a a FOR - a (;RANI' ()II R0(J(;II SI'ONE QUARRY LEASE IN TOTAI LEASE GR.AXTAD 'ffitt'lAY zoto { PROP'OsED PERIOD OF i,i { lPrGp|.rod Undor Rul€ 19 {l) Tsmtl radu Mtro! M Per A.Eeadrr€rrt Undor RuIe - { LOCATION OF THE APPLIED AREA

{ EXTENT ; 4.94.12 Ha.

S.F, NO : 314 (PART-rrr) - a VILLAGE : THUPPUGANAPALLI. ! TALUK : SHOOLAGIRI { DISTRICT : . { STATE : TAMILNADU. { APPI,ICANT - THIRU.G. PERUMAL, t S/o GOPAL, a A-14, HIiDCO, t THALLY ROAD, -a TALUK, KRISHNACIRI DISTRICT - 6351(D. ro a PREPARID BY: S.DHANASTXAR, M.Sc., a RQP/MAS/22Sl20r UA a 8/3, KULI,APPAN STREET, OPPIINDIAN BANK LIND, a ()MAL('R TAt,(rK 636 455, o SALf,M DISTRICT. Dnnil: eeodhana@Yal|oo.(o.in a CELL | 9a9t6-2891n & 73733-7 47O a o ''il a ra .',

<, ulNtNs 44!-EOB-!4INAB-!4ryE84!E it. ROUGH STONE OUARRY (opn tt \ r0!s_ ):, |RT-lll) o,f e Ov€r an extenl of4.94.32 hcctsre! ofGovernment poromboke I"."g3,il,$Y^llll,, l' .rt THUPPUGANAPALLI Vlllage, SHOOLAGIRI T!luk, KRISHN l*8rft SIaG.l (Pr€prred Und€r Rule l9 (l) Trmll Nadu Minor Mineml Concession 3 Und€r Rule 4l & 42) a a r.O NTRODUCTION AND EXECUTIVE SUMMARY: a l. fillRu. G, PERUMAL' S/o GOPAL residing at A-14, THALLY HUDCO, THALLY ROAD, HOSUR n TALUK, and KRJSHNAGIRI DISTzuCT - 6365109 has applied for the grant of quarry lease Under Tender/Auction to quarry Rough Stone over an extent of 4.94.32 Hechres of Governm€nt Poromboke

a land in S.F.Nos.314 (PART-IID of THUPPUGANAPALLMIIage' SHOOLAGIRI Taluk'

3 of State for a period ofTEN Years.

a 2. The Applicant has been the Successtul bidder Highest Bidder Amount Rs 4, 62' 00'000 /' in a tender cum a public action conducted by the Govemmont ofTamilnadu and Rough Stone quarry l€ase had been ganted

t to 'IIIIRU. G. PERUMAL in 4.94.32 Hect res of Govcrnment Poromboke land in S.F.Nos 3l4 t (PART-IID of THUPPUGANAPALLI Viuag€, SHOOLAGIRI Tsluh and KRISHNAGIRJ District of t Tamil Nadu State for a period of TEN Years Vide Proceeding No RC No 2I4r2018/MINES dated:

) 09.03,2018. a 3. The District Collector. KRISHNAGIRI in his lett€r Rc. No. 2I'1,018/MINES dated: 09'03'2018' Has a directed the applicant to produce apFoved Mining Plan and Envimnnental cleannce certtficate from the a District kvel Envirunmental Impact Assessmen! Authority (DEIAA) for the grant of quarry lease for the a applied quarry area. a 4.Accordingly'MiningPlanispreparcdunderRul€19(l)Tarni|NaduMinorMineralconcessionRules' Rule 4 I & 42 by incorpomling tbe conditioos imPosed in the preche area e I 959 & As per Amendment und€r I communicatioDletterandbyincof?omtingallihedetai|sproposedintheletterNo.DElAA-TN/Minof Assessmenl Authority a Minerals / 2017 dated | 3.06.2017 of District Levol Environmental Impact for approval lor a 5, In the above circumstsnces THIRU. G. PERUMAL is here by Feparing tho Mining Plan pre Feasibility repofi to obtam a fresh Rough Stono Quarry' And subsequent submission of Forml and t environmental clearancc from the DEIAA ofTamil Nadu, Krishnagii 'i| -F.nnhrffi"' a RQP/MAS/22sl2011/A a J - 2 {:::}i-. Thb Mining Plan h propnrod lbr rhc Fr€sh Rough Ston€ euarry for a period ofF

1. ln order lo onsuro complltnca ot the order ofthe Honoumble Supreme Courl

12.13.2011 in Spcchl l,orv6 l,otirion SLP(C) No 19628-19629/2009, it has -*"dF?,lrf"4 3 mining projects of mlnor nlncrals including their r€n€wal irrespective of siz€s

- forth require prior onvlronmcntal clearance. Mining project within ttre lease La uoaffi- zs l"

t including projecls or minor mineral with lease area less lhen 5Ha would be tr€ated as cat€gory B as d€fin€d

t in the EIA notification 2006 and will b€ considered by the state DEIAA notjfied by MoEF as prescrib€j

: Plocedule prescrib€d under EIA notification 2006.

a This Mining Plan is prepared by considering the TNMMCR 1959, and as per the EIA Notification 2006 and t it are subsequent am€ndments and judgments,

9. The lease period Total ceological es t Rese 9t47717M5 and Mineable R€serves is estimatet as 44q a8Sfd a and recoverable reserves is estimated as 25895s3M! of Rough Stone afier leaving necessary saf€ty a distance from the lease boundary as indicated in th€ Lease cranted proceedings and relevant mining laws in J forc€ t 10. Production Schedule is proposed an avenge production offive y€ars about 2589553M! oJ Rough Stone. I Production Schedule is proposed an av€mge production of5l79llM! ofRough Stone per year t lI. Environmental paramelers, t i) There is no int€rstat€ boundary around loKms radius. ii) There is no wild life anirnal sanctuary within loKms radius form the project site area under the a Wildlife (Protection) Act, lg72.'ftt€Iefore the project seeks clearanc€ only from State Level a Environmental Inpact Assessment Authorig (SEIAA), under 92 Category. il 12, Environmental measwes to be adopted shall be, l) Dust Control at sowce while drilling and Proposed Confol Blasting

$ ! a ii) Dust suppression at loading point and tmnsport haul roaals, iii) Noise Control in Proposed Control Blasting, control offly rock missiles and vibration by peak iD doing particle volocity wilh in slrndard as prescrib€d by the DGMS and MoEF. * ,J iv) Unnecessary land degradation should be avoided or damaged land should be reclaimed or rehabilitated. a v) Avoid uneven rat hole mining and follow scientific and systematic mining by safe bench sysrem of J open casl mlnm8, n vi) Mining near major fraclure zones if any should be avoided to control g:ound watcr fluctuation in th€ t adjacent agricultuml lan&. it -.o 2 .t-,.".. su_::-', - - 3 vii) Emhsion t.d ol vohl0lor should be in stack to maintain minimum emission viii) Noh. llvol iholld nol cxc€ed 80db and the vehicles should use on rnegsil-Ht+AYvrx0lq, on road noar rorldonllalor6os. ix) Safety zon6s e! proccrlbcd by lhe Depaitmenl ofceology and Mining a should bc striclly ndhorlng to. 3 x) And any othcr condhions ns slipulated by the concemed authorities should,b-q followed to Fotect the 3 envtonm€nL 2.0-EXEcEM{ESUMMABI!

: a. Name ofthe village TIIUPPUGANAPALLI 3 b. Name ofthe Panchat / Union TIII'PPUGANAPALLI / SHOOLAGIRI t The proposed total Minable Reserves 2589553M'(Total Depth of2l lmt) Top Soil lm + Rough stone 2lom) Ground surface above t 78m and belol33m. a d. The Foposed qua ity ofreserves (level of 2589553M! (Totai Depth of85nt) Top Soil lm 3 production) for Five Yerrs to be mined is + Rough stone 84m) Ground surface above 78m (Recoverabl€ reserv€s) and below ?rn. a Toial extent ofthe area 4.94,32 Ha 3 t Proposed Pedod of rnining Five years c. Proposed Depth of mining ?8m fron above ground Surface level and ?m 3 from below ground Surface level. Tolal depth- , 85m aa h. Existing Pit Dimension NIL

al Avemg€ production per year 5l791lM'

: J' Method of mining / level of mechanization Opencasl" Semi-mechanjzed Mining witl) a bench h€ighl ofTm and bench width of5m is proposed.

a T'?es ofMachineries used in the quarry i) Compressor with jack hammer a ii) Excavator ol0.90cbm bucket Capacity a L Cost ofthe Pmj€ct a. Fixed Cost Rs.4,64,60,000/- ir b. Op€rational Cost tu. 20,00,000/- a c. EMP Cost Rs.3,70,000/- t The area applied for lease is bounded by four Toposheet No. 57 - M4 comeN and the coordinates ar€ $ Latitude 12'36' 45.64"N To 12'36'55.36"N * Longitude 77o 55'16.83"E To 77o 55r25.45r'E s North Easl 12.36', 53.03' N 77. 55',25.45"E South East 12. 36' 45.75' N 770 55' 21,67',F' o North West 12.36'55.36" N 77" 55' t6.83'E n South West 12. 36',45.65" N 77. 55' t8,36',8 a e 10 r\