Allocation-Based Management for Federally Permitted Charter Vessels

Total Page:16

File Type:pdf, Size:1020Kb

Allocation-Based Management for Federally Permitted Charter Vessels Tab B, No. 12(b) 3/30/2018 Allocation-Based Management for Federally Permitted Charter Vessels Draft Amendment 41 to the Fishery Management Plan for the Reef Fish Resources of the Gulf of Mexico April 2018 Gulf of Mexico Fishery Management National Oceanic & Atmospheric Council Administration 2203 North Lois Avenue, Suite 1100 National Marine Fisheries Service Tampa, Florida 33607 Southeast Regional Office 813-348-1630 263 13th Avenue South 813-348-1711 (fax) St. Petersburg, Florida 33701 888-833-1844 Toll Free 727-824-5305 [email protected] 727-824-5308 (fax) http://www.gulfcouncil.org http://sero.nmfs.noaa.gov This is a publication of the Gulf of Mexico Fishery Management Council Pursuant to National Oceanic and Atmospheric Administration Award No. NA15NMF4410011. This page intentionally left blank. Gulf of Mexico Reef Fish Amendment 41 Draft Environmental Impact Statement (DEIS) Cover Sheet Draft Amendment 41 to the Fishery Management Plan for the Reef Fish Resources of the Gulf of Mexico: Allocation-Based Management for Federally Permitted Charter Vessels, including a Draft Environmental Impact Statement (DEIS) Abstract: This DEIS is prepared pursuant to the National Environmental Policy Act to assess the environmental impacts associated with a regulatory action. The DEIS will analyze the impacts of a range of alternatives for management actions to establish an allocation-based management program for the harvest of reef fish by vessels with a federal Gulf of Mexico charter/headboat permit for reef fish that are not eligible for the program being developed in Amendment 42. Responsible Agencies and Contact Persons: Gulf of Mexico Fishery Management Council (Council) 813-348-1630 2203 North Lois Avenue, Suite 1100 813-348-1711 (fax) Tampa, Florida 33607 [email protected] Matthew Freeman ([email protected]) http://www.gulfcouncil.org National Marine Fisheries Service (Lead Agency) 727-824-5305 Southeast Regional Office 727-824-5308 (fax) 263 13th Avenue South http://sero.nmfs.noaa.gov St. Petersburg, Florida 33701 Susan Gerhart ([email protected]) Type of Action: ( ) Administrative ( ) Legislative (X) Draft ( ) Final Filing Dates with EPA: Notice of intent (NOI) to prepare EIS published: May 17, 2016 Draft environmental impact statement (DEIS) filed with EPA: DEIS comment period ended: EPA comments on DEIS: Amendment 41: Allocation-Based iii Management for Federally Permitted Charter Vessels ABBREVIATIONS USED IN THIS DOCUMENT ABC acceptable biological catch ACL annual catch limit ACT annual catch target ALS accumulated landings system AM accountability measure ASAP Age Structured Assessment Program Bi Op biological opinion Charter AP Ad Hoc Red Snapper Charter For-hire Advisory Panel COI certificate of inspection Council Gulf of Mexico Fishery Management Council CS consumer surplus DEIS Draft Environmental Impact Statement DLMToolkit Data Limited Methods Toolkit DPS distinct population segment EA Environmental assessment EEZ exclusive economic zone EFH essential fish habitat EIS Environmental Impact Statement EJ environmental justice ESA Endangered Species Act For-hire permit Gulf Charter/Headboat permit for Reef Fish FL Fork length FMP Fishery Management Plan FWC Florida Fish and Wildlife Conservation Commission GDP gross domestic product GPS global positioning system GT-IFQ grouper-tilefish individual fishing quota program Gulf Gulf of Mexico gw gutted weight HBC headboat collaborative HMS highly migratory species IBQ individual bluefin quota IFQ individual fishing quota IPCC Intergovernmental Panel on Climate Change IRFA Initial Regulatory Flexibility Analysis ITQ individual transferable quota Joint AP Ad Hoc Reef Fish Headboat and Red Snapper Charter Advisory Panels LA Creel Louisiana Recreational Creel Survey LAPP limited access privilege program Magnuson-Stevens Act Magnuson-Stevens Fishery Conservation and Management Act MFMT maximum fishing mortality threshold MMPA Marine Mammal Protection Act mp million pounds MRFSS Marine Recreational Fisheries Survey and Statistics Amendment 41: Allocation-Based iv Management for Federally Permitted Charter Vessels MRIP Marine Recreational Information Program MSST minimum stock size threshold MSY maximum sustainable yield NEPA National Environmental Policy Act NMFS National Marine Fisheries Service NOAA National Oceanic and Atmospheric Administration NOR net operating revenue NS national standard OFL overfishing limit OSY optimum sustainable yield OY optimum yield PAH polyaromatic hydrocarbons PFA permit fishing allocation PFQ permit fishing quota PIMS permit information management system PS producer surplus RA Regional Administrator RS-IFQ red snapper individual fishing quota program SEAMAP Southeast Area Monitoring and Assessment Program Secretary Secretary of Commerce SEDAR Southeast Data, Assessment, and Review SEFSC Southeast Fishery Science Center SERO Southeast Regional Office SPR spawning potential ratio SRHS Southeast Region Headboat Survey SSASPM State-Space Age-Structured Production Model SSB spawning stock biomass SSBR spawning stock biomass per recruit SSC Scientific and Statistical Committee TAC Total allowed catch TL total length TPWD Texas Parks and Wildlife Department VMS vessel monitoring system ww whole weight Amendment 41: Allocation-Based v Management for Federally Permitted Charter Vessels TABLE OF CONTENTS Abbreviations Used In This Document.......................................................................................... iv Table of Contents ........................................................................................................................... vi List of Tables ............................................................................................................................... viii List of Figures ................................................................................................................................. x Chapter 1. Introduction .................................................................................................................. 1 1.1 Background ................................................................................................................... 1 1.2 Purpose and Need ....................................................................................................... 11 1.3 History of Management .............................................................................................. 11 Chapter 2. Management Alternatives .......................................................................................... 23 2.1 Action 1 – Type of Allocation-based Management Program ..................................... 23 2.2 Action 2 – Species to Include in the Charter For-Hire Management Program .......... 30 2.3 Action 3 – Charter Vessel Endorsement or Permit ..................................................... 32 2.4 Action 4 – Allocation of Annual Catch Limit to Charter Vessels .............................. 35 2.5 Action 5 – Units of Measure for Quota Distribution and Reporting .......................... 41 2.6 Action 6 – Distributing the Charter Quota to Charter Vessels ................................... 43 2.7 Action 7 – Adaptive Catch Share Management ......................................................... 48 Action 7.1: Adaptive Management Cycle ......................................................................... 54 Action 7.2: Reclamation of Shares .................................................................................... 56 Action 7.3: Redistribution of Reclaimed Shares ............................................................... 58 Action 7.4: Reclamation of Latent Shares ........................................................................ 60 2.8 Action 8 – Transferability of IFQ Shares ................................................................... 62 2.9 Action 9 – Maintenance of IFQ Shares ...................................................................... 64 2.10 Action 10 – Transferability of Annual Allocation...................................................... 66 2.11 Action 11 – Share Caps .............................................................................................. 69 2.12 Action 12 – Cap on Allocation Usage ........................................................................ 72 2.13 Action 13 – Retaining Annual Allocation before a Quota Reduction ........................ 75 2.14 Action 14 – Cost Recovery Fees ................................................................................ 77 Chapter 3. Affected Environment ................................................................................................ 79 3.1 Description of the Fishery .................................................................................................. 79 3.1.1 Commercial Sector...................................................................................................... 79 3.1.2 Recreational Sector ..................................................................................................... 80 3.2 Description of the Physical Environment .......................................................................... 83 Amendment 41: Allocation-Based vi Management for Federally Permitted Charter Vessels 3.3 Description of the Biological Environment ....................................................................... 85 3.3.1 Information on Reef Fish Species ............................................................................... 85 3.3.2
Recommended publications
  • Volume 2 Main Text Part 3 of 3
    Kinsale Area Decommissioning Project Environmental Impact Assessment Report Volume 2 Main Text Part 3 of 3 253993-00-REP-08 | 30 May 2018 PSE Kinsale Energy Limited Kinsale Area Decommissioning Project Environmental Impact Assessment Report Table of Contents Page Glossary of Terms 1 Introduction 1 1.1 Introduction 1 1.2 Project Background 1 1.3 EIAR 3 1.4 Consent Application Process 3 1.5 Environmental Assessment Process 4 1.6 Overall Project Schedule 4 1.7 Structure of the EIAR 6 1.8 Consultation 7 1.9 List of Contributors 8 2 Legal and Policy Framework 11 2.1 Legislative Framework 11 2.1.1 Introduction 11 2.1.2 Relevant National Legislation 11 2.1.3 Relevant European Legislation 13 2.1.4 Relevant International Conventions 14 2.1.5 Summary of key relevant National and European legislation 15 2.2 Legislative basis for EIA and EIAR 15 2.3 EIAR Guidance and Methodology 16 2.4 Kinsale Energy Environmental Management System Overview 16 3 Project Description 18 3.1 Introduction 18 3.1.1 History of Kinsale Area 18 3.1.2 Rationale for Decommisstioning 19 3.2 Kinsale Area Facilites 21 3.2.1 Kinsale Head Development 22 3.2.2 Ballycotton Subsea Development 24 3.2.3 Southwest Kinsale and Greensand Subsea Developments 25 3.2.4 Seven Heads Subsea Development 26 3.2.5 Wells 27 3.2.6 Onshore Pipeline and Terminal 28 3.2.7 Summary of Kinsale Area Facilities 31 3.3 Consideration of Potential Re-Uses 41 3.4 Decommissioning Alternatives Considered 42 3.4.1 Do Nothing Alternative 42 3.4.2 Other Decommissioning Alternatives Considered 42 3.4.3 Platform Topsides
    [Show full text]
  • Powerhead™ 12
    PowerHead™ 12 Instructions for use and parts list Nilfisk-Advance MODELS 56648042, 56250185 English 7/00 revised 3/04 Form Number 56041495(083483C-1) IMPORTANT SAFETY INSTRUCTIONS This machine is only suitable for commercial use, for example in hotels, schools, hospitals, factories, shops and offices other than normal residential housekeeping purposes. When using an electrical appliance, basic precautions should always be followed, including the following: READ ALL INSTRUCTIONS BEFORE USING THIS APPLIANCE. WARNING! To reduce the risk of fire, electric shock, or injury: • Do not leave the appliance when it is plugged in. Unplug the unit from the outlet when not in use and before servicing. • To avoid electric shock, do not expose to rain. Store indoors. • Do not allow to be used as a toy. Close attention is necessary when used near children. • Use only as described in this manual. Use only the manufacturer’s recommended attachments. • Do not use with damaged cord or plug. If the appliance is not working as it should be, has been dropped, damaged, left outdoors or dropped into water, return it to a service center. • Do not pull or carry by the cord, use the cord as a handle, close a door on the cord, or pull the cord around sharp edges or corners. Do not run the appliance over the cord. Keep the cord away from heated surfaces. • Do not unplug by pulling on the cord. To unplug, grasp the plug, not the cord. • Do not handle the plug, cord or appliance with wet hands. • Do not put any object into openings.
    [Show full text]
  • Excel 1 Owners Manual
    Version 2.3 January 2012 BWC EXCEL 1 24 VDC Battery Charging System Owner’s Manual EXCEL 1 Wind Turbine PowerCenter Controller Bergey Windpower Co. 2200 Industrial Blvd. Norman, OK 73069 USA Telephone: (405) 364-4212 Fax: (405) 364-2078 E-mail: [email protected] Web: www.bergey.com BWC EXCEL 1 Wind Turbine 24V Battery Charging System OWNER’S MANUAL Table of Contents 1. Overview .................................................................................................................................................. 2 2. Cautions and Warnings ............................................................................................................................ 3 3. Identification ............................................................................................................................................. 4 4. System Description .................................................................................................................................. 5 5. SYSTEM OPERATION ............................................................................................................................ 7 6. Turbine Installation ................................................................................................................................. 15 7. PowerCenter Installation ........................................................................................................................ 22 8. Inspections and Maintenance ...............................................................................................................
    [Show full text]
  • Acclaim Electric Powerhead Manual
    ACCLAIM 12 AND ACCLAIM 15 by SEBO POWERHEADS OWNER’S MANUAL For Household Use Only TABLE OF CONTENTS Technical Details 2 Identification of Parts 2 Important Safety Instructions 3 Acclaim Powerhead Product Features 4 Operating Instructions 5 Operating the Powerhead 5 The Brush Height Adjustment Feature 5 Indicator Lights 5 Maintenance 6 Changing the Brush Rollers 6 Cleaning the Brush Rollers 6 Clog Removal 6 Clogs in the Airflow Pathway 6 Clogs in the Swivel Neck 6 Trouble-Shooting Guide 7 Acclaim 12 Powerhead Schematic and Part Numbers 8 Acclaim 15 Powerhead Schematic and Part Numbers 9 Warranty Information 10 TECHNICAL DETAILS Acclaim 12 Acclaim 15 Brush motor 175 Watts, 1.6 Amps 200 Watts, 1.8 Amps Width 12 in. 15 in. Weight 5.4 lbs. 5.7 lbs. Brush roller Replaceable Replaceable Brush drive Toothed belt with electronic Toothed belt with electronic overload protection overload protection IDENTIFICATION OF PARTS 1. Powerhead 1 4 2. Brush height adjustment 3. Swivel neck 2 3 4. Connection plug 8 5. Brush indicator light 9 6. Brush on/off switch and power light (not available on all models) 8 10 7. Brush roller end cap 7 2 8. Foot Pedal 1 9. Telescopic Tube release button 5 6 10. Brush roller release button 2 IMPORTANT SAFETY INSTRUCTIONS READ ALL INSTRUCTIONS BEFORE USING THIS MACHINE ! SAVE THESE INSTRUCTIONS. WARNING: To reduce the risk of fire, electric shock, or injury: 1. Do not leave Powerhead while plugged in. Unplug when 15. Maintenance and repairs must be done by qualified not in use and before servicing.
    [Show full text]
  • BS Powerhead En Manual 20171213
    Operator’s Manual Model: P0820B Reproduction for Not Important! It is essential that you read the instructions in this manual before operating this machine. Reproduction for Not 1 3 2 4 ReproductionFig. 1 for 5 Not 6 Fig. 2 Fig. 3 English (original instructions) SAFETY INFORMATION Indicates a potentially READ ALL INSTRUCTIONS CAREFULLY hazardous situation, WARNING WARNING which, if not To avoid serious personal injury, do not avoided, could attempt to use this product until you have result in death read this Owner’s Manual thoroughly and or serious understand it completely. If you do not injury. understand the warnings and instructions Indicates a in this Owner’s Manual, do not use this potentially product. Contact an authorized service hazardous center for assistance. situation, CAUTION which, if not WARNING avoided, may For use only with Briggs & Stratton result in minor batteries BSB2AH82 (2 amp-hour) or or moderate BSB4AH82 (4 amp-hour) or BSB5AH82 (5 injury. amp-hour) and Briggs & Stratton charger Indicates a BSRC82 or BSSC82. situation that may result in Battery-operated products do not have NOTICE damage to the to be plugged into an electrical outlet; product. therefore, they are always in operating condition. Be aware of possible hazards Some of the following symbols may be used when not using the powerhead. FollowingReproduction on this product. Please study them and this rule will reduce the risk of electric learn their meaning. Proper interpretation shock, fire, or serious personal injury. of these symbols will allow you to operate The following signal words and meanings the product better and safer.
    [Show full text]
  • Recommended Safe Storage Prohibited Firearms Levels 1, 2 & 3
    Vers 2.2 July 2021 OFFICIAL SCHEDULE 1 PROHIBITED FIREARMS Safe Storage Levels 1, 2 & 3 All persons possessing firearms in NSW must comply with the safe keeping and storage requirements as prescribed by the Firearms Act 1996, associated Regulation and as recommended by the Commissioner. This fact sheet provides information on the safe keeping and storage requirements for prohibited firearms. What are the general requirements in relation to the safe keeping of firearms? All licence holders in NSW are subject to the general requirement for safe storage of firearms under section 39 of the Firearms Act 1996 (Act). Any person in possession of a firearm must take all reasonable precautions to ensure the firearm is kept safely, is not lost or stolen and does not come into the possession of an unauthorised person. A licence or permit holder may only store a firearm in an inhabited dwelling or in a dwelling where the licence or permit holder, or someone on their behalf, can easily observe the premises where the firearm is stored. An inhabited dwelling is a person’s principal place of residence, where the licence or permit holder may or may not also live, or where a person lives while the firearm is stored there. If a person stores their firearms in a place other than an inhabited dwelling, they can do so provided the following safe storage requirements are met or exceeded: All firearms must be - • stored in a safe of an approved type, and • fitted with a trigger or barrel lock that prevents the firearm from being discharged, and • secured individually on, or in, a locked device within the safe.
    [Show full text]
  • KEMPER PROFILER Main Manual 7.0 Legal Notice 2
    Legal Notice 1 Direm KEMPER PROFILER Main Manual 7.0 Legal Notice 2 Legal Notice This manual, as well as the software and hardware described in it, is furnished under license and may be used or copied only in accordance with the terms of such license. The content of this manual is furnished for informational use only, is subject to change without notice and should not be construed as a commitment by Kemper GmbH. Kemper GmbH assumes no responsibility or liability for any errors or inaccuracies that may appear in this book. Except as permitted by such license, no part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, recording, by smoke signals or otherwise without the prior written permission of Kemper GmbH. KEMPER™, PROFILER™, PROFILE™, PROFILING™, PROFILER PowerHead™, PROFILER PowerRack™, PROFILER Stage™, PROFILER Remote™, KEMPER Kabinet™, KEMPER Kone™, KEMPER Rig Exchange™, KEMPER Rig Manager™, PURE CABINET™, and CabDriver™ are trademarks of Kemper GmbH. All features and specifications are subject to change without notice. (Rev. July 2019) © Copyright 2019 Kemper GmbH. All rights reserved. www.kemper-amps.com Table of Contents 3 Table of Contents About this Main Manual 19 Rigs and Signal Chain 20 Effect Modules 21 Effect Presets 22 Effect Select Screen 22 Clear Effect 23 Autoload 23 Load Defaults 24 Load Type 24 Auto Type 24 Stack Section 25 Front Panel Controls Head, PowerHead, Rack, and PowerRack 26 Chicken Head Knob (1) 27 INPUT Button (2) 27 INPUT
    [Show full text]
  • Consultation Paper Proposed Amendments to the Firearms Importation Regime
    Consultation Paper Proposed amendments to the Firearms Importation Regime Regulation 4F and Schedule 6 of the Customs (Prohibited Imports) Regulations 1956 Page 1 of 34 CONTENTS INTRODUCTION ................................ ................................ ................................ ................................ 3 INVITATION FOR COMME NTS ................................ ................................ ................................ ...... 3 PROPOSED AMENDMENTS ................................ ................................ ................................ ............. 4 FIREARMS ................................ ................................ ................................ ................................ ........... 4 1. DEFINITION OF HANDGUN ................................ ................................ ................................ .......... 4 2. CLASSIFICATION OF MUZ ZLE -LOADING AND PAINTBAL L MARKER HANDGUNS ......................... 4 3. CLASSIFICATION OF REV OLVING RIFLES ................................ ................................ .................... 5 4. BLANK -FIRE FIREARMS ................................ ................................ ................................ .............. 5 5. CLARIFICATION OF MEAN ING OF ‘FLARE GUN ’ UNDER DEFINITION OF FIREARM ....................... 6 6. RESTRICTIONS ON .50 BMG FIREARMS ................................ ................................ ...................... 6 MAGAZINES ................................ ................................ ...............................
    [Show full text]
  • Kealakekua Bay, Hawai‘I
    Community Perceptions of Activities, Impacts, and Management at Kealakekua Bay, Hawai‘i Final Report Prepared By: Mark D. Needham, Ph.D. Department of Forest Ecosystems and Society Oregon State University Brian W. Szuster, Ph.D. Department of Geography University of Hawai‘i at Mānoa Conducted For and In Cooperation With: Hawai‘i Division of Aquatic Resources Department of Land and Natural Resources July 2010 Community Perceptions of Kealakekua Bay i ACKNOWLEDGMENTS The authors thank Dr. Bill Walsh, Emma Anders, Petra MacGowan, Dan Polhemus, Athline Clark, and Carlie Wiener at the Hawai‘i Department of Land and Natural Resources for their assistance, input, and support during this project. Caitlin Bell, Rhonda Collins, and Barry Needham are thanked for their assistance with project facilitation and data collection. Special thanks are extended to all of the community residents who took time to complete surveys. Funding for this project was provided by the Hawai‘i Division of Aquatic Resources, Department of Land and Natural Resources pursuant to National Oceanic and Atmospheric Administration (NOAA) Coral Reef Conservation Program award numbers NA06NOS4190101 and NA07NOS4190054. This project was approved by the institutional review boards at the institutions of both authors and complied with all regulations on human subjects research. Although several people assisted with this project, any errors, omissions, or typographical inconsistencies in this final report are the sole responsibility of the authors. All content in this final report was written by the authors and represent views of the authors based on the data and do not necessarily represent views of funding agencies or others who assisted with this project.
    [Show full text]
  • Model 4650 Hot Water Control Valve
    Model 4650 Hot Water Control Valve Valve Speci[ cations ▼ Valve material Lead-free brass* Front (without cover) Inlet/Outlet 3/4", 1" or 1-1/4" Cycles 7 Flow Rates (50 psi Inlet) - Valve Alone Back (without cover) ▼ Continuous (15 psi drop) 20 GPM Peak (25 psi drop) 26 GPM Cv (flow at 1 psi drop) 5 Max. backwash (25 psi drop) 7 GPM Regeneration Downflow/Upflow Downflow only Adjustable cycles Brine fill only Time available 180 minutes per cycle Dimensions Distributor pilot 1-1/20" O.D. Features Drain line 1/2" NPTF # Designed with double backwash Injector brine system 1600 # Combines rugged, lead-free brass body with time-tested Brine line 3/8" "L" style powerhead Mounting base 2-1/2" - 8 NPSM Height from top of tank 7" # Uses standard 5600 style yokes and bypasses # 7-cycle down\ ow brining control is ef[ cient and reliable Typical Applications # Injector/drain modules containing the brine valve, \ ow Water softener 6" - 12" diameter controls, and injector are removable from the valve's exterior Filters 6" - 10" diameter # Continuous service \ ow rate of 20 GPM Additional Information # Backwash capacity accommodates tanks up to Electrical rating ** 24 v, 110 v, 220 v - 50 Hz, 60 Hz 12" diameter Estimated shipping weight Time clock: 7 lbs. # Economical - very small annual power consumption; Hydrostatic: 300 psi Pressure keeps time, and activates the piston/valve Working: 20 - 125 psi mechanics with a single motor 34o - 110o F (cold water) Temperature 34o - 180o F (hot water) Options * As de[ ned in the U.S. EPA Safe Drinking Water Act # Fiber-reinforced polymer or stainless steel bypass valve ** 24 VAC Pentair Transformers: # Backwash [ lter 115 VAC +/- 20% Input, 24 VAC Output # Auxiliary switches 230 VAC +/- 20% Input, 24 VAC Output # Hot water up to 180oF for [ lters and non-metered control valves # Choice of 7 or 12 day clock Lenntech [email protected] Tel.
    [Show full text]
  • Hawaii Fishing Regulations
    HAWAI‘I FISHING REGULATIONS August 2015 CONTENTS Regulated marine species . 4 How to measure and determine sex . .14 Scientific names of regulated species . 16 Regulated freshwater species . .18 Regulated fishing areas O‘ahu . .20 Hawai‘i . 28 Kaua‘i. .39 Maui . 46 Lāna‘i . .49 Moloka‘i . .51 Other management areas . .52 Northwestern Hawaiian Islands . .53 Gear restrictions . 54 Special provisions, licenses, permits . .57 Commercial fishing . .58 Bottom fishing . .59 Sharks and manta rays . 62 David Y. Ige, Governor Fish Aggregating Devices (FADs) . 62 Division of Aquatic Resources (DAR) offices . .63 To report violations . .63 What’s new in this revision O‘ahu: New rules pertain to aquarium fishing (p. 55). BOARD OF LAND AND NATURAL RESOURCES Maui: New minimum size and bag limit rules pertain to all parrotfish and goat- fish species (pp. 4-7). Hā‘ena, Kaua‘i: New Community Based Subsistence Fishing area established Suzanne D. Case, Chairperson (p. 44). This information is presented to acquaint sport and commercial fishermen with Members State laws and rules pertaining to fishing in Hawai‘i. It is not to be used as a legal document. Failure to include complete statutes or administrative rules in this summary does not relieve persons from abiding by those statutes and Keith "Keone" Downing James A. Gomes rules. Any discrepancies between this summary and the statutes or rules from which it was prepared will be enforced and adjudicated according to the official statutes and rules in effect on the date the activity took place. The full text of Thomas Oi Stanley H. Roehrig the statutes and rules is available for review at most public libraries in the State and at Division of Aquatic Resources (DAR) and Division of Conservation and Ulalia Woodside Christopher Yuen Resources Enforcement (DOCARE) offices.
    [Show full text]
  • Uncertainty Analysis of Integrated Powerhead Demonstrator Mass Flowrate Testing and Modeling
    Mississippi State University Scholars Junction Theses and Dissertations Theses and Dissertations 5-1-2005 Uncertainty analysis of integrated powerhead demonstrator mass flowrate testing and modeling King Jeffries Molder Follow this and additional works at: https://scholarsjunction.msstate.edu/td Recommended Citation Molder, King Jeffries, "Uncertainty analysis of integrated powerhead demonstrator mass flowrate testing and modeling" (2005). Theses and Dissertations. 4812. https://scholarsjunction.msstate.edu/td/4812 This Graduate Thesis - Open Access is brought to you for free and open access by the Theses and Dissertations at Scholars Junction. It has been accepted for inclusion in Theses and Dissertations by an authorized administrator of Scholars Junction. For more information, please contact [email protected]. UNCERTAINTY ANALYSIS OF INTEGRATED POWERHEAD DEMONSTRATOR MASS FLOWRATE TESTING AND MODELING By King Jeffries Molder A Thesis Submitted to the Faculty of Mississippi State University in Partial Fulfillment of the Requirements for the Degree of Master of Science in Mechanical Engineering in the Department of Mechanical Engineering Mississippi State, Mississippi August 2005 UNCERTAINTY ANALYSIS OF INTEGRATED POWERHEAD DEMONSTRATOR MASS FLOWRATE TESTING AND MODELING By King Jeffries Molder Approved: _________________________________ _________________________________ W. Glenn Steele Susan T. Hudson Professor and Head of the Department of Adjunct Assistant Professor of Mechanical Mechanical Engineering Engineering (Director
    [Show full text]