00 0.00 1.45 8.32 6.79 2.14 0.00 0.00 18.72 31 Wheeled Energy of Wind Farm 8.61 7.99 6.45 10.15 6.11 2.14 5.69 4.88 8.80 6.52 4.81 12.32 84.47 32 Wheeled Energy of Solar Plant 27.57 29.46 24.81 31.11 36.97 41.12 49.24 55.00 52.31 66.73 63.36 79.28 556.97 33 Wheeled Energy of Bio-Mass 0.00 0.00 0.00 1.82 2.17 2.34 2.11 2.81 0.74 0.00 0.00 0.00 12.00 34 Wheeled Energy of Ascent Hydro 1.35 1.32 1.12 1.07 1.19 1.24 1.43 0.90 1.13 1.21 1.18 1.22 14.36 35 Export to MSEB (Nepa-Dharni) 0.00 0.00 0.00 -2.86 -3.19 -3.58 -3.40 -5.51 -5.15 -4.71 -4.06 -6.35 -38.80 36 Deviation Energy of MPPGCL Thermal -11.71 -19.44 -25.21 -17.55 -15.53 -1.71 5.16 3.01 -5.93 0.43 -3.32 3.64 -88.14 37 Energy Purchased by MP from Wind Farm 505.01 525.74 530.63 682.35 421.87 209.86 139.72 138.62 251.95 148.73 150.49 352.39 4057.36 38 Energy Purchased by MP from Solar Plant 100.86 94.32 101.32 69.53 82.89 99.28 92.97 112.15 101.88 122.11 137.71 173.04 1288.07 Firm / Infirm Energy of HEG +Hindalco+HEG Tawa +Trimula Ind. 39 171.01 173.70 169.69 121.87 95.94 55.03 29.25 38.68 98.47 87.95 111.87 76.76 1230.21 purchase by MP +Wheeled enrgy of CPP / IPP Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green 40 5.16 2.32 1.21 4.63 2.96 0.10 3.48 4.45 6.41 12.10 24.57 28.67 96.05 Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW 41 Deviation Energy of ISP 5.44 4.77 -6.02 3.43 1.72 3.89 2.83 3.33 2.82 3.08 2.59 2.88 30.74 42 Schedule Energy of BLA Power against LTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43 Schedule Energy of JP BINA Power against LTOA 55.54 73.35 45.22 19.30 59.63 91.73 122.92 135.41 129.64 139.86 70.89 164.66 1108.14 44 Import from bargi Left Bank Canal Power House + ISP NVDA 0.03 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.08 45 Chambal Complex Excess / less Overshare by MP -0.40 -1.77 3.92 4.86 -6.75 -6.98 -45.68 -38.53 -39.60 -21.26 -19.02 -3.10 -174.33 46 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 -0.12 -0.03 -0.03 -0.02 1.13 1.78 3.70 1.86 3.57 2.10 -0.02 13.90 47 State Supply (Ex-Power st. Bus) 5489.33 5543.27 4731.74 4624.36 5108.53 5190.06 6314.06 7073.87 7088.87 6847.70 5493.18 5701.91 69206.88 48 AVERAGE DAILY (Ex-Bus) 182.98 178.82 157.72 149.17 164.79 173.00 203.68 235.80 228.67 220.89 196.18 183.93 189.61 49 MINIMUM DAILY (MP Periphery) 162.70 149.61 138.02 1301.53 142.05 139.16 172.13 225.15 195.07 207.09 157.40 168.21 138.02 50 MAXIMUM DAILY (MP Periphery) 182.74 179.81 170.82 160.33 180.11 181.08 226.10 235.51 231.42 222.31 212.13 195.34 235.51 51 State Supply (Ex-Power st. Bus):- YEAR : 2016-17 5419.09 5106.72 4765.81 4189.32 4099.10 4743.50 5173.59 6415.66 6773.42 6418.88 5617.69 5524.78 64247.57 52 Year ((17-18)-(16-17))*100/Year (16-17) 1.30 8.55 -0.72 10.38 24.63 9.41 22.04 10.26 4.66 6.68 -2.22 3.21 7.72 53 Unshedule L/S : Year-2017-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54 Frequency Correction 2.97 3.19 2.06 2.26 2.40 4.42 5.88 7.07 5.77 5.03 4.14 4.94 50.12 55 Restricted Requirement : Year-2017-18 5492.30 5546.46 4733.79 4626.62 5110.93 5194.48 6319.94 7080.94 7094.64 6852.73 5497.31 5706.86 69257.00 56 Shedule L/S : Year-2017-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57 Un-Restricted Requirement : Year-2017-18 5492.30 5546.46 4733.79 4626.62 5110.93 5194.48 6319.94 7080.94 7094.64 6852.73 5497.31 5706.86 69257.00

Minutes of 63rd OCCM of MP 49 ENERGY BALANCE SHEET : Demand & Sypply Hours Year : 2017 - 18 S.NO. Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Yr 17-18 C. MORNING PEAK (MAX) 1 DEMAND MET 8328 8181 7075 6977 7763 7770 10520 11888 12240 12091 11409 9732 12240 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0 3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0 D. EVENING PEAK (MAX) 1 DEMAND MET 8106 7936 7571 7372 8189 8211 9503 10221 10084 10071 8906 8165 10221 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0 3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0 F. REGISTERED MAXIMUM 8349 8181 7659 7372 8189 8232 10520 11888 12240 12091 11409 9732 12240 G. COMPUTED MAXIMUM DEMAND 8364 8181 7689 7412 8251 8252 10533 11920 12277 12123 11409 9752 12277 H. UNRESTRICTED MAXIMUM DEMAND 8364 8181 7689 7412 8251 8252 10533 11920 12277 12123 11409 9752 12277 I. Average Power Supply per day to 1. Div. Head Quarters 23:49 23:41 23:42 23:40 23:45 23:44 23:47 23:48 23:47 23:46 23:48 23:50 23:46 2. District Head Quarters 23:51 23:45 23:43 23:44 23:49 23:46 23:50 23:53 23:53 23:52 23:52 23:52 23:49 3. Tahsil Head Quarters 23:44 23:38 23:33 23:37 23:42 23:39 23:43 23:47 23:45 23:44 23:44 23:47 23:42 4. Rural -Mixed 23:07 22:57 22:41 22:57 23:11 23:07 23:17 23:23 23:25 23:24 23:21 23:25 23:11 5. Rural -DLF 23:23 23:15 23:00 23:10 23:21 23:15 23:26 23:32 23:34 23:33 23:30 23:32 23:23 6. Rural -Irrigation 9:46 9:41 9:31 9:47 9:46 9:43 9:49 9:52 9:52 9:53 9:51 9:52 9:47 J LOAD FACTOR % 91.32 91.07 85.81 84.31 83.85 87.57 80.67 82.64 77.84 76.12 71.65 78.75 82.63 FREQUENCY ANALYSIS YEAR 2017-18 S.N PARTICULARS Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Yr 17-18 A. INTGRATED FREQUENCY 1 MAXIMUM 50.14 50.18 50.15 50.09 50.10 50.07 50.08 50.07 50.13 50.07 50.06 50.08 50.18 2 MINIMUM 49.83 49.78 49.85 49.82 49.81 49.80 49.85 49.70 49.84 49.83 49.86 49.85 49.70 B. INSTANTANEOUS FREQUENCY 1 MAXIMUM 50.26 50.26 50.26 50.26 50.20 50.20 50.20 50.20 50.20 50.20 50.20 50.20 50.26 2 MINIMUM 49.66 49.64 49.72 49.82 49.65 49.62 49.65 49.62 49.70 49.62 49.70 49.68 49.62 C. AVG FREQUENCY 49.99 49.99 50.00 49.99 49.99 49.97 49.97 49.97 49.98 49.62 49.98 49.97 49.95 D. % TIME WHEN FREQUENCY WAS 1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 50.05 TO 51.5 Hz 16.45 19.46 18.69 17.29 15.98 9.73 9.21 9.56 13.28 10.92 10.06 7.72 13.22 3 49.9 TO 50.05 Hz 74.49 71.45 75.50 76.15 76.82 78.50 77.18 73.53 73.86 77.94 80.25 79.29 76.22 4 49.7 TO 49.9 Hz 9.06 9.09 5.81 6.56 7.20 11.77 13.61 16.91 12.86 11.05 9.69 12.99 10.55 5 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Minutes of 63rd OCCM of MP 50 Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- February 2018 FIGURES IN MW

Own Generation Schedule from Load Shedding

Riha Intra UNRE Total REST. SCH nd+ Tot Act. Deviatio State DEMAN ST. Hrs. FREQ. THER. THER. Total Total Jhabu MTO DEMAN IPPs CPPs DVC JP MB to SE STO Mata Avl. Drl n STO D MET UN DEMA DEMAND Incl Excl HYD. ISP OSP Total CSS Sugen Lanco Sasan Essar a SSP Banking Sale Pur A Total SCH TOTAL D Injecti Injecti ER Nigri Power Railw Z A tila- A SCH ND Aux Aux Power at MET on on ay Rajg MP hat

1:00 49.99 2646 2447 141 0 0 261 403 3252 1843 153 0 246 1267 3 329 131 22 14 205 0 -25 -301 0 0 -226 14 3674 6926 3572 -103 -4 6819 0 0 0 6823 6823 6819

2:00 50.00 2590 2395 137 0 0 261 377 3170 1678 134 0 246 1265 2 324 109 2 14 206 0 -25 -219 0 0 -228 14 3522 6692 3404 -118 -4 6570 0 0 0 6572 6572 6569

3:00 49.99 2574 2380 143 0 0 261 364 3148 1695 139 0 251 1253 0 324 63 0 15 206 0 -25 -175 0 0 -228 14 3530 6678 3488 -42 -4 6633 0 0 0 6636 6636 6633

4:00 50.01 2555 2362 140 4 2 264 351 3123 1716 134 0 251 1257 1 324 58 1 15 204 0 -25 -156 0 0 -228 14 3566 6689 3534 -32 -4 6653 0 0 0 6655 6655 6653

5:00 49.99 2585 2390 142 37 21 268 338 3195 1783 151 0 251 1262 1 324 112 9 14 205 0 -25 -248 0 0 -228 14 3623 6818 3575 -48 -4 6766 0 0 0 6770 6770 6766

6:00 49.99 2683 2481 162 53 27 269 328 3321 2153 180 3 255 1255 7 324 197 30 14 204 0 -25 -529 0 0 -228 14 3853 7174 3900 47 -4 7217 0 0 0 7221 7221 7217

7:00 49.93 2860 2648 237 106 41 285 323 3641 2410 218 26 260 1259 10 324 297 83 14 206 0 -16 -317 0 0 -19 14 4769 8410 4993 224 -6 8629 0 0 0 8647 8647 8629

8:00 50.00 2945 2728 340 188 81 284 482 4102 2487 221 33 263 1272 13 324 328 98 14 206 0 356 -151 0 0 -40 14 5440 9542 5422 -18 -7 9517 0 0 0 9522 9522 9517

9:00 49.97 2950 2733 348 261 94 283 697 4416 2530 221 32 263 1260 14 324 330 106 14 206 0 361 -36 53 0 -87 14 5606 10021 5543 -63 -7 9951 0 0 0 9962 9962 9951

10:00 49.99 2950 2733 291 204 71 284 847 4431 2482 215 10 263 1257 13 324 325 96 15 206 0 360 -52 53 0 -124 14 5457 9888 5315 -142 -6 9740 0 0 0 9746 9746 9740

11:00 49.99 2920 2705 193 96 36 281 976 4287 2430 211 0 263 1254 12 324 315 86 15 200 0 349 -216 16 0 -174 14 5101 9387 4974 -127 -6 9255 0 0 0 9261 9261 9255

12:00 49.99 2824 2615 177 74 34 270 1034 4203 2275 188 0 263 1251 12 324 277 51 15 203 0 349 -390 7 0 -266 14 4574 8777 4336 -238 -6 8533 0 0 0 8537 8537 8533

13:00 50.00 2807 2598 154 20 12 272 1041 4097 2283 201 3 263 1250 14 324 266 62 15 196 0 341 -384 0 0 -303 14 4547 8643 4541 -6 -6 8632 0 0 0 8634 8634 8632

14:00 50.00 2756 2550 150 33 14 273 999 4019 2201 178 0 263 1252 14 324 259 30 15 195 0 341 -367 0 0 -315 14 4405 8424 4276 -129 -6 8289 0 0 0 8293 8293 8289

15:00 49.96 2759 2552 159 37 19 273 871 3911 2213 166 0 259 1248 15 324 274 23 15 202 0 341 -471 0 0 -294 14 4329 8240 4312 -17 -6 8217 0 0 0 8228 8228 8217

16:00 49.95 2780 2573 158 33 18 271 672 3725 2287 191 0 263 1254 14 324 290 38 16 200 0 341 -551 0 0 -258 14 4424 8149 4450 27 -7 8169 0 0 0 8181 8181 8169

17:00 49.96 2898 2683 162 25 19 274 392 3555 2358 193 3 259 1251 14 324 298 56 16 202 0 341 -558 0 0 -143 14 4629 8184 4491 -138 -7 8039 0 0 0 8050 8050 8039

18:00 50.02 2956 2738 209 45 28 278 191 3488 2418 214 5 263 1257 14 324 326 89 16 210 0 -32 -512 0 0 -55 14 4551 8039 4363 -188 -7 7845 0 0 0 7847 7847 7845

19:00 49.95 2947 2730 216 37 12 278 256 3528 2452 218 10 263 1251 13 329 344 63 16 210 0 -32 -461 0 0 -45 14 4645 8173 4634 -12 -7 8155 0 0 0 8167 8167 8155

20:00 49.98 2884 2669 200 40 9 276 323 3519 2349 193 0 263 1257 11 332 290 47 16 209 0 -32 -399 0 0 -65 14 4485 8004 4324 -161 -7 7837 0 0 0 7843 7843 7837

21:00 49.98 2846 2634 175 12 5 275 384 3484 2270 197 0 263 1253 10 332 242 33 15 210 0 -40 -618 0 0 -87 14 4094 7578 3908 -186 -6 7386 0 0 0 7392 7392 7386

22:00 50.05 2786 2577 145 8 2 268 422 3422 2199 176 0 263 1257 6 331 197 17 15 208 0 -40 -772 0 0 -202 14 3669 7091 3485 -184 -6 6901 0 0 0 6902 6902 6901

23:00 49.99 2784 2576 173 21 5 264 430 3468 2308 195 3 259 1259 7 331 252 36 15 202 0 -32 -608 0 0 -238 14 4000 7469 3942 -58 -5 7405 0 0 0 7410 7410 7405

24:00 49.99 2741 2535 167 8 2 260 423 3396 1885 145 0 255 1259 7 331 160 12 14 202 0 -32 -203 0 0 -233 14 3816 7213 3647 -169 -4 7039 0 0 0 7043 7043 7039

Avg. 49.99 2793 2585 188 56 23 272 538 3663 2196 185 5 259 1257 10 326 239 46 15 204 0 128 -362 5 0 -180 14 4346 8009 4268 -78 -6 7925 0 0 0 7931 7931 a

00 TO 06 49.99 2605 2409 144 16 8 264 360 3201 1811 149 0 250 1260 2 325 112 11 15 205 0 -25 -271 0 0 -228 14 3628 6830 3579 -49 -4 6776 0 0 0 6780 6780 HRS.

06 TO 12 49.98 2908 2694 264 155 60 281 726 4180 2436 212 17 263 1259 12 324 312 87 15 204 0 293 -194 21 0 -118 14 5158 9338 5097 -60 -6 9271 0 0 0 9279 9279 HRS.

12 TO 18 49.98 2826 2616 165 32 18 274 694 3799 2293 190 2 262 1252 14 324 285 50 16 201 0 279 -474 0 0 -228 14 4481 8280 4406 -75 -6 8198 0 0 0 8206 8206 HRS.

06TO 18 49.98 2867 2655 215 94 39 277 710 3990 2365 201 9 262 1255 13 324 299 68 15 203 0 286 -334 11 0 -173 14 4819 8809 4751 -68 -6 8735 0 0 0 8742 8742 HRS.

18 TO 24 49.99 2831 2620 179 21 6 270 373 3470 2244 187 2 261 1256 9 331 247 35 15 207 0 -35 -510 0 0 -145 14 4118 7588 3990 -128 -6 7454 0 0 0 7459 7459 HRS.

Minutes of 63rd OCCM of MP 51 Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- March 2018 FIGURES IN MW

Own Generation Schedule from Load Shedding

Riha Intra UNRE Total REST. SCH nd+ Tot Act. Deviatio State DEMAN ST. Hrs. FREQ. THER. THER. Total Total Jhabu MTO DEMAN IPPs CPPs DVC JP MB to STO Mata Avl. Drl n STO D MET UN DEMA DEMAND Incl Excl HYD. ISP OSP Total CSS Sugen Lanco Sasan Essar a SSP SEZ Banking Sale Pur A Total SCH TOTAL D Injectio Injectio ER Nigri Power Railw A tila- A SCH ND Aux Aux Power at MET n n ay Rajg MP hat

1:00 49.97 2846 2624 125 11 4 312 679 3755 2404 0 0 203 1299 5 290 265 64 0 206 0 -315 -739 0 0 -110 12 3584 7339 3514 -69 -7 7262 0 0 0 7270 7270 7262

2:00 49.98 2835 2613 122 7 4 311 653 3711 2355 0 0 203 1299 4 290 254 58 0 208 0 -315 -825 0 0 -123 12 3420 7131 3224 -196 -7 6928 0 0 0 6933 6933 6928

3:00 49.98 2820 2600 109 7 4 311 635 3667 2371 0 0 203 1300 3 283 252 54 0 209 0 -315 -866 0 0 -220 12 3286 6953 3227 -59 -7 6887 0 0 0 6892 6892 6887

4:00 49.99 2823 2603 106 7 4 311 611 3643 2331 0 0 203 1303 3 283 250 61 0 207 0 -315 -833 0 0 -220 12 3285 6928 3214 -71 -6 6851 0 0 0 6855 6855 6851

5:00 49.97 2843 2622 107 22 12 313 576 3652 2331 0 0 203 1299 4 283 269 65 0 208 0 -315 -874 0 0 -220 12 3265 6917 3271 6 -6 6916 0 0 0 6922 6922 6916

6:00 50.00 2875 2652 118 33 14 318 558 3692 2462 0 0 203 1300 7 284 289 80 0 208 0 -315 -891 0 0 -89 12 3550 7242 3558 8 -7 7244 0 0 0 7247 7247 7243

7:00 49.99 2926 2700 172 76 31 321 568 3868 2568 0 5 203 1302 7 285 314 97 0 209 0 -315 -231 5 0 -28 12 4432 8300 4472 40 -9 8331 0 0 0 8337 8337 8331

8:00 50.00 2945 2718 238 116 57 322 728 4179 2633 0 9 203 1304 10 285 328 108 0 209 0 -300 -178 13 0 -50 12 4586 8765 4472 -115 -9 8641 0 0 0 8645 8645 8641

9:00 49.96 2945 2718 245 120 63 321 816 4282 2610 0 6 203 1304 9 285 333 107 0 209 0 -336 -254 18 0 -93 12 4413 8696 4324 -89 -9 8597 0 0 0 8608 8608 8597

10:00 50.00 2931 2705 230 83 42 321 1010 4392 2617 0 0 203 1304 7 285 334 113 0 208 0 -337 -458 8 0 -147 12 4150 8542 3871 -279 -9 8254 0 0 0 8258 8258 8254

11:00 49.96 2898 2673 166 44 22 318 1139 4362 2593 0 0 200 1304 8 286 328 106 0 206 0 -356 -820 0 0 -199 12 3668 8030 3453 -214 -8 7807 0 0 0 7817 7817 7807

12:00 49.99 2851 2629 142 33 16 314 1171 4305 2397 0 0 200 1304 4 291 262 63 0 206 0 -358 -1116 0 0 -223 12 3040 7345 2816 -223 -8 7113 0 0 0 7118 7118 7113

13:00 50.00 2800 2581 132 29 16 313 1149 4220 2425 0 0 200 1303 4 290 278 46 0 202 0 -358 -1233 0 0 -233 12 2937 7158 2913 -24 -8 7126 0 0 0 7129 7129 7126

14:00 49.99 2788 2571 119 22 14 313 1109 4148 2414 0 0 200 1301 3 290 246 42 0 200 0 -358 -1257 0 0 -232 12 2862 7010 2753 -109 -7 6894 0 0 0 6898 6898 6894

15:00 49.95 2826 2606 101 18 10 316 999 4051 2450 0 0 200 1305 4 291 270 50 0 204 0 -374 -1359 0 0 -215 12 2837 6888 2802 -36 -8 6845 0 0 0 6856 6856 6845

16:00 49.93 2858 2636 129 18 10 317 805 3916 2459 0 0 200 1311 7 291 281 68 0 201 0 -374 -1378 0 0 -179 12 2899 6815 2974 75 -8 6881 0 0 0 6895 6895 6881

17:00 49.97 2881 2658 127 25 12 319 556 3696 2456 0 0 200 1314 7 292 266 66 0 206 0 -374 -1134 0 0 -111 12 3200 6896 3163 -37 -8 6851 0 0 0 6859 6859 6851

18:00 50.01 2889 2666 190 43 25 322 332 3578 2454 0 0 200 1308 6 292 280 78 0 204 0 -358 -1272 0 0 -37 12 3167 6745 3139 -28 -9 6708 0 0 0 6709 6709 6708

19:00 49.93 2925 2699 197 58 39 357 358 3708 2557 0 5 200 1313 8 295 300 103 0 204 0 -317 -988 0 0 -52 12 3642 7351 3719 76 -9 7418 0 0 0 7433 7433 7418

20:00 49.98 2875 2652 183 73 35 354 465 3761 2453 0 2 200 1316 7 296 285 90 0 204 0 -315 -619 0 0 -67 12 3865 7626 3720 -145 -9 7472 0 0 0 7477 7477 7473

21:00 49.95 2824 2604 126 33 16 352 601 3732 2445 0 0 200 1311 6 298 276 78 0 204 0 -315 -808 0 0 -82 12 3624 7356 3448 -176 -9 7171 0 0 0 7181 7181 7171

22:00 50.02 2786 2569 131 32 10 352 682 3776 2398 0 0 200 1311 6 299 251 55 0 205 0 -315 -951 0 0 -104 12 3367 7143 3244 -123 -9 7011 0 0 0 7012 7012 7012

23:00 49.97 2842 2621 149 33 16 352 720 3890 2533 0 0 200 1311 8 301 297 90 0 202 0 -315 -663 0 0 -103 12 3873 7764 3741 -132 -8 7624 0 0 0 7632 7632 7624

24:00 49.97 2856 2633 126 22 16 320 725 3842 2390 0 0 200 1309 5 298 281 67 0 199 0 -315 -696 0 0 -94 12 3657 7499 3544 -113 -7 7379 0 0 0 7387 7387 7379

Avg. 49.98 2862 2640 150 40 21 324 735 3910 2463 0 1 201 1306 6 290 283 75 0 205 0 -333 -852 2 0 -135 12 3525 7435 3441 -85 -8 7342 0 0 0 7349 7349 a

00 TO 06 49.98 2840 2619 114 15 7 313 619 3687 2376 0 0 203 1300 4 286 263 64 0 208 0 -315 -838 0 0 -164 12 3398 7085 3335 -63 -7 7015 0 0 0 7020 7020 HRS.

06 TO 12 49.98 2916 2690 199 79 38 320 906 4231 2569 0 3 202 1304 7 286 316 99 0 208 0 -334 -510 7 0 -123 12 4048 8280 3901 -147 -9 8124 0 0 0 8130 8130 HRS.

12 TO 18 49.97 2840 2620 133 26 15 317 825 3935 2443 0 0 200 1307 5 291 270 58 0 203 0 -366 -1272 0 0 -168 12 2984 6919 2957 -26 -8 6884 0 0 0 6891 6891 HRS.

06TO 18 49.98 2878 2655 166 52 27 318 865 4083 2506 0 2 201 1305 6 289 293 79 0 205 0 -350 -891 4 0 -146 12 3516 7599 3429 -87 -8 7504 0 0 0 7511 7511 HRS.

18 TO 24 49.97 2851 2630 152 42 22 348 592 3785 2463 0 1 200 1312 7 298 282 80 0 203 0 -316 -787 0 0 -84 12 3671 7456 3569 -102 -8 7346 0 0 0 7354 7354 HRS.

Minutes of 63rd OCCM of MP 52 Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- February 2018 FIGURES IN MW EZONE CZONE WZONE Railway

Hrs. FREQ. Restricte Unrestrict Restricte Unrestrict Restricte Unrestrict Demand O/U SCH Unsch Demand O/U SCH Unsch Demand O/U SCH Unsch Total SCH d ed SCH d ed SCH d ed Total Sch Met DRL LS LS Met DRL LS LS Met DRL LS LS Drawal Demand Demand Demand Demand Demand Demand

1:00 49.99 2135 2166 31 0 0 2168 2168 2339 2368 29 0 0 2369 2369 2235 2071 -164 0 0 2072 2072 205 215

2:00 50.00 2024 2012 -12 0 0 2013 2013 2234 2228 -5 0 0 2229 2229 2207 2108 -99 0 0 2109 2109 206 221

3:00 49.99 1993 2001 8 0 0 2002 2002 2143 2182 40 0 0 2183 2183 2313 2236 -78 0 0 2237 2237 206 213

4:00 50.01 1975 2011 36 0 0 2012 2012 2142 2149 7 0 0 2149 2149 2339 2288 -51 0 0 2289 2289 204 205

5:00 49.99 1977 2027 50 0 0 2028 2028 2159 2189 30 0 0 2191 2191 2399 2341 -58 0 0 2343 2343 205 209

6:00 49.99 2044 2065 21 0 0 2066 2066 2266 2356 90 0 0 2357 2357 2622 2583 -40 0 0 2584 2584 204 213

7:00 49.93 2282 2409 126 0 0 2414 2414 2580 2800 220 0 0 2806 2806 3245 3196 -49 0 0 3203 3203 206 224

8:00 50.00 2527 2541 14 0 0 2543 2543 3033 3066 33 0 0 3068 3068 3765 3690 -75 0 0 3691 3691 206 220

9:00 49.97 2575 2501 -75 0 0 2503 2503 3289 3328 39 0 0 3331 3331 4026 3908 -118 0 0 3912 3912 206 215

10:00 49.99 2605 2495 -110 0 0 2496 2496 3290 3298 8 0 0 3301 3301 3862 3734 -128 0 0 3737 3737 206 213

11:00 49.99 2587 2506 -81 0 0 2508 2508 3176 3169 -7 0 0 3171 3171 3525 3377 -148 0 0 3379 3379 200 202

12:00 49.99 2416 2274 -142 0 0 2275 2275 2943 2872 -71 0 0 2874 2874 3277 3179 -97 0 0 3181 3181 203 207

13:00 50.00 2388 2323 -65 0 0 2323 2323 2746 2811 65 0 0 2812 2812 3338 3304 -34 0 0 3305 3305 196 194

14:00 50.00 2298 2184 -114 0 0 2185 2185 2719 2673 -46 0 0 2674 2674 3268 3238 -31 0 0 3239 3239 195 194

15:00 49.96 2215 2155 -60 0 0 2158 2158 2600 2576 -24 0 0 2580 2580 3235 3284 49 0 0 3289 3289 202 201

16:00 49.95 2188 2140 -48 0 0 2143 2143 2545 2541 -4 0 0 2545 2545 3198 3288 90 0 0 3293 3293 200 199

17:00 49.96 2226 2151 -75 0 0 2155 2155 2607 2593 -14 0 0 2597 2597 3105 3091 -14 0 0 3096 3096 202 203

18:00 50.02 2262 2217 -45 0 0 2218 2218 2601 2539 -63 0 0 2539 2539 2893 2877 -16 0 0 2877 2877 210 212

19:00 49.95 2547 2582 35 0 0 2586 2586 2533 2605 72 0 0 2609 2609 2874 2745 -128 0 0 2749 2749 210 223

20:00 49.98 2546 2567 21 0 0 2569 2569 2576 2545 -31 0 0 2547 2547 2669 2508 -161 0 0 2510 2510 209 217

21:00 49.98 2436 2441 5 0 0 2443 2443 2428 2371 -58 0 0 2372 2372 2510 2362 -148 0 0 2364 2364 210 212

22:00 50.05 2287 2260 -27 0 0 2260 2260 2281 2261 -20 0 0 2261 2261 2319 2171 -147 0 0 2171 2171 208 209

23:00 49.99 2336 2351 14 0 0 2352 2352 2475 2567 92 0 0 2569 2569 2431 2292 -139 0 0 2293 2293 202 195

24:00 49.99 2219 2246 28 0 0 2248 2248 2417 2433 16 0 0 2434 2434 2338 2157 -180 0 0 2158 2158 202 203

Avg. 49.99 2295 2276 -19 0 0 2278 2278 2588 2605 17 0 0 2607 2607 2916 2835 -82 0 0 2837 2837 204 209

00 TO 06 49.99 2025 2047 22 0 0 2048 2048 2214 2245 32 0 0 2247 2247 2352 2271 -81 0 0 2272 2272 205 213 HRS. 06 TO 12 49.98 2499 2454 -45 0 0 2457 2457 3052 3089 37 0 0 3092 3092 3616 3514 -102 0 0 3517 3517 204 214 HRS. 12 TO 18 49.98 2263 2195 -68 0 0 2197 2197 2636 2622 -14 0 0 2624 2624 3173 3180 7 0 0 3183 3183 201 201 HRS. 06TO 18 49.98 2381 2325 -56 0 0 2327 2327 2844 2856 11 0 0 2858 2858 3395 3347 -47 0 0 3350 3350 203 207 HRS. 18 TO 24 49.99 2395 2408 13 0 0 2410 2410 2452 2464 12 0 0 2466 2466 2523 2373 -151 0 0 2374 2374 207 210 HRS.

Minutes of 63rd OCCM of MP 53 Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- March 2018 FIGURES IN MW EZONE CZONE WZONE Railway

Hrs. FREQ. Restricte Unrestrict Restricte Unrestrict Restricte Unrestrict Demand O/U SCH Unsch Demand O/U SCH Unsch Demand O/U SCH Unsch Total SCH d ed SCH d ed SCH d ed Total Sch Met DRL LS LS Met DRL LS LS Met DRL LS LS Drawal Demand Demand Demand Demand Demand Demand

1:00 49.97 2345 2375 30 0 0 2377 2377 2411 2417 5 0 0 2419 2419 2400 2258 -142 0 0 2260 2260 206 213

2:00 49.98 2288 2219 -70 0 0 2220 2220 2349 2306 -43 0 0 2308 2308 2316 2183 -133 0 0 2184 2184 208 221

3:00 49.98 2224 2214 -10 0 0 2215 2215 2261 2233 -28 0 0 2235 2235 2327 2220 -107 0 0 2222 2222 209 220

4:00 49.99 2211 2210 -1 0 0 2211 2211 2240 2201 -39 0 0 2202 2202 2327 2222 -105 0 0 2223 2223 207 218

5:00 49.97 2186 2215 29 0 0 2217 2217 2213 2211 -2 0 0 2213 2213 2335 2270 -65 0 0 2272 2272 208 220

6:00 50.00 2218 2213 -5 0 0 2214 2214 2278 2326 48 0 0 2327 2327 2543 2485 -59 0 0 2486 2486 208 220

7:00 49.99 2470 2454 -17 0 0 2456 2456 2565 2621 56 0 0 2622 2622 3099 3029 -70 0 0 3031 3031 209 228

8:00 50.00 2510 2424 -87 0 0 2425 2425 2738 2663 -75 0 0 2664 2664 3343 3324 -19 0 0 3325 3325 209 230

9:00 49.96 2460 2375 -85 0 0 2378 2378 2717 2662 -55 0 0 2665 2665 3377 3340 -37 0 0 3345 3345 209 221

10:00 50.00 2483 2362 -121 0 0 2363 2363 2683 2544 -139 0 0 2545 2545 3254 3127 -127 0 0 3128 3128 208 221

11:00 49.96 2416 2349 -66 0 0 2352 2352 2525 2387 -137 0 0 2390 2390 2990 2857 -133 0 0 2861 2861 206 213

12:00 49.99 2256 2115 -141 0 0 2116 2116 2310 2146 -164 0 0 2147 2147 2710 2640 -70 0 0 2641 2641 206 213

13:00 50.00 2171 2130 -41 0 0 2131 2131 2110 2046 -64 0 0 2046 2046 2745 2748 3 0 0 2749 2749 202 202

14:00 49.99 2072 1998 -74 0 0 1999 1999 2068 1972 -96 0 0 1974 1974 2700 2720 20 0 0 2722 2722 200 203

15:00 49.95 2026 1979 -47 0 0 1982 1982 2010 1926 -84 0 0 1929 1929 2666 2729 63 0 0 2733 2733 204 211

16:00 49.93 1994 2003 9 0 0 2007 2007 1972 1928 -45 0 0 1932 1932 2639 2745 105 0 0 2750 2750 201 206

17:00 49.97 2030 2010 -20 0 0 2012 2012 2038 1981 -58 0 0 1983 1983 2609 2643 34 0 0 2646 2646 206 218

18:00 50.01 2053 2003 -50 0 0 2003 2003 2091 2048 -44 0 0 2048 2048 2422 2435 13 0 0 2435 2435 204 222

19:00 49.93 2375 2473 99 0 0 2478 2478 2221 2320 98 0 0 2325 2325 2529 2400 -130 0 0 2405 2405 204 225

20:00 49.98 2481 2513 32 0 0 2514 2514 2460 2418 -43 0 0 2419 2419 2501 2320 -180 0 0 2322 2322 204 222

21:00 49.95 2411 2439 28 0 0 2442 2442 2365 2323 -42 0 0 2326 2326 2366 2193 -173 0 0 2196 2196 204 217

22:00 50.02 2323 2334 11 0 0 2334 2334 2290 2263 -27 0 0 2263 2263 2355 2200 -156 0 0 2200 2200 205 215

23:00 49.97 2471 2493 21 0 0 2495 2495 2515 2546 31 0 0 2549 2549 2543 2382 -161 0 0 2384 2384 202 203

24:00 49.97 2404 2422 18 0 0 2425 2425 2484 2472 -12 0 0 2474 2474 2441 2283 -158 0 0 2285 2285 199 202

Avg. 49.98 2287 2263 -23 0 0 2265 2265 2330 2290 -40 0 0 2292 2292 2647 2573 -74 0 0 2575 2575 205 216

00 TO 06 49.98 2245 2241 -5 0 0 2243 2243 2292 2282 -10 0 0 2284 2284 2374 2273 -102 0 0 2275 2275 208 219 HRS. 06 TO 12 49.98 2433 2346 -86 0 0 2348 2348 2589 2504 -86 0 0 2506 2506 3129 3053 -76 0 0 3055 3055 208 221 HRS. 12 TO 18 49.97 2058 2021 -37 0 0 2023 2023 2048 1983 -65 0 0 1985 1985 2630 2670 40 0 0 2673 2673 203 210 HRS. 06TO 18 49.98 2245 2184 -62 0 0 2185 2185 2319 2244 -75 0 0 2246 2246 2879 2861 -18 0 0 2864 2864 205 216 HRS. 18 TO 24 49.97 2411 2446 35 0 0 2448 2448 2389 2390 1 0 0 2393 2393 2456 2296 -160 0 0 2299 2299 203 214 HRS.

Minutes of 63rd OCCM of MP 54 System Disturbance / System Incidence of FEB-2018

1. System Disturbance on 14.02.2018 in Bina, MPPTCL area: On dated 14.02.2018 at around 01:43 Hrs. M.P system was normal, weather was foggy and frequency of National Grid was 50.03 Hz , 315 MVA ICT-no 1 was out of service due to tripping and all feeders were in charged condition and normally loaded. At 01:44 hrs, 220kv Bina-Bina interconnector-II tripped from both end , also 400/220KV 315MVA ICT-II at 400kv s/s Bina got tripped on Differential protection and Buchholz relay indication. On patrolling on 220kv Bina I/C-II ckt location no.-26 R- phase string found failed . After the tripping ,Bina remained with only 1 ICT, for the load management several 220kv and 132kv ckts has been shifted towards Bhopal , Gwalior , Sagar area. Due to above tripping there was no load loss and no generation loss . Faulty transformer is presently out of service.

2. System Disturbance on 14.03.2018 in Birsinghpur area: On dated 14.03.2018 at around 16:35 Hrs. M.P system was normal and frequency of National Grid was 49.97 Hz. At 16:35 Hrs, R-ph PT of 220kv Main bus- II Burst at 220kv s/s Birsinghpur resulting in the tripping of multiple feeders at 220kv s/s Birsinghpur. This caused the total interruption in 220kv s/s Birsinghpur and 132kv s/s Umaria for 24 min. System Disturbance resulting into tripping of following ckts-

From Remote end only- 220kv Birsinghpur-Birsinghpur I/C-I 220kv Birsinghpur-Birsinghpur I/C-II 220kv Birsinghpur-Birsinghpur I/C-III 220kv Birsinghpur-Birsinghpur I/C-IV 220kv Birsinghpur-Birsinghpur Hydel ckt 220kv Birsinghpur-Jabalpur ckt I 220kv Birsinghpur- Jabalpur ckt II

Along with this Unit#3 of SGTPS, MPPGCL also tripped in jerk leading to the generation loss of 188 MW and load loss of 30 MW. Bus bar protection not operated due to check zone kept out due to wiring modification and testing work of new DPR of Railway traction-2 ckt. Damaged 220kv R phase PT replaced.

3. System Disturbance on 20.03.2018 in Bhopal area: On dated 20.03.2018 at around 09:55 Hrs. M.P system was normal and frequency of National Grid was 50.11 Hz. At 09:58 Hrs, During changeover of 220kv Vidisha ckt from bus 1 to bus 2, LBB Protection operated at 400kv s/s Bhopal . System Disturbance resulting into tripping of following X-mers/ckts-

315 MVA , 400/220KV ICT-I

Minutes of 63rd OCCM of MP 55 315 MVA , 400/220KV ICT-II 315 MVA , 400/220KV ICT-III 400KV Bhopal-Damoh ckt 400KV Bhopal-Bina ckt-I 400KV Bhopal-Bina ckt-II 220kv Bhopal-Bhopal ckt-I 220kv Bhopal-Bhopal ckt-II 220kv Bhopal-Bairagarh ckt-I 220kv Bhopal-Bairagarh ckt-II 220kv Bhopal-Ganjbasoda ckt 220kv Bhopal-Vidisha ckt 220kv Bhopal-Shujalpur ckt-I 220kv Bhopal-Mungaliachhap ckt 220kv Bus tie

This caused the total interruption in 220kv s/s Mungaliachhap 25 min. There was No generation loss, and load loss of about 6 MW. Supply to 220kv s/s Mungaliachhap restored through 220kv Ashta ckt, later other elements restored gradually.

4. System Disturbance on 28.03.2018 in Julwaniya area: On dated 28.03.2018 at around 14:38 Hrs. M.P system was normal and frequency of National Grid was 49.88 Hz. At 14.39 hrs, Y-ph CVT, Make-CDC, of 132kv Julwaniya interconnector – II Burst at 220kv s/s Julwaniya resulting in the tripping of multiple feeders and 160 MVA x-mer at 220kv s/s Julwaniya. This caused the total interruption in 220kv s/s Julwaniya for 32 min. Supply to all the nearby s/s remain managed from the other 132kv linkages.

System Disturbance resulting into tripping of following ckts-

From Remote end- 132kv Julwaniya-Talakpura ckt 13v2k Julwaniya-Julwaniya I/C- ckt-I 132kv Julwaniya-Barwani ckt 132kv Julwaniya-Sendhwa ckt From Both ends- 132kv Julwaniya- Julwaniya I/C -ckt-II

There was load loss of 21.6 MW and No generation loss and 132 kV Y-Phase CT Burst causing damage to R Phase CT & Y Phase PI of line side Isolator.Supply to 220kv s/s Julwaniya restored by charging 132kv Julwaniya- Barwani ckt. Later other 132kv ckts got charged. Faulty ckt charged after replacement of R & Y Phase CTs of 132kV Interconnector-II at 00.22 on dated 30.03.18.

Minutes of 63rd OCCM of MP 56 Minutes of 63rd OCCM of MP 57 Minutes of 63rd OCCM of MP 58

Annexure-6.11A

Schemes of Western Region funded under PSDF

State I UT Sr. Details of the Scheme Nos. of Grant Date of Funds %age of

No. Schemes Sanctioned Sanction released fund

(in Rs (in Rs Crores) Disbursed

Crores) as on against

30.11.2016 Grant

sanctioned

Madhya 1. Implementation of 2 3.6 17/03/2016 0 0%

Pradesh Integrated system for

availability based

tariff.

2. Renovation and 92.7 17/03/2016 0 0%

Upgradation of

protection system of

substations of

MPPTCL

Madhya 3. Renovation and 2 47.11 5/9/2016 0 0%

Pradesh Upgradation of

protection system of

substations MPPGCL

4. Installation of 5.59 0 0%

125MVARBus

Reactor at SSTPP

Khandwaand

50MVARLine

Reactor at SGSTPS

Birsinghpur

substation of

MPPGCL.

Chhattisgarh 5. Renovation and 1 61.67 5/9/2016 0 0%

Upgradation of

protection system of

substations

Gujarat 6. Automatic Demand 3 1.50 11105/2015 1.35 89.82%

Management Scheme 17/03/2015

7. Load Forecasting 3.70 04/08/2015 0 0%

Scheme

8. Wind generation 1.62 17/03/2015 0 0%

forecasting project

for State of Gujarat.

TOTAL 8 217.49

Minutes of 63rd OCCM of MP 59 Annexure-6.11B Reporting Format to the PSDF Project Monitoring Group

1. Name of the Scheme

1.1 Name of the substation and its Location

1.2 Executing Agency

1.3 State/Region

2. Date of Sanction Order

2.1 Date of Agreement of Entity with State Govt. / NLDC

2.2 Total Approved Cost of Scheme

2.3 Approved Grant by Monitoring Committee (Rs. In Lakhs)

2.4 Date of Requisition by the Entity

2.4 a) Date and Reference of LOA

2.4 b) Amount of LOA

2.5 Date of Disbursement and amount

2.5.1 Ist Installment

2.5.2 IInd Installment

2.5.3 IIIrd Installment

2.6 Date of Scheduled completion of work

2.7 Date of Handling over of Site to entity ( In case of Turn key project)

Report for the Month of JANUARY 2017

CUMMULATIVE Quantity PROGRESS till date Qty. AS PER Received during

No. Supply Discription LOA Month Sch. Act. Balance Remark

1 Item Details (As per Annexure-II)

1.1

1.2

works as per Progress During CUMMULATIVE Erection Discription Balance LOA Month PROGRESS till date

2 Work Details

2.1

2.2

3 Others

Signature With Seal of The Nodal Officer

Minutes of 63rd OCCM of MP 60 ANNEXURE-6.14 RGMO COMMISSIONED WORKING CONDITION IN SERVICE

NAME OF INSTALLED IF NOT WORKING CONDITION IF NOT IN SERVICE CONDITION S.NO. ELIGIBLE CAPACITY IF NOT COMMISSIONED THEN REASON YES/NO YES/NO THEN REASON FOR NOT YES/NO THEN REASON FOR NOT IN UNITS IN MW FOR NOT COMMISSIONING WORKING SERVICE

Minutes of 63rd OCCM of MP 61 Annexure-8.1.i

SNO Meter No Location Feeder Name District T & C Circle T & C Division Data Not Available Dates

1 MPE51834 132KV S/S BARWANI 40MVA 132/33KV XMER BBL S.NO.3072/1 BARWANI 400KV Indore Testing Division - II Indore 01/03/2018 to 31/03/2018 2 MPE51793 132KV S/S PITHAMPUR 40MVA 132/33KV X'MER-I BHEL S.NO. 2009745 DHAR 400KV Indore Testing Division - II Indore 01/03/2018 to 31/03/2018 3 MPE51761 32KV S/S AYODHYANAGAR BHOPA 40MVA MAKE TELK SN 120459-16 BPL BHOPAL 400 KV Testing Division Bhopal 01/03/2018 to 31/03/2018 4 MPM06718 132KV S/S BIORA 40MVA MAKE BBL SN 3072/7 RAJGARH BHOPAL Testing Division -I Bhopal-S/s DN Beora 01/03/2018 to 31/03/2018 5 MP924844 132KV S/S GAIRATGANJ 63MVA MAKE BBL SN 5038/01 RAISEN BHOPAL Testing Division -II Bhopal 01/03/2018 to 31/03/2018 6 MSP44327 132KV S/S GOPALPUR 40MVA TRANSFORMER PC0100096 T&R SEHORE BHOPAL Testing Division -II Bhopal 01/03/2018 to 31/03/2018 7 XB577396 132KV S/S SHAMSHABAD 20MVA MAKE NGEF VIDISHA BHOPAL Testing Division -II Bhopal 05/03/2018 to 31/03/2018 8 MPE51945 132KV S/S MOTIZEEL 40 MVA MAKE BBL SN 4910/5 GWL GWALIOR Testing Division -I Gwalior 01/03/2018 to 31/03/2018 9 MPE51950 132KV S/S TIGHRA 40 MVA MAKE BBL SN 4732/2 GWL GWALIOR Testing Division -I Gwalior 01/03/2018 to 31/03/2018 10 DEPALPUR_NEW 132KV S/S DEPALPUR 40 MVA BHEL IND INDORE Testing Division - I Indore 01/03/2018 to 31/03/2018 11 MPE51707 132KV S/S MANSAKARA 40MVA MAKE TELK SN 120459-1 KATNI JABALPUR Testing Division -Katni 01/03/2018 to 31/03/2018 12 MPP28814 132KV S/S SHUJALPUR Tr.132KV M. Kheda Rly.Tra. SHAJAPUR RAILWAY Testing Division - Shujalpur 05/03/2018 to 31/03/2018 13 MPE51722 132KV S/S BIJAWAR 40MVA MAKE NGEF SN 5076/12 CHATARPUR SAGAR Testing Division -II Sagar 01/03/2018 to 31/03/2018 14 MPP28381 132KV S/S PRITHVIPUR 20 MVA MAKE NGEF SN 2800034786 TIKAMGARH SAGAR Testing Division -II Sagar 03/03/2018 to 31/03/2018 15 ABB01789 220 KV S/S KOTAR 63MVA XMER SATNA SATNA Testing Division - Satna 02/03/2018 to 31/03/2018 16 Y0221275 132KV S/S BEOHARI 50 MVA X-mer SN 204292 SHAHDOL SATNA Testing Division - Satna- S/S DN Shahdol 01/03/2018 to 31/03/2018 17 MPE51662 132KV S/S BAIHAR BIRSA FEEDER/HCL MALAJKHAND BALAGHAT SEONI Testing Division -II Chindwara 01/03/2018 to 31/03/2018 18 MPE51655 132KV S/S BALAGHAT 40MVA NGEF XMER BALAGHAT SEONI Testing Division -II Chindwara 01/03/2018 to 31/03/2018 19 MPC58840 132KV S/S PANWADI 50MVA MAKE BBL SN 5406/02 SHAJAPUR UJJAIN Testing Division - Dewas 01/03/2018 to 31/03/2018 20 MPE51892 132KV S/S MANASA 40MVA MAKE TELK S.NO.120271/3 NEEMUCH UJJAIN Testing Division - Ratlam-S/S DN Neemuc 01/03/2018 to 31/03/2018 21 MPE51874 132KV S/S NEEMUCH 40MVA MAKE GEC SN B-27790 NEEMUCH UJJAIN Testing Division - Ratlam-S/S DN Neemuc 01/03/2018 to 31/03/2018 22 MPE53429 132KV S/S GHONSLA 40MVA MAKE BBL SN 5033/2 UJJ UJJAIN Testing Division - Ujjain 01/03/2018 to 31/03/2018 23 MPE51895 132KV S/S TARANA 63MVA MAKE BBL TRANSFORMER UJJ UJJAIN Testing Division - Ujjain 01/03/2018 to 31/03/2018 24 Y0221427 220KV S/S UJJAIN 40MVA MAKE CROMPTON SN T-8362/3 UJJ UJJAIN Testing Division - Ujjain 01/03/2018 to 31/03/2018 25 MPE51752 132KV S/S BHONRA 40 MVA XMER EMCO GUNA 400KV BINA Testing Division Guna 24/03/2018 to 31/03/2018 26 MPE53490 132KV S/S CHANDERI 40MVA BBL MAKE XMER ASHOKNAGAR 400KV BINA Testing Division Guna 24/03/2018 to 31/03/2018 27 MPE51928 220KV S/S GUNA 40MVA,BHEL-II GUNA 400KV BINA Testing Division Guna 24/03/2018 to 31/03/2018 28 MPE51809 220KV S/S S/Z, INDORE 40 MVA 132/33 KV XMAR-III CGL S.NO. 24791 IND 400KV Indore 440 KV Testing Division, Indore 09/03/2018 to 31/03/2018 29 GEC08895 132KV S/S BAGDI 40 MVA MAKE BBL DHAR 400KV Indore Testing Division - II Indore 14/03/2018 to 31/03/2018 30 MPE51964 132KV S/S BARELI 40MVA MAKE TELK SN 120356-1 RAISEN BHOPAL Testing Division -II Bhopal 24/03/2018 to 31/03/2018 31 MPP28350 220KV S/S BIRSINGPUR Tr.220 KV NOROWZABAD TRACTION II UMARIYA RAILWAY Testing Division - Satna- S/S DN Shahdol 11/03/2018 to 18/03/2018 32 MPP28387 220KV S/S KATNI Tr.TRACTION-I FEEDER KATNI RAILWAY Testing Division -Katni 10/03/2018 to 30/03/2018 33 MPE51750 132KV S/S REWA 132 KV SATNA (for JP BELA Cement ) REWA SATNA Testing Division - Rewa 07/03/2018 to 31/03/2018 34 MPE51742 132KV S/S LAKHANADON 40MVA BBL XMER SEONI SEONI Testing Division -II Jabalpur 11/03/2018 to 12/03/2018 35 MPE53468 132KV S/S ARNIAKALA 40MVA MAKE BBL SN 5076/5 SHAJAPUR UJJAIN Testing Division - Dewas - S/S Dn Shujalpu 06/03/2018 to 31/03/2018

Minutes of 63rd OCCM of MP 62 Annexure-8.1.ii List of newly commissioned substations / recently connected HT Consumers required to be included in supplementary list. SNO Meter No Location Feeder Name T & C Circle T & C Division 1 MP924834 132KV S/S KHURAI 40 MVA BHEL 400KV BINA 400 KV Testing Division Bina

2 MPC58874 132KV S/S CHANDERI 20MVA EMCO SN 1023/10789 400KV BINA Testing Division Guna

3 MPP28723 220 KV BINA DISCOM_33KV VIDISHA FEEDER ( EZ TO CZ) 400KV BINA 400KV Testing Division -BINA

4 MPC57149 132KV S/S 40MVA XMER BHEL S.NO. 2037088 400KV Indore Testing Division - II Indore

5 MPE51799 132KV S/S DHAR 40MVA BHEL 400KV Indore Testing Division - II Indore

6 GEC88970 220KV S/S HOSANGABAD SPM M/S SPM BHOPAL Testing Division Hoshangabad

7 XB577467 132KV S/S BANKHEDI 40MVA MAKE IMP BHOPAL Testing Division Hoshangabad

8 XB577430 132KV S/S SEMRI HARCHAND 40 MVA IMP PT6722 BHOPAL Testing Division Hoshangabad

9 XB577404 220KV S/S PIPARIA 12.5MVA BHEL MAKE 6001776 BHOPAL Testing Division - Itarsi 10 XB577379 132KV LATERI 40MVA IMP SN PT-7282 BHOPAL Testing Division -II Bhopal

11 XB577712 132KV HASTINAPUR 40MVA BHEL SN 2037087 GWALIOR Testing Division -I GWL

12 XB569562 132KV S/S BARODA 40MVA ABB GWALIOR Testing Division Guna-S/S Dn Shivpuri

13 XB577730 220KV S/S DATIA 40MVA GWALIOR Testing Division -II Gwalior

14 Y0221431 132KV S/S KARERA 20MVA BHEL MAKE SN 6004351 GWALIOR Testing Division Guna-S/S Dn Shivpuri

15 XB577385 132KV S/S BADAGAON 40MVA IMP GWALIOR Testing Division -I Gwalior

16 MSP56852 132KV S/S BANMORE 132 kv AMBA SHAKTI GWALIOR Testing Division -I Gwalior

17 XB583341 132KV GOHAD 63 MVA MAKE IMP SN PT7479 GWALIOR Testing Division -II Gwalior

18 MPP28712 132KV KOLARAS 20MVA CGL GWALIOR Testing Division -GUNA S/S Shivpuri

19 MPE51942 132KV S/S MORAR 63 MVA MAKE BBL Sno. 5308/9 GWALIOR Testing Division -I Gwalior

20 GEC88916 132KV S/S SENDHWA 20MVA CGL SN 24400 INDORE Testing Division - II Barwaha

21 MPE51805 132KV S/S CHHANERA 20MVA MAKE CGL SN 24641 INDORE Testing Division - Khandwa

22 MPC59861 132KV S/S 20MVA BBL 1991/3 INDORE Testing Division - Rajgarh

23 MPC57146 132KV S/S ANJOD CH GANJ 40 MAVA BHEL INDORE Testing Division - I Indore

24 MPC58410 132KV S/S BICHHUA 40MVA BHEL XMER JABALPUR Testing Division -II Chindwara

25 MP925055 220KV S/S PANAGAR 220KV PANAGAR JABALPUR Testing Division - JABALPUR

26 MPP28518 220KV S/S CHHINDWARA 50MVA XMER JABALPUR Testing Division -II Chindwara

27 XB577406 132KV S/S BADGAON 40MVA BBL 5423/5 KHANDWA Testing Division - Khandwa

28 MPE22595 132KV S/S JEERAPUR 20MVA NGEF RAJGARH Testing Division -I Bhopal-S/s DN Beora

29 XB549199 132KV S/S DONGARITAL 20 MVA EMCO SN 1058 B/10930 REWA Testing Division - Rewa

30 XB552535 132KV S/S SIRMOUR 40MVA IMP REWA Testing Division - Rewa

31 MPC60964 132KV S/S DIGODA 20MVA SAGAR Testing Division -II Sagar

32 MPC57148 132KV BUDERA 40MVA SAGAR Testing Division -II Sagar

33 XB583338 132KV MUNGAOLI 63MVA SAGAR Testing Division -II SAGAR

34 GEC88948 132KV S/S MAIHAR 132 KV RELIANCE FEEDER SATNA Testing Division - Satna

35 MP924832 132KV S/S RAMPUR NAIKIN 40 MVA X-mer (33 kv side) SATNA Testing Division - Satna

36 KA907077 220KV S/S ANUPUR 132KV MOSERBEAR SATNA Testing Division - Satna- S/S DN Shahdol

37 MPC58838 220KV S/S SIDHI 220KV S/S SIDHI SATNA Testing Division - Rewa

38 KA904800 220KV S/S ANUPUR 132KV OPM SATNA Testing Division - Satna- S/S DN Shahdol

39 XB577419 132KV S/S UMARIYA 20 MVA NGEF SATNA Testing Division - Rewa

40 MPP28662 132KV S/S TARANA 20MVA MAKE GEC TRANSFORMER UJJAIN Testing Division - Ujjain

41 MPC58871 132KV S/S MAXI 40MVA MAKE UJJAIN Testing Division - Dewas

42 XB580676 132KV S/S BHERUGARH 63MVA MAKE IMP UJJAIN UJJAIN

43 MP924841 220KV S/S SHANKARGARH 40MVA MAKE BHEL UJJAIN Testing Division - Dewas

44 MP924848 132KV S/S BAROTHA 40MVA MAKE BHEL SN 2037 UJJAIN Testing Division - Dewas

45 MPC58406 132KV SATWAS 40MVA MAKE BHEL SN 2037078 UJJAIN Testing Division - Dewas

Minutes of 63rd OCCM of MP 63 46 MPC58408 132KV SHAJAPUR 40MVA BHEL S.N. 2037089 UJJAIN Testing Division - Dewas

47 XB593845 132KV NALKHEDA 40MVA ALSTOM S.N. B-30818 UJJAIN Testing Division - UJJAIN 48 XB583619 132KV KALAPIPAL 40MVA TOSHIBA SN 90153 UJJAIN Testing Division - Shujalpur

49 MPC58866 132KV PORSA 12.5MVA MAKE EMCO SN 969B/10463 GWALIOR Testing Division -I Gwalior, S/S DN Morena

50 XB577443 132KV S/S BHERUGARH 40MVA MAKE BBL SN-4732/4 UJJAIN Testing Division - Ujjain

51 MPC72357 132KV S/S SHIVANI 40 MVA XMER ALSTOM 400KV Indore Testing Division - II Indore

52 BENEGAON_ 132KV BENEGAON 12.5MVA JABALPUR Testing Division -II Chindwara

53 MPC74042 132KV TAMOT 40MVA MAKE CGL SN 24788 BPL Testing Division -II Bhopal

54 XB577473 132KV S/S MAKSUDANGARH 63MVA MAKE BBL SN 5442/07 GWALIOR Testing Division Guna

55 MPP08529 220KV S/S CHHEGAON MAKHA63MVA 132/33KV BBL S.No. 5442/11 IND Testing Division - Khandwa

56 XB577425 132KV S/S SLEEMANABAD 12.5MVA NGEF SN2800022226 JBP Testing Division -Katni

57 XC530817 132KV S/S LALBARRA 40MVA IMP JBP Testing Division -II Chindwara

58 XC548595 132KV S/S UMRETH 40MVA BBL XMER JBP Testing Division -II Chindwara

59 KA909252 132KV S/S LAUNDI 40MVA IMP SGR Testing Division -II Sagar

60 MPP28606 132KV S/S RATLAM 50MVA X-mer BBL SN 5406/10 UJJ Testing Division - Ratlam

61 XB577773 220KV S/S GWALIOR-II 40 MVA MAKE GWALIOR Testing Division -I Gwalior

62 XB577474 132KV AMARWARA 50MVA BHEL JABALPUR Testing Division -Chhindwara

63 MPC58407 220KV S/S JULWANIYA 40MVA BHEL SN 2037620 INDORE Testing Division - II Barwaha

64 XB560307 220KV S/S MUNGALIYA CHHAP 40MVA BHEL SN 2037622 BHOPAL Testing Division - I Bhopal

65 XB577435 132KV S/S KATNI 50MVA MAKE BHEL JABALPUR Testing Division - Katni

66 XB577453 220KV S/S SEONI 50MVA BHEL JABALPUR Testing Division - Seoni

67 MPP28396 132KV S/S KATRA 50MVA BHEL MAKE XMER SATNA Testing Division - Rewa

68 XB577438 132KV S/S NAGOD 40 MVA X-mer SATNA Testing Division - Satna

69 XC573291 132 KV ANDHAD 40MVA INDORE Testing Division - II Indore

70 ESAGARH_N 132KV S/S ESAGARH_NEW 40MVA GWALIOR Testing Division Guna

71 XB583342 132KV S/S KOTHIYA 20MVA GWALIOR Testing Division Guna

72 XC573290 132KV S/S TAL 40MVA MAKE IMP UJJAIN Testing Division - Ratlam

73 XB583343 132KV PRATAPURA 40MVA GWALIOR Testing Division -II Gwalior

74 JHABUA_NEW132KV JHABUA 40 MVA MAKE NGEF INDORE Testing Division - II Indore

75 XB577383 132KV S/S GUDGAON 50MVA BHEL SN 2042484 BHOPAL Testing Division Itarsi

76 MPP28696 132KV S/S SHIVPURI 40MVA,BBLSN 5033/1 GWALIOR Testing Division Guna-S/S Dn Shivpuri

77 XB577374 132KV S/S BOREGAON 50MVA BHEL SN.2042482 JBP Testing Division -II Chindwara

78 MPC73878 132KV 63MVA IMP INDORE Testing Division KHANDWA

79 KASRAWAD_132KV S/S 20MVA INDORE Testing Division - I Indore

80 XB577371 220KV BHANPURA 50MVA BHEL SN 2042485 UJJAIN Testing Division - Neemuch

81 XB577434 132KV S/S REWA-II 50MVA BHEL SATNA Testing Division - Rewa

82 XB577412 132KV S/S NARSINGPUR 50MVA BHEL SN2042481 JABALPUR Testing Division -II Jabalpur

83 Y0221147 220KV S/S CHICHLI 50MVA XMER MAKE BHEL SR. 2042480 JABALPUR Testing Division -II Jabalpur

84 Y0221433 132KV S/S BARODA 40MVA NGEF GWALIOR Testing Division Guna-S/S Dn Shivpuri

85 ICHHAWAR_N132KV S/S ICHHAWAR 40MVA BBL SN 1448/3 BHOPAL Testing Division - I Bhopal

86 SATWAS_NE 132KV S/S SATWAS 20MVA NGEF SN 280002-2214 UJJAIN Testing Division - Dewas

87 XB577472 220 KV S/S KOTAR 50MVA BHEL SATNA Testing Division - Satna

88 XB569347 220KV S/S ANUPUR 50MVA BHEL SATNA Testing Division - Satna- S/S DN Shahdol

89 TALAKPURA_132KV S/S TALAKPURA 40 MVA INDORE Testing Division - Barwaha

90 Y0062910 132KV S/S GADARWARA 132KV TC_NTPC JABALPUR Testing Division -II Jabalpur

91 Y0221471 220KV S/S NEEMUCH 50MVA BHEL UJJAIN Testing Division - Neemuch

Minutes of 63rd OCCM of MP 64 92 MPC73877 132KV S/S SINGHANA 40 MVA IMP INDORE Testing Division - II Indore

93 XB552537 132KV S/S Kishangarh 40 MVA IMP INDORE Testing Division - Dewas

94 XC559777 220KV MORENA 63MVA GWALIOR Testing Division Morena

95 XB583344 132KV BHANDER 63MVA GWALIOR Testing Division DATIA

96 MPM06716 220KV S/S RAJGARH BIAORA 20MVA BHOPAL Testing Division -I Bhopal-S/s DN Beora

97 XC530820 132KV BAGRODA 40MVA BHOPAL Testing Division -I Bhopal

98 MPC57144 132KV S/S RUNAHA 63MVA MAKE BBL SN 5308/10 BHOPAL Testing Division -II Bhopal

99 MPC59988 220KV S/S BARNAGAR 40MVA MAKE BBL SN 3661/2 UJJAIN Testing Division - Ujjain

100 XC559792 132KV S/S MORENA 40 MVA MAKE BBL SN 4910/7 GWALIOR Testing Division -I Gwalior, S/S DN Morena

101 MPP28683 220KV S/S BINA 132KV BINA-BORL CKT-I 400KV BINA 400 KV Testing Division Bina

102 MPP28684 220KV S/S BINA 132KV BINA-BORL CKT-II 400KV BINA 400 KV Testing Division Bina

103 MPP28697 132KV S/S DABRA 63MVA MAKE BHEL SN 2042500 GWALIOR Testing Division -II Gwalior

104 MPC58835 132KV S/S POLAIKALAN 20 MVA EMCO UJJAIN Testing Division - Shujalpur

105 Y0221529 220KV S/S UJJAIN 63MVA MAKE BBL SN 5442/9 UJJAIN Testing Division - Ujjain

106 MPM08323 132KV S/S SHIVPURI 40MVA,BBLSN 5033/1 GWALIOR Testing Division Guna

107 MPC58403 132KV S/S PANSEMAL 40MVA BBL MAKE SN 5076/10 INDORE Testing Division - II Barwaha

108 ABB06601 132KV S/S BALWADA 63MVA INDORE Testing Division - II Barwaha

109 MPC75135 220KV S/S DHAR 132 KV VACMAT UJJAINI INDORE Testing Division - II Indore

110 XC582192 132KV S/S SUSNER 50MVA BBL MAKE SN 5406/1 UJJAIN Testing Division - Ujjain

111 Y0280030 132KV S/S AMLA Tr.132KV RLY. TR. BORDAHI_AMLA BHOPAL Testing Division - I Bhopal

112 XB577712 132 KV S/s Hastinapur 40 MVA MAKE BHEL SN 2037087 GWALIOR Testing Division -I Gwalior

113 XB583340 132KV S/S CHINNOR 50MVA MAAKE BBL SN 5406/04 GWALIOR Testing Division -II Gwalior

114 Y0221830 132KV S/S Makdone 40 MVA BHEL UJJAIN Testing Division - Ujjain

115 KAILARAS_N 132KV S/S KAILARAS 40 MVA GWALIOR Testing Division -I Gwalior

116 RAHATGARH 132KV S/S RAHTGARH 40 MVA SAGAR Testing Division -II SAGAR

117 Y0221711 132KV S/S SALAMATPUR 40MVA IMP BHOPAL Testing Division -I Bhopal-S/s DN Beora

118 MPC74039 220KV S/S PITHAMPUR 63MVA SEZ_II 400KV Indore Testing Division - II Indore

119 X0209252 132KV S/S UMRETH 132KV Rly Trac.Umreth RAILWAY Testing Division -II Chindwara

120 XC530820 132KV S/S BAGRODA 40MVA BHOPAL Testing Division -II Bhopal

121 XB577480 220KV S/S GUNA 63MVA BBL SN 5442/10 400KV BINA Testing Division Guna

122 BAROD_NEW132KV S/S BAROD 40MVA BBL S.NO 5564/05 UJJAIN Testing Division - Ratlam

123 Y0221711 132KV S/S SALAMATPUR 40MVA IMP BHOPAL Testing Division -II Bhopal

124 PAWAI_NEW 132KV S/S PAWAI 40MVA BBL SAGAR Testing Division - Satna

125 X0209247 220KV S/S NARSINGHPUR Tr.TRACTION-NARSINGHPUR RAILWAY Testing Division -Katni

126 MPP28790 132KV S/S BANKHEDI 132KV RLY TRAC BANKHEDI RAILWAY Testing Division Itarsi

127 MPC73855 132KV S/S ENTKHEDI 63 MVA BHOPAL Testing Division -II Bhopal

128 MP925355 132KV S/S BARHI 40 MVA IMP JABALPUR Testing Division Katni

129 Y0221370 132KV S/S INDERGARH 50 MVA BHEL GWALIOR Testing Division -II Gwalior

130 BAIRAD_NEW132KV S/S BAIRAD 40MVA BHOPAL Testing Division Guna-S/S Dn Shivpuri

131 MADA_NEW 132KV S/S MADA 50MVA GWALIOR Testing Division Guna-S/S Dn Shivpuri

132 BANDA_NEW132KV S/S BANDA 50MVA BHEL SGR Testing Division -II Sagar

133 KARPGAON_ 132KV S/S KARPGAON 50MVA BHEL JABALPUR Testing Division -II Jabalpur

134 DEPALPUR__132KV S/S DEPALPUR 40MVA INDORE Testing Division - II Indore

135 MP924845 220KV S/S MANGLIYA 63MVA INDORE Testing Division - I Indore

136 X0363187 132KV KAPSI 63MVA GWL Testing Division - Guna

137 UNHEL_NEW 132KV UNHEL 50MVA BBL UJJ Testing Division - Nagda

138 JOBAT_NEW132KV JOBAT 40MVA INDORE Testing Division RAJGARH

Minutes of 63rd OCCM of MP 65 M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL 132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18 Annexure-8.1.iii IMPORT EXPORT NAME OF 132/33 KV METER PREVIOUS PRESENT MF ASSESEME CONSUMPTION PREVIOUS PRESENT MF ASSESEMENT CONSU- MPTION Sl. No. DETAILS OF TRANSFORMERS REMARKS SUBSTATION SIDE SERIAL NO. READING WITH READING WITH NT (MWH) READING READING WITH (MWH) TIME & DATE TIME & DATE WITH TIME & TIME & DATE DATE T&C CIRCLE BHOPAL :- 132KV 466190.00 468345.00 4.00 0.00 8620.00 17.00 17.00 4.00 0.00 1 50MVA 132/33KV Xmer I Bairagarh Bhopal 33 KV 452973.00 457359.00 2.00 0.00 8772.00 701.00 701.00 0.67 0.00 0.00 220 132 KV 340202.00 342884.00 1.00 0.00 2682.00 215.00 215.00 1.00 0.00 2 20MVA 132/33KV Xmer II 33 KV 1435473.00 1446811.00 0.24 0.00 2721.12 485.00 485.00 1.33 0.00 132KV 3 40MVA 132/33K Xmer-I 33 KV 132KV 4 Bhopal Lalghati 63MVA 132/33K Xmer-II 33 KV 132KV 5 40MVA 132/33K Xmer-III 33 KV 132KV 6 63MVA 132/33K Xmer-I 33 KV Kurawar 132KV 7 40MVA 132/33K Xmer-II 33 KV 132KV 8 40MVA 132/33K Xmer-I 33 KV Biaora 132KV 9 40MVA 132/33K Xmer-II 33KV 132KV 10 20MVA 132/33K Xmer-I 33 KV Khilchipur 132KV 11 50MVA 132/33K Xmer-II 33 KV 132KV 12 20MVA 132/33K Xmer-I 33 KV 132KV 13 Sarangpur 63MVA 132/33K Xmer-II 33 KV 132KV 14 12.5MVA 132/33K Xmer 33 KV 132KV 15 63MVA 132/33K Xmer-I 33 KV Sehore 132KV 16 40MVA 132/33K Xmer-II 33 KV 132KV 17 40MVA 132/33K Xmer 33 KV Ichhawar 132 KV 18 20MVA 132/33K Xmer 33KV 132KV 19 50MVA 132/33K Xmer-I 33 KV Ashta 132KV 20 40MVA 132/33K Xmer-II 33 KV 132KV 21 40MVA 132/33K Xmer I 33 KV Pachore 132KV 22 40MVA 132/33K Xmer II 33 KV

Minutes of 63rd OCCM of MP 66 M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL 132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18 Annexure-8.1.iii IMPORT EXPORT NAME OF 132/33 KV METER PREVIOUS PRESENT MF ASSESEME CONSUMPTION PREVIOUS PRESENT MF ASSESEMENT CONSU- MPTION Sl. No. DETAILS OF TRANSFORMERS REMARKS SUBSTATION SIDE SERIAL NO. READING WITH READING WITH NT (MWH) READING READING WITH (MWH) TIME & DATE TIME & DATE WITH TIME & TIME & DATE DATE 132KV 23 40MVA 132/33K Xmer 33 KV Shyampur 132KV 24 20MVA 132/33K Xmer 33 KV 132KV 40MVA 132/33K Xmer 33 KV 24 Jeerapur 132KV 20MVA 132/33K Xmer 33 KV 132KV 40MVA 132/33K Xmer 33 KV 25 Rajgarh 132KV 20MVA 132/33K Xmer 33 KV 132KV 26 Mugaliyachaap 40MVA 132/33K Xmer 33 KV 132KV 26 Mandideep 220 40MVA 132/33K Xmer 33 KV

Minutes of 63rd OCCM of MP 67 M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL 132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18 Annexure-8.1.iii IMPORT EXPORT NAME OF 132/33 KV METER PREVIOUS PRESENT MF ASSESEME CONSUMPTION PREVIOUS PRESENT MF ASSESEMENT CONSU- MPTION Sl. No. DETAILS OF TRANSFORMERS REMARKS SUBSTATION SIDE SERIAL NO. READING WITH READING WITH NT (MWH) READING READING WITH (MWH) TIME & DATE TIME & DATE WITH TIME & TIME & DATE DATE 132KV 27 63MVA 132/33K Xmer-I 33 KV 132KV 28 Bhopal MACT 40MVA 132/33K Xmer-II 33 KV 132KV 29 63 MVA 132/33K Xmer-III 33 KV 132KV 30 63 MVA 132/33K Xmer 1 33 KV Vidisha 132KV 31 63MVA 132/33K Xmer 2 33 KV 132KV 32 20 MVA 132/33K Xmer-I 33 KV 132KV 33 Beresia 40 MVA 132/33KV Xmer-II 33 KV 132KV 34 16MVA 132/33K Xmer-III 33 KV 132KV 35 40MVA 132/33K Xmer-I 33 KV Mandideep 132 132KV 36 40MVA 132/33K Xmer-II 33 KV 132KV 37 20MVA 132/33K Xmer-I 33 KV 132KV 38 Raisen 20MVA 132/33K Xmer-II 33 KV 132KV 39 40MVA 132/33K Xmer 33 KV 132KV 40 40MVA(TELK) 132/33K Xmer 33 KV

132KV 41 Bareli 50MVA 132/33K Xmer 1 33 KV

132KV 42 40MVA(EMCO)132/33K Xmer 2 33 KV 132KV 43 20MVA 132/33K Xmer I 33 KV Sironj 132KV 44 40 MVA 132/33K Xmer II 33 KV 132KV 40MVA 132/33K Xmer 33 KV GanjBasoda 132KV 45 20MVA 132/33K Xmer 33 KV 132KV Runha 63MVA 132/33K Xmer 33 KV 132KV 46 40MVA 132/33K Xmer I 33 KV Nasrullaganj 132KV 47 40MVA 132/33K Xmer II

Minutes of 63rd OCCM of MP 68 M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL 132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18 Annexure-8.1.iii IMPORT EXPORT NAME OF 132/33 KV METER PREVIOUS PRESENT MF ASSESEME CONSUMPTION PREVIOUS PRESENT MF ASSESEMENT CONSU- MPTION Sl. No. DETAILS OF TRANSFORMERS REMARKS SUBSTATION SIDE SERIAL NO. READING WITH READING WITH NT (MWH) READING READING WITH (MWH) TIME & DATE TIME & DATE WITH TIME & TIME & DATE 47 40MVA 132/33K Xmer II DATE 33 KV 132KV 48 40MVA 132/33K Xmer 33 KV Gairatganj 132KV 63MVA 132/33K Xmer 33 KV 132KV 49 Shamshabad 40MVA 132/33K Xmer 33 KV 132KV 50 Lateri 40MVA 132/33K Xmer 33 KV 132KV 51 Gopalpur 40MVA 132/33K Xmer 33 KV 132KV 49 40MVA 132/33K Xmer 33 KV Itarsi 220 132KV 50 20MVA 132/33K Xmer 33 KV 132KV 51 40MVA 132/33K Xmer-I 33 KV Sarni 220 132KV 52 20MVA 132/33K Xmer-II 33 KV

Minutes of 63rd OCCM of MP 69 M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL 132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18 Annexure-8.1.iii IMPORT EXPORT NAME OF 132/33 KV METER PREVIOUS PRESENT MF ASSESEME CONSUMPTION PREVIOUS PRESENT MF ASSESEMENT CONSU- MPTION Sl. No. DETAILS OF TRANSFORMERS REMARKS SUBSTATION SIDE SERIAL NO. READING WITH READING WITH NT (MWH) READING READING WITH (MWH) TIME & DATE TIME & DATE WITH TIME & TIME & DATE DATE 132KV 53 40MVA 132/33K Xmer-I 33 KV Harda 132KV 54 63 MVA 132/33K Xmer-II 33 KV 132KV 55 40MVA 132/33K Xmer-I 33 KV 132KV 56 Hoshangabad 40MVA 132/33K Xmer-II 33 KV 132KV 57 20MVA 132/33K Xmer 33 KV 132KV 58 40MVA 132/33K Xmer-II 33 KV Pipariya 132 132KV 59 40MVA 132/33K Xmer-I 33 KV 132KV 60 63MVA 132/33K Xmer-I 33 KV Multai 132KV 61 40MVA 132/33K Xmer-II 33 KV 132KV 62 40MVA 132/33K Xmer 33 KV Seoni 132KV 63 20MVA 132/33K Xmer 33 KV 132KV 63 40MVA 132/33K Xmer-I 33 KV Betul 132KV 64 40MVA 132/33K Xmer-II 33 KV 132KV 50MVA 132/33K Xmer 33 KV 65 Gudgaon 132KV 40MVA 132/33K Xmer 33 KV 132KV 66 40MVA 132/33K Xmer 33 KV Pipariya 220 132KV 67 50 MVA 132/33K Xmer 33 KV 132KV 67 Betul 220 40MVA 132/33K Xmer 33 KV 132KV Chicholi 132 40MVA 132/33KV X-MER 68 33KV 132KV Amla 132 40MVA 132/33KV X-MER 69 33KV 132KV 69 40MVA 132/33KV X-MER 33KV Bankhedi 132 132KV 63MVA 132/33KV X-MER 33KV 132KV 70 Sultanpur 132 40MVA 132/33KV X-MER

Minutes of 63rd OCCM of MP 70 M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL 132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18 Annexure-8.1.iii IMPORT EXPORT NAME OF 132/33 KV METER PREVIOUS PRESENT MF ASSESEME CONSUMPTION PREVIOUS PRESENT MF ASSESEMENT CONSU- MPTION Sl. No. DETAILS OF TRANSFORMERS REMARKS SUBSTATION SIDE SERIAL NO. READING WITH READING WITH NT (MWH) READING READING WITH (MWH) TIME & DATE TIME & DATE WITH TIME & TIME & DATE 70 Sultanpur 132 40MVA 132/33KV X MER DATE 33KV

132KV 71 40MVA 132/33KV X-MER 33KV Semriharchand 132 72 132KV 40MVA 132/33KV X-MER 33KV 132KV 73 Khirkiya 132 40MVA 132/33KV X-MER 33KV 70 63MVA 132/33K Xmer 132KV 33 KV 71 40MVA 132/33K Xmer 132KV Bhopal Chambal 33 KV 72 63MVA 132/33K Xmer-I 132KV 33 KV 132KV 72 40MVA 132/33K Xmer 33 KV Ayodhya 132KV 73 20MVA 132/33K Xmer 33 KV Amarawat Khurd 132KV 74 63MVA 132/33K Xmer Bhopal 33 KV 132KV 75 40MVA 132/33K Xmer 33 KV Shahganj 132KV 76 20MVA 132/33K Xmer 33 KV 132KV 77 SHAMSHABAD 20MVA 132/33K Xmer 33 KV 132KV 78 Saharwasa 40MVA 132/33K Xmer 33 KV 132KV 81 Bagroda 40MVA 132/33K Xmer 33 KV 132KV 82 Tamot 40MVA 132/33K Xmer 33 KV 132KV 50 Salamatpur 40MVA 132/33K Xmer 33 KV 132KV 51 Entekhedi 63MVA 132/33K Xmer 33 KV

Minutes of 63rd OCCM of MP 71 THESE THREE S/S TELEMETRY IS OUT SINCE LONG TIME 1. BEOHARI 132 KV 2. MORWA 132 KV 3. WAIDHAN 132 KV

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER SATNA CIRCLE DATA OUT FROM LONG TIME INTERMIITENT TELEMETRY 1 MORWA 132 KV S/S 1 220 KV SIDHI 2 BEOHARI 132 KV S/S 2 220 KV ANUPPUR 3 WAIDAN BEOHARI 132KV S/S 1 ALL T.M. DATA CB ,MW,MVAR N/A 2 132/33 KV(50MVA) XMER CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED BIRSINGHPUR 220 KV S/S 1 220 KV INTERCONNECTOR 1 & 4 MW/MVAR N/C 115/15 ANUPPUR 220 KV S/S 1 132 KV KOTMA 1 CB N/A

2 220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A PROCESSES CONNECTION 3 132 KV SHAHDOL CB N/A REQUIRED 4 132 KV KOTMA 2 CB N/A 5 132 /33 KV TR 2 CB ,MW,MVAR N/A KOTMA 132 KV S/S 1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED 2 132 KV ANUPPUR 1 CB FAULTY SHAHDOL 220 KV S/S 1 220 KV ATPS MW/MVAR N/A 2 220 KV SGTPS MW/MVAR N/A PROCESSES CONNECTION REQUIRED 3 220/132 KV TR (160 MVA) PRI & SEC MW/MVAR N/A

REWA 220 KV S/S 1 220 KV BUS COUPLER CB FAULTY OPEN 2 132 KV RAMPUR NIKEN CB FAULTY CLOSE

Minutes of 63rd OCCM of MP 72 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER SEONI CIRCLE

Sr.no. DESCRIPTION Status Telemetry value at SLDC Actual value at site SEONI 220 KV S/S 1 132/33 KV XMER 2 MW/MVAR N/A

CHINDWARA 132 KV S/S TELEMETRY MOST OF TIME OUT DUE TO PLCC CHANNEL NOISE SINCE LAST 10 DAYS

Minutes of 63rd OCCM of MP 73 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER SAGAR CIRCLE

Sr.no. DESCRIPTION Status elemetry value at SLD Actual value at site

Minutes of 63rd OCCM of MP 74 BINA CIRCLE BINA 400 KV S/S Sr.no. DESCRIPTION Status Telemetry value at SLDC Actual value at site 1 220 KV BINA BINA PG MW/MVAR 2 220 KV GWALIOR MW/MVAR 3 220 KV GUNA MW/MVAR FREQUNTLY DATA 4 220 KV DATIA MW/MVAR NON CURRENT 5 220 KV SHIVPURI MW/MVAR 6 400/220 KV XMER 2 &3 MW/MVAR 6 220 KV BUS VOLTAGE/FREQUENCY 0 225/50 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 16-12-2017 GUNA 220 KV S/S

1 132 KV ESAGARH MW/MVAR NON CURRENT

Minutes of 63rd OCCM of MP 75 INDORE 400 KV S/S 1 220KV Transfer Buscoupler CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED INDORE EAST 220 KV S/S SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED INDORE CHAMBAL 132 KV S/S PITAMPUR 220 KV S/S(CHEMTROL RTU) 2 220/132 TR3 SEC SIDE MW,MVAR N/C 3 132/33 TR3 CB FAULTY CLOSE 4 220/132 TR2 PRI SIDE MW MVAR NOT COMING SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

PITAMPUR 220 KV S/S-II SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NEPANAGAR 220 KV S/S 1 220/132 160 MVA XMER-2 CB OPEN CIOSE

DEPALPUR 132 KV S/S SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED RAJGRAH (DHAR) 220 KV S/S SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 220KV S/s DHAR 5 33KV K DEVI CB FAULTY CLOSE 7 132KV/33KVTRF -4(sec side) CB FAULTY CLOSE

Minutes of 63rd OCCM of MP 76 132 KV S/S KUKSHI SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 132 KV S/S KACHROD 220 KV S/S DALODA SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 132 KV S/S JAORA SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 132 KV S/S SAILANA SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 220 KV S/S BADNAGAR SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED GHOSLA 132 KV S/S SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED DEWAS BNP 132 KV S/S 2 33KV IND NO-4 CB FAULTY CLOSE 3 33KV DRP CB FAULTY CLOSE 4 33KV SIYA CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED SONKATCH 132 KV S/S 1 33KV BUSCOUPLER CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 132 KV S/S CHAPDA 1 132/33 KV 20MVA TR-2 CB OPEN CLOSE 2 33KV DEVGARH CB FAULTY CLOSE 3 132/33 KV 20MVA TR-4 SEC SIDE CB FAULTY CLOSE MAKSI 132 KV S/S 1 33KV SIDE HZ N/A SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 132 KV S/SUWASRA 1 33KV CAP. BANK 1 CB FAULTY CLOSE 2 33KV CAP BANK-2 CB FAULTY CLOSE 3 132/33kv TRF 4 CB FAULTY CLOSE 4 33KV KYAMPUR CB FAULTY CLOSE 5 33KV RAWTI CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 132KV BAHADARPUR 1 132 KV RLY TRC-2 CB OPEN CLOSE 2 33KV CAP BANK-2 CAP. BANK 2 FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Minutes of 63rd OCCM of MP 77 400 KV S/S 1 132 KV BUSCOUPLER CB FAULTY 2 400KV BUS 2 KV N/C 3 400KV BUS 2 HZ N/C 4 400/220KV TRF-2PRI CB OPEN CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

JULWANIA 220 KV S/S 4 132 KV INTCC-1 CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED CHHEGAON 400 KV S/S

1 400 KV BUS COUPLER CB FAULTY OPEN 2 220/132 TRF-3 HV Side CB FAULTY CLOSE 3 132KV INTCC-2 CB FOULTY CLOSE 4 33KV DONGGAON CB FAULTY CLOSE 5 BHOJAKHEDI CB FOULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 132 KV S/S CHHEGAON SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED 132 KV S/S BAHADURPUR 1 132KV RAILWAY TRAC 2 MW NOT COMING 2 132KV RAILWAY TRAC 2 MVAR NOT COMING 33KV SIDE CAP. BANK 1 OPEN CLOSE 4 33KV SIDE CAP. BANK 2 FOULTY SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED BARWAHA 220 KV S/S SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NIMRANI 220 KV S/S 3 132/33KV 63MVA TRF-2 CB FOULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Minutes of 63rd OCCM of MP 78 NAGDA 400 KV S/S 1 400/220KV 315MVA TRF-4 CB OPEN CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NAGDA 220 KV S/S 1 132kV RLY TRc 1 CB OPEN CLOSE 2 132KV INTCC CB OPEN CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED NEEMUCH 220 KV S/S 1 220KV BUS 2 KV, HZ N/C 2 132 KV CAP BANK-2 CB FOULTY OPEN 3 132KV BUS COUPLER-2 CB FOULTY OPEN 5 33KV DHNERAKALAN CB FAULTY CLOSE SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Minutes of 63rd OCCM of MP 79 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 16-04-2018 BHOPAL 4000 KV S/S 1 400KV BINA-2 (PG) CB OPEN CLOSE 2 80 MVAR REACTOR-1 CB OPEN CLOSE 3 220KV BHOPAL-2 CB NON CURRENT CLOSE

GANJBASODA 220 KV S/S 1 132 KV BINA CB FAULTY

VIDISHA 220 KV S/S 1 220KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED 2 132 KV R.-TRACT.-1 CB NON CURRENT 3 132KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED 4 220/132 KV 160 MVA XMER-2(LV CB STATUS NON CURRENT CLOSE

MANDIDEEP 132 KV S/S ALL CB STATUS ARE NON CURRENT

BERASIA 132 KV S/S 1 132KV BUS COUPLER CB NON CURRENT

Minutes of 63rd OCCM of MP 80 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 16-04-2018 SARNI 220 KV S/S 1 220/132 KV 160 MVA XMER(HV) CB FAULTY CLOSE

HARDA 132 KV S/S 1 132/33KV 40 MVA XMER MW/MVAR WRONG VALUES ALL CB STATUS ARE NON-CURRENT

HANDIA 220 KV S/S 1 220/132 KV 160 MVA XMER-2(LV) CB FAULTY CLOSE 2 132 KV HARDA-2 CB FAULTY CLOSE

BETUL 220 KV S/S 1 220 KV BUSCOUPLER CB STATUS NON-CURRENT 2 220 KV BUS TIE CB STATUS NON-CURRENT 3 132 KV BUSCOUPLER CB STATUS NON-CURRENT

RAJGARH 220 KV S/S 1 220/132 KV 160 MVA XMER-1(LV SIDE) CB OPEN CLOSE

ASHTA 400 KV S/S 1 400 KV & 220 KV BUS FREQUENCY WRONG VALUES 2 400 KV SATPURA-2 CB FAULTY CLOSE 3 315MVA X-MER-1 MW/MVAR WRONG VALUES 4 400 KV SATPURA-2 LINE REACTOR MVAR NON CURRENT 5 400 KV BUS COUPLER CB FAULTY BAIRAGRAH 220 KV S/S 1 132 KV ETKHEDI CB NON CURRENT CLOSE

HOSHANGABAD 220 KV S/S 1 220 KV BUSCOUPLER PROCESSES CONNECTION REQUIRED ALL CB STATUS NON-CURRENT . ICHAWAR 132 KV S/S 1 132/33KV 20 MVA XMER CB NON CURRENT 2

SARANGPUR 132 KV S/S 1 SOE DATA PROCESSES CONNECTION REQUIRED

Minutes of 63rd OCCM of MP 81 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 16-04-2018

MALANPUR 220 KV S/S 1 220 KV BUS COUPLER-2 CB FAULTY 2 220 KV BUS COUPLER-1 MW/MVAR NON CURRENT 3 132 KV BUS COUPLER-2 CB FAULTY OPEN

PICHORE 132 KV S/S 1 132 KV BUS VOLTAGE WRONG VALUES 2 132 KB BASAI-1 & 2 CB FAULTY CLOSE 3 132 KV RAJGHAT CB FAULTY

GWALIOR 220 KV S/S 1 132 KV TIGRA CB FAULTY CLOSE 2 20/132 KV 3X40 MVA XMER(LV CB FAULTY CLOSE

SHIVPURI 220 KV S/S 1 132 KV BUS COUPLER MW/MVAR NON CURRENT 2 132 KV KOLARAS -2 CB FAULTY CLOSE 3 132 KV KOLARAS -2 MW/MVAR NON CURRENT

SABALGARH 220 KV S/S 1 132 KV MOTIJHEEL MW/MVAR/CB PROCESSES CONNECTION REQUIRED ALL CB STATUS NON CURRENT

VIJAYPUR 132 KV S/S 1 132/33 KV 40 MVA TR CB NON CURRENT CLOSE

Minutes of 63rd OCCM of MP 82 Name at SLDC end at site end SATPURA T P S 1 GEN 6 GT MW/MVAR 0 155 /10 2 GEN 7 GT MW/MVAR 0 160/10 3 GEN 6 GT CB FAULTY OPEN 4 GEN 7 GT CB FAULTY OPEN 5 220 KV TRB CB FAULTY CLOSE AMARKANTAK TPS 1 STATION XMER 5A & 5B CB N/A 2 132/33 AUTO XMER CB N/A SINGHA JI S T P S 1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C S G T P S 1 400/220 KV ICT P & S (BOTH SIDE) CB FAULTY CLOSE 2 400 KV STN TRANSFORMER A & B CB NA CLOSE 3 STN TR 1 ,2 (220 KV ) CB NA CLOSE 4 220 KV BUS TIE CB NA CLOSE 5 220 /33 KV TR CB/MW/MVAR NA 6 GEN 1 CB FAULTY CLOSE 7 400 KV BUS 1 FREQ 49.79 49.98 8 220 KV BUS 2 VOLTAGE 264 230 9 220 KV PANAGAR CB FAULTY CLOSE 10 220 KV ATPS 2 CB FAULTY CLOSE 11 220 KV SHAHDOL CB FAULTY CLOSE GANDHI SAGAR H P S 1 GEN 4 CB FAULTY CLOSE RAJGHAT H P S 1 GEN 3 CB OPEN CLOSE

DEOLOAN H P S Telemetry N/C PENCH H P S RTU OUT

Minutes of 63rd OCCM of MP 83 ISP H P S 1 ISP-INDORE 400KV FEEDER 2 MW/MVAR 583 58

Minutes of 63rd OCCM of MP 84 ANNEXURE-9.9.i S.NO. NAME OF SUB-STATION VOLTAGE LEVEL 1 BINA 400 2 BHOPAL 400 3 KATNI 400 4 INDORE 400 5 NAGDA 400 6 SGTPS 400 & 220 7 ISP 400 8 JP BINA 400 9 BINA-PG 400 10 ITARSI-PG 400 11 DAMOH-PG 400 12 KSTPS 400 13 SHUJALPUR-PG 400 14 DEHGAM 400 15 ASOJ 400 16 RAJGARH-PG 400 17 INDORE-PG 400 18 BHOPAL-BDTCL 400

Minutes of 63rd OCCM of MP 85 Annexure-9.9.II

Positive Negative Zero Substation Line Name / Voltage CT/CVT line length in PT Ratio sequence sequence sequence Relay Type Name X'mer Level Ratio Km impedance impedance impedance

Zone-I Resistive Reactive Reach in Reach in Time delay Reach in % Reach in Km primary primary in msec Ohm Ohm

Zone-2 Resistive Reactive Reach in Reach in Time delay Reach in % Reach in Km primary primary in msec Ohm Ohm

Zone-3 Resistive Reactive Reach in Reach in Time delay Reach in % Reach in Km primary primary in msec Ohm Ohm

Zone-4 Power Swing Blocking

Resistive Reactive Reach in Reach in Time delay Reach in % Reach in Km Forward(ZF) Reverse(ZR) primary primary in msec Ohm Ohm

Minutes of 63rd OCCM of MP 86