132 KV EHV LINES IN AS ON 31.3.2020 (PROV.) Sl. No. Name of the Section No.Of Circuits Total Length Year Of (Cir.Km.) Completion/ Energisation 132 K.V.TRANSMISSION LINES 1 Hissar-Rajgarh SC 72.000 1959-60 2 Rajgarh-Ratangarh SC 98.800 1960-61 3 GandhiSagar-Kota DC 149.860 1960-61 4 Sakatpura-Ind.Area Kota DC 22.680 July,1962 5 Kota-Lakheri DC 140.460 July,1962 6 Lakheri-SwaiMadhopur DC 83.680 July,1962 7 SwaiMadhopur-Jaipur via Niwai SC 128.740 July,1962 8 Jaipur-Phulera56.61527.8.2012 SC 56.320 April,1963 9 Phulera-Ajmer SC 71.310 April,1963 10 Neemuch-Debari SC 117.870 June,1963 11 Ratangarh-Jaipur SC 206.500 March,1965 12 Jodhpur-pali SC 60.150 August,1967 13 Jaipur-Alwar SC 127.600 February,1968 14 Inter-connection RPS DC 38.400 February,1968 15 T-off from Gandhi Sagar-Kota line to RAPP SC 3.700 1968-69 16 R.P.S.-Bhilwara DC 230.400 March,1969 17 Alwar-Bharatpur SC 112.000 March,1969 18 Bhilwara-Pali SC 137.600 April,1969 19 Ajmer-Beawar SC 50.000 August,1969 20 Bhilwara-Beawar SC 96.000 September,1970 21 Sirsa-Hanumangarh SC 82.000 December,1970 22 Debari-Zawar mines SC 36.000 September,1972 23 Hanumangarh-Rajiasar SC 95.000 9/6/73 24 Kota-Jawahar Sagar DC 46.000 17/8/73 25 Ratangarh-Bikaner SC 126.000 11.4.73 26 Mathura-Bharatpur SC 3.500 18.7.73 27 Debari-Sirohi SC 117.000 8.10.74 28 Kota-Sangod SC 61.000 21.1.76 29 R.P.S.-Ind.Area Kota SC 42.000 12.8.75 30 Alwar-Hindaun SC 103.010 20.1.76 31 Beawar-Bilara SC 64.500 16.1.76 32 Sirohi-Bhinmal SC 61.500 25.3.76 33 Alwar GSS-MIA Alwar DC 20.200 May,1976 34 Debari-Kankroli SC 53.000 June,1976 35 Churu-Jhujunu SC 50.000 24.9.76 36 Sirohi-Jalore SC 61.000 21.11.76 37 Beawar-Gulabpura SC 40.000 22.12.76 38 Zawarmines-Sagwara SC 84.650 2.1.77 39 Zawarmines-Sagwara SC 6.550 31.7.97 40 Bikaner-Bazzu SC 92.000 March,1977 41 Phulera-Makrana SC 64.000 March,1977 42 Debari GSS-Zinc Smelter SC 1.360 1976-77 43 Jodhpur-Bilara SC 73.610 14.10.77 44 Jodhpur-Dechu SC 106.500 23/26.1.78 45 Dechu-Pokran SC 48.920 26.1.78 46 Kunda ki Dhani-Dausa SC 53.250 22.2.78 47 Sagwara-Banswara SC 44.300 23.3.78 48 Alwar-KishangarhBas SC 35.000 31.3.78 49 Jalore-Balotra SC 74.250 October,1978 50 Ratangarh-Deedwana Via GSS SC 80.970 30.3.79 51 Alwar-Kotputli SC 62.000 31.3.79 52 Nimbahera-Chittorgarh SC 37.000 31.3.79 53 V.K.I.A.-M/S PratapSteel SC 1.060 1978-79 54 I.A.Kota-J.K. SC 0.570 1978-79 55 I.A.Kota-S.F.C. SC 0.840 1978-79 56 Beawar-Merta SC 70.690 4.11.79 57 Kota-Bundi Sc 33.670 31.3.80 58 Chittor-BirlaCementWorks SC 1.500 7.6.80 59 Kota-Modak SC 57.700 3.10.80 60 Heerapura-Renwal SC 45.000 24.1.81 61 Debari GSS-Udaipur Cement works SC 8.160 14.1.81 62 Suratgarh-Padampur SC 48.980 3.2.81 63 Hindaun-Dholpur SC 88.400 2.7.81 64 Nimbahera GSS -J.K.Cement Works SC 4.000 30.7.81 65 Bhilwara-Chittorgarh SC 48.600 30.7.83 66 Ratangarh-Rajiasar SC 143.000 30.7.83 67 T-off Rajgarh SC 3.000 1.10.81 68 T-off Puranaghat DC 6.800 2.10.81 69 Modak-Jhalawar SC 25.120 15.10.81 70 Sangod-Baran SC 27.480 28.11.81 71 Palana-Mavli DC 19.380 16.11.81 72 Mavli-Dariba SC 23.800 23.1.82 73 Nimbahera-Pratapgarh SC 68.300 19.12.81 74 Dariba GSS-Hindustan-Zink Ltd. SC 3.000 15.1.82 75 Jhunjhunu-Chirawa SC 27.400 15.1.82 76 T-off Sanganer SC 0.000 28.1.82 77 Sirohi-Pindwara SC 24.300 15.2.82 78 Kishangarh Bas-Bhiwadi SC 45.600 8.2.82 79 Bilara-Sojat SC 35.000 21.2.82 80 Pindwara-Basantgarh SC 13.000 1.2.82 81 Heerapura-Sanganer-Purana Ghat SC 33.220 5.10.82 82 Kotputli-Shahpura SC 38.890 26.2.83 83 Alwar S/S 132 KV-M/S Modi Alkalies SC 5.720 9.2.83 84 Alwar S/S 132 KV-M/S Modi Alkalies DC 7.660 9.2.83 85 Sawai madhopur-Tonk SC 58.000 26.3.83 86 Bharatpur 220 KV &132 Interconnection DC 13.000 30.10.82 87 I.A.Kota-M/S Shri Ram Vinayal & Chemical,KOTA SC 0.930 19.3.83 88 Sujangarh-Nagaur Sc 101.000 25.1.83 89 Sirohi-Sumerpur SC 47.210 25.1.83 90 Balotra-Barmer SC 84.690 31.3.83 91 Padampur-Sriganganagar SC 43.000 15.5.83 92 T-off Nagar DC 5.600 30.10.83 93 Kotputli-Behror SC 29.750 14.1.84 94 Sikar-Nawalgarh SC 30.660 30.4.83 95 Kotputli-Neem ka Thana SC 44.950 29.10.83 96 Bharatpur-Nadbai DC 65.000 28.10.83 97 Nadbai-Weir SC 27.600 28.10.83 98 Weir-Hindaun SC 36.500 28.10.83 99 Bundi-Kekri SC 84.300 30.10.83 100 Gotan-Bhopalgarh SC 24.500 28.3/84 101 Merta-Gotan SC 32.770 28.3.84 102 Hindaun-Gangapurcity SC 45.960 23.12.83 103 Nadbai-Alwar SC 64.450 22.6.80 104 Makrana-Kuchaman SC 17.330 28.8.84 105 Bilara-Borunda SC 31.160 19.11.84 106 Hirapura-Bagru SC 20.150 31.12.84 107 Dausa-Bandikui SC 36.218 21.1.85,31.7.92 108 Bandikui-Mandawar SC 29.500 26.1.85 109 Pindwara-Abu Road SC 47.600 31.1.85 110 RAPP Link Line SC 3.220 23.1.85 111 Beawar-Shree Cemant SC 5.800 16.2.85 112 Gotan-JK white cement SC 2.120 March,85 113 Mahi Power House I 132KV GSS Lodha,Banswara DC 27.200 Dec.84 114 Modak-Bhawanimandi SC 36.180 31/3/86 115 Renwal-Danta SC 27.340 10/10/85 116 Sumerpur-Falna SC 16.670 11/1/86 117 HindaunGSS-Rly.Traction DC 3.000 31/3/86 118 GangapurGSS-Rly.Traction DC 4.420 31/3/86 119 Bharatpur-Rly.Traction DC 2.800 19/3/86 120 Madari T-Off DC 4.400 3/3/86 121 Bhilwara-Gangapur SC 40.330 17/10/86 122 Lilo Bhinder DC 20.400 4/3/87 123 Banswara-Pratapgarh SC 67.560 10/2/87 124 P.H.-2,Banswara SC 28.180 1986-87 125 Chittorgarh-Chittorgarh Cement Works SC 1.790 1986-87 126 Sikar-Dhod SC 22.160 29/3/87 127 Gotan-Kharia Khanger(Indian Rayon & Ind.) SC 5.930 29/3/87 128 Chirawa-Pilani SC 16.600 30/3/88 129 SWM-SWM Rly.Feeder DC 3.180 23/9/87 130 Kisangarh-Malpura SC 63.610 31/12/87 131 Kota-Gurla Rly.Station DC 24.580 21/8/87 132 Lakheri-Lakheri Rly. Station DC 1.960 24/9/87 133 Modak-RamganjMandi DC 16.500 21/11/87 134 Jhalawar-Prithvipura(J.K.Feeder) DC 17.640 11/3/89 135 Mahi P.H.-2,-Banswara DC 58.690 20/12/88 136 Ajmer-Bherunda SC 37.940 8/11/88 137 V.K.I.A.Jaipur loopline DC 8.140 88-89 138 Puranaghat-JawaharNagar DC 7.500 7/11/88 139 Puranaghat-Dausaline TO Bassi Loopline DC 2.330 24/9/88 140 Khetri-Chirawa DC 54.040 30/9/88 141 Khetri-Neem Ka Thana SC 52.460 26/8/89 142 Sagawara-Dungarpur SC 46.900 30/9/88 143 SVCI First-Kota Feeder DC 1.600 5/9/89 144 Debari-Mavali SC 24.150 30/3/90 145 Bhinmal-Raniwara SC 26.370 2/5/89 146 Gotan-Nihon Nirman SC 1.070 19/11/89 147 Dechu-PS-5 SC 51.000 2/5/89 148 PS-5-PS-4 SC 21.580 2/5/89 149 P.S.-4-P.S.-3(Upto Bhimji Ka Gaon) SC 11.770 2/5/89 150 Chittor-Chanderia SC 8.420 8/1/91 151 Lilo 132K.V.Laxmangarh(SIKAR) DC 2.300 11/12/90 152 Khetri-Gudagorji SC 40.900 11/4/90 153 Rajgarh-Bhadra SC 59.190 15/6/90 154 Madari-RSMM SC 12.800 19/3/91 155 Gulabpura-Agucha SC 11.210 11/1/91 156 Jodhpur-Baori-Bhopalgarh SC 81.000 2/5/91 157 Sirohi-Reodar SC 42.000 25/7/91 158 Sangod-Kawai SC 49.480 30/3/92 159 Bhinmal-Sanchore SC 59.000 31/10/91 160 Liloline For Baori DC 5.800 5/12/91 161 Weir-Bayana DC 36.620 29/3/92 162 Suratgarh-Anoopgarh SC 72.220 30/3/92 163 Lilo-Mangaliyas TO Nasirabad DC 50.000 7/9/91 164 Nasirabad-Kekri SC 48.000 17/6/91 165 Interconnection 132 GSS Jodhpur-220 K.V.GSS Jodhpur DC 9.060 91-92 166 Chirawa TO Sultana SC 14.830 19/11/92 167 Pokaran -Jaisalmer SC 105.315 27/8/92 168 LILO Heerapura-Chambal at NPH Jaipur DC 13.040 94-95,97-98 169 Khetri -Bhuwana SC 15.150 29/9/92 170 Merta -Kuchera SC 35.494 31/12/92 171 LILO-Kuchera DC 5.322 30/3/93 172 Dausa-Lalsot SC 34.904 25.12.92 173 LILO Debari Sirohi At Sukher DC 9.176 8.1.93 174 LILO At Pilibanga DC 2.200 25.1.93 175 LILO Heerapura -Renwal At Hingonia DC 9.732 23.1.93 176 LILO Bhilwara Pali At Kharchi DC 3.764 23.1.93 177 Sangod-Jhalawar SC 43.980 31.3.93 178 Jaisalmer TO Ramgarh DC 3.492 31.3.93 179 Jaisalmer TO Ramgarh SC 62.626 31.3.93 180 Pali- Falana SC 72.571 31.3.93 181 Nalla Power House GSS -Chambal GSS SC 0.000 29.8.92 182 PS 5 TO PS 6 SC 17.702 13/6/92 183 PS 7 TO Tinwari SC 13.469 1992-93 184 PS 8 TO Jodhpur SC 23.178 1992-93 185 Sumerpur-Umaidpur SC 23.537 28.2.93 186 LILO Beawar Bilara For S/S at Jaitaran DC 11.300 10/11/93 187 Nagaur -Kuchera SC 35.320 15/2/94 188 Anoopgarh-Gharsana SC 23.730 31.3.94 189 LILO For S/S At Bhankrota DC 3.740 31.3.94 190 Sikar-Udaipurwati SC 36.060 19.3.94 191 Bharatpur-Deeg-Kanma SC 53.080 30.3.94 192 Bilara-Peepali Kalan SC 26.410 31.3.94 193 Jhalawar -Aklera SC 51.040 31.3.94 194 Reengus -Srimadhopur Bhim ji ka Gaon SC 7.912 31.12.93 195 PS2 TO PS3 SC 12.900 12.6.93 196 PS 1 TO PS 2 SC 9.740 12.6.93 197 PS 9 TO PS 1 SC 9.930 12.6.93 198 Behror-Shahjhanpur SC 19.786 1.6.94 199 Behror-Shahjhanpur DC 3.280 1.6.94 200 LILO-Saradhana DC 1.960 29.3.95 201 LILO-Banar SC 3.500 31.3.95 202 LILO-Pindwara-Sirohi,Debari Line Laxmi Cement Works DC 11.060 29.10.94 203 Jaisalmer-Ramgarh II SC 64.510 13.3.95 204 Sangod-Anta SC 25.060 28.3.95 205 LILO- RPS SC 1.010 30.3.95 206 Bazzu -PS I SC 57.940 30.3.95 207 Bazzu -PS I SC 0.395 95-96 208 LILO-Amarapuratheri SC 4.830 31.3.95 209 LILO-Bansur Sub Station DC 0.600 30.3.95 210 Chittorgarh-Grasim Cement SC 20.250 94-95 211 Hindaun-Karauli SC 31.500 17.6.93 212 LILO-220 kv GSS Merta to 132 kv Kuchera Nagaur line DC 1.440 16.12.95 213 LILO -Banar DC 4.800 31.3.96 214 LILO-CHB -Jodhpur DC 0.380 30.3.96 215 PS 8 to PS 1 SC 7.260 30.4.95 216 Jaisalmer -Barmer DC 8.780 31.3.96 217 Jaisalmer -Barmer SC 150.250 31.3.96 218 DLF Cement works( Jaitaran -Village RAS) SC 19.610 10.6.95 219 Sakatpura -Gopal mill SC 14.540 30.3.96/31.3.97 220 Reengus to Danta Ramgarh SC 40.060 25.11.95 221 LILO-132 KV GSS Mansarowar,jaipur DC 0.000 31.3.96 222 Weir-Bayana SC 18.000 29.3.96 223 Hindaun-Srimahaveerji SC 13.290 10.11.95 224 Hindaun-Srimahaveerji DC 1.540 10.11.95 225 LILO-Hamirgarh Line DC 14.000 10.11.95 226 LILO -Salumber DC 20.000 5.1.96 227 Bali-Falana DC 20.100 31.3.96 228 LILO -Sardarsahar DC 0.960 2/96 229 LILO -Dungargarh DC 0.320 30.3.96 230 Sriganganagar-Lalgarh SC 13.480 9/95 231 LILO-Amarapura theri DC 4.840 30.6.95 232 LILO-132 KV GSS (Rampura Handi) DC 0.950 31.3.97 233 Nagaur-Khivsar SC 40.410 16.12.96 234 Jodhpur -Tinwari SC 60.050 9.11.96 235 220 KV GSS Jodhpur-M/S Murless steel SC 4.730 20.11.96 236 Pindwara-Binani cement SC 7.230 9.2.97 237 LILO PUGAL ROAD-Bikaner DC 12.830 18.1.97 238 Bikaner-Gajner DC 5.280 24.8.97 239 Bikaner-Gajner SC 39.364 24.8.97 240 Suratgarh-Nokhasar SC 68.810 31.3.97 241 RICCO VIHAR SC 4.300 30.3.97 242 LILO-SAWA (Chittorgarg J.K.) DC 7.000 31.3.97 243 LILO-Nawa OFF Phulera Makarana line DC 4.300 31.3.97 244 Bhinmal -Dhorimanna SC 94.275 31.3.97 245 Bhinmal- Sayla SC 45.590 31.3.97 246 LILO-132 KV Heerapura Phulera line for 132 Kv GSS SIRSI DC 5.200 17.5.96 247 Bhiwadi-Kushkheda SC 10.800 30.3.98 248 Tinwari-Denchu SC 62.520 31.3.98 249 Lakheri-A.C.C. SC 1.080 28.2.98 250 Gopal Mill IA,Kota SC 14.380 30.6.97 251 Bhawani Mandi-Dug SC 58.490 26.3.98 252 Bali-Rani SC 23.380 31.3.98 253 Kankroli-Amet SC 30.980 31.3.98 254 LILO-RAYLA DC 29.220 31.3.98 255 Nimbhahera-Sawa SC 19.020 31.1.98 256 Dungarpur-Rishabdev SC 28.250 31.3.98 257 Hanumangarh-Sangariya SC 16.470 31.3.98 258 Hanumangarh-Sangariya DC 10.340 31.3.98 259 Suratgarh-Jokhasar DC 44.060 14.12.97 260 Bikaner-Nokha SC 57.410 31.3.98 261 Lilo Newai -Sanganer(For 132 KV GSS Chaksu) DC 3.640 30.3.99 262 Lilo Ajmer -Bherunda Line DC 0.100 11.10.98 263 Lilo Jodhpur -Tinwari Line(For 132 KV GSS Mathania) DC 1.300 30.3.99 264 Barmer-Gadara SC 81.100 24.2.99 265 Barmer-Gadara DC 8.800 24.2.99 266 Abu Road-Revadar SC 44.880 27.3.99 267 Madari -Sukher SC 12.270 11.11.98 268 Rayala -Shahpura SC 31.630 31.1.99 269 Banswara -R.S.M.Ltd. SC 0.600 Exiting 270 Bharatpur-Deeg-Kanma SC 0.840 98-99 271 Sanganer -Mansarover DC 8.780 II circuit 15.9.99 272 Chirawa - Surajgarh SC 9.000 31.5.99 273 Chirawa - Surajgarh DC 0.820 31.5.99 274 LILO FOR BANGAR GSS DC 3.560 29.3.2000 275 DANTA-CHITAVA SC 20.920 10.1.2000 276 KUCHAMAN-CHITAVA SC 18.330 17.3.2000 277 LILO FOR MANDORE GSS DC 0.200 30.3.2000 278 LILO-JODHPUR-TINWARI LINE FOR SURSAGAR GSS DC 5.480 18.6.99 279 LILO JALORE-BALOTRA LINE For SIWANA GSS DC 7.640 31.10.99 280 LILO-SISARMA DC 23.920 8.3.2000 281 BIKANER- NAPASAR SC 20.050 27.5.99 282 SUJANGARH-BIDASAR SC 25.060 30.8.99 283 MORAK GSS TO MANGALAM CEMENT S.C. 0.400 99-2000 284 V.K.I.A- KUKAS S.C 16.860 99-2000 285 KUKAS-KUNDA KI DHANI (I CIRCUIT) S.C 3.610 99-2000 286 KUKAS-KUNDA KI DHANI (II CIRCUIT) S.C. 3.750 99-2000 287 KUKAS-JAMUA RAMGARH S.C. 14.170 99-2000 288 Dahra - Chambal Fertilizers SC 16.168 13.05.2000 289 LILO for Nathdwara DC 16.236 03.06.2000 290 I/C 220 kv Dahra - Goapl Mill I/A DC 24.130 30.06.2000 291 Diversion Work of HZL line SC 2.797 30.08.2000 292 I/C 220 Kv & 132 Kv GSS Jhunjhunu DC 21.660 28.09.2000 293 Bikaner-Loonkaransar SC 58.234 31.10.2000 294 Bikaner-Loonkaransar DC 13.712 31.10.2000 295 Kuchaman - Molasar SC 22.299 30.11.2000 296 K. G. Bas - Mundawar Via Kherthal SC 20.065 30.11.2000 297 Mandalgarh - Began SC 22.485 07.12.2000 298 LILO for Ranoli DC 3.366 19.01.2001 299 LILO for Suwana DC 2.972 19.01.2001 300 Mansarowar - SMS Stadium DC 11.492 13.02.2001 301 Baran - Kelwara SC 46.548 28.02.2001 302 LILO for Vaishali Nagar DC 2.952 30.03.2001 303 Rayala -Gulabpura SC 33.291 30.03.2001 304 LILO FOR SITAPURA DC 0.072 21.04.2001 305 I/C 220 KV TO 132 KV GSS BHIWADI SC 4.960 30.04.2001 306 LILO FOR LADNOO DC 7.096 15.06.2001 307 CHOMU-MARKHI SC 25.624 16.06.2001 308 BHADRA-NOHAR SC 42.450 05.07.2001 309 PILANI-CHANGOTHI SC 9.176 21.07.2001 310 LAKHERI-ITAWA SC 23.300 05.11.2001 311 BANSUR-THANAGAZI SC 34.890 30.01.2002 312 JHUNJHUNU-KUMAWAS SC 15.887 27.03.3002 313 TPS TO 220KV TINWARI SC 12.489 31.07.2001 314 KHINVSAR-SOILA SC 20.122 31.07.2001 315 CHHOTI SADRI-BARI SADRI SC 22.769 15.08.2001 316 BILARA-PIPARCITY SC 32.234 28.11.2001 317 LILO FOR BAGIDORA DC 3.000 30.11.2001 318 DHORIMANNA-SAWA SC 30.834 13.03.2002 319 LILO FOR JOJHAWAR DC 25.768 26.03.2002 320 LILO FOR SHEO DC 5.740 24.04.2002 321 I/C of 132 kv SIRSI-BAGRU LINE SC 1.694 14.08.2002 322 LILO-BIDIYAD OFF DC 1.248 31.08.2002 323 MAKARANA-BAGOT SC 32.680 31.08.2002 324 MOLASAR-DEEDWANA SC 21.787 31.10.2002 325 NAPASAR-BADNU SC 25.491 27.11.2002 326 SAWAIMADHOPUR-UNIARA-NAINWA SC 55.592 28.11.2002 327 LILO FOR BAGRU DC 3.234 31.12.2002 328 UDHYOG VIHAR-SADULSHAR SC 22.494 17.01.2003 329 DHOD-KHOOD SC 11.356 20.01.2003 330 RAJGARH-TARANAGAR SC 32.000 21.01.2003 331 PHULERA-JOBNER SC 19.213 28.01.2003 332 JHUNJHUNU- MANDAWA SC 21.119 29.01.2003 333 LILO FOR GOGUNDA DC 1.364 31.01.2003 334 KUCHERA-SANJOO SC 22.969 13.02.2003 335 SAWA-KAPASAN SC 33.820 14.02.2003 336 LILO FOR DESNOKH DC 9.210 17.03.2003 337 LILO FOR KOLAYAT DC 4.590 24.03.2003 338 MARKHI-AJEETGARH SC 10.062 30.03.2003 339 LILO FOR KHERLI DC 10.730 31.03.2003 340 Heerapura-VKIA (Exiting Line) SC 0.913 2002-03 341 BIDASAR-BAMBOO SC 24.477 31.03.2003 342 BAMBOO-TEHENDESAR SC 12.010 31.03.2003 343 LILO FOR BHATEWAR DC 3.322 31.03.2003 344 LILO FOR BALESAR DC 52.836 08.05.2003 345 BALOTRA-SAMDARI SC 35.505 29.03.2004 346 BALOTRA-SINDHARI SC 42.533 23.02.2004 347 BHAWANI MANDI-HEMDA SC 24.170 21.02.2004 348 BHINMAL-POONASA SC 22.576 11.02.2004 349 I/C BHOPALGARH DC 10.670 20.11.2003 350 LILO FOR BISSAU DC 3.600 30.07.2003 351 DAHRA-ANTA-BARAN SC 50.021 24.07.2003 352 LILO FOR DASPAN DC 11.054 19.12.2003 353 DHOLPUR-RAJAKHERA SC 38.860 28.11.2003 354 JHUNJHUNU-MANDRELLA SC 24.094 22.05.2003 355 KISHANGARHBAS-TIZARA SC 17.448 24.01.2004 356 LILO FOR MOKHAMPURA DC 0.902 09.04.2003 357 PADAMPUR-SRIKARANPUR SC 22.242 17.07.2003 358 I/C PALI DC 6.224 02.04.2003 359 LILO FOR PHALODI DC 1.780 22.01.2004 360 LILO FOR PRATAPNAGAR DC 1.800 31.03.2004 361 LILO FOR SENTHI DC 1.962 27.03.2004 362 TONK-TODARAISINGH SC 34.666 31.03.2004 363 LILO FOR TODABHIM DC 15.624 27.05.2003 364 WEIR-BHUSAWAR SC 11.445 25.08.2003 365 BALOTRA-SAMDARI(DC PORTION) DC 2.324 16.04.2004 366 LILO FOR BHADRONA DC 20.950 24.03.2005 367 LILO FOR CHANDAN DC 3.394 01.06.2004 368 DAUSA -TOONGA SC 24.046 10.12.2004 369 LILO FOR DEOGARH DC 5.031 29.03.2005 370 LILO FOR MALA KHERA DC 1.340 08.07.2004 371 I/C SUJANGARH DC 1.025 21.06.2004 372 LILO FOR GUDA MALAI DC 5.892 06.12.2004 373 TINWARI-OSIAN SC 22.298 22.12.2004 374 LILO BAGRA-JALORE DC 6.920 31.08.2005 375 LILO BHINASAR SC 2.320 31.03.2006 376 CHITAWA-LOSAL SC 20.507 26.11.2005 377 LILO FOR DEOGARH DC 5.031 21.05.2005 378 GOGUNDA-MANASIWAKAL SC 31.112 20.05.2005 379 KAWAI-CHIPABAROD SC 20.565 26.10.2005 380 LILO FOR KHANPUR DC 27.570 31.03.2006 381 KHINVSAR-BHOMIYAJI KA MOD(HESABA) SC 21.707 30.12.2005 382 KHINVSAR-BHOMIYAJI KA MOD(HESABA) DC 0.560 30.12.2005 383 PADAMPUR-RAISINGHNAGAR SC 26.234 24.10.2005 384 RANIWARA-SANKAD SC 22.140 10.03.2006 385 RATANGARH-MOMASAR SC 33.865 31.03.2006 386 SALASAR-KACHHAWA SC 19.270 06.03.2006 387 SHAHPURA-MANOHARPUR SC 12.951 10.09.2005 388 SUJANGARH-SALASAR DC 44.550 27.02.2006 389 TODABHIM-SIKANDRA SC 27.879 31.03.2006 390 LILO FOR KHATUSHYAMJI DC 1.214 25.01.2007 391 JHALAWAR-BAKANI SC 25.153 29.05.2006 392 LILO FOR BASSI DC 5.410 03.06.2006 393 DEPOSIT WORK OF M/S AMTEK AT 220kV GSS BHIWADI SC 1.000 31.03.2007 394 RAYLA-SHAHPURA(BALANCE WORK) SC 0.260 26.03.2007 395 MERTAROAD-MERTACITY DC 33.530 28.03.2007 396 MERTAROAD-ROON SC 20.609 28.03.2007 397 LILO BARMER-SHEO FOR 220kV GSS BARMER DC 20.226 01.11.2006 398 LILO FOR CHAMU DC 2.714 27.02.2007 399 BARMER-MEHLOO SC 37.705 28.02.2007 400 MANSIWAKAL-JHADOL DC 13.660 30.03.2007 401 SAYLA-JEEWANA SC 20.064 16.11.2006 402 SAYLA-PADROO SC 25.138 31.03.2007 403 LILO FOR RAMSEEN DC 2.200 25.02.2007 404 LILO SIWANA-JALORE FOR 220 kV GSS JALORE DC 18.628 25.05.2006 405 Reengus-RSWM Reengus SC 2.222 18.08.2007 406 LILO for Koodan DC 3.844 27.08.2007 407 Sanganer-Balawala SC 4.431 14.08.2007 408 Shifting/Diversion work of Beawar-Gulabpura line for M/S Shree SC 0.961 22.04.2007 cement 409 Thadoli-Todaraisingh DC 18.104 29.12.2007 410 Bhawanimandi-Kanwari SC 19.257 21.01.2008 411 Duni-Thadoli (Line I ) SC 30.992 19.02.2008 412 Gulabpura-RSWM Gulabpura SC 1.600 19.11.2007 413 Hameergarh-RSWM Hameergarh SC 1.050 30.11.2007 414 Khuskhera-M/S Shree cement SC 2.635 19.06.2007 415 Shahjahanpur-Mandan SC 14.121 29.10.2007 416 LILO for Ramgarh DC 16.494 19.03.2008 417 Lodha-Mordi SC 12.741 02.07.2007 418 Rishabdeo-RSWM Rishabdeo SC 0.478 27.07.2007 419 LILO for Ajoliya Ka Khera DC 17.876 19.09.2007 420 LILO for Mundwa DC 7.400 27.08.2007 421 Jalore-Sayla DC 76.964 22.01.2008 422 Modification of 132kV Sukher-Pindwara line for M/S Binani cement SC 1.000 24.04.2007

423 LILO of 132kV Ratangarh-Bikaner line for 220kV GSS Sridungargarh DC 1.846 11.07.2007

424 KOTPUTLI-M/S GRASIM IND. SC 5.084 24.04.2008 425 KHUSKHERA-HONDA SEIL DC 1.612 09.09.2008 426 GOVINDGARH-KALADERA SC 10.108 04.07.2008 427 LILO OF 132 Kv SAWAIMADHOPUR-SHEOPUR LINE FOR DC 25.934 05.07.2008 KHANDAR 428 DUNI-THADOLI CKT.II SC 30.357 10.07.2008 429 LILO FOR DEOLI MANJHI DC 3.568 30.07.2008 430 AKLERA-MANOHARTHANA SC 37.890 24.12.2008 431 KHUSKHERA-M/S NAHAR IND. SC 5.756 16.06.2008 432 LILO OF 132kV BEHROR-SHAHJAHANPUR LINE FOR DC 2.552 03.10.2008 NEEMRANA 433 KARAULI-SAPOTRA SC 35.458 02.03.2009 434 LILO OF 132kV MODAK-JHALAWAR LINE FOR 132kV GSS DC 8.990 10.03.2009 MAYLARAMGANJMANDI 435 MADRI-RELIANCE CHEMOTEX SC 2.250 16.05.2008 436 LILO OF 132kV AJMER-KISHANGARH FOR 220kV GSS DC 10.122 28.11.2008 KISHANGARH 437 LILO OF RPS-MANDALGARH LINE FOR BEEGOD DC 1.680 26.01.2009 438 LILO OF 132kV KISHANGARH-MALPURA LINE FOR 132kV GSS DC 13.152 24.03.2009 SILORA 439 PALI-SOJAT CITY SC 31.945 10.06.2008 440 PHALODI-AAO SC 51.573 14.07.2008 441 PHALODI-LOHAWAT SC 26.900 19.07.2008 442 D/C PORTION COMMON TO BOTH PHALODI -AAO & PHALODI- DC 13.794 14.07.08/19.07.08 LOHAWAT LINE 443 DECHU-KALAU SC 26.912 23.10.2008 444 LOHAWAT-MATORA SC 27.895 24.11.2008 445 SHEO-UNDOO SC 47.980 01.12.2008 446 GHARSANA-KHAJUWALA SC 61.854 26.09.2008 447 SUJANGARH-PAREWARA SC 37.210 14.02.2009 448 LILO OF 132kV BHADRA-SADULPUR LINE FOR 220kV GSS DC 4.200 30.03.2009 BHADRA 449 LILO OF 132kV ALWAR-BHARATPUR LINE FOR 132kV GSS DC 6.484 26.07.2009 KUMHER 450 LILO OF 132kV ANTA-BARAN LINE FOR 220kV GSS BARAN DC 1.756 10.07.2009 451 JHALAWAR-KANWARI SC 20.520 26.07.2009 452 FROM BARAN GSS TO TRACTION SUB-STATION AT BARAN SC 2.868 03.08.2009 RAILWAY STATION (DEPOSIT WORK) 453 INTER CONNECTING LINE FROM 220KV GSS VKIA TO 132 KV SC 0.296 30.11.2009 GSS VKIA 454 INTER CONNECTING LINE FROM 220KV GSS VKIA TO EXISTING SC 0.682 04.12.2009 132 KV VKIA-KUKAS LINE 455 LILO OF 132kV SANGOD-BARAN LINE FOR 220kV GSS BARAN DC 7.104 07.12.2009

456 LILO OF KOTPUTLI-SHAHPURA LINE FOR 132kV GSS PAOTA DC 0.960 07.02.2010

457 BALAWALA-PHAGI SC 21.687 15.03.2010 458 SAWAIMADHOPUR-BHADOTI SC 29.968 24.03.2010 459 LILO OF 132KV BUNDI-DEOLI LINE FOR 132kV GSS HINDOLI DC 7.940 30.03.2010

460 LILO OF K.G.BAS-BHIWADI LINE FOR 220kV GSS KHUSKHERA DC 4.880 31.03.2010

461 LILO OF 132KV KOTPUTLI-NEEM KA THANA LINE FOR 132kV DC 4.156 22.04.2009 GSS PATAN 462 LILO OF 132KV PRATAPNAGAR-BANSWARA LINE FOR 132kV DC 47.000 25.04.2009 GSS DALOT 463 LILO OF 132KV SIKAR-UDAIPURWATI LINE FOR 132kV GSS DC 6.678 24.05.2009 PIPRALI 464 LILO OF 132KV KISHANGARH-PHULERA LINE FOR 220kV GSS DC 23.436 27.06.2009 KISHANGARH 465 NAGAUR-JAYAL SC 47.156 03.02.2010 466 LILO OF 132KV RPS-BEEGOD(CKT-I) FOR 132kV GSS BIJOLIYA DC 28.668 31.03.2010

467 BANSWARA-PALODA SC 35.458 31.03.2010 468 LILO OF 132KV BIKANER-SRIDUNGARGARH LINE FOR 132kV DC 18.944 22.05.2009 GSS DULCHASAR 469 SRIDUNGARGARH-BADNU SC 27.701 27.06.2009 470 LILO OF 132KV JALORE-SIWANA LINE FOR 132kV GSS DC 3.222 31.08.2009 MANDAWALA 471 LILO OF 132KV BARMER-GADRA ROAD LINE FOR 220kV GSS DC 15.498 29.11.2009 BARMER 472 LILO OF 132KV BHINMAL-GUDAMALANI LINE FOR 132kV GSS DC 12.986 06.12.2009 BAGORA 473 RAJIASAR-SHREE CEMENT(DEPOSIT WORK) SC 11.090 22.01.2010 474 BADNU-JASRASAR SC 27.217 27.02.2010 475 BADNU-JASRASAR DC 2.482 27.02.2010 476 KAWAI GSS-TRACTION SUB-STATION AT CHHABRA GUGOR SC 15.951 07.04.2010 RLY. STATION(DEPOSIT WORK) 477 LILO OF BAGRU-BHANKROTA LINE FOR 220 KV GSS BAGRU DC 7.256 04.05.2010

478 LILO OF KOTPUTLI-BEHROR LINE FOR 132 KV GSS DC 3.746 18.06.2010 KESHWANA 479 LILO OF BHIWARI-KHUSKHERA LINE FOR 132 KV GSS DC 10.034 22.07.2010 CHOPANKHI 480 INTERCONNECTION OF 132KV PURANAGHAT-SITAPURA LINE DC 0.404 30.10.2010 AT 220KV GSS INDIRA GANDHI NAGAR 481 PHULERA-DUDU SC 21.948 17.11.2010 482 JOBNER-M/S SHREE CEMENT(DEPOSIT WORK) SC 6.314 15.11.2010 483 BEHROR-JHAKRANA(TURNKEY LINE) SC 15.486 06.12.2010 484 KAWAI-ATRU(TURNKEY LINE) SC 11.530 14.12.2010 485 DUNI-DEOLI SC 33.402 15.12.2010 486 LILO OF MANDAWAR-TODABHIM LINE FOR 132 KV GSS DC 1.616 22.02.2011 MAHUWA 487 LILO OF S/C JAMWARAMGAH-RAJGARH LINE FOR 132 KV GSS DC 3.320 17.02.2011 ANDHI 488 LILO OF HEERAPURA-HINGONIA LINE FOR 132 KV GSS DC 4.598 22.02.2011 CHAMPAPURA 489 DHOLPUR-ROOPWAS(TURNKEY LINE) SC 45.297 16.03.2011 490 LILO OF BUNDI-KOTA LINE FOR 132 KV GSS TALERA DC 4.470 26.03.2011 491 LILO OF KOTA-MODAK LINE FOR 132 KV GSS MANDANATOWN DC 9.542 27.03.2011

492 RAYLA-M/S SANGAM INDUSTRIES(DEPOSIT WORK) SC 6.251 10.04.2010 493 LILO OF NIMBAHERA-SAWA LINE FOR 132KV GSS BHADESAR DC 29.220 26.04.2010

494 LILO OF BHILWARA-RAYLA LINE FOR 132KV GSS DANTA DC 9.156 06.06.2010 495 KISHANGARH-ROOPANGARH SC 22.426 10.06.2010 496 LILO OF BHILWARA-PALI LINE FOR 132KV GSS KARERA DC 3.792 17.06.2010 497 BANSWARA-MAHI CEMENT(DEPOSIT WORK) SC 19.310 27.06.2010 498 JHUNJHUNU-BHERUNDA KALAN SC 18.240 29.07.2010 499 SURAJGARH-DULANIYA(TURNKEY) SC 14.170 28.07.2010 500 SULTANA-BHERUNDA KALAN SC 13.789 28.10.2010 501 LILO OF KHINWSAR-SOYALA LINE FOR 132KV GSS NARWA DC 23.062 07.12.2010

502 SALUMBER-DHARIYAWAD(TURNKEY) SC 68.784 20.12.2010 503 NEEM KA THANA -BINANI CEMENT(DEPOSIT WORK) SC 5.640 15.12.2010 504 LILO OF KHETRINAGAR-NEEM KA THANA LINE AT 132 GSS DC 2.384 19.01.2011 BABAI 505 RANOLI-KHANDELA MOD SC 25.001 24.03.2011 506 LILO OF LAXMANGARH-FATEHPUR LINE FOR 132KV GSS DC 18.810 27.03.2011 ANTROLI 507 LILO FOR SANCHORE DC 6.636 28.04.2010 508 SANCHORE-GALIFA SC 18.502 28.04.2010 509 SRIDUNGARGARH-RIRI SC 16.855 24.06.2010 510 LILO OF SURATGARH-ANOOPGARH LINE FOR 132KV GSS DC 20.752 26.06.2010 SRIVIJAINAGAR 511 REODAR-BADAGAON SC 34.933 30.06.2010 512 LILO OF PALI-FALNA LINE FOR 132KV GSS TAGORE NAGAR DC 1.246 15.08.2010

513 LILO OF DHORIMANNA-SAWA LINE FOR 132KV GSS RANASAR DC 9.560 03.11.2010

514 SAWA-SATA SC 46.011 07.01.2011 515 LILO OF JALORE-JEEWANA LINE FOR 132KV GSS SAYLA DC 2.592 13.01.2011 516 DECHU- SANWREEJ SC 24.710 14.03.2011 517 LILO OF DECHU-POKHRAN LINE FOR 220KV GSS DECHU SC 1.105 28.03.2011 518 SANGARIA-BIOMASS PLANT(DEPOSIT WORK) SC 0.350 31.03.2011 519 LILO OF 132KV MANDAWAR-ALWAR LINE FOR PINAN DC 3.542 02.04.2011 520 LILO OF 132KV TODABHIM-SIKANDRA LINE FOR SIKRAI DC 4.148 30.04.2011 521 LILO OF 132KV D/C HINDAUN-TODABHIM LINE FOR DC 4.286 09.07.2011 P.S.MAHUWA 522 BHIWADI-M/S AMTEK AUTO(DEPOSIT WORK) SC 0.806 06.08.2011 523 NPH-PWD BANGLOW(TWO CIRCUITS) DC 7.301 14.10.2011 524 LILO OF HINDAUN-GANGAPUR LINE FOR BAROLI DC 15.320 11.01.2012 525 LILO OF KHETRI-GUDAGORJI LINE FOR 132KV GSS NANGLI DC 1.010 31.05.2011

526 DHOD-KACHHAWA SC 20.349 15.06.2011 527 DHOD-LOSAL SC 15.136 15.06.2011 528 DEOLI-JAHAZPUR SC 18.330 30.06.2011 529 LILO OF D/C BANSWARA-SAGWARA LINE FOR 132KV GSS DC 18.784 07.07.2011 PARTAPUR 530 LILO OF 132KV BHILWARA-HAMIRGARH LINE FOR 132KV GSS DC 0.932 22.08.2011 RIICO BHILWARA 531 SARADHANA-PUSHKAR ROAD SC 19.600 23.08.2011 532 LILO OF 132KV REENGUS-GOVINDGARH LINE FOR 132KV GSS DC 3.878 24.09.2011 RIICO REENGUS 533 LILO OF SENTHI-NIMBAHERA LINE FOR 132KV GSS DC 0.700 30.11.2011 RASOOLPURA 534 LILO OF CHITTORGARH-HAMIRGARH LINE FOR 132KV GSS DC 38.620 01.12.2012 RASHMI 535 JAYAL-M/S AZURE POWER SC 4.675 31.12.2011 536 JHUNJHUNU-MALSISAR SC 46.300 20.01.2012 537 LILO OF 132KV MDSU-BHERUNDA LINE FOR 132KV GSS DC 20.802 30.03.2012 PUSHKAR 538 LILO OF 132KV DECHU-POKHRAN LINE FOR 220KV GSS DC 1.105 06.04.2011 DECHU 539 LILO OF 132KV DECHU-PHALODI LINE FOR 220KV GSS DECHU DC 5.120 06.04.2011

540 MOMASAR-PATLISAR PHANTA SC 12.654 02.07.2011 541 HANUMANGARH-RAWATSAR SC 40.839 27.07.2011 542 RIRI-UPANI SC 13.274 29.07.2011 543 PHALODI-BAAP SC 32.036 29.07.2011 544 NOKHA-JASRASAR DC 76.108 09.08.2011 545 HANUMANGARH-GALUWALA SC 29.027 25.01.2012 546 LILO OF JODHPUR-PALI LINE FOR 220KV GSS BORANADA DC 10.376 05.03.2012

547 132 KV SC Sapotra - Keladevi Line SC 22.308 27.4.2012 548 132 KV SC Gangapur City (220 KV GSS ) Sapotra Line SC 28.387 7.6.2012 549 LILO of 132 Kv DC line Talera - Bundi at 220 Kv GSS Bundi DC 12.544 10.7.2012 550 132 Kv Dc Line Gangapurcity (220 KV GSS) - Ganagapurcity (132 DC 6.900 31.7.2012 Kv GSS) 551 132 KV SC line Neemrana (220 KV GSS ) - M/S. SEL Textile SC 2.924 25.8.2012 552 132 KV SC Baseri - Sarmathura SC 27.810 31.8.2012 553 LILO of 132 KV Sangod- Kawai Line for Bapwar DC 3.960 31.10.2012 554 132 KV SC Line from location No. 3 of 220 KV GSS Bhiwadi - SC 0.227 22.10.2012 Chopankhi Line tS Saint Gobain (Deposit Works) 555 132 KV S/CLine from Chopankhi - M/S. Sri Ram Piston (Deposit SC 2.931 27.11.2012 Works) 556 Shifting of 132 KV SC Bhawanimandi - Modak Line near Rewa Dam SC 5.390 4.1.2013

557 132 Kv SC Manoharpur - Ajeetgarh Line SC 29.727 5.1.2013 558 132 KV Sc Srimahaveerji - Ngl Sherpur SC 15.633 2.2.2013 559 LILO of 132 KV Mandawar - Bandikui Line for 132 KV GSS DC 5.492 7.2.2013 Dhingariabhim 560 132 KV SC line from 200 KV GSS Bundi to 132 KV GSS Bundi SC 8.361 18.2.2013 561 132 KV SC Line from 132 KV GSS Hameergarh - Nitin Spiners SC 4.301 28.6.2012

562 132 KV SC Srimadhopur - Thoi SC 21.840 13.8.2012 563 132 KV SC line to RIICO Reengus from ctNo. 60B SC 1.775 4.9.2012 564 132 KV SC Line Kankroli - Sapol ( 24.076 Km. SC line SC 25.976 6.11.2012 commoissioned on 6.11.2012 and remaining 1.900 KM. line commissioned on 14.2.2013 565 132 KV SC Zawarmines - Rishabdeo SC 33.997 23.11.2012 566 LILO of 132 KV Asind Beawer lineat 132 KV GSS Pratappura DC 21.816 26.12.2012 567 132 KV SC Beegod- Kachola line SC 18.790 10.1.2013 568 132 KV SC line from 220 KV GSS Sawa to M/S/ Lafarg Ltd. SC 15.785 19.2.2013 (Deposit Works) 569 132 KV DC LILO of Salumber - Dhariyabad line at 220 KV GSS DC 23.080 13.3.2013 Aspur 570 Modification work of 132 KV RPS - Bhilwara line at 220 KV GSS SC 2.782 4.3.2013 Mandalgarh 571 LILO of 132 KV DC Bhinasar - Kolayat line at 220 KV GSS Gajner DC 27.950 9.7.2012

572 132 KV SC Padroo- Junameetha Khera( Section of 132 KV SC SC 16.692 23.7.2012 Padroo- Junameetha Khera- SindhariSindhari - Junameetha Khera ( Line) 573 132 KV SC Padroo- Junameetha Khera SC 12.610 15.8.2012 574 132 KV SC Srikaranpur - Kaminpura SC 20.551 7.8.2012 575 LILO of 132 KV SC Sawa-Sata line for Swdwa DC 4.260 26.9.2012 576 LILO of 132 KV SC Jodhpur (220 KV GSS)- Banar Line at 132 KV DC 2.040 31.10.2012 GSS Khuribhagtasani 577 LILO of 132 KV SC Jodhpur -Baori Line for 220 KV GSS Bhawad DC 12.860 4.3.2013

578 132 KV XLPE Cable from 132 KV GSS Banar to OPH S DC 13.720 15.3.2013 579 132 KV SC line DC Towers from PS-2 to M/S. Godavari Green SC 10.670 26.3.2013 (Deposit Works) 580 LILO OF 132KV DHOLPUR-RAJAKHERA LINE AT 132KV GSS D/C MANIYA 29.832 01.04.2013 581 LILO OF 132KV KG BAS -KHUSHKHERA LINE AT 132KV GSS PUR D/C KOTKASIM 11.088 01.04.2013 582 132 KV S/C MANOHARPUR - SHAHPURA(CKT-II) S/C 13.151 08.07.2013 583 132 KV S/C JHAKHARANA - MANDAN LINE S/C 31.895 14.11.2013 584 LILO OF 132KV PAOTA - SHAHPURA LINE AT 132KV GSS D/C BILWADI 11.052 22.01.2014 585 LILO OF 132KV BANSUR - THANAGAZI AT 132KV GSS D/C NARAINPUR 4.02 21.02.2014 586 132KV D/C LINE FROM 220KV GSS BHIWADI - M/S STRIDE D/C 4.454 12.03.2014 AUTO PARTS LTD.,I/A KAHRANI(DEPOSIT WORK)** 587 LILO OF 132KV KEKRI-DEOLI LINE AT 132KV GSS SAWAR D/C 9.94 11.04.2013 588 132KV S/C MDSU-PUSHKAR ROAD LINE S/C 11.706 12.04.2013 589 132KV S/C GANGAPUR-RAIPUR LINE S/C 22.824 22.04.2013 590 132KV S/C MAVLI - SANWAD LINE S/C 16.738 07.06.2013 591 132KV S/C DHOD - DAYALPUR LINE S/C 30.17 11.06.2013 592 132 KV S/C AJOLIYA KA KHERA - BASSI LINE S/C 18.31 27.07.2013 593 D/C 20.052 29.07.2013 LILO OF 132KV BEAWER -GULABPURA LINE AT 132 KV MASUDA 594 Gentry work of Lilo of 132kV Beawer - Gulabpura line at 132kV D/C 0.160 23.10.2013 GSS Masuda 595 132KV S/C LINE FROM 132KV GSS DANTA - M/S KANCHAN S/C 2.475 15.09.2013 INDIA LTD. NANK PURA(DEPOSIT WORK) 596 D/C 10.372 12.10.2013 LILO OF 132KV KHETRI NAGAR- BABAI LINE AT 132 KV MEHARA 597 132KV S/C MAHALPAS-BUHANA LINE S/C 14.251 15.10.2013 598 132KV S/C AJEETGARH - SANWALPURA TANWARAN LINE S/C 17.108 15.03.2014 599 LILO OF 132KV BADNU - JASRASAR LINE AT 132KV GSS D/C LALMDESAR BADA 4.592 03.04.2013 600 D/C LILO OF 132KV PUGAL ROAD -GAJNER AT 220KV GSS GAJNER 31.102 05.04.2013 601 LILO OF 132KV REODAR - ABU ROAD LINE AT 132KV GSS RIICO D/C ABUROAD 0.976 06.04.2013 602 132 KV S/C SANCHORE - PALADAR LINE S/C 17.331 21.08.2013 603 LILO OF 132KV NAPASAR - BADNU LINE AT 132KV GSS D/C MOONDSAR 5.40 21.10.2013 604 132 KV S/C BAITHWASIA - MATORA LINE S/C 18.755 15.11.2013 605 (33 Mtr gantry portion at 220kV GSS Baithwasia pending) 606 132KV S/C BORUNDA- NIMBOL LINE FOR M/S SIDHI VINAYAK S/C 15.49 01.03.2014 (DEPOSIT WORK)** 607 132kV S/C cable laying between 220kV GSS I.G.Nagar to 132kV GSS MNIT (GIS) S/C 8.464 02.04.2014 608 LILO of 132kV Dausa - Lalsot line at 132kV GSS Nangal Pyariwas D/C 5.514 05.07.2014 609 132kV S/C Chomu - Jatawali line S/C 14.359 12.11.2014 610 132kV S/C Lalsot - Bagadi line S/C 21.10 31.12.2014 611 132kV S/C Bhadoti - Bagadi line S/C 36.20 31.12.2014 612 (Above two lines earlier shown as 132kV S/C Lalsot - Badoti Line & LILO of 613 132kV Lalsot - Bhadoti line at 132kV GSS Bagadi ) 614 132kV S/C Gangapurcity - Shrimahaveerji line S/C 33.775 08.01.2015 615 132KV S/C line from 132kV GSS Tijara to M/s Kajaria Ceramics (Deposit work) S/C 16.217 30.01.2015 616 132kV S/C Bansur - Mundawar S/C 33.178 03.03.2015 617 132kV S/C Dahra - Sultanpur S/C 22.243 11.03.2015 618 132kV S/C line on D/C tower from 132kV GSS Ramgarh to Railway TSS Ramgarh (Deposit work) S/C 1.57 14.03.2015 619 132kV S/C Nangalsherpur- Gudachanderji S/C 21.57 31.03.2015 LILO of 132kV S/C Kankroli- Sapol line at 220kV GSS Baman Ka tukda D/C 18.922 07.04.2014 620 LILO of 132kV Salumber - Sagwara line at 220kV GSS Aspur D/C 23.668 30.05.2014 621 132kV S/C Madri - Dakan Kotda S/C 10.16 09.10.2014 LILO of 132kV Beawer- Merta at 220kV GSS Jethana D/C 32.61 09.12.2014 622 LILO of 132kV Ajmer - Saradhana at 132kV GSS Subhashnagar D/C 0.826 16.12.2014 623 132kV D/C interconnection between Deedwana(400kV) - Deedwana(132kV) D/C 8.978 17.12.2014 132kV S/C Mahapalwas - Dulaniya S/C 23.926 24.02.2015 624 132kV S/C Bagidora - Kushalgarh S/C 31.63 28.02.2015 625 LILO of 132kV Rishabhdev- Dungarpur at 132kV GSS Kherwara D/C 27.232 28.02.2015 LILO of 132kV Nagaur - Ladnu at 132kV GSS Deh D/C 0.49 23.03.2015 626 132kV D/C under ground cable from LILO Point of 132kV Jodhpur - PS8 line to 132kV GSS CHB Jodhpur D/C 7.94 11.06.2014 627 132kV underground cable from 132kV GSS CHB Jodhpur to 132kV GSS Pratapnagar GIS Jodhpur D/C 10.16 11.06.2014 132kV S/C Tehendesar - Parewara S/C 19.003 15.06.2014 628 LILO of existing 132kV S/C Aau- Phalodi line at proposed 220kV GSS Aau D/C 1.346 30.07.2014 629 132kV S/C CHB line along bypass road to interconnect 132kV line emanating from 220kV GSS Jodhpur to Pali & PS- 8 S/C 2.244 20.02.2015

LILO of 132kV Pokharan- Askandra at 132kV GSS Ajasar D/C 0.53 28.02.2015 630 132kV D/C underground cable (500 sq.mm) from 132kV GSS NPH to 132kV GIS MBM Engineering College Jodhpur D/C 8.658 29.03.2015 631 132kV S/C underground cable (500 sq.mm) from 132kV GSS OPH to 132kV GIS MBM Engineering College Jodhpur S/C 2.415 29.03.2015 632 132kV D/C Chonkarwada - Mahuwa D/C 52.48 17.04.2015 633 132kV S/C Gangapurcity - Batoda S/C 20.76 10.06.2015 634 132kV S/C Chhipabarod - Kolukheri S/C 24.735 10.06.2015 635 220kV D/C Interconnection between 220kV GSS Sitapura - 132kV GSS Sitapura(charged on 132kV) D/C 0.65 24.07.2015 636 LILO of 132kV Heerapura - VKIA - Rampura Dabri at 132kV GSS Sarnadoongar D/C 2.00 31.07.2015 637 LILO of 132kV D/C Keshwana - Behror at 220kV GSS Behror D/C 28.82 30.10.2015 638 LILO of 132kV S/C Kotputli - Bansur at 220kV GSS Bansur D/C 4.78 20.11.2015 639 LILO of 132kV Balawala-Phagi line at 220kV GSS Vatika D/C 14.84 16.12.2015 640 LILO of 132kV Nagar - Ramgarh at 132kV GSS Govindgarh D/C 14.388 31.01.2016 641 LILO of 132kV Jhalawar - Bakani at 132kV GSS Rooparail D/C 0.564 11.02.2016 642 132kV S/C Line from 220kV MIA Alwar - M/s Synergy steel (Deposit work)** S/C 0.849 18.03.2016 643 Section from 220KV D/C IG Nagar - 132V GSS Sitapura (A part of 2nd ckt of 220kV D/C IG Nagar to 220KV Sitapura line)** S/C 7.738 19.03.2016 644 LILO of 132kV Baran - Kelwara at 132kV GSS Kishanganj** D/C 4.45 27.03.2016 645 LILO of 132kV Silora- Malpura at 132kV GSS Arain D/C 15.148 27.07.2014 646 132kV S/C Roopangarh - Parbatsar S/C 22.546 21.12.2015 647 132kV S/C Sagwara - Seemalwara S/C 41.279 23.12.2015 648 132kV S/C Paloda - Ghatol S/C 40.597 28.12.2015 649 LILO of 132kV S/C Mokhampura - Amet at 220kV GSS Baman ka tukda D/C 11.128 09.01.2016 650 132kV S/C Kherwara - Bichhiwara S/C 21.334 03.03.2016 651 LILO of 132kV Banswara - Dalot line at 132kV GSS Peepalwa D/C 2.74 16.03.2016 652 132kV S/C Asind - Bhim S/C 27.6 18.03.2016 653 LILO of 132kV S/C Buhana - Dulaniya at 132kV GSS Mahapalwas D/C 3.804 17.03.2016 654 132kV S/C Bhadla - Khetusar (on D/C towers) S/C 27.88 24.04.2015 655 132kV S/C Deshnok - Panchu S/C 34.072 07.08.2015 656 132kV S/C Jaitaran - Anandpur Kaloo S/C 17.651 27.09.2015 657 LILO of 132kV Sayla-Jeewana at 220kV GSS Sayla D/C 5.766 30.09.2015 658 132kV D/C Baithwasia-Osian (Only one ckt is charged) S/C 12.94 06.10.2015 659 132kV S/C Bhawad - Mathania S/C 14.035 16.10.2015 660 132kV S/C Tinwari - Kirmasariya S/C 12.98 27.10.2015 661 LILO of 132kV Sirohi-Sumerpur at 132kV GSS Posaliya D/C 3.042 28.10.2015 662 132kV S/C Parewara - Bhasina S/C 14.698 29.10.2015 663 132kV S/C Baithwasia - Hatundi S/C 22.94 16.12.2015 664 LILO of 132kV Bikaner - Dulchasar at 132kV GSS Sherera(only one ckt is charged) D/C 14.25 29.01.2016 665 LILO of 132kV Phalodi - Aau at 132kV GSS Shaitan Singh Nagar D/C 1.132 10.03.2016 666 LILO of 132kV Sardarshahar - Rajiasar at 132kV GSS Bhanipura D/C 0.778 16.03.2016 667 132kV D/C Baithwasia-Osian (2nd ckt is charged) S/C 11.61 17.03.2016 668 (one ckt already charged on 06.10.15) 669 LILO of 132kV Sayla-Daspan at 220kV GSS Sayla D/C 19.13 18.03.2016 670 LILO of 132kV Pindwara - Abu Road at 132kV GSS Swaroopganj D/C 5.78 30.03.2016 671 132 KV S/C Line from 220 KV GSS Baran to proposed 132 KV GSS Mangrol S/C 32.13 11.04.2016 672 132kV S/C Line from 132kV GSS Mundawar to Railway TSS (between Khairtal - Harsauli railway stations)(Deposit work ) S/C 6.571 04.05.2016 673 LILO of 132kV Bassi - Puranaghat at 220kV GSS Goner D/C 21.24 09.05.2016 674 132kV S/C Kaman- Pahari S/C 24.858 13.05.2016 675 132kV S/C Bhawanimandi - M/s RTM (Deposit work) S/C 6.552 29.06.2016 676 LILO of 132kV Chomu - Markhi at 220kV GSS Niwana D/C 14.234 30.06.2016 677 132kV S/C Lalsot - Toonga S/C 28.091 02.07.2016 678 132kV S/C Line from 132kV Deeg to Railway TSS Deeg (on D/C towers)(Deposit work of Railways) S/C 4.452 13.07.2016 679 LILO of 132 KV Behror-Jakhrana line at 220 KV GSS Behror D/C 2.2 23.11.2016 680 132kV D/C line from 220kV GSS Niwana - 132kV GSS Govindgarh** D/C 18.286 08.02.2017 681 LILO of existing 132 KV Kuchera-Sanjoo line at proposed 220 KV GSS Kuchera D/C 2.648 05.04.2016 682 LILO of existing 132 KV Kuchera-Merta line at proposed 220 KV GSS Kuchera D/C 2.764 06.04.2016 683 132 kV S/C Sanju- Bherunda line with LILO at 132 kV GSS Degana S/C 67.402 21.12.2016 684 Lilo of 132 kV Dalot-Pratapgarh line for 132 kV GSS Mokhampura D/C 33.7 17.01.2017 685 132 kV S/C Bhinder-Joojhpura S/C 22.995 27.01.2017 686 LILO of existing 132 kV S/C Jodhpur(220kV GSS)- Bilara line at 220 KV GSS Jhalamand (1 ckt. Only) D/C 0.615 28.10.2016 687 132 kV S/C Dechu - Setrawa S/C 25.519 27.10.2016 688 LILO of 132 kV Sridungargarh- Ratangarh line for 132 kv GSS Parsneu D/C 2.16 21.12.2016 689 132 kV S/C Baithwasia - Bhikamkore S/C 21.345 27.12.2016 690 LILO of 132 kV CBH -Soorsagar line at 220kV GSS Barli D/C 11.818 14.01.2017 691 LILO of 132KV D/C Sridungargarh- Ratangarh line for D/C 3.03 25.02.2017 132KV GSS, Kitasar 692 LILO of 132KV Jaisalmer- Sheo line for 132KV GSS, Sangarh D/C 1.764 26.02.2017

693 132KV S/C Bali-Desuri line for 132KV GSS, Desuri S/C 32.854 28.02.2017 694 lilo OF 132 kv Sakatpura-Talera Line at 132 KV GSS Nanta D/C 0.26 29.3.2017 695 LILO of 132 KV Sawaimadhopur- Tonk at 132 KV GSS Chauth Ka Barwara D/C 4.128 29.3.2017 696 LILO of 132 KV Sakatpura I/A-II Line on Narrow base & Monopole Towers at 132 KV GSS Dadabari D/C 3.668 30.3.2017 697 132 Kv S/C Kelwara-Mamoni Line S/C 23.568 30.3.2017 698 LILO of 132 KV S/C Madri-Zawar Mines for 132 KV GSS Balicha D/C 15.638 14.3.2017 699 132 KV S/C Nimbahera-Kanasar Line for 132 KV GSS Kanasar(S/C portion 11.462 KM. +one CKT of D/C portion- 26.5 KM. + one CKT of D/C portion Nimbahera - Neemach modification section- 8.68 KM. TOTAL- 11.462+8.68+26.5=46.642 Kms.) S/C 46.642 25.3.2017 700 LILO of 132 KV S/C Sikar-Ranoli Line at 132 KV GSS Water Works, Sanwali Road, Sikar D/C 1.332 31.3.2017 701 132 KV S/C Aau-Bapini Line for 132 KV GSS, Bapini S/C 26.941 2.3.2017 Updating of existing 132 KV S/C Sikar-Laxmangarh - Fatehpur-Ratangarh Line (with Wolf conductor on H-Pole tpwers to ACSR Panther conductor on Lattice type towers) S/C 80.559 3.10.2016 702 LILO of 132 kV S/C Bhawanimandi Dug line at 220 kV GSS D/C 1.392 29.06.2017 Bhawanimandi 703 LILO of 132 kV S/C Bhawanimandi- Hemda line at 220 kV D/C 0.99 29.06.2017 GSS Bhawanimandi 704 LILO from existing 132 KV Kota-Sawai Madhopur line D/C 7.898 12.10.2017 circuit-I to 132 KV GSS Keshorai Patan 705 1200 Sq mm 132 KV single core XLPE Cable for establishing of approx. 2.2 Km 132 KV D/C from LILO point of Vaishali- D/C 4.38 28.10.2017 VKIA line to 132 KV GIS new Jhotwara 706 LILO of 132kV Dholpur - Rajakhera line at 132 kV GSS D/C 13.212 05.09.2017 Marena * 707 132KV S/C Nimbahera- Bijaypur Line [ S/C portion - 12.66 kM + one ckt of D/C portion - 26.5 kM + one ckt of D/C portion Nimbhera-Neemach modification S/C 47.84 29.04.2017 section - 8.68 kM Total= 12.66+8.68+26.5= 47.84 Kms ] 708 LILO of exsisting 132 kV Bigod-Bijoliya line at 220 kV GSS D/C 0.5 30.05.2017 Mandalgarh 709 132 KV Jethana (220KV GSS) - Saradhana line S/C 15.861 15.06.2017 710 LILO of 132 KV Nasirabad- Beawer line at 220 KV GSS D/C 10.982 28.06.2017 Jethana 711 LILO of 132 KV S/C Debari-Sukher line at 220 KV GSS D/C 2.932 04.08.2017 Amberi 712 LILO of 132 KV S/C Sukher- Sisarama line at 220 KV GSS D/C 2.968 05.08.2017 Amberi 713 LILO of existing 132KV S/C Mandalgarh-Begun line at 220 D/C 0.760 19.08.2017 KV GSS Mandalgarh 714 LILO of 132 kV Hamirgarh(220 kV GSS) - M/s Nitin D/C 7.974 10.11.2017 Spinners at 132 kV GSS RIICO Growth Center Hamirgarh 715 132 kV line from 132 kV GSS PS2 to 220 kV GSS Kanasar D/C line 23.156 22.09.2017 716 Construction of 132 KV S/C Line for M/S ALP Polymer Pvt. S/C 3.812 25.02.2018 Ltd. At 132 KV GSS Shahjahanpur & its Bay (Deposit Work) 717 132kV Dug - Gangdhar line ** S/C 22.75 19.03.2018 718 LILO of 132kV Jhalawar-Aklera line for 132 kV GSS Dhanodi D/C 2.76 24.03.2018 719 LILO of 132kV Bhiwadi - Khushkhera line for 132 kV GSS D/C 0.748 28.03.2018 Baba Mohan RamTemple 720 132kV Khanpur - Sarola Kalan line S/C 19.244 29.03.2018 721 LILO of 132 kV Dholpur-Maniya line for 132 kV GSS RIICO D/C 2.168 30.03.2018 Dholpur 722 Construction of 132 KV S/C Line for M/S Honda Motorcycle & Scooter India Pvt. Ltd. At 220 KV GSS Khushkhera S/C 1.66 24.03.2018 (Deposit Work) ** 723 132 kV Kapasan-Bhopalsagar line S/C 12.996 03.01.2018 724 LILO of 132 kV S/C Padampur-Sriganganagar line at 132 kV D/C 9.01 17.01.2018 GSS Tatarsar 725 LILO of 132 kV S/C Nokha-Dechu line at 132 kV GSS D/C Bhamatsar 15.84 28.01.2018 726 132KV Khajuwala-Chhatargarh line S/C 53.953 15.02.2018 727 132 kV Nokhadhaiya-Khajuwala line ** S/C 84.39 08.03.2018 728 132kV Dechu - Nathrau line ** S/C 22.6 30.03.2018 729 132kV Bali - Bera line ** S/C 25.471 31.03.2018 730 132 kV S/C Karauli-Mandrayal line S/C 36.296 24.04.2018 731 132 KV Two Phase line from 132 KV GSS Rajgarh to Railways TSS Rajgarh S/C 3.96 28.04.2018 ( Deposit work of Railways) 732 132 KV S/C Hindoli-Dablana Line S/C 23.91 30.06.2018 733 LILO of RPS-Mandalgarh line for 132 kV GSS Dabi D/C 31.42 25.10.2018 734 132 KV S/C line fit on D/C Circuit tower from 132 KV GSS Nangal Pyariwas to TFS Khan-Bhankri TSS ( Deposit work S/C 26.93 02.11.2018 of Railways) 735 Construction of 132 KV Two Phase line from 132 KV GSS Mandan to Railways TSS Kathuwas ( Deposit work of S/C 7.316 06.11.2018 Railways) 736 132KV D/C from 132KV GSS Nawalgarh to (U/C) 220KV D/C 23.184 26.04.2018 GSS Nawalgarh(PPP) 737 132KV LILO of Nagaur-Khinvsar line at 132KV GSS Gogelaw D/C 22.194 18.07.2018 738 132KV S/C Nawalgarh-Udaipurwati line at (U/C) 220KV S/C 25.760 26.07.2018 GSS Nawalgarh(PPP) 739 132 kV LILO of Nimbhahera-Mangalwar line at 132 kV GSS D/C 3.640 17.08.2018 Dhoriya Chauraha 740 132 kV LILO of Bhilwara-RPS-I line at 132 kV GSS Kotri D/C 21.840 23.10.2018 741 132 kV S/C 220KV GSS Nawalgarh(U/C PPP) - Kumawas- S/C 22.864 29.10.2018 line 742 132 kV S/C 220KV GSS Nawalgarh(U/C PPP)- Gudagorgi S/C 28.886 31.10.2018 line 743 132 kV S/C Dudu-Pata patan line ** S/C 26.970 30.03.2019 744 LILO of 132 kV Tinwari-Osian line at 132 kV GSS Bana Ka D/C 35.336 30.04.2018 Bas 745 132KV LILO of Jodhpur (Basni)- PS-8 at 220KV Barli D/C 2.92 05.05.2018 746 132 kV D/C PSIII - Kanasar D/C 22.262 21.05.2018 747 LILO of 132 KV D/C Jalore-Sayla line at 132kV GSS Bakara D/C 14.718 30.06.2018 748 LILO of S/C Nokhadaiya -khajuwala line at 132kv GSS RD-710 D/C 14.55 31.07.2018 749 LILO of S/C Suratgarh-Pilibanga -Hanumangarh line at 132 D/C 20.92 11.10.2018 kV GSS Fatehgarh 750 LILO of 132KV S/C Sardarsahar-Rajiasar line at 220KV GSS D/C 9.07 29.11.2018 Halasar 751 132 kV S/C line from 132 kV GSS Kharchi to TSS Marwar Junction S/C 3.40 19.03.2019 ( Deposit work of Railways) ** 752 132 kV S/C Gangapurcity(220 kV GSS)-Bamanwas line S/C 23.857 26.07.2019 753 132 KV line from 132 KV GSS Bhiwadi to M/S APM Bhiwadi S/C 0.162 01.08.2019 (Deposit Work) 754 LILO of 132 kV S/C Kishangarh Bas-Mundawar Line at D/C 0.92 22.08.2019 132 kV GSS Khairthal 755 132 KV S/C Line from 220 KV GSS Phulera to 132 KV S/C 1.535 11.10.2019 railway TSS Phulera (Deposit work) 756 LILO of 132 kV S/C Alwar-Bansur Line at 132KV GSS D/C 1.144 24.10.2019 Telco Circle (Alwar) 757 LILO of 132 kV S/C Alwar-Kishangarh bas line at 132KV D/C 11.312 01.11.2019 GSS Bahadarpur (Alwar) 758 LILO of 132 kV S/C Dholpur-Baseri line at 132 KV GSS D/C 24.524 14.11.2019 Bari 759 LILO of 132 kV S/C Bansur-Narainpur at 220 kV GSS D/C 8.134 07.12.2019 Bansur 760 Construction of 132 KV S/C line from 132 KV GSS Rasoolpura to premises of M/s J.K Cement Ltd. Mangrol S/C 9.950 16.10.2019 (Deposit Work) 761 Construction of 132 KV S/C Two Phase Transmission line on D/C Tower from 132 KV GSS Senthi to Gosunda S/C 9.650 27.12.2020 132/25 KV TSS for Railway electrification work (Deposit Work of Railway) 762 LILO of 132 kV S/C Rajiasar-bhanipura -Sardarshahar D/C 7.98 01.06.2019 line at 132 kV GSS Pallu 763 132 kV S/C Jaisalmer(132 kV GSS)- Military Station (Jaisalmer) line S/C 4.6 15.07.2019 (Deposit Work) 764 132 kV S/C Sata-Galifa line S/C 48.275 17.07.2019 765 132kV S/C Sawa - Chohtan line S/C 33.213 26.09.2019 766 132 KV S/C Amarpura Thedi-Tibbi Transmission line S/C 11.684 09.11.2019 767 132kV S/C line from 220 KV GSS Rawatsar to 132 KV S/C 37.105 17.12.2019 GSS Nohar

TOTAL 132 KV Lines 17851.698

MISCELLANEOUS WORK:

220KV D/C Chhatrail-Ramgarh line [ 220KV D/C Chhatrail-Ramgarh line charged on 220 KV Voltage (Antitheft) from 220 KV Ramgarh-Amarsagar line (from location no. 2&3 )without gantry from both end. ] D/C 89.58 29.01.2017 [Line was commissioned during FY 2016-17 but late reported, hence the achievement is to be incorporated in the FY 2016-17] 1

220 KV D/C line from PGCIL'S 400/220 KV Neemrana (PG) to Behror ( 220 KV GSS) [Line was commissioned during FY 2017-18 but late D/C 55.64 29.12.2017 reported, hence the achievement is to be incorporated in the FY 2017-18] 2