TIMBER TRUSS BRIDGE CONSERVATION STRATEGY Submissions Report and Revised Conservation Strategy AUGUST 2012

Total Page:16

File Type:pdf, Size:1020Kb

TIMBER TRUSS BRIDGE CONSERVATION STRATEGY Submissions Report and Revised Conservation Strategy AUGUST 2012 TIMBER TRUSS BRIDGE CONSERVATION STRATEGY Submissions report and revised conservation strategy AUGUST 2012 RMS 13.170 ISBN 978-1-922194-17-6 Roads and Maritime Services Timber Truss Bridge Conservation Strategy Submissions report and revised conservation strategy August 2012 Prepared by Futurepast Heritage Consulting P/L and NSW Roads and Maritime Services Executive summary The Roads and Maritime Services (RMS) Timber Truss Bridge Conservation Strategy Submissions Report and Revised Conservation Strategy sets out how RMS undertook public consultation on its draft Strategy for conservation of timber truss road bridges in NSW, how submissions from stakeholders and the public were analysed, and presents the revised strategy which reflects its response to those submissions. In 2010 NSW Roads and Maritime Services prepared the document Timber Truss Road Bridges – A Strategic Approach to Conservation (the Strategy), which detailed a methodology for assessing the conservation suitability and approach to managing the 48 remaining timber truss bridges managed by RMS. These bridges have a range of limitations within a modern road network and the Timber Truss Bridge Conservation Strategy (the Strategy) outlines both operational and heritage considerations and applies a methodology to determine which of the 48 bridges represent better candidates for long-term conservation within the road network. The Strategy was advertised for public comment, and these comments form the basis of this Submissions Report. Responses have been provided to all matters raised in the submissions. The Strategy was advertised between 18 July and 26 August 2011 in a range of local and state-wide newspapers. Roads and Maritime Services also set up a website containing the complete Strategy, a Summary Report and supporting documentation including the initial heritage assessment of the timber truss bridges undertaken in 1998. A project-specific telephone number and email address were also established to receive submissions and answer questions. Roads and Maritime Services wrote directly to many stakeholders, including 367 local historical societies, affected NSW local councils and other bodies and individuals who have made representations in relation to this issue in the past. Several public meetings were held including at Carrathool, Bombala and in Sydney (for the National Trust of Australia (NSW) and Engineering Heritage Australia). Submissions were accepted up until 15 September 2011. The 106 submissions received included general comments on the approach of the Strategy, however the majority of submissions focussed on one bridge or a small subset of bridges in a local area. Submissions from heritage stakeholder agencies acknowledged the need for a strategic approach to the issue, although with some reservations. Community comment included submissions from 10 local councils, 15 historical societies and community groups, 13 businesses and more than 50 individuals. Comments varied in terms of support for retention or replacement of various bridges. The bridges with the greatest community concern were Carrathool (17 submissions – majority for replacement), Tabulam (14 submission – majority for replacement), Crankies Plains (also called Coolumbooka) (11 submissions – majority for retention) and Barham (9 submissions – majority for retention). Only six bridges attracted more than half a dozen submissions, 13 attracted between two and six submissions, another ten attracted one submission and the remaining 19 bridges attracted no individual submissions. The Strategy has been amended in response to the results of the community consultation. The amended Strategy presented in this report proposes retaining 26 timber truss bridges and progressively replacing the remaining 22, as road demands Timber Truss Bridge Conservation Strategy i Submissions Report and Revised Strategy and funding become available. The 26 bridges identified for retention now include Barham and Wallaby Rocks bridges. Roads and Maritime Services will retain these bridges in response to strong community support. Following strong representations from Goulburn-Mulwaree Council for a new bridge RMS now proposes to replace Lansdowne Bridge. RMS also received very strong representations from Carrathool Shire Council and the local community for a new bridge. However Carrathool Bridge has unique features which strongly support it retention. As it would be located on a local road the provision of a new bridge is outside the scope of this strategy. Roads and Maritime Services’ position remains unchanged on all other bridges. The Revised Strategy is presented in Section 4 of the report. Roads and Maritime Services will present this position to the NSW Heritage Council for endorsement. Summary of the Strategy recommendation for individual bridges Bridges proposed to be retained Bridge LGA Current Proposed Comment listing listing Old PWD Clarence Town Dungog SHR SHR Monkerai Great Lakes SHR SHR McDonald Galston Hornsby SHR SHR Traditional construction Junction Tumut SHR SHR McKanes Lithgow City SHR SHR Allan Mid-Western Beryl S170 S170 Central West group Regional Carrathool Carrathool SHR SHR Dunmore Maitland City SHR SHR Hinton Maitland City SHR SHR Morpeth Maitland City SHR SHR Paytens Forbes S170 S170 Central West group Rossi Goulburn-Mulwaree SHR SHR Traditional construction Swan Hill Wakool SHR SHR Victoria Wollondilly SHR SHR Traditional construction Wallaby Rocks* Bathurst Regional SHR SHR Central West group Wee Jasper Yass Valley SHR SHR deBurgh Barham* Wakool SHR SHR Cobram Berrigan S170 SHR Traditional construction Middle Falbrook Singleton SHR SHR St Albans Hawkesbury City SHR SHR Dare Briner Clarence Valley S170 SHR Colemans Lismore City SHR SHR Timber Truss Bridge Conservation Strategy ii Submissions Report and Revised Strategy New Buildings Bega Valley SHR SHR Rawsonville Dubbo City S170 S170 Central West group Scabbing Flat Wellington S170 S170 Central West group Warroo Forbes S170 S170 Central West group Bridges proposed to be replaced Bridge LGA Current Comment listing McDonald Crankies Plains Bombala SHR Five Day Creek Kempsey SHR Allan Abercrombie Bathurst Regional S170 Barrington Gloucester S170 Boonanga Moree Plains S170 Charleyong Palerang S170 Gundaroo Upper Lachlan S170 Thornes Goulburn-Mulwaree S170 Tooleybuc Wakool SHR Vacy Dungog SHR deBurgh Beckers Singleton SHR Crookwell Upper Lachlan S170 Holman Cowra S170 Lansdowne* Goulburn-Mulwaree S170 Tabulam Kyogle SHR Dare Bulga Singleton SHR Coonamit Wakool SHR Coorei Dungog SHR Gee Gee Wakool SHR Korns Crossing Tweed S170 Mungindi Moree Plains S170 Sportsmans Creek Clarence Valley S170 * Significant change in outcome to the draft Timber Truss Bridge Strategy (‘Traditional construction’ refers to bridges that can be maintained without introducing modern materials as they will not carry loads exceeding 16 tonnes.) RMS will support the strategy with policies to ensure that heritage conservation, interpretation and sustainability outcomes are achieved. Prepare an environmental assessment guideline for timber truss bridge replacement. Undertake a heritage assessment of timber truss lift span bridges to allow their opening mechanisms to be reactivated where necessary. Within five years Roads and Maritime Services will undertake a heritage study of all 26 movable span bridges within its ownership. Prepare a heritage interpretation strategy that will apply to both bridges to be Timber Truss Bridge Conservation Strategy iii Submissions Report and Revised Strategy retained and to the sites and materials from bridges that have been replaced, to identify suitable means of capturing and sharing information about the heritage significance of these places. Prepare a comprehensive book on the heritage significance of the timber truss bridges of NSW. Implement the Recycling of used bridge timbers policy for all bridges to be removed. Implement the Timber Procurement Strategy to ensure adequate timber supply for all bridges to be retained. Implement a skills development program to ensure the skills for timber bridge maintenance are retained within RMS, including bridge carpentry skills and heritage awareness for engineers and designers. Timber Truss Bridge Conservation Strategy iv Submissions Report and Revised Strategy Contents Executive summary......................................................................................................................................................... 1 1 Introduction and background.......................................................................................................... 1 1.1 Purpose........................................................................................................................................................................ 1 1.2 The proposal............................................................................................................................................................ 1 1.3 Report consultation............................................................................................................................................ 1 2 Response to issues................................................................................................................................... 3 2.1 Overview of issues raised............................................................................................................................ 3 2.2 General issues in relation to the Strategy.....................................................................................
Recommended publications
  • Murrumbidgee Regional Fact Sheet
    Murrumbidgee region Overview The Murrumbidgee region is home The river and national parks provide to about 550,000 people and covers ideal spots for swimming, fishing, 84,000 km2 – 8% of the Murray– bushwalking, camping and bird Darling Basin. watching. Dryland cropping, grazing and The Murrumbidgee River provides irrigated agriculture are important a critical water supply to several industries, with 42% of NSW grapes regional centres and towns including and 50% of Australia’s rice grown in Canberra, Gundagai, Wagga Wagga, the region. Narrandera, Leeton, Griffith, Hay and Balranald. The region’s villages Chicken production employs such as Goolgowi, Merriwagga and 350 people in the area, aquaculture Carrathool use aquifers and deep allows the production of Murray bores as their potable supply. cod and cotton has also been grown since 2010. Image: Murrumbidgee River at Wagga Wagga, NSW Carnarvon N.P. r e v i r e R iv e R v i o g N re r r e a v i W R o l g n Augathella a L r e v i R d r a W Chesterton Range N.P. Charleville Mitchell Morven Roma Cheepie Miles River Chinchilla amine Cond Condamine k e e r r ve C i R l M e a nn a h lo Dalby c r a Surat a B e n e o B a Wyandra R Tara i v e r QUEENSLAND Brisbane Toowoomba Moonie Thrushton er National e Riv ooni Park M k Beardmore Reservoir Millmerran e r e ve r i R C ir e e St George W n i Allora b e Bollon N r e Jack Taylor Weir iv R Cunnamulla e n n N lo k a e B Warwick e r C Inglewood a l a l l a g n u Coolmunda Reservoir M N acintyre River Goondiwindi 25 Dirranbandi M Stanthorpe 0 50 Currawinya N.P.
    [Show full text]
  • River Murray Weekly Report for the Week Ending Wednesday, 20 February 2019
    River Murray Weekly Report For the week ending Wednesday, 20 February 2019 Trim Ref: D19 8405 Rainfall and inflows There was little to no rainfall across the Murray-Darling Basin this week, with only small patches of light rainfall recorded in New South Wales and Queensland (Map 1). Map 1 - Murray-Darling Basin rainfall map week ending 20 February 2019 (Source: Bureau of Meteorology). In comparison to the previous week where tributaries increased with widespread rainfall, most upper Murray tributaries have receded with dry conditions this week. The flow in the upper Mitta Mitta River at Hinnomunjie fell from 190 ML/day to the current flow near 140 ML/day; likewise the upper Murray at Biggara eased from 160 to 100 ML/day. Downstream of Hume Reservoir, inflow from the Kiewa River at Bandiana averaged 210 ML/day, while the Ovens River flow reduced from 340 ML/day to 240 ML/day through the week at Wangaratta. Subscribe to the River Murray Weekly Report River Data website Water in Storages River Murray Weekly Report Photo 1: Swampy Plain river upstream of Khancoban in the Snowy Mountains (Photo courtesy: Tom Zouch, MDBA) Subscribe to the River Murray Weekly Report River Data website Water in Storages River Murray Weekly Report River operations • Transfers between Dartmouth to Hume winding down • Delivery of Goulburn Valley IVT water via the Goulburn River to ease • Reductions in Murray Irrigation Limited escapes bypassing water around the Barmah Choke to begin • Euston weir pool level returning to the full supply level • Flow over Weir 32 in the lower Darling River ceased System operations Following an extended period of near capacity flows and transfers to ensure supply through the system, latest operations forecasting is indicating flows through the system can now start to be eased.
    [Show full text]
  • Gauging Station Index
    Site Details Flow/Volume Height/Elevation NSW River Basins: Gauging Station Details Other No. of Area Data Data Site ID Sitename Cat Commence Ceased Status Owner Lat Long Datum Start Date End Date Start Date End Date Data Gaugings (km2) (Years) (Years) 1102001 Homestead Creek at Fowlers Gap C 7/08/1972 31/05/2003 Closed DWR 19.9 -31.0848 141.6974 GDA94 07/08/1972 16/12/1995 23.4 01/01/1972 01/01/1996 24 Rn 1102002 Frieslich Creek at Frieslich Dam C 21/10/1976 31/05/2003 Closed DWR 8 -31.0660 141.6690 GDA94 19/03/1977 31/05/2003 26.2 01/01/1977 01/01/2004 27 Rn 1102003 Fowlers Creek at Fowlers Gap C 13/05/1980 31/05/2003 Closed DWR 384 -31.0856 141.7131 GDA94 28/02/1992 07/12/1992 0.8 01/05/1980 01/01/1993 12.7 Basin 201: Tweed River Basin 201001 Oxley River at Eungella A 21/05/1947 Open DWR 213 -28.3537 153.2931 GDA94 03/03/1957 08/11/2010 53.7 30/12/1899 08/11/2010 110.9 Rn 388 201002 Rous River at Boat Harbour No.1 C 27/05/1947 31/07/1957 Closed DWR 124 -28.3151 153.3511 GDA94 01/05/1947 01/04/1957 9.9 48 201003 Tweed River at Braeside C 20/08/1951 31/12/1968 Closed DWR 298 -28.3960 153.3369 GDA94 01/08/1951 01/01/1969 17.4 126 201004 Tweed River at Kunghur C 14/05/1954 2/06/1982 Closed DWR 49 -28.4702 153.2547 GDA94 01/08/1954 01/07/1982 27.9 196 201005 Rous River at Boat Harbour No.3 A 3/04/1957 Open DWR 111 -28.3096 153.3360 GDA94 03/04/1957 08/11/2010 53.6 01/01/1957 01/01/2010 53 261 201006 Oxley River at Tyalgum C 5/05/1969 12/08/1982 Closed DWR 153 -28.3526 153.2245 GDA94 01/06/1969 01/09/1982 13.3 108 201007 Hopping Dick Creek
    [Show full text]
  • Benchmark Conditions of Development for Assessment of the SDL Supply Contribution
    Benchmark conditions of development for assessment of the SDL supply contribution October 2017 TECHNICAL REPORT - The Benchmark report is a model of a fully implemented Basin Plan. The report describes how changes were included into the Basin Plan Benchmark scenario to produce the Sustainable Diversion Limit Benchmark scenario. This represents the implementation of the Basin Plan to achieve 2,750 GL of water recovery for the environment. This model was agreed to by all Basin governments. Published by the Murray-Darling Basin Authority. MDBA Publication No 36/17 ISBN 978-1-925599-42-8 (online) © Murray–Darling Basin Authority 2017 With the exception of the Commonwealth Coat of Arms, the MDBA logo, trademarks and any exempt photographs and graphics (these are identified), this publication is provided under a Creative Commons Attribution 4.0 licence. GPO Box 1801, Canberra ACT 2601 1800 230 067 [email protected] mdba.gov.au https://creativecommons.org/licenses/by/4.0 The Murray‒Darling Basin Authority’s preference is that you attribute this publication (and any Murray‒Darling Basin Authority material sourced from it) using the following wording within your work: Title: Benchmark conditions of development for assessment of the SDL supply contribution Source: Licensed from the Murray‒Darling Basin Authority under a Creative Commons Attribution 4.0 Licence Accessibility The Murray‒Darling Basin Authority makes its documents and information available in accessible formats as far as possible. Some content is highly technical in nature which may mean that we cannot make it fully accessible. If you encounter accessibility problems or the document is in a format that you cannot access, please contact us.
    [Show full text]
  • Deliverabiliy of Environmental Water in the Murray Valleyx
    Deliverability of Environmental Water in the Murray Valley Report to Murray Group of Concerned Communities May 2012 Final Report Version: 3.0 Page 1 of 41 Citation Murray Catchment Management Authority (2012) Deliverability of Environmental Water in the Murray Valley. © 2012 Murray Catchment Management Authority This work is copyright. With the exception of the photographs, any logo or emblem, and any trademarks, the work may be stored, retrieved and reproduced in whole or part, provided that it is not sold or used for commercial benefit. Any reproduction of information from this work must acknowledge Murray Group of Concerned Communities, Murray Catchment Management Authority, or the relevant third party, as appropriate as the owner of copyright in any selected material or information. Apart from any use permitted under the Copyright Act 1968 (Cth) or above, no part of this work may be reproduced by any process without prior written permission from Murray Group of Concerned Communities or Murray Catchment Management Authority. Murray Group of Concerned Communities Disclaimer This report has been prepared for Murray Group of Concerned Communities and is made available for general use to assist public knowledge and discussion regarding the development of the Draft Murray Darling Basin Plan. The opinions, comments and analysis (including those of third parties) expressed in this document are for information purposes only. This document does not indicate the Murray Group of Concerned Communities’ commitment to undertake or implement a particular
    [Show full text]
  • Regional Water Availability Report
    Regional water availability report Weekly edition 14 January 2019 waternsw.com.au Contents 1. Overview ................................................................................................................................................. 3 2. System risks ............................................................................................................................................. 3 3. Climatic Conditions ............................................................................................................................... 4 4. Southern valley based operational activities ..................................................................................... 6 4.1 Murray valley .................................................................................................................................................... 6 4.2 Lower darling valley ........................................................................................................................................ 9 4.3 Murrumbidgee valley ...................................................................................................................................... 9 5. Central valley based operational activities ..................................................................................... 14 5.1 Lachlan valley ................................................................................................................................................ 14 5.2 Macquarie valley ..........................................................................................................................................
    [Show full text]
  • Riparian Vegetation of the River Murray COVER: Healthy Red Gum in the Kex)Ndrook State Forest Near Barham N.S.W
    Riparian Vegetation of The River Murray COVER: Healthy red gum in the Kex)ndrook State Forest near Barham N.S.W. Background, black box silhouette. PHOTO: D. Eastburn ISBN 1 R75209 02 6 RIVER MURRAY RIPARIAN VEGET ION STUDY PREPARED FOR: MURRAY-DARLING BASIN COMMISSION BY: MARGULES AND PARTNERS PTY LTD PAND J SMITH ECOLOGICAL CONSULTANTS DEPARTMENT OF CONSERVATION FORESTS AND LANDS VICTORIA January 1990 SUMMARY AND CONCLUSIONS The River Murray Riparian Vegetation Survey was initiated by the Murray­ Darling Basin Commission t9 assessJhe present status ofthe vegetationalong the Murray, to identify causes ofdegradation, and to develop solutions for its rehabilitation and long term stability. The study area was the floodplain of the Murray River and its anabranches, including the Edward-Wakool system, from below Hume Dam to the upper end of Lake Alexandrina. The components of the study were: · Literature Review A comprehensive bibliography was compiled on the floodplain vegeta­ tion, its environment and the impact ofman's activities. The literature was reviewed and summarised. · Floristic Survey A field survey was carried out, visiting 112 sites throughout the study area and collecting vegetation data from 335 plots. Data collected were the species present, their relative abundance, the condition of the eucalypts, the amount ofeucalypt regeneration and indices ofgrazing pressure. Brief studies were made of the effects of river regulation and salinisation at specific sites. Thirty-seven plant communities were identified from a numerical analyis ofthe floristic survey data. The differences reflect environmental changes both along the river and across the floodplain. The most important factors were identified as soil salinity levels and flooding frequency.
    [Show full text]
  • Aboriginal Flora and Fauna Names of Victoria: As Extracted from Early Surveyors’ Reports
    Aboriginal Flora and Fauna Names of Victoria: As extracted from early surveyors’ reports Sue Wesson research consultant © Victorian Aboriginal Corporation for Languages 2001 Published by the Victorian Aboriginal Corporation for Languages, 238 High Street, Northcote 3070, Victoria This publication is copyright. Apart from any fair dealing for private study, research, criticism or review allowed under the Copyright Act 1968, no part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, photocopying or otherwise, without the prior written permission of the Victorian Aboriginal Corporation for Languages. Disclaimer The views expressed in this report are those of the authors and do not necessarily represent the views or policies of the Victorian Aboriginal Corporation for Languages. Information published by the Victorian Aboriginal Corporation for Languages (VACL) is considered to be true and correct at the time of publication. Changes in circumstances after the time of publication may impact on the accuracy of this information and the Corporation gives no assurance of any information or advice contained. Citation This report may be cited as: Wesson, S. (2001) Aboriginal flora and fauna names of Victoria: As extracted from early surveyors’ reports. Victorian Aboriginal Corporation for Languages, Melbourne. ISBN 9–9579360–0–1 Copies of this report are available through the Victorian Aboriginal Corporation for Languages: 238 High Street, Northcote 3070, while stocks last. Printed on recycled paper to help conserve our natural environment Summary The Flora and Fauna Names Project is an initiative of the Victorian Aboriginal Corporation for Languages and the Victorian Biodiversity Strategy.
    [Show full text]
  • Weekly Report 21 April 2021
    River Murray Weekly Report For the week ending Wednesday, 21 April 2021 Trim Ref: D21/10192 Rainfall and inflows Little to no rainfall was observed across much of the Murray Darling Basin this week, with the highest totals recorded in north-east New South Wales (Map 1). Specific information about flows at key locations can be found at the MDBA’s River Murray data webpage. Dry conditions are forecast to persist across much of the Basin in the coming week. Following heavy rain in late March, Water NSW has estimated that 650-850 GL of inflow may reach Menindee Lakes as a result of flow in the Darling River. This estimate will be revised in coming weeks as flows move towards Menindee Lakes. These inflows are likely to result in the water stored in Menindee Lakes increasing above the trigger volume (640 GL), which means the Menindee Lakes will be part of the River Murray shared water resources. For updates on flow forecasting in the northern Basin please see the Water NSW website. Up-to-date river data for sites in the upper Murray can also be found on BoM’s website and in the Murray River Basin Daily River Report at the Water NSW website. Map 1: Murray-Darling Basin rainfall for the week ending 21 April 2021. Source: Bureau of Meteorology. Subscribe to the River Murray Weekly Report River Data website Water in Storages River Murray Weekly Report River operations • Significant flows in the northern Basin are contributing to increased storage at Menindee Lakes. • Water for the environment pulse taking place in the Goulburn river.
    [Show full text]
  • Edward/Kolety-Wakool System Environmental Flows Newsletter, Issue 4
    Edward/Kolety-Wakool system Environmental Flows Newsletter Issue Number 4 | 1 April – 30 June 2020 Edward/Kolety-Wakool Monitoring, Evaluation and Research Program Welcome to the issue 4 of the Edward/Kolety-Wakool What’s in issue #4 Environmental Flows Newsletter - a quarterly newsletter that will provide updates on our progress as we monitor and undertake research on the ecosystem outcomes of Update on monitoring and research Commonwealth environmental watering actions in the Edward/Kolety-Wakool system. Hydrology Water quality The Edward/Kolety-Wakool MER Program is a collaboration Ecosystem metabolism between universities, state government agencies, consultants and local community organisations. Fish monitoring and research More information on the program can be found at: Environmental DNA research https://flow-mer.org.au/selected-area-edward-kolety-wakool/ https://www.csu.edu.au/research/ilws/research/environmental- Physical habitat research water Turtle research Focus on fish population monitoring Focus on fish movement research What have we been doing during the COVID-19 restrictions? 1 Update on monitoring and research Hydrology We use data from flow gauges and information from water accounts to determine the contribution of environmental water to changes in flow and water level in the Edward/Kolety-Wakool river system. In the last newsletter we described a period of low operational flows from January to April 2020. In contrast, between mid-May and early June 2020 there was an unregulated flow event in the system due to significant rainfall in the upper catchments. Inflows to the Murray system reached levels not observed for several years. This caused a flow pulse that was evident throughout the Wakool-Yallakool, Colligen-Niemur and Edward/Kolety rivers.
    [Show full text]
  • Review of Environmental Impacts of Flow Regulation and Other Water Resource Developments in the River Murray and Lower Darling River System
    Review of Environmental Impacts of Flow Regulation and Other Water Resource Developments in the River Murray and Lower Darling River System Includes Glossary of Terms Final Report to Murray-Darling Basin Commission by Fluvial Systems Pty Ltd July 2002 Review of Environmental Impacts of Flow Regulation and Other Water Resource Developments in the River Murray and Lower Darling River System Includes Glossary of Terms Final Report to Murray-Darling Basin Commission by Fluvial Systems Pty Ltd Fluvial Systems Pty ltd PO Box 4117 Melbourne University Retail Parkville Vic 3010 ABN 71 085 579 095 Ph 03 93447780 Ph 0411855573 Email: [email protected] Authors Christopher Gippel Dominic Blackham July 2002 This document should be referenced as follows: Gippel, C.J. and Blackham, D. 2002. Review of environmental impacts of flow regulation and other water resource developments in the River Murray and Lower Darling River system. Final Report by Fluvial Systems Pty Ltd, Stockton, to Murray-Darling Basin Commission, Canberra, ACT. Environmental Impacts of Flow Regulation on the River Murray Murray-Darling Basin Commission Contents EXECUTIVE SUMMARY.............................................................................................iv 1 INTRODUCTION ..................................................................................................1 1.1 ENVIRONMENTAL FLOWS AND WATER QUALITY OBJECTIVES FOR THE RIVER MURRAY PROJECT .........................................................................................................1
    [Show full text]
  • Upper Murray Storage 8I Times During the Latter Year, While 'In the Forrner Th~ Discharge Represents Less Than Three-Quarters of the Capacity Of
    -iot Upper Murray Storage 8i times during the latter year, while 'in the forrner th~ discharge represents less than three-quarters of the capacity of. the dam. .'. , Since the inauguration of the . River Murray Commission the gaugings are being continued by the three States as here- . tofore, daily gauge heights being recorded at the various stations, and current meter" observations taken as frequently ' as pra~ticable. Erom these, curves of discharge for any height on gauge are compiled, and the v.olumes of , discharge worked out. ! I' ,i l i:iJi By direction' of the Oommissi'on a Oonference of Gauging Officers has ·been sitting for some time pa~t, under the Ohair­ manship of Mr. H. Shute, L.S., with the object of ensuring uniformity in gauging methods, and also to deal with matters generally affecting the .measurement of streams, 'and diver­ sions, etc. This report has recently been completed, but not yet dealt • with by t~e. Oommission. ) , UPPER MURRAY STOR,!GE. ·f At Bringenbwhg, ,some '90 miles by 'road above Albury, the main stream, of the Murray is formed by the junction of the Swampy Plains River, rising in, N.S.W., and the Indi River, which rises in the Snowy Mountains in VictorIa. Be­ tween Bringenbrong and Jingellicit is joined by' the Tooma River, rising in New South Wales, and between Jingellic and AIl:!ury by the Mitta lVIitta and Kiewa Rivers, rising III Victoria. Oumberoona Site.-The 1902 Royal Oommission, after ill­ vestigating several sites, fixed upon that at Oumberoona, 20 miles by river above the junction of the Mitta M;itta River, llS the most suitable.
    [Show full text]