Malvern View Bredons Norton, Worcestershire Malvern View Bredons Norton Worcestershire

Total Page:16

File Type:pdf, Size:1020Kb

Malvern View Bredons Norton, Worcestershire Malvern View Bredons Norton Worcestershire Malvern View BREDONS NORTON, WORCESTERSHIRE Malvern View BREDONS NORTON WORCESTERSHIRE Tewkesbury 6 miles Cheltenham 12 miles Worcester 14 miles Birmingham 48 miles M5 (J9) 6 miles (Distances approximate) A beautifully presented cottage overlooking the Malvern Hills Reception hall Drawing room Sitting room Kitchen/breakfast room Dining room Utility room Study/landing Hall Shower room Family bath room Three bedrooms Upstairs bathroom/potential bedroom Double garage Gardens Gardens in all about 0.41 acres 0.165 hectares. These particulars are intended only as a guide and must not be relied upon as statements of fact. Your attention is drawn to the Important Notice on the last page of the brochure. Situation • Malvern View is situated in the desirable village of Bredons Norton with views of the Malvern Hills. • Bredons Norton offers a village hall, farm shop and a church. The village has a mixture of properties from black and white timber framed cottages to Cotswold stone houses. • Cheltenham to the south offers a wide range of shopping and recreational facilities including a selection of private and state schools. • Worcester to the north offers much the same with the added benefit of Rugby at Sixways and Horse racing on the banks of the River Severn. • The village has excellent access to junction 8 and junction 9 of the M5. • Excellent schools can be found in both Worcester (Kings and Grammar) and Cheltenham (Dean Close and the Ladies College). For sale freehold • Malvern View is a Grade II listed black and white timber framed cottage dating back to the mid-17th Century with later additions in the 1990’s. • The property is part-thatched and has been fitted with a new ridge which was finished in December 2014 with additional lead flashings. • The accommodation is flexible and offers a spacious reception hall with open plan access into a dining room with inglenook fireplace and log burning stove with brick surround. • There is a spacious sitting room with gas burning stove with views to the front gardens and rolling countryside beyond. • The kitchen/breakfast room is beautifully presented with floor and wall mounted units and extends into a glass oak-framed extension with patio doors and steps leading to a further drawing room with a vaulted ceiling. • Beyond the kitchen there is also a utility room with additional storage and a downstairs shower room. There is access from the hallway to the double garage. • Beyond the drawing room there are two spacious bedrooms with a large family bathroom with rolled top bath and separate shower. The hallway also provides access to the patio and gardens to the rear of the property. • Upstairs in the original part of the cottage there is a spacious double bedroom with spacious bathroom and a featue rolled top bath. There are exceptional views of the Malvern Hills to the front. Gardens and grounds Approximate Gross Internal Floor Area • The gardens at Malvern View are exceptional, with a large variety of 209 sq.m (2,250 sq ft) mature plants and shrubs including an ornamental pond to the rear of the property. A variety of trees and hedged borders create a private and peaceful setting. Reception • There are paved walkways and a large patio terrace which is excellent Bedroom for entertaining in the summer months. • There is a large gravelled driveway with double five bar gates and Bathroom additional parking to the front of the property in front of the spacious Kitchen/Utility double garage which could be converted to additional accommodation (subject to obtaining the necessary consents). Storage Recreation Services First Floor Mains water, electricity, gas and drainage. Fixtures and fittings All items mentioned in these sales particulars are included in the sale. All others are specifically excluded. Local Authority Whychavon District Council: 01527 64252 Council Tax Band: F Directions (GL20 7FB) From Cheltenham head north on the M5, if coming from Worcester head south on the M5 leave the motorway at junction 9 heading onto the A46 towards Evesham. Remain on the A46 heading through Ashchurch and passing the army barracks on the left hand side, turn left at the traffic lights sign posted ‘Bredon’. Remain on this road passing through the village of Kinsham and heading into the village of Bredon. At the end of this road turn left towards Tewkesbury and then take the next right towards Eckington and Pershore. Stay on this road for a short while and then turn right signposted to Bredons Norton. Head through the village passing the chapel on the right, follow the road round ignoring the first right hand turn junction, take the next right into the no-through road and Malvern View will Ground Floor be found on the right hand side. This plan is for layout guidance only. Not drawn to scale unless stated. Windows & door openings are approximate. Whilst every care is taken in the preparation of this plan,please check all dimensions, shapes & compass bearings before making any decisions reliant upon them. Important Notice: Particulars: These particulars are not an offer or contract, nor part of one. You should not rely on statements by Knight Frank LLP in the particulars 01905 723438 01242 246959 or by word of mouth or in writing (“information”) as being factually accurate about the property, its condition or its value. Neither Knight Frank LLP nor any joint agent has 5 College Street 123 Promenade any authority to make any representations about the property, and accordingly any information given is entirely without responsibility on the part of the agents, seller(s) or lessor(s). Photos etc: The photographs show only certain parts of the property as they appeared at the time they were taken. Areas, measurements and distances given are Worcester WR1 2LU Cheltenham GL50 1NW approximate only. Regulations etc: Any reference to alterations to, or use of, any part of the property does not mean that any necessary planning, building regulations or other [email protected] [email protected] consent has been obtained. A buyer or lessee must find out by inspection or in other ways that these matters have been properly dealt with and that all information is correct. KnightFrank.co.uk VAT: The VAT position relating to the property may change without notice. Knight Frank LLP is a limited liability partnership registered in England with registered number OC305934. Our registered office is 55 Baker Street, London, W1U 8AN, where you may look at a list of members’ names. Ref: WRC140362 Photographs: February 2015 Particulars: March 2015. Kingfisher Print and Design. 01803 867087..
Recommended publications
  • Infrastructure Delivery Position Updates – MOD Ashchurch, 2016
    Cheltenham, Gloucester and Tewkesbury Councils SA8 – MOD Ashchurch Infrastructure Delivery Position Statements Issue | 20 April 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number Ove Arup & Partners Ltd 63 St Thomas St Bristol BS1 6JZ www.arup.com Cheltenham, Gloucester and Tewkesbury Councils SA8 – MOD Ashchurch Infrastructure Delivery Position Statements Contents Page 1 Strategic Allocation Key Data 1 1.1 Location & Extent of Allocation 1 1.2 Key Data 2 1.3 Proposed Scale & Mix of Development 2 1.4 Proposed Build Out Trajectory & Population Growth 4 2 Infrastructure Requirements 5 2.1 Identification of Priority Infrastructure 5 2.2 Critical Infrastructure: Transport 7 2.3 Critical Infrastructure: Flood, Water & Waste Water 8 2.4 Critical Infrastructure: Education 8 2.5 Critical Infrastructure: Healthcare 9 2.6 Desirable Infrastructure : Community & Culture 9 2.7 Desirable Infrastructure: Sports & Outdoor Recreation (Pitches & Play Space), Informal & Natural Open Space 10 2.8 Essential Infrastructure: Energy 10 | Issue | 20 April 2016 200416_MOD ASHCHURCH JCS INFRASTRUCTURE POSITION STATEMENT.DOCX Cheltenham, Gloucester and Tewkesbury Councils SA8 – MOD Ashchurch Infrastructure Delivery Position Statements 1 Summary of Infrastructure Risk This statement has been produced to set out the current position in terms of infrastructure requirements for the proposed Site Allocation at MOD Ashchurch. The statement draws upon a number of resources including planning application supporting material and detailed discussions with the site promoters and service providers undertaken in September / October 2015.
    [Show full text]
  • Midlands 16 South Midlands OAR March 2017
    Route strategies: Option Assessment Report Study Name Midlands Study Area 16 Road / Junction A46 – M5 to M40 Name Route South Midlands Local Authority/ies Warwickshire County Council, Worcestershire County Council and Gloucestershire County Council HE Region Midlands Date: 05/01/17 Version: 0.1 1 Document Control Document Title A46 between M5 J9 and the M40 J15 (inclusive of M5 J9) OAR Author Nicola Glover (ACJV) Owner Strategy and Planning Route Strategies team Distribution For review Document Status Final Draft Revision History Version Date Description Author 0.1 06/12/2016 Draft Nicola Glover 2.1 24/02/2017 Draft for assurance review Nicola Glover Reviewer List Name Role AECOM Highways England Spatial Planning Consultants for East and West Midlands Chris Bate Highways England Asset Manager – Worcestershire Kathryn Simmonite Highways England Asset Manager – Worcestershire Serena Howell Highways England Asset Manager - Worcestershire Approvals Name Signature Title Date of Version Issue Tim Lund Tim Lund Project Manager 21/03/17 2.1 Reviewed by regional coordinators March 2017. Please ensure that comments in Annex F are reviewed. Original format of this document is copyright to the Highways England. 2 Table of Contents 1. Understanding the current situation 5 2. Understanding the future situation 16 3. Justification for intervention 18 4. Identifying objectives and defining geographic scope 20 5. Generating and assessing potential options 22 6 Better performing option(s) - costing 31 Annex A – Current Year Issues from the Stakeholder
    [Show full text]
  • Tewkesbury Borough Housing Monitoring Report
    Tewkesbury Borough Housing Monitoring Report 2018/19 AUGUST 2019 Tewkesbury Borough Council Planning Policy Tewkesbury Borough Council Council Offices Gloucester Road Tewkesbury Gloucestershire GL20 5TT www.tewkesbury.gov.uk 1 TABLE OF CONTENTS TABLE OF CONTENTS ........................................................................................................................................... 2 LIST OF TABLES .................................................................................................................................................... 3 EXECUTIVE SUMMARY ........................................................................................................................................ 4 INTRODUCTION ................................................................................................................................................... 5 What is the Housing Monitoring Report? ...................................................................................................... 5 Adopted Plan Context ..................................................................................................................................... 5 Joint Core Strategy ...................................................................................................................................... 5 Tewkesbury Borough Plan to 2011 .............................................................................................................. 6 Emerging Planning Policy – Tewkesbury Borough Plan ..............................................................................
    [Show full text]
  • Ashton Under Hill Parish Council
    ASHTON UNDER HILL PARISH COUNCIL Parish Clerk: Michelle English, Delamere House, Hill Furze, Fladbury, Pershore, WR10 2NB Tel: 01386 860502, email [email protected] Source Minutes of the Parish Council Meeting held on Tuesday 12th January 2015 @ 7.00pm in the Green Room, Ashton under Hill Members and Officers present: Cllr Smith (Chair), Cllr Moore, Cllr Cope, Cllr Hague, Cllr Becket, Cllr McIntyre & Cllr Rowley In attendance: District Cllr Darby, 2 members of the public 1. Apologies: M English (Clerk) 2. Declarations of Interest: a) Register of Interests: Councillors are reminded of the need to update their register of interests. b) To declare any Disclosable Pecuniary Interests in items on the agenda and their nature. Confirmed that Cllr Hague and Cope have submitted Declaration of Interest forms to Wychavon. c) To declare any Other Disclosable Interests in items on the agenda and their nature. d) Written requests for the council to grant a dispensation (S33 of the Localism Act 2011) are to be with the clerk at least four clear days prior to a meeting. e) Councillors who have declared a Disclosable Pecuniary Interest, or an Other Disclosable Interest which falls within the terms of paragraph 12(4) (b) of the code of conduct, must leave the room for the relevant items. Failure to register or declare a Disclosable Pecuniary Interest may result in the commission of a criminal offence. 3. Minutes from November meeting were approved as true and accurate The meeting was adjourned for Public Question Time at 7.10pm to listen to Mr Finch & Mr Facer, (notes attached below) The time allocated is at the discretion of the council/chairman.
    [Show full text]
  • Land at Church Farm, Ashchurch, Gloucestershire
    LAND AT CHURCH FARM, ASHCHURCH, GLOUCESTERSHIRE ARCHAEOLOGICAL WATCHING BRIEF C.A.T JOB: 1170 C.A.T REPORT: 01065 DATE: JUNE 2001 This report has been researched and compiled with all reasonable skill, care, and attention to detail within the terms of the project as specified by the Client and within the general terms and conditions of Cotswold Archaeological Trust Ltd. The Trust shall not be liable for any inaccuracy, error or omission in the report or other documents produced as part of the Consultancy and no liability is accepted for any claim, loss or damage howsoever arising from any opinion stated or conclusion or other material contained in this report or other documents supplied as part of the Consultancy. This report is confidential to the Client. Cotswold Archaeological Trust Ltd accept no responsibility whatsoever to third parties to whom this report, or any part of it is made known. Any such party relies upon this report entirely at their own risk. © Cotswold Archaeological Trust Headquarters Building, Kemble Business Park, Cirencester, Gloucestershire, GL7 6BQ Tel. 01285 771022 Fax. 01285 771033 E-mail: [email protected] Land at Church Farm, Ashchurch, Gloucestershire: Archaeological Watching Brief CONTENTS LIST OF ILLUSTRATIONS ........................................................................................... 2 SUMMARY ..................................................................................................................... 3 1. INTRODUCTION .................................................................................................
    [Show full text]
  • Bristol to Birmingham Corridor Strategic Study Final Report
    OFFICIAL Bristol to Birmingham Corridor Strategic Study Final Report June 2021 VERSION 1.0 OFFICIAL TABLE OF CONTENTS Executive Summary 3 1. What Strategic Questions does the study seek to answer? 8 a. Introduction 8 b. What are the Strategic Questions? 8 c. Why are we asking these questions? 9 d. How has the study been undertaken? 9 e. What role has economic analysis played? 10 f. What role has timetable analysis played? 11 g. How has the study addressed the impacts of COVID-19? 12 2. What is the Bristol to Birmingham Corridor like today? 13 a. What are the strategic transport problems? 13 b. What is the rail infrastructure like? 13 c. What are rail services like? 15 d. What are the key safety and performance constraints? 17 e. What are the key capacity and capability constraints? 18 3. What could the Bristol to Birmingham Corridor be like tomorrow? 19 a. What are the rail plans and growth opportunities? 19 b. What is the new evidence on demand for passenger services? 25 c. What is the new evidence on demand for freight services? 33 4. How could stakeholder aspirations be met for tomorrow’s railway? 36 a. What are the options for improved train service specifications? 36 b. What are the options for improvements other than to train service specifications? 45 5. What is the recommended course of action? 48 a. What service improvements are we recommending? 48 b. Why are we recommending these service improvements? 53 c. What interventions are we recommending? 59 6. What are the answers to the Strategic Questions? 72 7.
    [Show full text]
  • CONCEPT MASTERPLAN REPORT JANUARY 2018 Tewkesbury Area Draft Concept Masterplan Report
    Tewkesbury Area Draft Concept Masterplan CONCEPT MASTERPLAN REPORT JANUARY 2018 Tewkesbury Area Draft Concept Masterplan Report Contents 1.0 INTRODUCTION 04 1.1 Growth context 05 1.2 Site Analysis 06 1.3 Benchmarking 07 2.0 FUTURE POTENTIAL OF TEWKESBURY 11 2.1 Opportunities and constraints 13 2.2 Development principles 15 3.0 DRAFT CONCEPT MASTERPLAN 17 3.1 Concept masterplan 18 3.2 Assumptions and approaches 19 3.3 Urban form and character 23 3.4 Development phasing 24 4.0 MASTERPLAN STRATEGIES 37 4.1 Transport strategy 38 4.2 Landscape strategy 48 4.3 Economic strategy 55 4.4 Community infrastructure strategy 57 4.5 Ashchurch Local Centre strategy 60 5.0 CONCLUSIONS AND NEXT STEPS 63 2 01. Introduction Tewkesbury Area Draft Concept Masterplan Report Introduction Purpose of this report Study Area Tewkesbury Borough Council has The indicative boundary of the study area commissioned BDP - and subconsultants and key elements are shown in Figure Urban Flow, Hardisty Jones and Alder King 1, which is the Tewkesbury area centred - to prepare a concept masterplan and around Ashchurch. Based on flooding delivery strategy for the Tewkesbury area and other constraints, this is considered with the following aims: to be the principal part of the Tewkesbury • Provide a holistic spatial growth strategy area with future development potential. for the area However the relationship to the existing settlement of Tewkesbury is important A46 • Support the strategic level development and the concept masterplan contained ASHCHURCH plan making process for Ashchurch and within responds to the opportunities of the surrounding areas the wider area.
    [Show full text]
  • Tewkesbury Community Connector
    630 Tewkesbury Community Connector 24th May 2013 Community transport service for Tewkesbury Borough Operated by Third Sector Services in partnership with Gloucestershire County Council Introduction to the Tewkesbury Community Connector Tewkesbury Community Connector is a community transport service provided on a not-for-profit basis which will serve the villages shown on the map opposite. How will it work? Beckford for Evesham on Wednesdays and Saturdays and Sedgeberrow for To use Tewkesbury Community Evesham on Thursdays. Connector, you need to book in advance. It runs on Mondays to There are also regular connections Saturdays, covering villages shown to Cheltenham and Gloucester on the map on different days. Pick from Tewkesbury. Don’t worry ups from local bus stops are between about missing your onward bus as 9.00am and 10.45am, returning Tewkesbury Community Connector will between 12.00pm and 3.00pm. get to the bus stop for the connecting service. Connecting you better in Gloucestershire Coming home, the connections are guaranteed so even if the bus is Tewkesbury Community Connector running late, Tewkesbury Community provides more opportunities for people Connector will wait. Tewkesbury to travel to Tewkesbury. In addition, Community Connector will not wait if Evesham, Bishop’s Cleeve and you choose to catch a later bus. Cheltenham are easier to reach and available more frequently than before. Connections are provided at: Bishop’s Cleeve for Cheltenham on Mondays and Tuesdays; When and where you can use Tewkesbury Community Connector
    [Show full text]
  • Understanding Tewkesbury Borough 2015
    Understanding Tewkesbury Borough 2015 Produced by the Strategic Needs Analysis Team, Gloucestershire County Council Version: v1.0 1 Contents 1. Introduction ................................................................................................................ 4 2. Executive summary .................................................................................................... 5 3. Tewkesbury Borough context ..................................................................................... 0 3.1 About this section ................................................................................................... 0 3.2 Demographics ......................................................................................................... 0 3.3 Deprivation ............................................................................................................. 8 3.4 Life expectancy ..................................................................................................... 15 3.5 Mortality ................................................................................................................ 16 3.6 Economy ............................................................................................................... 21 3.7 Protected characteristics ....................................................................................... 39 3.8 Key messages ...................................................................................................... 46 4. Getting the right start in life ......................................................................................
    [Show full text]
  • Garden Communities Programme – Monitoring
    Tewkesbury Garden Town – Homes England Briefing Note June 2019 1 Proposition: Transformational garden town for Tewkesbury, focused on the development of the Ashchurch area to the east. The project will deliver 10,195 new homes with 35% affordable housing and create 8,464 jobs with a new local centre by 2050. Vision: Reimagine Ashchurch as the 'modern' part of the historical Tewkesbury with a complete mix of housing options, expanded employment, transport improvements and a new centre located around the station and St. Nicholas Church. Ashchurch possesses the foundations to help deliver a vision for sustainable growth of the town, utilising the excellent transport links to the M5 and its prime location as a high-tech employment area, thereby encouraging people to live and work locally. Key components Project partners Site size: 604 ha 10,195 homes Tewkesbury Borough Council (Lead 8,464 jobs Authority) 6 schools Gloucester City Council 1 health & care centres Cheltenham Borough Council Planning status of site 4 community facilities Gloucestershire County Council The Gloucester, Cheltenham and Tewkesbury Joint Core Strategy (JCS), was adopted 1 district centres & local centres Homes England in December 2017 and is now under review, having undergone its first ‘issues and 200 ha of green space MOD/DIO options’ consultation in early 2019. This Initial consultation has opened up the dialogue with stakeholders and local communities on the opportunities for accommodating additional growth at Ashchurch. The site in entirety will form a Land ownership and site assembly strategic allocation in the JCS as part of the review process. Under the existing JCS MOD base - 80 ha under agreement with St.
    [Show full text]
  • Gloucestershire. Ashleworth
    DIRECTORY. J GLOUCESTERSHIRE. ASHLEWORTH. 31 <county, lower division of the hundred, union and petty in I9II was 786 in the civil and 8o6 in the ecclesiastical sessioBal division an!i county court> district of Tewkes­ parish (which includes part of Kemerton). bury, rural deanery of Tewkesbury and archdeaconry and diocese of Gloueester. The Thirle brook, a feeder PAMJ,NGTON is a tithing, village and hamlet, half a of the Swilgate, flows through the pariah. The church mile south-east. of St. Nicholas is an ancient building of stone in the ASTON-UPON-CARRANT is -a tithing and hamlet, Norman style, with additions mostly of the 14th cen- about I mile east-north-east. Here is a Wesleyan tury, and consists of chancel, clerestoried nave of six chapel, built in I845· bays, ,south porch, nortih aisle and an embattled western tower of the qth century, with four pinnacles, and FIDDINGTON is a tithing and haml~t, 1/i miles south. containing 6 bells: it has a handsome carved oak NATTON is a hamlet half a mile south-by-east, in screen, with canopy, and some remains of ancient Fiddington tithing. Here was formerly a Seventh-day stained glass: in the chancel are five stained windows, Baptist chapel, now disnsed. and there are memorial windows to the Rev. Charles NORTHWAY is a tithing and hamlet, half a mile Holden Steward, d. 1894, Mrs. Steward, d. 1910, and north. Northway House is now (I9I3) unoccupied. to Col. Henry Gillum-Webb, d. I904 ~ two brasses in the chancel to Herbert Charles Steward, who died on HO.\l:EDOWNS is a tithing and hamlet, half a mile board the S.S.
    [Show full text]
  • Bromsgrove Stations As Places Prospectus
    STATIONS AS PLACES Opportunity Prospectus An integrated masterplan vision and delivery plan for Bromsgrove Bromsgrove Station November 2020 Contents Page Introducing the concept of Stations for Places The Stations as Places programme aims to promote local railway stations as community ‘hubs’ rather than simply access points onto the rail network. The vision is to develop local railway stations as an asset highly valued within the community, contributing to economic growth and acting as a hub for creativity, heritage and social amenity. The Vision “We will develop stations as quality gateways between communities and the railway, supporting the changing needs of our passengers, residents and visitors. Stations in the West Midlands will be community assets, supporting the wellbeing and development of the areas they serve through involving local community and business.” West Midlands Station Alliance (WMSA) Mission Statement Chapter Page Chapter Page Why ‘Stations as Places’ for 3-7 Listening to our Community 23 Bromsgrove? Development Opportunities 24 Bringing our Partners Together 8 Opportunities for Investment 25 Key Facts 9 Action Plan and Targets 26 The Next Steps 27 What do we know? 10-12 Who to contact and how to get 28 The Station – Services and Trains 13 involved Headline Opportunities 14-16 ‘Last Mile’ Concept Plan 17-18 Get in touch and keep up to date Opportunity Plan 19 Community Insight 20 You can email [email protected] and one of The Aspiration 21-22 the team will get back to you! You can also follow progress on Stations as Places at: www.wmre.org.uk/stationsalliance 2 Coronavirus (Covid-19) Reviving our Railway The Covid-19 pandemic has caused massive economic and social disruption.
    [Show full text]