Oregon State Rail Plan 2014 Oregon State Plan Rail

Total Page:16

File Type:pdf, Size:1020Kb

Oregon State Rail Plan 2014 Oregon State Plan Rail OREGON STATE RAIL PLAN 2014 OREGON STATE RAIL PLAN STATE 2014 OREGON An Element of the Oregon Transportation Plan Adopted September 18, 2014 THE OREGON DEPARTMENT OF TRANSPORTATION Plan development was supported by fi ve Technical Memorandums that served as background for the document. The Technical Memorandums, which refl ect the latest information at the time of their development, can also be accessed at the Project Website and include: • Freight and Passenger System Inventory • Needs Assessment: Oregon’s Economy • Needs Assessment: Passenger Rail • Needs Assessment: Freight Rail • Investment Program Technical Report A copy of the 2014 Oregon State Rail Plan is available on the Project Website at: https://www.oregon.gov/ODOT/Planning/Pages/Plans.aspx#OSRP. To obtain additional copies of this document contact: Oregon Department of Transportation (ODOT) Transportation Development Division, Planning Section 555 13th Street NE, Suite 2 Salem, OR 97301-4178 (503) 986-4121 Copyright 2015 by the Oregon Department of Transportation Permission is given to quote and reproduce parts of this document if credit is given to the source. A copy of the draft as the Oregon Transportation Commission adopted is on fi le at the Oregon Department of Transportation. Limited editorial changes for consistency and formatting have been made in this document. Oregon Transportation Commission Catherine Mater, Chair Tammy Baney David Lohman Susan Morgan Alando Simpson Other Elements of the State Transportation Plan • Aviation System Plan • Bicycle and Pedestrian Plan • Freight Plan • Highway Plan • Public Transportation Plan • Transportation Options Plan • Transportation Safety Action Plan OREGON STATE RAIL PLAN Development of the Oregon State Rail Plan was a joint effort between Oregon Department of Transportation Rail and Public Transit Division and the Transportation Development Division. Produced by: RAIL AND PUBLIC TRANSIT DIVISION H.A. (Hal) Gard, Division Administrator TRANSPORTATION DEVELOPMENT DIVISION Jerri Bohard, Division Administrator Rail Section Stacy Snider, Rail Operations Manager Bob Melbo, State Rail Planner Planning Section Erik Having, Planning Section Manager Amanda Pietz, Transportation Planning Unit Manager Michael Rock, Oregon State Rail Plan Manager Cambridge Systematics, Inc. Mike Fischer, Project Manager With JLA and Associates and HDR Engineering Photos provided by the Oregon Department of Transportation, David Astle and the Port of Coos Bay. This project was funded in part by the Federal Railroad Administration, U.S. D.O.T. Graphic design provided by Cathy Sattergren, Oregon Department of Transportation, Business Services. OREGON STATE RAIL PLAN AN ELEMENT OF THE OREGON TRANSPORTATION PLAN Adopted by the Oregon Transportation Commission September 18, 2014 Oregon Department of Transportation This page intentionally left blank. TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................1 1 The Role of Rail in Statewide Transportation ........................................................................19 Oregon’s Multimodal Transportation Goals ......................................................................19 The Role of Rail in Oregon’s Multimodal Transportation System ....................................22 Institutional Structure of Rail Programs in Oregon ...........................................................22 Oregon’s Funding and Financing Authority ......................................................................26 2 The Existing Rail System in Oregon .......................................................................................31 Description and Inventory ..................................................................................................31 Passenger Rail Service Objectives and Evaluation ............................................................53 Current Rail Funding .........................................................................................................61 3 Rail System Issues and Opportunities.....................................................................................67 Trends and Forecasts ..........................................................................................................67 Rail Service Needs and Opportunities ...............................................................................84 4 The State’s Rail Service and Investment Program ..............................................................107 State Rail Plan Vision Statement and Goals ....................................................................107 Decision-Making Framework ..........................................................................................109 Benefi ts of Rail Project Types ..........................................................................................116 Rail Policies and Strategies ..............................................................................................119 Passenger and Freight Rail Investment ............................................................................129 5 Coordination, Review and Next Steps ...................................................................................137 Project Public Involvement Plan ......................................................................................137 Public Agency Coordination ............................................................................................139 Rail Plan Steering Committee ..........................................................................................140 Public Review and Comments .........................................................................................141 Steps Following Plan Adoption .......................................................................................141 Appendix A — Passenger Rail Defi nitions ...............................................................................145 Appendix B — Oregon State Rail Plan Steering Committee Members ...............................147 Appendix C — Example Projects by Type ..............................................................................149 Appendix D — Findings of Compliance with Oregon’s Statewide Planning Goals ............153 LIST OF TABLES AND FIGURES Tables Table 1: Rail Investment Decision-Making Framework .........................................................13 Table 2: Snapshot of Oregon’s Multimodal Transportation System .......................................22 Table 3: ConnectOregon Rail Funding History ......................................................................26 Table 4: Freight Railroads Serving Oregon ............................................................................33 Table 5: Class I Railroad Operating Characteristics in Oregon .............................................37 Table 6: Non-Class I Railroads in Oregon, Ranked by Revenue, 2011 ..................................39 Table 7: Major Rail Yards and Terminals in Oregon .............................................................42 Table 8: Oregon Amtrak Stations and Services ......................................................................52 Table 9: WES Ridership, System Characteristics and Performance, FY2009- 2012 .............53 Table 10: Amtrak Cascades On-Time Performance by Quarter (October 2011 to December 2012) ..........................................................................56 Table 11: Recent Oregon Rail Program Funding, FY 2013-2015 ...........................................62 Table 12: Statewide Commodity Flows by Mode ...................................................................77 Table 13: Summary of Non-Class I Railroad Conditions .......................................................88 Table 14: Rail Lines At-Risk for Abandonment 2013-2020 ...................................................92 Table 15: Rail Investment Decision-Making Framework .....................................................112 Table 16: Quantitative Evaluation Factors ............................................................................113 Figures Figure 1: Rail System in Oregon ..............................................................................................4 Figure 2: Intercity Rail Service in Oregon ................................................................................7 Figure 3: Oregon’s Integrated Transportation Planning Process ............................................20 Figure 4: Rail System in Oregon ............................................................................................36 Figure 5: Freight Railroad Vertical Clearance Restrictions ....................................................46 Figure 6: Intercity Rail Service in Oregon ..............................................................................50 Figure 7: Amtrak Cascades Ridership, 1994-2012 .................................................................55 Figure 8: Amtrak Cascades On-Time Performance in Oregon (July 2012-April 2013) .........57 Figure 9: Empire Builder and Coast Starlight Ridership, 1981-2011 .....................................59 Figure 10: GDP Growth Index, Oregon Compared to the United States, 1997-2011 ............68 Figure 11: Oregon Population Growth, 1970-2040 ...............................................................69 Figure 12: Net Population Growth by County, 2010-2035 .....................................................70 Figure 13: Oregon Merchandise Exports
Recommended publications
  • Oregon State Rail Plan
    Oregon State Rail Plan Oregon Transportation Commission Final Draft September 18, 2014 Oregon Department of Transportation Copies of the 2014 Oregon State Rail Plan are available on the Project Website at: http://www.oregon.gov/ODOT/TD/TP/Pages/railplan.aspx. Plan development was supported by five Technical Memorandums that served as background for the document. The Technical Memorandums, which reflect the latest information at the time of their development, can also be accessed at the Project Website (shown above) and include: Freight and Passenger System Inventory Needs Assessment: Oregon’s Economy Needs Assessment: Passenger Rail Needs Assessment: Freight Rail Investment Program Technical Report To obtain additional copies of this document contact: Oregon Department of Transportation (ODOT) Transportation Development Division, Planning Section 555 13th Street NE, Suite 2 Salem, OR 97301-4178 (503) 986-4121 Oregon State Rail Plan OTC FINAL DRAFT: September 18, 2014 Table of Contents Executive Summary ........................................................................... ES-1 1.0 The Role of Rail in Statewide Transportation .............................. 1-1 1.1 Oregon’s Multimodal Transportation Goals ..................................... 1-1 1.2 The Role of Rail in Oregon’s Multimodal Transportation System ...... 1-3 1.3 Institutional Structure of Rail Programs in Oregon .......................... 1-4 1.4 Oregon’s Funding and Financing Authority ..................................... 1-8 2.0 The Existing Rail System in Oregon.............................................
    [Show full text]
  • Oregon Highway-Railroad Crossing Safety Action Plan
    Oregon Highway RailroadCrossing Safety | 2019 Action Plan Oregon Highway-Railroad Crossing Safety Action Plan 2019 Copies of the Oregon State Highway-Railroad Crossing Safety Action Plan and supporting materials can be found at the project website: https://www.oregon.gov/ODOT/RPTD/Pages/Safety.aspx To obtain additional copies of this document contact: Oregon Department of Transportation (ODOT) Rail and Public Transit Division 555 13th Street NE Salem, OR 97301-4178 (503) 986-4164 This document has been submitted to the Federal Railroad Administration for review and approval. Copyright 2019 by The Oregon Department of Transportation. Permission is given to quote and reproduce parts of this document if credit is given to the source. Oregon Highway-Railroad Crossing Safety Action Plan 2019 Acknowledgments The Oregon Department of Transportation would like to thank the Stakeholder Committee for their commitment and input throughout the development of this Plan. Please see Appendix A for a listing of the stakeholder committee members. ODOT Project Team Roseann O’Laughlin Project Manager Michael Rock Transportation Planning Richard Shankle Crossing Safety Unit Unit Manager Manager Robert Melbo State Rail Planner Jennifer Lanzarotta GIS Analyst The Oregon Department of Transportation would like to thank the following partners who participated in the Plan development. Hal Gard RPTD Administrator ODOT Crossing Safety Staff Heather King ODOT Road Inventory and John Brown • Jim Covert • Zackary Hunter Classification Services • Prescott Mann • Carrie
    [Show full text]
  • Red Hill Restoration Forest Service
    United States Department of Agriculture Red Hill Restoration Forest Service Preliminary Assessment November 2012 Hood River Ranger District Mt. Hood National Forest Hood River County, Oregon Legal Description: T1S R8-9E; T2S, R8E; Willamette Meridian West Fork Hood River Watershed United States Department of Agriculture Red Hill Restoration Forest Service Preliminary Assessment November 2012 Hood River Ranger District Mt. Hood National Forest Hood River County, Oregon Legal Description: T1S R8-9E; T2S, R8E; Willamette Meridian Lead Agency: U.S. Forest Service Responsible Official: Chris Worth, Forest Supervisor Mt. Hood National Forest Information Contact: Jennie O'Connor Card Hood River Ranger District 6780 Highway 35 Mount Hood/Parkdale, OR 97041 (541) 352-6002 [email protected] Project Website: http://www.fs.fed.us/nepa/fs-usda- pop.php/?project=35969 The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual’s income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA’s TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410, or call (800) 795-3272 (voice) or (202) 720-6382 (TDD).
    [Show full text]
  • Freight Rail and the Oregon Economy a Background Paper
    Freight Rail and the Oregon Economy A Background Paper final report prepared for Port of Portland prepared by Cambridge Systematics, Inc. March 2004 www.camsys.com final report Freight Rail and the Oregon Economy A Background Paper prepared for Port of Portland prepared by Cambridge Systematics, Inc. 100 CambridgePark Drive, Suite 400 Cambridge, Massachusetts 02140 March 2004 Freight Rail and the Oregon Economy A Background Paper Table of Contents Executive Summary ........................................................................................................... ES-1 1.0 Introduction................................................................................................................ 1-1 2.0 Freight Demand and the State of the Rail Industry .............................................. 2-1 3.0 Oregon’s Rail System................................................................................................ 3-1 3.1 Rail Network....................................................................................................... 3-1 4.0 Rail’s Role in the Oregon Economy ........................................................................ 4-1 4.1 Measures.............................................................................................................. 4-1 5.0 Rail Use by Industry Statewide ............................................................................... 5-1 5.1 Overview............................................................................................................. 5-1 6.0
    [Show full text]
  • State of the System 2016 Report on Oregon's Transportation System
    STATE OF THE SYSTEM 2016 REPORT ON OREGON’S TRANSPORTATION SYSTEM OREGON DEPARTMENT OF TRANSPORTATION PHOTO CREDITS All photos: ODOT Photo and Video Services or ODOT staff. TABLE OF CONTENTS A INTRODUCTION 2 Transportation System Infrastructure Map 3 An Overview of Oregon’s Transportation System and Why it’s Important for Oregon 3 Purpose of the State of the System Report 3 The Oregon Department of Transportation and its Role in the System 4 Trends Affecting Oregon and its Transportation System 5 The Oregon Transportation Plan and its Implementation 7 The Seven Oregon Transportation Plan Goals B THE STATE OF THE SYSTEM 8 Mobility and Accessibility 14 Management of the System 20 Economic Vitality 28 Sustainability 32 Safety and Security 38 Funding the Transportation System 42 Coordination, Communication and Cooperation C MOVING FORWARD 48 Where to Find Additional Information PAGE 2 STATE OF OREGON State of Oregon TRANSPORTATIONTransportation System SYSTEM Infrastructure INFRASTRUCTURE ? September 2016 Port of Astoria p Port of St. Helens Port of Morrow Port of Umatilla ? Port of Hood River ? Port of Cascade Locks Port of Arlington ? Port of Nehalem ? Port of The Dalles Eastern Oregon THE NUMBERS Port of Portland Regional at Pendleton Portland International ? ? ¨¦§84 ? o ? o ? 73,933 total miles of Port of Garibaldi ? ? highways, streets and Port of Tillamooik Bay roads 8,032 miles of state highways 32,907 miles of county roads ? 11,029 miles of city streets Port of Newport ? Port of Toledo ? 21,965 miles of “other roads” miles of "other
    [Show full text]
  • Corridor Plan
    HOOD RIVER MT HOOD (OR HIGHWAY 35) Corridor Plan Oregon Department of Transportation DOR An Element of the HOOD RIVER-MT. HOOD (OR 35) CORRIDOR PLAN Oregon Department of Transportahon Prepared by: ODOT Region I David Evans and Associates,Inc. Cogan Owens Cogan October 1997 21 October, 1997 STAFF REPORT INTERIM CORRIDOR STRATEGY HOOD RIVER-MT. HOOD (OR HWY 35) CORRIDOR PLAN (INCLUDING HWY 281 AND HWY 282) Proposed Action Endorsement of the Hood River-Mt. Hood (OR HWY 35) Corridor Strategy. The Qregon Bep ent of Transportation (ODOT) has been working wi& Tribal and local governments, transportation service providers, interest groups, statewide agencies and stakeholder committees, and the general public to develop a long-term plan for the Hood River-Mt. Hood (OR HWY 35) Corridor. The Hood River-Mt. Hood Corridor Plan is a long-range (20-year) program for managing all transportation modes within the Oregon Highway 35 corridor from the 1-84 junction to the US 26 junction (see Corridor Map). The first phase of that process has resulted in the attached Interim Com'dor Stvategy. The Interim Corridor Strategy is a critical element of the Hood River- Mt. Hood Corridor Plan. The Corridor Strategy will guide development of the Corridor Plan and Refinement Plans for specific areas and issues within the corridor. Simultaneous with preparation of the Corridor Plan, Transportation System Plans (TSPs) are being prepared for the cities of Hood River and Cascade Locks and for Hood River County. ODOT is contributing staff and financial resources to these efforts, both to ensure coordination between the TSPs and the Corridor Plan and to avoid duplication of efforts, e.g.
    [Show full text]
  • Grain, Flour and Ships – the Wheat Trade in Portland, Oregon
    Grain, Flour and Ships The Wheat Trade in Portland, Oregon Postcard Views of the Oregon Grain Industry, c1900 Prepared for Prosper Portland In Partial Fulfillment of the Centennial Mills Removal Project Under Agreement with the Oregon SHPO and the USACE George Kramer, M.S., HP Sr. Historic Preservation Specialist Heritage Research Associates, Inc. Eugene, Oregon April 2019 GRAIN, FLOUR AND SHIPS: THE WHEAT TRADE IN PORTLAND, OREGON By George Kramer Prepared for Prosper Portland 222 NW Fifth Avenue Portland, OR 97209 Heritage Research Associates, Inc. 1997 Garden Avenue Eugene, Oregon 97403 April 2019 HERITAGE RESEARCH ASSOCIATES REPORT NO. 448 TABLE OF CONTENTS Page List of Figures ......................................................................................................................... iv List of Tables ........................................................................................................................... v 1. Introduction ........................................................................................................................ 1 2. Historic Overview – Grain and Flour in Portland .............................................................. 4 Growing and Harvesting 4 Transporting Grain to Portland ................................................................................... 6 Exporting from Portland ............................................................................................. 8 Flour Mills .................................................................................................................
    [Show full text]
  • Transit Ridership Per Capita
    Transit Rides Average number of transit rides each year per Oregonian Our strategy Oregon’s transportation system supports the increased ridership throughout Oregon. This • Expand services to better serve state’s quality of life and economy across a Key Performance Measure will assist ODOT low-income Oregonians and students in diversity of geographies and people. Public in assessing the impact of the new funds. grades 9 – 12. transportation is a key piece of the transportation system for those who cannot With more money, transit providers will: About the target or choose not to drive. The demand for • Increase service levels in both urban and The target is an annual goal of 32 rides per public transportation in Oregon is rural areas Oregonian. The goal will need to be re- anticipated to increase as population grows. • Offer more intercity and regional route evaluated in two to four years. The target service was set by evaluating transit ridership trends Starting in 2019, an influx of funds from the • Improve transit supports such as and population growth over the five-year Statewide Transportation Improvement improved passenger facilities, and period of 2011 to 2016. Fund (STIF), created as part of the 2017 technologies such as electronic fare and transportation funding package, Keep other integrated fare systems. Oregon Moving, will fund new and expanded • Procure low- and no-emission vehicles. public transportation service, resulting in Facts • 18.9% of households report having a person who regularly uses transit (at least once a week) • 5.0% of workers report normally using transit to get to work * • 4.6% of students report normally using transit to get to school & to work September 2019 Transit Rides, cont.
    [Show full text]
  • ALL COSTS CONSIDERED III — LERC Report on Contracting
    All Costs Considered III: Further Analysis on the Contracting Out of School Support Services in Oregon Gordon Lafer, PhD Bob Bussel, PhD Jaxon Love, MBA Labor Education and Research Center University of Oregon February 2013 Acknowledgement The authors wish to thank the Oregon School Employees Association for providing financial assistance for this report. Table of Contents Introduction . 7 “A Big Impact on Longtime Employees” . 9 Assessing Privatization in Central Point . 17 Conclusion . 55 Appendix: Sources . 57 Introduction to “All Costs Considered III: Further Analysis on the Contracting Out of School Support Services in Oregon” ll Costs Considered III” marks employees working under private an extension of two previous contractors. studies conducted by the Labor “A Education and Research Center Since our previous research in (LERC) that examined the 2004 and 2008, several important transfer of school support services developments have occurred (transportation, custodial, food that have influenced the focus of service) to private operation in the this new study. During its 2009 state of Oregon. In our ongoing session, the Oregon Legislature analysis of contracting out (also passed a law (ORS 279B) known as “privatization”), we requiring that public agencies have been guided by a similar conduct a rigorous cost-benefit set of questions. Does the analysis before they decide to shift from public to private contract out a given service. The management actually deliver law stipulates that budgetary promised or predicted savings savings resulting from this to school districts? What is the administrative transfer cannot This study is an personal impact of contracting come solely from reduced wages extension of two out on workers who provide and benefits for workers employed previous studies school support services, and by a public entity.
    [Show full text]
  • National Register of Historic Places Continuation Sheet
    NPS Form 10-900-a OMB Approval No. 1024-0018 (8-86) United States Department of the Interior National Park Service National Register of Historic Places Continuation Sheet Section number Page SUPPLEMENTARY LISTING RECORD NRIS Reference Number: 93001507 Date Listed: 1/24/94 Mt. Hood Railroad Linear Historic District Hood River OR Property Name County State N/A Multiple Name This property is listed in the National Register of Historic Places in accordance with the attached nomination documentation subject to the following exceptions, exclusions, or amendments, notwithstanding the National Park Service certification included in the nomination documentation. Signature Keeper Date of Action Amended Items in Nomination: Classification/Resource Count: The historic jitney bus is considered a contributing structure for purposes of the resource count. U.T.M.: The UTM coordinate for Point A-Section 1 is revised to read: 10 E615910 N5062700. This information was confirmed by telephone with Elizabeth Potter of the Oregon SHPO. DISTRIBUTION: National Register property file Nominating Authority (without nomination attachment) NPS Form 10-900-a OMB Approval No. 1024-0018 (8-86) * United States Department of the Interior National Park Service RECEIVED National Register of Historic Places Continuation Sheet o , HEGISTER Section number —i— Page —±— MT. HOOD RAILROAD LINEAR HISTORIC DISTRICT (1906-1944) Historic right-of-way from the northern terminus at Hood River to the southern terminus at Parkdale, containing 165 acres, all in Hood River County, Oregon The purpose of this continuation sheet is to ensure that the cover sheet for the above-named nomination is marked as a nomination at the statewide level of significance based on 1) the rarity of historic logging railroads in continuous regular use in the state and 2) the role played by the Mt.
    [Show full text]
  • What Is the Policy Framework for Natural Hazards Planning in Oregon?
    Hood River County Multi-Jurisdictional Natural Hazards Mitigation Plan Hood River County and the Cities of Cascade Locks and Hood River Prepared for: Hood River County Emergency Management Department 601 State Street DRAFTHood River, OR 97031 Prepared by: University of Oregon’s Community Service Center: Resource Assistance for Rural Environments & Department of Land Conservation and Development 1209 University of Oregon Eugene, Oregon 97403-1209 635 Capitol St. NE #150 Salem, OR 97301 June 2018 DRAFT Special Thanks & Acknowledgements Hood River County developed this Natural Hazards Mitigation Plan through a regional partnership funded by the Federal Emergency Management Agency’s Pre-Disaster Mitigation Competitive Grant Program. FEMA awarded the Mid-Columbia Gorge Region grant to support the update of natural hazards mitigation plans for eight counties in the region. The region’s planning process utilized a four-phased planning process, plan templates and plan development support provided by Resource Assistance for Rural Environments (RARE) and the University of Oregon’s Community Service Center. This project would not have been possible without technical and financial support provided by the Department of Land Conservation and Development. Regional partners include: Department of Land Conservation and Development Oregon Emergency Management FEMA Region X DRAFTUniversity of Oregon’s Community Service Center Resource Assistance for Rural Environments at the University of Oregon’s Community Service Center Project Steering Committee:
    [Show full text]
  • Transportation Resource Guide
    PORTLAND TRANSPORTATION RESOURCE GUIDE A guide for getting around Portland ST_Transportation_Resource_Guide_2018_0223.indd 1 2/23/18 3:57 PM Table of Contents Walking 1 MAPS AND INFORMATION COMMUNITY WALKS AND HIKES Bicycling 3 MAPS AND INFORMATION COMMUNITY RIDES AND CLINICS BICYCLE RENTALS BICYCLE RIDES AND CLINICS AT A GLANCE Transit 8 Mobility Devices and Accessibility 8 Motorcycles and Motor Scooters 10 Skates and Skateboards 10 Taxis and Pedicabs 10 Sharing 10 BIKE SHARING RIDE SHARING CAR SHARING Getting Out of Portland ������������������������������������������������������������������������������������������� 11 General Transportation Resources ����������������������������������������������������������������������� 13 Important City of Portland Numbers ���������������������������������������������������Back Cover Women-specific rides and clinics offered TABLE OF CONTENTS ST_Transportation_Resource_Guide_2018_0223.indd 2 2/23/18 3:57 PM Walking — Maps and Information City of Portland Active Transportation and Safety Division Walking maps, summer guided walks, safety information, resources, policies and more. portlandoregongov/transportation/at
    [Show full text]