NEW RAILWAYS NEW A progressive journey since 2014 Keonjhar Parliamentary Constituency

KEONJHAR RAILWAYS’ DEVELOPMENT IN ODISHA (2014-PRESENT) KEONJHAR PARLIAMENTARY CONSTITUENCY

A. ASSEMBLY SEGMENTS : , , , Patna, Keonjhar, , . RAILWAY STATIONS COVERED : Chilikdara, Harichandanpur, Nilakantheswar, Sitabinj, Basantpur, Naranpur, Kendujhargarh, Goaldih, Porjanpur, , Jaroli, Banspani, Deojhar, Jamkundia, Padapahar, , . B. WORKS COMPLETED IN LAST FOUR YEARS : B.1. New Lines & Electrication  Chilikidhara to Sitabinj DOUBLING 28 KM, Porjanpur to Naranpur DOUBLING 28 KM have been completed at a cost of ` 336 Crore. B.2. Improvement of Passenger Amenities :  Circulating Area, Signage Boards, Waiting Hall Provided at Kendujhargarh Station at a cost of ` 0.537 Crore.  Platform shelter at Barbil at a cost of ` 0.280 Crore.  1 bay Platform shelter at Harichandanpur station at a cost of ` 0.124 Crore.  Latrines Provided at Harichandanpur and Kendujhargarh stations at a cost of ` 0.180 Crore.  Foot Over Bridge Provided at Basantpur, Gualidih, Harichandanpur, Naranpur, Kendposi and Pandrasali Stations at a cost of ` 7.360 Crore.  Water Coolers have been provided at 24 important stations over Khurda Road Division. It is a combined work for 10 constituencies at a cost of ` 1.390 Crore.  Platform Extension at Barbil Station at a cost of ` 0.290 Crore. B.3. Trafc Facilities :  Limited Height Subways at 10 locations at a cost of ` 14.48 Crore. B.4. Additional Facilities :  Construction of running room (Phase-I) at Barbil at a cost of ` 0.210 Crore.  Diversion of road to close LC no.PB-2 between Padapahar-Deojhar at a cost of ` 0.170 Crore.  Replacement of damaged and old AC sheet roof in staff quarters at stations- Padapahar, Deojhar, Banspani, Jaroli under the jurisdiction of ADEN Dangoaposi at a cost of ` 0.050 Crore. C. ON-GOING WORKS : C.1. Passenger Amenities :  Improvement of Barbil Station by renovating circulating area at a cost of ` 0.200 Crore.  Provision of Deep tube well pump house and PVC tank at 32 stations over Khurda Road Division. It is a combined work for 10 constituencies at a cost of ` 1.890 Crore.  Improvement of Barbil Station by providing benches at a cost of ` 0.010 Crore.  Chakradharpur Division -27 bay Platform shelter at 13 stations at a cost of `1.920 Crore.  Improvement of Barbil Station by providing 02 Nos. Platform Shelter at a cost of ` 0.300 Crore.  92 bays platform shelter at various stations over Khurda Road Division. It is a combined work for 12 MP constituencies at a cost of ` 11.650 Crore.  Provision of Latrines and Urinals at 32 stations over Khurda Road Division. It is a combined work for 10 MP constituencies at a cost of ` 1.280 Crore.  Provision of Public Adress System at 25 stations over Khurda Road Division. It is a combined work for 10 MP constituencies at a cost of ` 1.790 Crore.  Improvement of Barbil Station by renovating Platform surface at a cost of ` 0.100 Crore.  Improvement to platform surface and other miscellaneous work at Pandrasali,Singhpokharia, Jhinkpani, Talaburu, Kendposi, Maluka, Jaroli,Banspani,Murgamahadeo Road, Deojhar,Jamkundia and Barjamda at a cost of ` 0.280 Crore. C.2. Trafc Facilities :  Banspani Jaroli Yards - Concrete loading platform with retaining wall, proper drainage system at a cost of ` 7 Crore.  9 Limited Height Subways in lieu of 11 manned Level Crossing Gates over Khurda Road Division. It is a combined work for 7 MP constituencies at a cost of ` 21.460 Crore.  Provision of Limited Height Subways in lieu of Unmanned Level Crossing Gate over Sitabinj and Basantpur section at a cost of ` 1.590 Crore.  Provision of Limited Height Subways in lieu of Unmanned Level Crossing Gate over Chilikdhara and Sagadpeta section at a cost of ` 1.580 Crore.  Development of infrastructure for stabling of track machines /provision of resting facilities for track machine staff at 5 stations of Chakradharpur Division at a cost of ` 2.210 Crore. RAILWAYS’ DEVELOPMENT IN ODISHA (2014-PRESENT) KEONJHAR PARLIAMENTARY CONSTITUENCY

 Increase CSL (Length of Line) at 20 stations in Khurda Road Division without shifting of points and crossings. It is a combined work for 10 MP constituencies at a cost of ` 0.950 Crore.  Provision of Concrete loading platforms with retaining wall and proper drainage system at Banspani and Jaroli Yards at a cost of ` 7 Crore.  Provision of 2nd Bay at traction substation at Banspani at a cost of ` 4.91 Crore.  Provision of track machine infrastructure at Banspani and Barbil stations at cost of ` 83.54 Lakh. C.3. Additional Facilities :  5 Nos. of Manning of Unmanned LC at a cost of ` 1.030 Crore.  Rajkharswan-Dongaposi- Barajamda-Gua-Bolanikhadan- Banspani - Inputs on bridges for running 25 ton axle load trains at a cost of ` 2.130 Crore.  Chakradharpur Division - Strengthening of bridges by reinforced concrete cement boxes (16 bridges) at a cost of ` 5.920 Crore.  Jaroli Staff Quarters at a cost of ` 0.900 Crore.  9 Nos. of Manning of un-manned level crossing No. PB-6 at Km. 37936B-38B at Jamkundia yard under the jurisdiction of ADEN Dangoaposi at a cost of ` 0.580 Crore.  Improvement of Power supply at Murgamahadeo Road and NALDA Grid Barajamda at a cost of ` 0.110 Crore.  Construction of Gate goomties at Manned LC gates (05Nos.) in Rajkharswan-Padapahar-Banspani section at a cost of ` 0.150 Crore.  Construction of RCC Box culvert at Bridge No.17at Km 39635-37 between Barajamda-Barbil at a cost of ` 0.220 Crore.  Rajkharsawan-Gua, Barajamda-Barbil Padapahar-Jarauli - Robust type height gauge at level crossing road under bridges at a cost of ` 1.130 Crore.  Provision for approach warning system and voice logger at 25 level crossings over Khurda Road Division. It is a combined work for 10 MP constituencies at a cost of ` 4.060 Crore.  Replacement of Level crossing gates by electrically operated lifting barrier over Khurda Road Division. It is a combined work for 10 MP constituencies at a cost of ` 3.750 Crore.  Integrated power supply at mid section interlocked level crossing gates. It is a combined work for 10 MP constituencies at the cost of ` 6.150 Crore.  Pre cast Fibre reinforced RCC blocks for road surface at various 15 manned Level Crossing gates over and Jenapur section and Tomka and Jaroli section at a cost of ` 0.920 Crore.  Provision of 6 quad cable and accessories over Khurda Road Division . It is a combined work for 11 MP constituencies at a cost of ` 10.790 Crore.  Replacement of old point machines at various station yards over Khurda Road Division . It is a combined work for 11 MP constituencies at a cost of ` 2.800 Crore.  Replacement of worn out point machines at different stations over Khurda Road Division . It is a combined work for 11 MP constituencies at a cost of ` 0.840 Crore.  Provision for earthing improvement by maintenance free earth for signalling and telecom installations over Khurda Road Division . It is a combined work for 11 MP constituencies at a cost of ` 0.960 Crore.  Replacement of old SCADA system by latest SCADA system as per latest RDSO specication over Khurda Road division. It is a combined work for 11 MP constituencies at a cost of ` 7.570 Crore.  Provision of 9 Units type 2 Staff Quarters each at Murgamahadeo Road and Jaroli at a cost of ` 1.80 Crore.

Kendujhargarh Station Building Harichandanpur Station Building