TTC Route Map Guidelines
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Routing Changes - Junction Area Study Update
For Action Routing Changes - Junction Area Study Update Date: July 10, 2018 To: TTC Board From: Chief Customer Officer Summary The TTC bus network is very mature. In order to ensure that the network continues to reflect the way our customers travel across the city, staff has developed a program to review different segments of the city over time. This report provides an update on the status of the Junction Area Study. The objective of the study is to improve transit travel for customers by restructuring the bus route network in the Junction Area. In spring 2017, the TTC began the study with a customer survey to better understand customer travel patterns in the Junction Area. Feedback was also collected on existing services to identify key concerns for customers. Three key issues were identified: • No continuous transit service along Dundas Street West between Dundas West Station and Kipling Station; • No continuous transit service along St Clair Avenue West between Gunn's Loop (Weston Road) and Scarlett Road; and, • Need to extend the 80 Queensway from its current eastern terminus at Humber Loop to Keele Station via Parkside Drive in the late evening and on Sundays and holidays. Based on this feedback, staff prepared and proposed a preliminary transit network to reflect the data collected and address concerns raised by customers. The new transit network includes a number of service proposals that include restructuring and rationalizing existing services and improving periods of service on routes. In May 2018, the TTC held public information sessions at Runnymede, High Park, and Dundas West stations, and Gunn’s Loop to share the proposed transit network with customers and to collect feedback on the proposals. -
Service Changes Effective Sunday, June 21, 2015 Route Period Veh Veh Old New Old New Old New 1 Yonge-University PM Peak 2'31&Quo
Service Changes Effective Sunday, June 21, 2015 Route Period Headway Veh Headway Veh Headway Veh Old New Old New Old New M-F Saturday Sunday 1 Yonge-University PM Peak 2'31" 2'40" -3 Seasonal reduction 2 Bloor-Danforth AM Peak 2'21" 2'31" -3 Seasonal reduction PM Peak 2'31" 2'51" -5 192 Airport Rocket Pan-Am Games service M-F AM Peak, Midday & PM Peak 8'30" 7' 1 Morning 10' 8' 1 10' 8' 1 Afternoon 8' 7'30" 1 8' 7'30" 1 Early Evening 9' 7'30" 1 10' 8' 1 10' 8' 1 Late Evening 10' 8' 1 10' 8' 1 10' 8' 1 117 Alness AM Peak 10' 13'30" -1 Seasonal reduction PM Peak 12' 16' -1 61 Avenue Road North AM Peak 10' 12' -1 7 Bathurst AM Peak 9'10" 9'45" -1 Seasonal reduction PM Peak 7'45" 8'15" -1 Late evening 12' 10' 2 Ten Minute Network 511 Bathurst Late Evening 8' 6' 3 6' 1 Seasonal change 11 Bayview AM Peak 6' 6'23" -2 Seasonal change 11A to Steeles 12' 12'45" 11A Tripper 1 0 -1 11B to Sunnybrook 12' 12'45" PM Peak 6' 7'30" -2 11A to Steeles 12' 15' 11B to Sunnybrook 12' 15' 9 Bellamy AM Peak 15' 18' -1 Seasonal change PM Peak 15' 19' -1 17 Birchmount AM Peak / Weekend Morning 6'30" 7' Seasonal cut & construction effects 17A Warden Stn - 14th Ave 19'30" 21' 17B Warden Stn - Passmore 6'30" 7' 17C to Steeles 15' 14'30" 1 24' 20'30" 1 Midday / Weekend Afternoon 17C to Steeles 13' 13' 1 15' 14'30" 1 18' 17' 1 PM Peak 8' 9' 17A Warden Stn - 14th Ave 24' 27' 17B Warden Stn - Passmore 8' 9' Early Evening 17C to Steeles 12' 12' 1 22' 18' 1 22' 24' 1 50 Burnhamthorpe AM Peak 10' 13'30" -1 Seasonal change 506 Carlton AM Peak 3'45" 4' -2 Seasonal change PM -
Service Changes Effective Sunday, April 1, 2018 Route Period / Service M-F Saturday Sunday Headway R.T.T
Service Changes Effective Sunday, April 1, 2018 Route Period / Service M-F Saturday Sunday Headway R.T.T. Vehicles Headway R.T.T. Vehicles Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Old New Old New Old New Where running times are shown as "A+B", the first part is the scheduled driving time and the second part is the scheduled "recovery" time (layover) usually provided to round out the trip time as a multiple of the headway. Vehicle Types: C: CLRV A: ALRV F: Flexity B: Bus AB: Artic Bus Reconstruction of The Queensway, Humber Loop and Lake Shore Boulevard 501 Queen The schedule for 501 Queen was modified in mid-February in anticipation of the re-opening of Humber Loop depending on construction progress. No change is required for April 2018. The schedules taking effect on Sunday, May 13, 2018 will reflect a resumption of streetcar service through to Long Branch Loop. Actual implementation depends on construction status. 501L buses from Long Branch will loop via Humber Loop if a workable route can be devised, but otherwise they will loop at Windermere and connect with streetcar service there. (This is subject to confirmation.) 66 Prince Edward Schedules revert to May 2017 versions. AM Peak / Sat-Sun Early Morning 66A Old Mill Stn to Qsy/Windermere 12' 38+4 3.5B 24' 34+2' 1.5B 66A Old Mill Stn to Humber 12' 26+4' 2.5B 30' 22+8' 1B 66B Old Mill Stn to Lake Shore 12' 12' 40+2 40+2' 3.5B 3.5B 24' 30' 28+2' 28+2' 1.5B 1B Combined 6' 6' 7B 6B 12' 15' 3B 2B M-F Midday / Sat-Sun Late Morning 66A Old Mill Stn to Qsy/Windermere -
Grand Opening of the Todd Bardes Meadowlands Side Trail by Nancy Tilt, TBTC Conservation Committee
Winter 2016-2017 THE QUARTERLY OF THE TORONTO BRUCE TRAIL CLUB Vol. LIII No. 4 www.torontobrucetrailclub.org | 416-763-9061 | [email protected] Grand Opening of the Todd Bardes Meadowlands Side Trail by Nancy Tilt, TBTC Conservation Committee Friends and family, hikers, and Toronto Bruce Trail Club Conservation Committee members, about 75 in all, gathered at Limehouse Com- munity Hall on a beautiful early September Sunday. The occasion was the Grand Opening of a new Side Trail in memory of Todd Bardes, a dedicated and treasured Bruce Trail volunteer. Car and bus thru-hikes had been organized for the day to coincide with the early afternoon opening of the Trail. Peter Leeney, friend of Todd and currently Land Stewardship Director and past President of the Toronto Club, spoke of Todd's long history with the Bruce Trail. Todd joined the Bruce Trail Association in 1994 and had been actively involved with trail activities since 1996 both at the club level, the broader Board level, and most recently as President. In 2001 the Bruce Trail purchased the 39-acre Springle property just north of Limehouse. Todd and his wife, Christina, subsequently took on the role of Land Stewards. Existing ATV disturbance in the mead- owland portion of the property was an issue needing attention. Fellow Bruce Trail volunteer, Andrew Costley, came up with the idea of a community-based and monitored Side Trail through the meadow. Todd, along with support from other volunteers, wholeheartedly agreed, and through their efforts the Side Trail came to life. Andrew Costley, on behalf of all volunteers who knew Todd, spoke Hike Leader Training 2017 of him as a friend and mentor, providing both advice and leadership with wise and patient counsel. -
Service Changes Effective Sunday, September 3, 2017 Route Period / Service M-F Saturday Sunday Headway R.T.T
Service Changes Effective Sunday, September 3, 2017 Route Period / Service M-F Saturday Sunday Headway R.T.T. Veh Headway R.T.T. Veh Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Miscellaneous Changes Wheel Trans Wheel Trans will now serve bus bay 3 at Coxwell Station, and bus bay 2 at Woodbine Station. 6 Bay and 63 Ossington Scheduled travel time for dead-head trips from Mount Dennis garage to the route will be increased in the PM peak. 22/322 Coxwell Two earlier Sunday morning trips will be operated by 22 Coxwell to correct a scheduling error in May 2017 that created a gap between night and day services. 44 Kipling South Late night service will be cut after 1:00 am to match demand with service on Monday-Saturday now running every 30 minutes in place of every 10. Last trips will be NB from Lake Shore at 2:15 am and SB from Kipling Stn at 2:30 am. 188 Kipling S Rocket AM peak service will be improved to operate every 10 minutes SB from Kipling Stn from 6:30 am, then at 7'30" (the current headway) from 7:00 am. The 7:28 PM peak NB trip will be dropped so that the last trip now operates at 7:20 pm. 50 Burnhamthorpe The following AM peak trips will be eliminated due to low ridership. Times of nearby trips will be adjusted to fill the gaps. EB from Mill Rd: 6:15 am WB from Islington Stn: 6:35 and 9:25 am 310/317 Spadina Night The route number will be changed to 310 to match the daytime 510. -
Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C. -
Eglinton Crosstown LRT Interchange Stations – Final Designs
Report for Action Eglinton Crosstown LRT Interchange Stations – Final Designs Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Summary Metrolinx is currently constructing the Eglinton Crosstown LRT between Weston Road and Kennedy subway station, scheduled to open in 2021. This new LRT line will be operated by TTC and be identified as TTC Line 5. Approximately half of the 19 km LRT line will run underground, and connect to three existing subway stations. These interchange stations are currently under construction and will connect to Line 1 at Eglinton West Station (to be renamed Cedarvale Station) and Eglinton Station, and Line 2 at Kennedy Station. As the owner and operator of the subway system in Toronto, the TTC has a responsibility to ensure that the structural integrity of the existing subway infrastructure is maintained during construction, and that safe and efficient operation of the system is maintained. This report presents the final Metrolinx/Crosslinx Transit Solutions designs of the 3 interchange stations at Eglinton West (Cedarvale), Eglinton and Kennedy. Recommendations It is recommended that the Board: 1. Approve the final designs for Cedarvale, Eglinton and Kennedy interchange stations, as presented in this report. Financial Summary The Master Agreement between Metrolinx, the City of Toronto and the TTC, states that Metrolinx, as owner and developer, is responsible for expenditures related to the delivery of the Eglinton Crosstown Light Rail Transit Project. The Chief Financial Officer has reviewed this report and agrees with the financial impact information. Eglinton Crosstown LRT Interchange Stations – Final Designs Page 1 of 5 Equity/Accessibility Matters The new interchange stations are designed to be accessible, with barrier free paths from street to platform levels. -
3 Renewal of West Construction Field Office Lease 1 East
Insert TTC logo here STAFF REPORT ACTION REQUIRED Renewal of West Construction Field Office Lease – 1 East Mall Crescent Date: April 27, 2016 To: TTC Board From: Chief Executive Officer Summary The purpose of this report is to seek the Board’s approval, in respect of the lease of the premises located at 1 East Mall Crescent, Suite 200 (the West Construction Field Office), to extend the term of the lease for an additional five years, subject to the terms and conditions outlined in this report. Recommendations It is recommended that the Board: 1. Authorize the execution of the lease amendment agreement to extend the lease between Madekat Holdings Corporation and the Toronto Transit Commission for the lease of the premises located at 1 East Mall Crescent, Suite 200, Toronto, for a term of five years, and amend the lease to provide for an additional option to extend for five years in accordance with the terms and conditions set out in the agreement and as summarized in this report, in accordance with the Toronto Transit Commission’s policies, and any other documents or agreements arising as a result of entry into the lease, acceptable to the TTC’s Head - Legal and General Counsel. 2. Approve the expenditure of $396,980 plus HST for rent payments for the premises (including utilities) for a five year term, subject to change from current projections due to the escalation of additional rent, in accordance with the terms and conditions of the lease. Implementation Points The recommendations are for TTC staff to proceed with negotiations of the extension and amendment of the lease in accordance with the terms and conditions set out in this report. -
Eglinton Crosstown Light Rail Transit
The City of Toronto holds public consultations as one way to engage residents in the life of their city. Toronto thrives on your great ideas and actions. We invite you to get involved. Eglinton Crosstown Light Rail Transit (LRT) Transit Project Assessment Study Notice of Commencement and Public Open Houses starting November 23, 2009 Public Consultation We are holding seven Open Houses where you can learn more about this transit project, ask questions, and share your comments. All Open Houses will be held from 6:30pm to 9:00pm. Location and Dates: York Memorial Collegiate, 2690 Eglinton Avenue West Etobicoke Olympium, 590 Rathburn Road Monday, November 23, 2009 Tuesday, November 24, 2009 Northern Secondary School, 851 Mount Pleasant Road Richview Collegiate, 1738 Islington Avenue Wednesday, November 25, 2009 Thursday, November 26, 2009 CNIB Conference Centre, 1929 Bayview Avenue Don Montgomery Community Centre, 2467 Eglinton Avenue East Wednesday, December 2, 2009 Tuesday, December 8, 2009 Beth Shalom Synagogue, 1445 Eglinton Avenue West Thursday, December 10, 2009 Background The Toronto Transit Commission (TTC) and the City of Toronto are planning a new Light Rail Transit (LRT) route along Eglinton Avenue from Kennedy Subway Station to Pearson International Airport. The LRT will link to the Yonge Subway at Eglinton Station and to the Spadina Subway at Eglinton West Station. As part of the Transit City light rail network, this route will connect with the proposed Don Mills LRT, Jane LRT, and Scarborough-Malvern LRT. The Eglinton Crosstown LRT will provide modern, accessible and comfortable light rail transit service. The LRT will operate underground from Laird Drive in the east to Keele Street in the west, as the width of Eglinton Avenue in this area is too narrow to accommodate street level LRT. -
Mobility Hubs December 2008
Mobility Hubs December 2008 1. Introduction This is one in a series of backgrounders that have been produced by Metrolinx to provide further explanation and clarification on the policies and directions of the Regional Transportation Plan (RTP). The RTP is available for downloading at www.metrolinx.com. This backgrounder should be read as an accompaniment to Strategy 7 of the RTP. It is intended to provide additional detail on the mobility hub policies of the RTP and clarification of the terms and definitions used in the RTP with respect to mobility hubs. Metrolinx wishes to acknowledge the invaluable contribution of Urban Strategies Inc. and IBI Group to the preparation of this backgrounder. 2. What is a Mobility Hub? The mobility hub policies of the RTP build on the overall policy framework established in the Growth Plan for the Greater Golden Horseshoe, particularly those related to major transit station areas. The Growth Plan defines major transit station areas as the area within a 500m radius (10 minute walk) of any existing or planned higher order transit station within a settlement area or around a major bus depot in an urban core. Major transit station areas that are particularly significant for the regional rapid transit system are recognized as mobility hubs in the RTP. Mobility hubs are major transit station areas with significant levels of transit service planned for them in the RTP, high development potential, and a critical function in the regional transportation system as major trip generators. They are places of connectivity where different modes of transportation — from walking to high- speed rail — come together seamlessly and where there is an intensive concentration of employment, living, shopping and/or recreation. -
Service Improvements for 2002
SERVICE IMPROVEMENTS FOR 2002 Subway Streetcars Buses RT October 2001 Service Improvements for 2002 - 2 - Table of contents Table of contents Summary................................................................................................................................................................4 Recommendations ..............................................................................................................................................5 1. Planning transit service ...............................................................................................................................6 2. Recommended new and revised services for the Sheppard Subway .......................................10 Sheppard Subway.................................................................................................................................................................................10 11 BAYVIEW – Service to Bayview Station...........................................................................................................................................10 25 DON MILLS – Service to Don Mills Station ....................................................................................................................................11 Don Mills/Scarborough Centre – New limited-stop rocket route ....................................................................................................11 Finch East – Service to Don Mills Station...........................................................................................................................................11 -
Toronto Transit Commission Category 47 2015 OPERATING BUDGET OVERVIEW 3
OPERATING PROGRAM SUMMARY Contents Overview I: 2015–2017 Service Overview and Plan 7 II: 2015 Budget by Service 12 III: Issues for Discussion 36 Appendices: 1. 2014 Performance 44 2. Operating Budget by Expense Category 47 Toronto Transit Commission 3. 2015 Organization Chart 48 2015 OPERATING BUDGET OVERVIEW TTC expects that its Conventional service will provide transit to 545 4. Summary of 2015 Service million riders with service that spans 238.5 million kilometres and 9 Changes N/A million hours in 2015. Wheel-Trans provides door-to-door 5. Summary of 2015 New & accessible transit service to 3.2 million riders with physical Enhanced Service Priorities 50 disabilities. 6. Inflows/Outflows to/from 2015 Budget Highlights Reserves & Reserve Funds 51 The total cost to deliver Conventional and Wheel-Trans transit to 7. 2015 User Fee Rate Toronto residents and visitors in 2015 is $1.694 billion and $115.313 Changes N/A million respectively, as shown below. TTC Conventional 2014 2015 Change (in $000's) Approved Budget $ % Gross Expenditures 1,606,683.6 1,693,820.3 87,136.7 5.4% Gross Revenues 1,166,602.6 1,220,089.5 53,486.9 4.6% Net Expenditures 440,081.0 473,730.8 33,649.8 7.6% Wheel-Trans 2014 2015 Change (in $000's) Approved Budget $ % Gross Expenditures 112,561.9 115,313.1 2,751.2 2.4% Gross Revenues 5,738.8 6,514.3 775.5 13.5% Net Expenditures 106,823.1 108,798.8 1,975.7 1.8% The 2015 Budget increases funds by $89.888 million gross ($35.626 million net) to accommodate increased ridership and expand transit services, including providing relief to families by eliminating the Child Fare (ages 12 and under), and introducing a 10 cent fare increase that will fund new and enhanced service priorities.