FRAMEWORK SERVICES CONTRACT ENTR/2008/006/LOT 1 Impact Assessment Study Concerning the Revision of Directive 2000/9/EC Relating to Cableway Installations Designed to Carry Persons Final Report prepared for DG Enterprise and Industry RPA October 2012 FRAMEWORK SERVICES CONTRACT ENTR/2008/006/LOT 1 Impact Assessment Study Concerning the Revision of Directive 2000/9/EC Relating to Cableway Installations Designed to Carry Persons Final Report – 19th October 2012 prepared for DG Enterprise & Industry by Risk & Policy Analysts Limited, Farthing Green House, 1 Beccles Road, Loddon, Norfolk, NR14 6LT, United Kingdom Tel: +44 1508 528465 Fax: +44 1508 520758 Email:
[email protected] RPA REPORT – ASSURED QUALITY Project: Ref/Title J766/Cableways Approach: In accordance with the Contract and the Commission’s Comments Report Status: Final Report Report Prepared by: Daniel Vencovsky, Senior Consultant Clare Bowman, Researcher Tobe Nwaogu, Principal Consultant Marco Camboni, Consultant Aländji Bouorakima, Researcher Jeremy Brutus, Consultant Report approved for issue by: Pete Floyd, Director Date: 19th October 2012 If produced by RPA, this report is printed on 100% recycled, chlorine-free paper DISCLAIMER While RPA considers that the information and opinions given in this report are sound, the report is based on assumptions and information that are subject to uncertainties. Due to such uncertainties and because events may not occur as expected, there is a possibility that the results presented in this report will be different from situations which occur in the future. This report has been prepared for the European Commission in accordance with the associated contract and RPA will accept no liability for any loss or damage arising out of the provision of the report (and/or associated data) to third parties.