Supplemental Ecms Advanced Information – March 18, 2010 (All Work to Be Completed to Appear in the Proposal)
SUPPLEMENTAL ECMS ADVANCED INFORMATION – MARCH 18, 2010 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated February 26, 2010 BEAVER COUNTY – SR 30(B19) #87134 PROPOSAL:$18.24 PLANS:$11.44 12X18:$14.04 24X36:$202.80 EXSTRUCT:$17.38 12X18:$21.33 24X36:$308.10 The description and location of the project is as follows: milling and resurfacing with superpave asphalt, transverse joint repair, base repair, guide rail, drainage, signing, pavement markings, placing waterproof membrane on culverts, new concrete deck on two pre-stressed adjacent box beam bridges, and other miscellaneous construction, all within an overall length of 22,990 linear feet (4.35 Miles) as indicated on the approved drawings included in the Bid Package for STATE ROUTE 30, SECTION B19, in BEAVER COUNTY, Hanover and Independence Townships, from approximately the intersection with SR 18 at Segment 130, Offset 302 to approximately 220 feet north of Maple Avenue (T313) at Segment 200, Offset 2109. DBE 5%, Anticipated Notice to Proceed 5-3-10, Required Completion 10-1-10. ____________________________________________________________________________________________ ALLEGHENY COUNTY – SR 8033(FCM) #88423 PROPOSAL:$15.24 The description and location of the project is as follows: For the washing and cleaning of pier caps, abutments, exposed structural members (vertical and horizontal surfaces), scupper drains, downspouts, expansion dams, drain troughs, decks, boxed members, inlets, other bridge components, and other miscellaneous construction, on VARIOUS STATE ROUTES, in
[Show full text]