INDIAN BUREAU of MINES Chennai Regional Office MINERALS

Total Page:16

File Type:pdf, Size:1020Kb

INDIAN BUREAU of MINES Chennai Regional Office MINERALS INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Chennai regional office Mine file No : TN/DAN/LST-4.MDS Mine code : 38TMN06007 (i) Name of the Inspecting : T003( ) S.THIRUNAVUKKARASU Officer and ID No. (ii) Designation : Senior Mining Geologist (iii) Accompaning mine : Mr. Ilangovan Owner. Official with Designation (iv) Date of Inspection : 05/12/2019 (v) Prev.inspection date : 12/04/2018 PART-I : GENERAL INFORMATION 1. (a) Mine Name : THETHAMPATTY- I (1.70 HA) (b) Registration NO. : (c) Category : B Manual (d) Type of Working : Opencast (e) Postal address State : TAMIL NADU District : DINDIGUL Village : THETHAMPATTY Taluka : NATHAM Post office : SIRUGUDI Pin Code : 624404 FAX No. : E-mail : Phone : 04544-77632 (f) Police Station : (g) First opening date : 01/03/1983 (h) Weekly day of rest : SUN 2. Address for : SIRUGUDI POST correspondance NATHAM TK. DINDIGUL DT 3. (a) Lease Number : TMN0001 (b) Lease area : 1.7 (c) Period of lease : 3 (d) Date of Expiry : 27/02/1986 4. Mineral worked : LIMESTONE Main PAGE : 2 5. Name and Address of the Lessee : S.ASAI ALANGARAM ,MINE OWNER SIRUGUDI POST NATHAM TK. DINDIGUL DT. DINDIGUL TAMIL NADU Phone:04544-77632 FAX : Owner : S.ASAI ALANGARAM, SIRUGUDI POST NATHAM TK DINDIGUL DT. DINDIGUL TAMIL NADU Phone: 04544-77632 FAX : Manager Name : SWAMIDURAI Qualification : MINING MATE Appointment/ : Termination date 6. Date of approval of Mining : Mining Scheme rule 12 MCDR1988 15/02/2001 Plan/Scheme of Mining Mining Scheme rule 12 MCDR1988 14/02/2002 Mining Scheme rule 12 MCDR1988 10/09/2007 Mining Scheme rule 12 MCDR1988 28/03/2013 MP modif under 17(3) MCR 2016 30/03/2016 PAGE : 3 PART - II : OBSERVATION/COMMENTS OF INSPECTING OFFICERS Exploration : Sl.No. Item Proposals Actual work Remarks 1a Backlog of NIL NA 5 Nos BH drilled previous year total 1b Exploration over NIL NA Explored under G1 lease area for level geological axis 1 or 2 1c Exploration YED M/s.Geo Exploration Agencies and mining solution Expenditure in lakh rupees during the year 1d Balance area to NIL NA NIL be explored to bring Geological axis in 1 or 2 1e Balance reserve --- (111) - 31656 tons NIL as on 01/04/20 221) - 202091 million tons 1f General remarks ---- ---- Geology, of inspecting exploration found officers on satisfactory geology, exploration etc Development : Sl.No. Item Propasals Actual work Remarks 2a Location of Existing pit --- Mine not working development no -1 w.r.t.lease area 2b Separate benches NIL NIL No top soil in topsoil, generation overburden and minerals (Rule 15) 2c Stripping ratio 1:0.25 nil Mine not working or ore to OB ratio 2d Quantity of NIL Nil No top soil topsoil generation generation in m3 2e Quantity of NIL NIL NO OB overburden generation in m3 PAGE : 4 2f General remarks ---- --- development of pit of inspecting found stisfactory officers on development of pit w.r.t. type of deposit etc Exploitation: Sl.No. Item Propasals Actual work Remarks 3a Number of pit 1 nos ---- Mine was proposed for temporarily production discontinued 3b Quantity of ROM 89705 tons nil Mine not working mineral (2018-19) production proposed 3c Recovery of 5382 tons NIL Mine not working sailable/usable mineral from ROM production 3d Quantity of 3588 tons nil Mine not working mineral reject generation 3e Grade of mineral NIL NIL NIL rejects generation and threshold value declared. 3f Quantity of sub NIL nil No sub-grade grade mineral mineral generation generation. 3g Grade of sub NJIL NA No sub-grade grade mineral mineral generation generation 3h Manual / Mechanised ---- Mine not working Mechanised method adopted for segregating from ROM 3i Any analysis or NIL NA NIL beneficiation study proposed and carried out for sub grade mineral and rejects. 3j Provision of yes --- Mine not working drilling and blasting in mineral benches PAGE : 5 3k Provision of Rock breaker & ---- Mine not working mining Excavator machineries in mineral benches 3l Whether height 4 m height 4 m height NIL of benches in overburden and mineral suitable for method of mining proposed in MP/SOM 3m Total area 1.05.6 NIL Mine not working covered under excavation/pits 3n Ore to OB ratio 1:0.25 NIL Mine not working for the pit/mine during the year. 3o Total area put -- 1.35.6 HA NIL in use under different heads at the end of year 3p Production of 2015-16 5354 2015-16 5483 Mine was ROM mineral 2016-17 5111 2016-17 5387 temporarily during the last 2017-18 45354 2017-18 NIL discontinued from five year period 2018-19 5382 2018-19 NIL 20.02.2017 as applicable 2019-20 4371 2019-20 NIL 3q General remarks --- ---- Mine was of inspecting temporarily officers on discontinue, method of mining inspection carried etc. out for ROMP Solid Waste Management - Dumping: Sl.No. Item Propasals Actual work Remarks 4a Separate dumping OB & mineral NIL Mine was of topsoil, OB proposed temporarily and mineral discontinued rejects (Rule 32,33) 4b Location of E1100 E1150 - ---- Mine not working topsoil, OB and N1150 N1200 mineral reject dumps 4c Number of dumps 1 1 Mine not working within lease area and outside of lease area PAGE : 6 4d Location of E1100 E1150 - ------ Mine not working dumps w.r.t. N1150 N1200 ultimate pit limit (Rule 16) 4e Number of active 1 1 Mine not working and alive dumps. 4f Number of dead NIL NIL NIL dumps. 4g Number of dumps NIL NIL NIL established. 4h Whether NIL NA NIL Retaining wall or garland drain all along dumps are there. 4i Length of NIL NA NIL Retaining wall or garland drain all along dumps 4j Number of NIL NA NIL settling ponds 4k Specific ---- ------ waste dump comments of management found inspecting to be satisfactory officer on waste dump management Solid Waste Management - Backfilling: Sl.No. Item Propasals Actual work Remarks 5a Status of part NA NA Mine was or full temporarily extraction of discontinued mineral from mined out area before starting backfilling. 5b Area under NA NA Mineral not fully backfilling of exhaust mined out area 5c Concurrent use NA NA Mineral yet to Be of topsoil for mined restoration or rehabilitation of mineral out area (Rule 32) 5d Total area NA NA Not at this stage fully reclaimed and rehabilitated PAGE : 7 5e General remarks -- --- Mine was of inspecting temporarily officers on discontinued backfilling and reclamation etc. Progressive Mine Clousre Plan: Sl.No. Item Propasals Actual work Remarks 6a Whether Annual yes Not Submitted Mine was report on PMCP temporarily submitted on discontinued time and correctly. Rule 23 E(2). 6b Area available NIL NA NIL for rehabilitation (ha) . 6c afforestation NA NA NA done (ha). 6d No. of saplings 15 NA Mine not working planted during the year 6e Cumulative no NIL NIL Mine not working .of plants 6f Any other method NIL NA No other method of rehabilitation 6g Cost incurred on nil NA NIL watch and care during the year 6h Compliance on nil NA No back filling reclamation and rehabilitation by backfilling (i) Voids available for backfilling ( Lx B x D 6i Compliance on NIL NA NIL reclamation and rehabilitation by backfilling (ii) Voids filled by waste / tailings PAGE : 8 6j Compliance on NIL NA NIL reclamation and rehabilitation by backfilling (iii)Afforestati on on backfilled area 6k Compliance on NIL NA NIL reclamation and rehabilitation by backfilling (iv) Rehabilitation by making water reservoir 6l Compliance on NIL NIL Back filling not reclamation and proposed rehabilitation by backfilling (v)any other specific means. 6m Compliance of NIL NA Not at this stage rehabilitation of waste land within lease (i)afforestation 6n Compliance of nil NA Mineral not fully rehabilitation explored of waste land within lease (ii)Area rehabilitation (ha) 6o Compliance of NIL NA NIL rehabilitation of waste land within lease (iii)Method of rehabilitation 6p Compliance of -- --- Mine was not environmental working monitoring (core zone and buffer zone) 6q General remarks of inspecting officers on PMCP compliance and progressive closure operations etc. Mineral Conservation: Sl.No. Item Propasals Actual work Remarks PAGE : 9 7a ROM Mineral ROM ----- Mine was dispatch or 8970 MT temporarily grade-wise (2018-19) discontinued from sorting within 20.02.2017 lease area 7b Method of grade- NIL NIL Mine not working wise mineral sorting i.e. manual or mechanical. 7c Different grade NIL NA Mine not working of mineral sorted out at mines. 7d Any NIL NA Mine not working beneficiation process at mines . 7e General remarks ---- -- Mine not working of inspecting officer on Mineral conservation and beneficiation issues Environment: Sl.No. Item Propasals Actual work Remarks 8a Separate removal NIL na No proposal and utilization of topsoil (Rule 32) 8b Concurrent use NIL NA No top soil or storage of topsoil 8c Separate dumps E1100 E1150 - --- Mine not working for overburden, N1150 N1200 waste rock, rejects and fines (Rule 33) 8d Use of NIL NA Not at this stage overburden, waste rock, rejects and fines dumps for restoring the land to its original use PAGE : 10 8e Phased NIL NIL NIL restoration, reclamation and rehabilitation of lands affected by mining operations (Pits, dumps etc) 8f Baseline 15 Nos of -- Mine not working information on plantatio existence of plantation and additional plantation done (Rule 41) 8g Survival rate 70% --- Mine not working 8h Water sprinkling Proposed --- Mine not working on roads to control airborne dust 8i General remarks ---- ---- Mine was of inspecting temporarily officer on discontinued from aesthetic beauty 20.02.2017 in and around mines area Compliance of Rule 45: Sl.No. Item Propasals Actual work Remarks 9a Status of yes Annual return for 2018- Mine was submission of 19 submitted temporarily Monthly and discontinued from Annual returns 20.02.2017 9b Scrutiny of NIL NIL Annual return for Annual return 2018-19 submitted for information on Mining Engineer, Geologist and Manager 9c Scrutiny of NIL NIL Annual return for Annual return on 2018-19 submitted land use pattern for area under pits, reclaimed area, dumps etc.
Recommended publications
  • Chapter 4.1.9 Ground Water Resources Dindugal District
    CHAPTER 4.1.9 GROUND WATER RESOURCES DINDUGAL DISTRICT 1 INDEX CHAPTER PAGE NO. INTRODUCTION 3 DINDUGAL DISTRICT – ADMINISTRATIVE SETUP 3 1. HYDROGEOLOGY 3-7 2. GROUND WATER REGIME MONITORING 8-15 3. DYNAMIC GROUND WATER RESOURCES 15-24 4. GROUND WATER QUALITY ISSUES 24-25 5. GROUND WATER ISSUES AND CHALLENGES 25-26 6. GROUND WATER MANAGEMENT AND REGULATION 26-32 7. TOOLS AND METHODS 32-33 8. PERFORMANCE INDICATORS 33-36 9. REFORMS UNDERTAKEN/ BEING UNDERTAKEN / PROPOSED IF ANY 10. ROAD MAPS OF ACTIVITIES/TASKS PROPOSED FOR BETTER GOVERNANCE WITH TIMELINES AND AGENCIES RESPONSIBLE FOR EACH ACTIVITY 2 GROUND WATER REPORT OF DINDUGAL DISTRICT INRODUCTION : In Tamil Nadu, the surface water resources are fully utilized by various stake holders. The demand of water is increasing day by day. So, groundwater resources play a vital role for additional demand by farmers and Industries and domestic usage leads to rapid development of groundwater. About 63% of available groundwater resources are now being used. However, the development is not uniform all over the State, and in certain districts of Tamil Nadu, intensive groundwater development had led to declining water levels, increasing trend of Over Exploited and Critical Firkas, saline water intrusion, etc. ADMINISTRATIVE SET UP The total geographical area of the Dindigul distict is6, 26,664 hectares, which is about 4.82 percent of the total geographical area of Tamil Nadu state.Thedistrict, is well connected by roads and railway lines with other towns within and outside Tamil Nadu.This district comprising 359 villages has been divided into 7 Taluks, 14 Blocks and 40 Firkas.
    [Show full text]
  • District Statistical Handbook 2016-17
    DISTRICT STATISTICAL HANDBOOK 2016-17 DEPUTY DIRECTOR OF STATISTICS DINDIGUL DISTRICT DISTRICT STATISTICAL HAND BOOK 2016-17 PREFACE At the instance of the Government of Tamil Nadu, District Statistics are collected every year based on the instructions and guidelines given by the Department of Economics and Statistics, Chennai. Dindigul District was curved out of the Composite Madurai District and became a separate entity since 15.9.1985. This 28th publication is brought out with the hearty co-operation and earnestness of the Government Departments, Public Sector undertakings Private institutions and Quasi-Government bodies. This Hand book for the year 2016-17 contains key Statistical data pertaining to various socio-economic conditions prevailing in this district. This book is designed in such a way to serve as a ready reference for Planners, Administrators, Research Scholars and other Social organizations with its wealth of information relating to Demography, Agriculture, Animal Husbandry, Co-Operation, Education, and Industries etc. I extend my sincere thanks to all Officers who had readily responded to my request and furnished the relevant data. Suggestions for further improvement of this issue are always welcome. DEPUTY DIRECTOR OF STATISTICS, DINDIGUL DISTRICT SALIENT FEATURES OF DINDIGUL DISTRICT Dindigul district was curved out of the composite Madurai District on 15.9.85, This Dindigul District which was under the way of the famous Muslim Monarch, Tippusultan, has a hoary past. The historical Rock Fort of this district was constructed by the famous Nayak King Muthukrishnappa Nayakker, It is located between 10005“ North 100 09” latitude and 77030” and 78020” East longitute, and its Mean Sea Level is (+) 280.11M This district is bound by Erode, Tirupur, Karur and Trichy districts on the North, by Sivaganga and Tiruchi District on the East, by Madurai district on the South and by Theni and Coimbatore Districts and Kerala State on the West.
    [Show full text]
  • DEPARTMENT of GEOLOGY and MINING DINDIGUL DISTRICT Contents S.No Chapter Page No
    DEPARTMENT OF GEOLOGY AND MINING DINDIGUL DISTRICT Contents S.No Chapter Page No. 1.0 Introduction 1 2.0 Overview of Mining Activity in the District; 4 3.0 General profile of the district 6 4.0 Geology of the district; 9 5.0 Drainage of irrigation pattern 13 6.0 Land utilisation pattern in the district; Forest, Agricultural, 14 Horticultural, Mining etc 7.0 Surface water and ground water scenario of the district 19 8.0 Rainfall of the district and climate condition 20 9.0 Details of the mining lease in the district as per following 22 format 10.0 Details of Royalty / Revenue received in the last three years 46 (2015-16 to 2017-18) 11.0 Details of Production of Minor Mineral in last three Years 47 12.0 Mineral map of the district 48 13.0 List of letter of intent (LOI) holder in the district along with its 49 validity 14.0 Total mineral reserve available in the district. 72 15.0 Quality / Grade of mineral available in the district 73 16.0 Use of mineral 73 17.0 Demand and supply of the mineral in the lase three years 74 18.0 Mining leases marked on the map of the district 75 19.0 Details of the area where there is a cluster of mining leases viz., 77 number of mining leases, location (latitude & longitude) 20.0 Details of eco-sensitive area 77 21.0 Impact on the environment due to mining activity 79 22.0 Remedial measure to mitigate the impact of mining on the 81 environment 23.0 Reclamation of mined out area (best practice already 83 implemented in the district, requirement as per rules and regulations, proposed reclamation plan 24.0 Risk assessment & disaster management plan 83 25.0 Details of occupational health issue in the district (last five – 85 year data of number of patients of silicosis & tuberculosis is also needs to be submitted) 26.0 Plantation and green belt development in respect of leases 85 already granted in the district 27.0 Any other information 85 List of Figure Chapter Page S.No No.
    [Show full text]
  • District Survey Report Dindigul District, Tamil Nadu
    DISTRICT SURVEY REPORT DINDIGUL DISTRICT, TAMIL NADU JULY, 2017 GEOLOGICAL SURVEY OF INDIA GOVERNMENT OF TAMIL NADU SU: TAMIL NADU & PUDUCHERRY DEPARTMENT OF GEOLOGY AND MINING, DINDIGUL DISTRICT SURVEY REPORT-DINDIGUL DISTRICT SURVEY REPORT DINDIGUL DISTRICT, TAMIL NADU ………………………………………………………………………………….... CONTENTS Sl. No. CHAPTERS Page No. 1 Introduction 1 2 Overview of mining activity in the district 2 3 List of mining leases in the district 3 4 Details of royalty or revenue received in last three years - Details of production of sand or Bajri or minor minerals in last three - 5 years 6 Process of deposition of river sediments in the district 38 7 General profile of the district 42 8 Land utilization pattern in the district 45 9 Physiography of the district 46 10 Rainfall month wise 48 11 Geology and mineral wealth 49 Conclusion and Recommendation 66 Sl. No. LIST OF FIGURES Page No. Fig.1.1 Dindigul District map 1 Fig.6.3.1. Schematic picture of meandering and deposition of sediments 40 Fig.6.3.2. River map of Dindigul 41 Fig.6.3.3. Ground water level of Dindigul from 1991 - 2016 41 Fig.8.1. Land Use & Utilisation map of Dindigul 46 Fig. 9.1. Geomorphology and Geohydrology map of Dindigul 47 Fig. 11.1. Geology of Tamil Nadu 49 Fig. 11.2. Geology of Dindigul district 51 Sl. No. LIST OF PHOTOGRAPHS Page No. 1 Charnockite quarry at Kothapulli, Dindigul (West) Taluk 54 2 Charnockite quarry at Thummalapatti, Palani Taluk 55 3 Layerred Charnockite quarry at Thimmananallur, Dindigul (East) 55 4 Limestone quarry at Alambadi, Vedasandur taluk 56 5 Limestone quarry at Panniyamalai, Natham taluk 56 6 Quartz & Feldspar quarry at Mulaiyur, Natham taluk 58 7 Quartz & Feldspar quarry at Kuttam, Vedasandur taluk 58 i DISTRICT SURVEY REPORT-DINDIGUL 8 Granite quarry at Eriyodu, Vedasandur taluk 59 9 Gravel excavation at Ellapatti, Oddanchatram taluk 60 10 Brick earth excavation at Tasiripatti, Oddanchatram taluk 61 Sl.
    [Show full text]
  • S.NO Name of District Name of Block Name of Village Population Name
    STATE LEVEL BANKERS' COMMITTEE, TAMIL NADU CONVENOR: INDIAN OVERSEAS BANK PROVIDING BANKING SERVICES IN VILLAGE HAVING POPULATION OF OVER 2000 DISTRICTWISE ALLOCATION OF VILLAGES -01.11.2011 Name of S.NO Name of Block Name of Village Population Name of the Bank Name of Branch District 1 Ariyalur Andiamadam Anikudichan (South) 2730 Indian Bank Andimadam 2 Ariyalur Andiamadam Athukurichi 5540 Bank of India Alagapuram 3 Ariyalur Andiamadam Ayyur 3619 State Bank of India Edayakurichi 4 Ariyalur Andiamadam Kodukkur 3023 State Bank of India Edayakurichi 5 Ariyalur Andiamadam Koovathur (North) 2491 Indian Bank Andimadam 6 Ariyalur Andiamadam Koovathur (South) 3909 Indian Bank Andimadam 7 Ariyalur Andiamadam Marudur 5520 Canara Bank Elaiyur 8 Ariyalur Andiamadam Melur 2318 Canara Bank Elaiyur 9 Ariyalur Andiamadam Olaiyur 2717 Bank of India Alagapuram 10 Ariyalur Andiamadam Periakrishnapuram 5053 State Bank of India Varadarajanpet 11 Ariyalur Andiamadam Silumbur 2660 State Bank of India Edayakurichi 12 Ariyalur Andiamadam Siluvaicheri 2277 Bank of India Alagapuram 13 Ariyalur Andiamadam Thirukalappur 4785 State Bank of India Varadarajanpet 14 Ariyalur Andiamadam Variyankaval 4125 Canara Bank Elaiyur 15 Ariyalur Andiamadam Vilandai (North) 2012 Indian Bank Andimadam 16 Ariyalur Andiamadam Vilandai (South) 9663 Indian Bank Andimadam 17 Ariyalur Ariyalur Andipattakadu 3083 State Bank of India Reddipalayam 18 Ariyalur Ariyalur Arungal 2868 State Bank of India Ariyalur 19 Ariyalur Ariyalur Edayathankudi 2008 State Bank of India Ariyalur 20 Ariyalur
    [Show full text]
  • First Name Middle Name Last Name Address Country State
    Biocon Limited Amount of unclimed and unpaid Interim dividend for FY 2010-11 First Name Middle Name Last Name Address Country State District PINCode Folio Number of Amount Proposed Securities Due(in Date of Rs.) transfer to IEPF (DD- MON-YYYY) JAGDISH DAS SHAH HUF CK 19/17 CHOWK VARANASI INDIA UTTAR PRADESH VARANASI BIO040743 150.00 03-JUN-2018 RADHESHYAM JUJU 8 A RATAN MAHAL APTS GHOD DOD ROAD SURAT INDIA GUJARAT SURAT 395001 BIO054721 150.00 03-JUN-2018 DAMAYANTI BHARAT BHATIA BNP PARIBASIAS OPERATIONS AKRUTI SOFTECH PARK ROAD INDIA MAHARASHTRA MUMBAI 400093 BIO001163 150.00 03-JUN-2018 NO 21 C CROSS ROAD MIDC ANDHERI E MUMBAI JYOTI SINGHANIA CO G.SUBRAHMANYAM, HEAD CAP MAR SER IDBI BANK LTD, INDIA MAHARASHTRA MUMBAI 400093 BIO011395 150.00 03-JUN-2018 ELEMACH BLDG PLOT 82.83 ROAD 7 STREET NO 15 MIDC, ANDHERI EAST, MUMBAI GOKUL MANOJ SEKSARIA IDBI LTD HEAD CAPITAL MARKET SERVIC CPU PLOT NO82/83 INDIA MAHARASHTRA MUMBAI 400093 BIO017966 150.00 03-JUN-2018 ROAD NO 7 STREET NO 15 OPP SPECIALITY RANBAXY LABORATORI ES MIDC ANDHERI (E) MUMBAI-4000093 DILIP P SHAH IDBI BANK, C.O. G.SUBRAHMANYAM HEAD CAP MARK SERV INDIA MAHARASHTRA MUMBAI 400093 BIO022473 150.00 03-JUN-2018 PLOT 82/83 ROAD 7 STREET NO 15 MIDC, ANDHERI.EAST, MUMBAI SURAKA IDBI BANK LTD C/O G SUBRAMANYAM HEAD CAPITAL MKT SER INDIA MAHARASHTRA MUMBAI 400093 BIO043568 150.00 03-JUN-2018 C P U PLOT NO 82/83 ROAD NO 7 ST NO 15 OPP RAMBAXY LAB ANDHERI MUMBAI (E) RAMANUJ MISHRA IDBI BANK LTD C/O G SUBRAHMANYAM HEAD CAP MARK SERV INDIA MAHARASHTRA MUMBAI 400093 BIO047663 150.00 03-JUN-2018
    [Show full text]
  • INDIAN BUREAU of MINES Chennai Regional Office MINERALS
    INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Chennai regional office Mine file No : TN/DAN/LST-12.MDS Mine code : 38TMN06010 (i) Name of the Inspecting : T028( ) T.PHALTHURAIRAJHEN Officer and ID No. (ii) Designation : Assistant Mining Geologis (iii) Accompaning mine : SRI. ILLANGOVAN. MANAGING PARTNER. Official with Designation (iv) Date of Inspection : 03/12/2016 (v) Prev.inspection date : 19/02/2010 PART-I : GENERAL INFORMATION 1. (a) Mine Name : SIRUGUDI- III (94 HA) (b) Registration NO. : (c) Category : B Manual (d) Type of Working : Opencast (e) Postal address State : TAMIL NADU District : DINDIGUL Village : THETHAMPATTY Taluka : NATHAM Post office : SIRUGUDI Pin Code : 624404 FAX No. : E-mail : Phone : 04544-77632 (f) Police Station : (g) First opening date : 14/05/1997 (h) Weekly day of rest : SUN 2. Address for : SIRUGUDI POST correspondance NATHAM TK. DINDIGUL DT.-624404 3. (a) Lease Number : TMN0613 (b) Lease area : .94 (c) Period of lease : 20 (d) Date of Expiry : 03/03/2017 4. Mineral worked : LIMESTONE Main PAGE : 2 5. Name and Address of the Lessee : S.ILLANGOVAN, MINE OWNER SIRUGUDI POST NATHAM TK. DINDIGUL DT. DINDIGUL TAMIL NADU Phone:04544-77632 FAX : Owner : S.ILLANGOVAN SIRUGUDI POST NATHAM TK DINDIGUL DT. DINDIGUL TAMIL NADU Phone: 04544-77632 FAX : Mining Engineer Name : M.DEEPA ALANKAR,Full Time Qualification : MSC (GEOLOGY) Appointment/ : 14/05/1997 Termination date 6. Date of approval of Mining : Mining Scheme rule 12 MCDR1988 01/07/2002 Plan/Scheme of Mining Mining Scheme rule 12 MCDR1988 10/09/2007 Mining Scheme rule 12 MCDR1988 27/03/2013 PAGE : 3 PART - II : OBSERVATION/COMMENTS OF INSPECTING OFFICERS Exploration : Sl.No.
    [Show full text]
  • Tiruchirappalli District
    CENSUS OF INDIA 2011 TOTAL POPULATION AND POPULATION OF SCHEDULED CASTES AND SCHEDULED TRIBES FOR VILLAGE PANCHAYATS AND PANCHAYAT UNIONS TIRUCHIRAPPALLI DISTRICT DIRECTORATE OF CENSUS OPERATIONS TAMILNADU ABSTRACT TIRUCHIRAPPALLI DISTRICT No. of Total Total Sl. No. Panchayat Union Total Male Total SC SC Male SC Female Total ST ST Male ST Female Village Population Female 1 Andanallur 25 89,225 44,677 44,548 23,937 11,774 12,163 30 17 13 2 Manikandam 22 1,07,526 53,312 54,214 18,986 9,275 9,711 498 247 251 3 Thiruverambur 20 1,05,191 52,713 52,478 21,696 10,863 10,833 491 259 232 4 Manapparai 21 1,07,837 53,942 53,895 19,187 9,610 9,577 151 93 58 5 Marungapuri 49 1,18,370 58,929 59,441 25,169 12,557 12,612 - - - 6 Vaiyampatti 18 96,463 47,844 48,619 14,956 7,345 7,611 10 5 5 7 Lalgudi 45 1,19,238 58,674 60,564 31,344 15,202 16,142 463 249 214 8 Manachanallur 35 1,53,865 76,964 76,901 29,077 14,366 14,711 159 89 70 9 Pullambadi 33 82,137 40,208 41,929 15,054 7,458 7,596 148 79 69 10 Musiri 33 1,00,879 50,147 50,732 23,894 11,682 12,212 41 25 16 11 Thottiam 26 1,09,278 54,483 54,795 22,226 10,941 11,285 10 4 6 12 Tattayyangarpettai 25 81,388 41,188 40,200 14,501 7,240 7,261 115 70 45 13 Thuraiyur 34 1,13,343 56,276 57,067 23,735 11,730 12,005 7,076 3,674 3,402 14 Uppiliyapuram 18 87,205 43,025 44,180 21,347 10,457 10,890 5,327 2,722 2,605 Grand Total 404 14,71,945 7,32,382 7,39,563 3,05,109 1,50,500 1,54,609 14,519 7,533 6,986 ANDANALLUR PANCHAYAT UNION Sl.
    [Show full text]
  • Tamil Nadu Public Service Commission Bulletin
    © [Regd. No. TN/CCN-466/2012-14. GOVERNMENT OF TAMIL NADU [R. Dis. No. 196/2009 2018 [Price: Rs. 145.60 Paise. TAMIL NADU PUBLIC SERVICE COMMISSION BULLETIN No. 7] CHENNAI, FRIDAY, MARCH 16, 2018 Panguni 2, Hevilambi, Thiruvalluvar Aandu-2049 CONTENTS DEPARTMENTAL TESTS—RESULTS, DECEMBER 2017 NAME OF THE TESTS AND CODE NUMBERS Pages Pages The Tamil Nadu Government office Manual Departmental Test for Junior Assistants In Test (Without Books & With Books) the office of the Administrator - General (Test Code No. 172) 552-624 and official Trustee- Second Paper (Without Books) (Test Code No. 062) 705-706 the Account Test for Executive officers (Without Books& With Books) (Test Code No. 152) 625-693 Local Fund Audit Department Test - Commercial Book - Keeping (Without Books) Survey Departmental Test - Field Surveyor’s (Test Code No. 064) 706-712 Test - Paper -Ii (Without Books) (Test Code No. 032) 694-698 Fisheries Departmental Test - Ii Part - C - Fisheries Technology (Without Books) Fisheries Departmental Test - Ii Part - B - (Test Code No. 067) 712 Inland Fisheries (Without Books) (Test Code No. 060) 698 Forest Department Test - forest Law and forest Revenue (Without Books) Fisheries Departmental Test - Ii Part - (Test Code No. 073) 713-716 A - Marine Fisheries (Without Books) (Test Code No. 054) 699 Departmental Test for Audit Superintendents of Highways Department - Third Paper Departmental Test for Audit Superintendents (Constitution of India) (Without Books) of Highways Department - First Paper (Test Code No. 030) 717 (Precis and Draft) (Without Books) (Test Code No. 020) 699 The Account Test for Public Works Department officers and Subordinates - Part - I (Without Departmental Test for the officers of Books & With Books) (Test Code No.
    [Show full text]
  • Tamil Nadu Government Gazette
    © [Regd. No. TN/CCN/467/2012-14. GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009. 2018 [Price : Rs. 19.20 Paise. TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 37] CHENNAI, WEDNESDAY, SEPTEMBER 12, 2018 Aavani 27, Vilambi, Thiruvalluvar Aandu – 2049 Part VI—Section 4 Advertisements by private individuals and private institutions CONTENTS PRIVATE ADVERTISEMENTS Pages. Change of Names .. 1515-1562 Notice .. 1562 NOTICE NO LEGAL RESPONSIBILITY IS ACCEPTED FOR THE PUBLICATION OF ADVERTISEMENTS REGARDING CHANGE OF NAME IN THE TAMIL NADU GOVERNMENT GAZETTE. PERSONS NOTIFYING THE CHANGES WILL REMAIN SOLELY RESPONSIBLE FOR THE LEGAL CONSEQUENCES AND ALSO FOR ANY OTHER MISREPRESENTATION, ETC. (By Order) Director of Stationery and Printing. CHANGE OF NAMES 21985. My daughter, B. Kavitha, daughter of Thiru 21988. I, V Palanivelan alias Palanivelu, son of Thiru G. Balamurugan, born on 12th December 2002 (native Vellian, born on 15th July 1941 (native district: Madurai), district: Virudhunagar), residing at No. 1/95, R.C. Street, residing at No. 10, Industrial Colony, K. Pudur, Madurai- Ilaiyaranendal, Kovilpatti Taluk, Thoothukkudi-627 713, 625 007, shall henceforth be known as V. PALANIVEL shall henceforth be known as B. RASIKA V PALANIVELAN alias PALANIVELU B. SEENIAMMAL Madurai, 3rd September 2018. Thoothukkudi, 3rd September 2018. (Mother) 21989. My son, P. Gokulkannan, son of Thiru V. Palanisamy, 21986. My daughter, Petchiyammal, born on 13th October born on 20th April 2002 (native district: Madurai), residing at 2003 (native district: Dindigul), residing at No. 4/411, No. 6E/2, Ex. Serviceman Colony, Mullai Nagar, Bibikulam, Kamatchipuram, Pudusukkampatti, Melur Taluk, Madurai- Madurai-625 002, shall henceforth be known as P.
    [Show full text]
  • Highways and Minor Ports Department
    Highways and Minor Ports Department Policy Note 2019-20 Demand No. 21 Edappadi K. Palaniswami Chief Minister © Government of Tamil Nadu 2019 INDEX 1 Introduction 1 2 Policy Outline 9 Structure and Activities of the 3 29 Department 4 Office of the Director General 45 5 Construction and Maintenance 55 6 National Highways 87 7 NABARD and Rural Roads 125 8 Projects 143 9 Metro 169 10 Tamil Nadu Road Sector Project-II 185 Chennai Kanyakumari Industrial 11 213 Corridor Project 12 Highways Research Station 223 13 Planning, Designs and Investigation 233 Tamil Nadu Road Development 14 241 Company Ltd Tamil Nadu Road Infrastructure 15 251 Development Corporation 16 Tamil Nadu Maritime Board 259 Poompuhar Shipping Corporation 17 269 Limited 18 Conclusion 277 HIGHWAYS AND MINOR PORTS DEPARTMENT POLICY NOTE – 2019-20 1. INTRODUCTION India is a fast developing economy with the second largest road network. Easy accessibility, flexibility and reliability have made road transport significant in both freight and passenger traffic. Tamil Nadu, the most urbanized State in the country, which is a developed, economically stable and highly literate one, is pioneer on more than one count. A lead player in Automobile sector, Manufacturing, Engineering, Leather, Garment industries, Health sector, Tourism and Cultural hotspots, it is also an agrarian based granary to the country. The GSDP of Tamil Nadu 2018-19 is Rs.1,789,703 crore, second largest State economy in the country. Agriculture, Industries and IT sectors contribute to the same. 1 The significant position the State occupies in the country map, is mainly due to the well developed network of roads and persistent efforts taken for a better infrastructure.
    [Show full text]
  • Tamil Nadu Siddha Medical Council, Chennai - 106
    TAMIL NADU SIDDHA MEDICAL COUNCIL, CHENNAI - 106. REGISTER OF 2D BARCODE ISSUED REGISTERED SIDDHA MEDICAL PRACTITIONERS UPTO 31st MARCH 2017 (Ref No. 60/TNSMC/2017.) A - Class No. VI(1)/330/2017. Sl.No. Reg. No. Name Father's Name Qualification Date of Regn. Address (1) (2) (3) (4) (5) (6) (7) ARIYALUR DISTRICT 1 4608 Dr. AISHWARYA A K. Ambalavanan B.S.M.S. 22/06/2015 No.1334, Palani Andavar Koil Street, Vilandai, Andimadam, Ariyalur - 621801 2 3316 Dr. AKHILA DEVI S P S. Panneer Selvam B.S.M.S. 20/05/2009 I-26-A, Anumar Koil Street, T.Palur, Ariyalur - 612904 M.D.(S) 21/07/2016 3 3993 Dr. AKILA K R. KALIYAPERUMAL B.S.M.S. 24/05/2012 No.1/89, North Street, Sirukalathur Post, Sendurai Taluk, M.D.(S) 14/03/2016 Ariyalur - 621710 4 4693 Dr. AMALA M V. Manickam B.S.M.S. 20/07/2015 No.3/759-3/154, West Street, Mathumadakki, Keezhamaligai Post, Sendurai Taluk, Ariyalur - 621710 5 3903 Dr. ANANTHI K V K. Vaithianathan B.S.M.S. 13/07/2011 No.112, Main Road, Variyankaval, Udayarpalayam Taluk, 2 M.D.(S) 27/01/2015 Ariyalur - 621806 6 4137 Dr. ANBARASI A S. Anbalagan B.S.M.S. 22/07/2013 No.123, Ponparappi / Kudikadu Post, Sendurai Taluk, M.D.(S) 14/03/2017 Ariyalur - 621710 7 4841 Dr. ANILADEVI P S. PANNEER SELVAM B.S.M.S. 07/01/2016 No.1/26, Anumar Koil Street, T. Palur, Ariyalur - 612904 8 4399 Dr. ANITHA A M.
    [Show full text]