GOVERNMENT OF INDIA MINISTRY OF URBAN DEVELOPMENT

LOK SABHA

UNSTARRED QUESTION No. 2431

TO BE ANSWERED ON NOVEMBER 30, 2016

LOAN BY NCRPB

No. 2431 SHRI DEEPENDER SINGH HOODA:

Will the Minister of URBAN DEVELOPMENT be pleased to state:

(a) the details of projects for which loan was sanctioned by National Capital Region Planning Board (NCRPB) in during the last three years and the current year so far;

(b) the year of sanctioning and the current status of these projects;

(c) the loan amount sanctioned and disbursed along with the date; and

(d) the name of the executing agency of these projects?

ANSWER

THE MINISTER OF STATE IN THE MINISTRY OF URBAN DEVELOPMENT

()

(a)to(d): National Capital Region Planning Board (NRPB) has informed that during the last 3 years and the current year it has sanctioned 10 projects (excluding those subsequently withdrawn by Government of Haryana) pertaining to Haryana. The details of the projects along with the year of sanction, current status, sanctioned amount, disbursed amount, date of disbursal and the name of executing agency are provided in the annexure to this reply.

Annexure referred to in reply to Unstarred Question No.2431 to be answered on 30.11.2016

Details of Projects pertaining to Haryana for which loan has been sanctioned by NCRPB since 2013-14

(Rs. In Cr.) S. Name of the Agency Statu Sector Loan Loan Date of No. Project s Sanctio Disburs Disburseme ned ed nt 2013-14 1 Construction of PWD On- Transport 20.75 8.30 15.9.2015 Road from NH-10 to (B&R) going (Road) NH-71 at southern Bye Pass in district 2 Four laning of PWD On- Transport 86.33 34.53 + 27.5.2016 & Jhajjar (B&R) going (Road) 25.00 29.8.2016 Farukhnagar- Gurgaon road in Jhajjar/Gurgaon district 3 Up gradation of 3 PWD On- Transport 62.65 25.06 15.9.2015 roads in Rewari (B&R) going (Road) Division (Haily mandi to Pahlawas road, kosli-Guryani to Pahlawas NH-71 and Dahina- Jatusana Road 2014-15 4 Water supply HSIIDC On- Water 155.65 31.13 23.3.2016 project at IMT going Supply Manesar by HSIIDC 2015-16 5 Development of HSIIDC On- Transport 343.35 274.68 3.10.2016 & access controlled going (Road) + 50.00 10.11.2016 Kundli-Manesar- Palwal Expressway section (Manesar RD 83.320 to Palwal RD. 135.650 km) by HSIIDC,Haryana (balance works) 6 Construction of 4 PWD On- Transport 23.15 9.26 27.5.2016 lane ROB at (B&R) going (ROB) Lakhanmajra S. Name of the Agency Statu Sector Loan Loan Date of No. Project s Sanctio Disburs Disburseme ned ed nt Meham road at L/C 79 on Bhatinda Railway line in Rohtak District -7 Construction of 2 PWD On- Transport 11.18 4.47 27.5.2016 lane ROB at L/C No. (B&R) going (ROB) 54 on Jind Panipat section (location 66/9-10) crossing road along with Delhi water carrier link channel in Panipat district 8 Construction of 2 PWD On- Transport 11.29 4.52 27.5.2016 lane ROB at LC No. (B&R) going (ROB) 55 on Jind Panipat Section Location 67/10-11 over road on Panipat Kabri road in Panipat district 9 Construction of PWD On- Transport 56.00 22.40 27.5.2016 additional 2 lane (B&R) going (ROB) ROB at LC no. 3 on Hisar Sadalpur Railway line crossing old DHS at RD 164.60 at Dabra Chowk, Hisar 10 Construction of PWD On- Transport 114.62 45.85 27.5.2016 Elevated Road on (B&R) going (Road) National Highway No 10 from Chottu ram Chowk to Old bus stand (KM 74.00 to 75.86) in Rohtak city Portion” Total 884.97 535.20

 PWD : Public Works Department (B&R),  HSIIDC : Haryana State Industrial Infrastructure Development Corporation Ltd.