housing for all plan of action and preparation of detailed project report for 28th MEEting of csmc Proposal for 28 towns (29th November 2017)

MiNISTRY OF HOUSING & URBAN AffAIRS (MoHUA ) DIRECTOR OF URBAN LOCAL BODIES HARYANA STRUCTURE OF PRESENTATION

PHYSICAL PART A – HOUSING FOR ALL PLAN OF ACTION FINANCIAL

STRUCTURE OF PRESENTATION

PHYSICAL PART B – PREPARATION OF DETAILED PROJECT REPORT FINANCIAL

We Think Better PART A – HOUSING FOR ALL PLAN OF ACTION

We Think Better HARYANA : AN OVERVIEW OF ULB’S

S.No Classification Name of the towns 1. Hyper Urban Area in and around town including the Urban Areas declared by the Government for Gurgaon- Manesar Urban complex Municipal Corporations 2. High Potential - Ballabgarh Complex, , , Gual Pahari-Balola Municipal Councils Zone Complex in , Sonepat-Kundli Urban Complex, . Municipal Committees

3. Medium Potential , , Ambala City, Ambala Cantt, Nagar, , Zone Jagadhari, , , Ganaur , , Hodal, , Dharuhera-Bawal and Oil Refinery Panipat.

4. Low Potential All the other urban areas in the State. Zone

We Think Better LIST OF 28 TOWNS: SR.NO NAME OF DISTRICT NAME OF TOWN 1 ATELI MAHENDRAGARH 2 NANGAL CHODHARY 3 JHAJJAR BERI 4 BHUNA 5 FATEHABAD TOHANA 6 RATIA 7 AMBALA BARARA 8 GANNAUR 9 KHARKHODA 10 SHAHBAD 11 KURUKSHETRA PEHOWA 12 LADWA 13 14 RAJOUND 15 PUNDRI 16 PANIPAT SAMALKHA 17 NARWANA 18 UCHANA 19 JULANA 20 MANDI DABWALI 21 KALANWALI 22 RANIA 23 ELLANABAD 24 NARNAUND HISAR 25 UKLANA 26 MEHAM 27 ROHTAK SAMPLA 28 KALANAUR

We Think Better IMPLEMENTATION PROCESS: STEP BY STEP APPROACH OF HFAPoA

Step 1: Initiation of HFAPoA Preparation

Step 2: Assessment of Slums

Step 3: Beneficiary Eligibility

Step 4: Demand Assessment of Urban Poor in Slums and Non Slums Areas

Step 5: Devising Development Options for Beneficiaries into Four (4) Verticals

Step 6: Assessment & Phasing of Investment Requirements and Preparation of Financial Plan

Step 7: Formulating Institutional Framework for Implementation of HFAPoA

Step 8: Finalization of HFAPoA & Formulation of Annual Implementation Plan

2 We Think Better

STEP : 1 1

- STEP – 1 : Initiation of HFAPoA Preparation:

STEP STEP 2

- Identification of Conducting stakeholder Brief City Profile and

Stakeholders workshop at cluster/city Housing Programme

STEP STEP

3 - Elected Representatives During the work shop Physical characteristics of the explain the scheme

STEP STEP City modalities, share existing

4 information for urban - Banks & Financial Institutions poor

Social, Demographic, STEP STEP Real Estate Developers & Economic, Housing and

5 Contractors Physical Infrastructure Profile -

STEP STEP Government Departments

6 Review the status of the past - interventions implemented in Community a city in order to arrive at

STEP STEP future housing requirements

for the urban poor. 7 - Representative of Slum

dwellers & other urban poor STEP STEP

3 We Think Better

STEP : 2 1

- STEP – 2 : Assessment of SLUMS

STEP STEP

2 -

Updated List of Slums STEP STEP

3 Review Tenability

-

STEP STEP 4 - Environmental Non – Conforming

Vulnerability Uses Semi –Tenable Slums

STEP STEP

5 -

STEP STEP Non - Tenable Review Tenable Slums 6

- By Changing Land Use

Tenable Slums

STEP STEP

7

- STEP STEP

3 We Think Better

STEP : 3 1 - STEP – 3 : Demand Assessment of Urban Poor in Non- Slums Areas

STEP STEP METHODOLOGY FOR THE WORK OF DEMAND SURVEY – NON- SLUM AREA 2

- Workshop for Demand Survey at Cluster/ULB level 1. Collection of Secondary Data Workshop for Demand 2. Orientation programme for all concerned stakeholders like elected representative, officials, NGOs,

STEP STEP Survey at Cluster/ ULB CBOs, slum etc. to explain the objective of the demand survey at Cluster/ULB level

Level

3 - 1. Discussion on four verticals 2. Size of dwelling units, topologies/categories of applicants

STEP STEP 3. Documents to be submitted by applicant and suggestion/feedback from potential applicants

4 - Advertisement for Advertisement for Demand Survey Demand Survey 1. Focus on demand survey procedure and convey the PMAY mission objectives STEP STEP 2. Advertisement in local newspaper, flyers & banners, as per discussion with concerned ULB

3. Information of beneficiary/survey, certain slum level and city level data is also essential to be collected

5 -

STEP STEP Analysis of SECC data, online data registered on MIS-PMAY, in conformity with demand survey

6 -

Data Entry of Application Form STEP STEP

7 Submission of document and Application Form - 1. Submission of documents/application from and also submit the soft copies and data entering and compilation

STEP STEP 2. Validation of Data

3 We Think Better

STEP : 3 1 - STEP – 3 : Documents Required

STEP STEP ewy ik=rk% 2

- •vkfFkZd n`f"V ls detksj oxZ ds ifjokj dh okf"kZd vk; jkf'k #i;s 3 yk[k rd gksA •fuEu vk; oxZ ds ifjokj dh okf"kZd vk; jkf'k #i;s 3 yk[k ls 6 yk[k rd gksA

STEP STEP •e/;e vk; oxZ &1 ds ifjokj dh okf"kZd vk; jkf'k #i;s 6 yk[k ls 12 yk[k rd gksA 3

- •e/;e vk; oxZ &2 ds ifjokj dh okf"kZd vk; jkf'k :Ik;s 12 ls 18 yk[k rd gksA •izkFkhZ }kjk viuh ikfjokfjd okf"kZd vk; rFkk ik+++=rk ckjs lkns dkxt ij Loa;&Äks"k.kk i= ds lkFk

STEP STEP viuh uohure QksVks izLrqr djuk vfuok;Z gSA 4

- •ykHkkFkhZ dk vk/kkj dkMZ ,oa cSad [kkrk gksuk vfuok;Z gSA •ns'k ds fdlh Hkh Hkkx esa ykHkkFkhZ vFkok ifjokj ds fdlh Hkh lnL; ¼ifr] iRuh ,oa vfookfgr

STEP STEP iq=@iq=h½ ds uke dksbZ iDdk edku u gksA 5 - •ykHkkFkhZ us iwoZ esa dsUnzh;@jkT; ljdkj dh fdlh Hkh vkoklh; ;kstuk ds vUrxZr ykHk u fy;k gkssA

STEP STEP •ykHkkFkhZ ;kstuk dh vkjEHk frfFk fnukad 17&06&2015 ls iwoZ jkT; dk fuoklh@jkT; ds “kgjh 6 - {ks= dh fdlh Hkh vkS|[email protected];d bdkbZ dk deZpkjh] tks fd yscj oSYQs;j cksMZ gfj;k.kk ls iathd`r gks@ dsUnzh;@ jkT; ljdkj ds foHkkx@miØe dk deZpkjh gks rFkk orZeku esa jkT; ds

STEP STEP 'kgj@dLcs dk fuoklh gksA 7 - •fuokl ds lR;kiu ds fy, izkFkhZ }kjk oksVj dkMZ@VsyhQksu fcy@fctyh dk fcy@jk'ku

STEP STEP dkMZ@ikliksVZ@cSad ikl&cqd@iSu cqd@vk/kkj dkMZ ;k ljdkj }kjk [email protected] fd;k x;k

nLrkost ftles izkFkhZ dk uke o irk Li’V :Ik ls vafdr gks] izLrqr djuk gksxkA 8 - •vukf/kd`r dkyksfu;ksa ds fuoklh ftuds ikl fufeZr iDdk vkokl gS] os bl ;kstuk esa ykHk ds ik=

STEP STEP ugha gksxsaA •;ksX; ykHkkFkhZs orZeku Hkw[k.M@vkokl3 dk uD'kk tks LFkkuh; izk:idkj@okLrqdkj }kjk rS;kj We Think Better ,oa lR;kfir fd;k x;k gks ,oa ftlesa uohu vkokl dk fuekZ.k vFkok [email protected] foLrkj Li"V :i ls n'kkZ;k gks] lyaXu djuk vfuok;Z gSA

STEP : 4 1

- STEP – 4 : Methodology STEP STEP

2 Ward Wise Survey – -

STEP STEP For towns with 31 wards,

3 - 3

2 •2 wards in 3 days STEP STEP 4 7 13 •Ward 1 to 31

4 1 6 - 18 8 10 5 11 12 Hence survey of one town

STEP STEP 19 20 9 14 will be completed in 45 days

31 17 5 - 16 21 For towns with 20 wards,

STEP STEP 30 23 26 22 15

6 24 - 28 •2 wards in 4days.

29 27 •Ward 1 to 20 STEP STEP

25 7 - Hence, survey of one town

will be completed in 45 days STEP STEP

extended for another 10 8

- days. STEP STEP

3 We Think Better

STEP : 3 1 - STEP – 3 : Demand Assessment of Urban Poor in Slums Areas

STEP STEP METHODOLOGY FOR THE WORK OF DEMAND SURVEY – SLUM AREA 2 - Stakeholder Consultation Beginning of Slum 1. Collection of Secondary Data 2. Interaction with slum stakeholders

STEP STEP Survey and FGD

3 - Households Survey 1. Door to Door slum survey as per format for information of beneficiary/slum survey etc. with ID proof

STEP STEP Conducting Slum 2. Interaction with slum people

Survey 3. Slum survey in all slums of the city including notified/non notified, identified and newly identified slums 4

- etc. STEP STEP Households Survey Data Entry Compilation of Data

5 1. Compilation of data - and Entry 2. Data entry as per format given in PMAY guidelines (information of beneficiary/slum survey)

3. Validation of data through ULB

STEP STEP

6 - Submission of Survey Document , form details submitted the concern ULB with data entry and compilation

STEP STEP Document

7 -

Validation of data and cross checking the data by concern ULB and finalization of Slum survey data STEP STEP

3 We Think Better STATE LEVEL WORKSHOPS/CONFERENCES

AMBALA DIVISON

ROHTAK DIVISION

We Think Better STATE LEVEL WORKSHOPS/CONFERENCES

HISAR DIVISION

GURUGRAM DIVISION

We Think Better Workshop/Stakeholder consultation Photos

Hon'ble Urban Local Bodies Minister, GOH Mrs Review Meeting HFA 19.4.17

Hon'ble Union Min. UD&H,GOI , Mr Venkaiah Naidu review meeting on 28.4.17

We Think Better Workshop/Stakeholder consultation Photos

SLSMC, Review meeting under chairmanship of Chief Secretary, Haryana

City Level Workshops/Video Conferences/Meetings

City Level Workshops/Video Conferences/Meetings

We Think Better MEDIA COVERAGE

We Think Better

STEP : 5 - ANALYSIS OF DEMAND SURVEY 1

- FOUR VERTICAL’S OF HOUSING for ALL STEP STEP

Credit Link

2 -

Redevelopment Affordable

STEP STEP Housing

3

-

LED LED

-

STEP STEP

4

-

HOUSING

STEP STEP

IN SITU REDEVELOPMENT SITU IN

5

-

CREDIT LINKED SUBSIDY LINKED CREDIT

AFFORDABLE HOUSING IN IN HOUSING AFFORDABLE

SUBSIDY FOR BENEFICIARY BENEFICIARY FOR SUBSIDY

AFFORDABLE HOUSING THROUGH THROUGH HOUSING AFFORDABLE

PARTNERSHIP (LAND AS RESOURCE) AS (LAND PARTNERSHIP

STEP STEP 6 - Upfront Subsidy@ Subsidy: 1 lac 1.5 lacs 1.5 lacs 6.5% upto 6 lacs CENTRAL SHARE

STEP STEP STATE SHARE 0.66 Lac NO SHARE 1.0 Lacs 1.0 lacs

7 (60:40) -

NO SHARE NO SHARE NO SHARE NO SHARE LOCAL BODY SHARE STEP STEP

8 BENIFICIARY BALANCE - BALANCE AS PER POLICY 100% SHARE AMOUNT AMOUNT

STEP STEP *Beneficiary can take advantage of One component only 2 We Think Better STATUS OF HFAPoA AND DPR FOR 28 VALIDATED TOWN

TOTAL DEMAND & PHASE WISE DISTRIBUTION FOR DPR

Total Number of sr.no Particulr Beneficiaries DPR PHASE 1 DPR PHASE 2 1 Total Number of Beneficiaries for DPR(Phase 1) 42804 24221 12431 2 BLC Category 20318 10275 10043 3 AHP Category 16031 13946 2085 4 ISSR Category 303 0 0 5 CLS 6152 0 0

We Think Better

YEAR WISE INVESTMENT REQUIREMENT 1 - STEP 6: Assessment of Investment Requirement Including projected

STEP STEP Migration): (HFAPoA)

Year-wise targets under different components (Format V under Annexure 5 of “Pradhan Mantri Awas Yojana – Housing for 2 - All (Urban), 2015”) Number of Beneficiaries and Central Assistance Required (Rs. in Lakh) Total 2015-16 2016-17 2017-18 2018-19 2019-20 2021-21 2021-22

STEP STEP Interventions N Amo Amou Amoun Amou Amo No No No No Amount No Amount No No Amount

3 o unt nt t nt unt - Redevelopment Slums

through Private STEP STEP

Participation 0 0 0 0 0 0 303 303 0 0 0 0 0 0 303 303 4

- Subsidy for Slums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 beneficiary- Non-

STEP STEP led/improvement of Slums

existing house 3048 4572 12190 18285 5080 7620 20318 30477 5 - Credit linked subsidy Slums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 to individual Non-

STEP STEP beneficiaries Slums 922 1797.9 3692 7199.4 1538 2999.1 6152 11996.4

Affordable Housing Slums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 - in partnership (AHP) Non-

Slums 2405 3607.5 9619 14428.5 5668 8502 1660 2490 19352 29028 STEP STEP

TOTAL 7

- 0 0 0 0 6375 9977.4 25804 40215.9 12286 19121.1 1660 2490 0 0 *46125 71804.4 STEP STEP

* 46125 BENEFICIRIES ARE INCLUSIVE OF MIGRATION TO ACHIVE HFA UP TO 2022

8

- STEP STEP

2 We Think Better

STEP :7 Institutional frame work 1 - STEP 7: Formulating Institutional Framework for Implementation of HFAPoA:

STEP STEP • The implementation modalities for the various

components identified in the HFAPoA would need 2 - to be worked out broadly

STEP STEP • The collaborative structure would be chaired by 3

- the ULB commissioner and aided by an expert committee

STEP STEP TASK FORCE CONSTITUTION

4 - SECTOR PLANNING & DESIGN IMPLEMENTATION O & M

Land use & Master Plan T& CP HUDA/ULB/HBH HUDA/ULB/HBH STEP STEP Water Supply PHED PHED PHED

5 Sewerage PHED PHED PHED - Roads, Bridges, Flyovers/ RoB PWD, NHAI, PWD, NHAI, PWD, NHAI, /Multilevel Parking STEP STEP Slum Development ULB ULB ULB

6 Housing HUDA/HBH/HSIIDC HUDA/HBH/HSIIDC HUDA/HBH/HSIIDC - Street Lighting ULB ULB ULB Storm Water Drainage PHED/ULB /IRRIGATION PHED/ULB /IRRIGATION PHED/ULB /IRRIGATION

STEP STEP Solid Waste Management ULB ULB ULB

Parks/ Playgrounds ULB/HUDA ULB/HUDA ULB/HUDA 7 - Tourism HTCL HTCL HTCL Fair / Melas UIT/AMC UIT/AMC UIT/AMC

STEP STEP Private Building / Development T&CP PRIVATE DEVELOPER PRIVATE DEVELOPER/RWA

2 We Think Better

HOUSING FOR ALL PLAN OF ACTION, HARYANA : METHODOLOGY 1 - STEP 8: Finalization of HFAPoA & Formulation of Annual Implementation Plan:

STEP STEP  Sharing of HFAPoA with elected representatives and incorporation of findings

2 -

STEP STEP  SLSMC approval 3 -  Submission to MoHUA CSMC Committee through Central Appraisal agencies (HUDCO,

STEP STEP BMTPC etc.)

4

-

STEP STEP

5

-

STEP STEP

6

-

STEP STEP

7

-

STEP STEP

8

- STEP STEP

2 We Think Better Status of Mandatory Reforms:

SI Conditions Specify the timeline No. (Either through Executive Order/ Notification/ Legislation) (YY - YY)*

State/UTs shall remove the requirement of separate Non Agricultural (NA) 1. Permission in case land falls in the residential zone earmarked in the Master Plan Completed of city/town. States/UTs shall prepare/amend the Master Plans earmarking land for Affordable Completed 2. Housing. State/UTs shall put in place a single-window- time bound clearance system Completed 3. for layout approvals and building permissions. States/UTs shall adopt pre approved building permission and layout ap- proval Completed 4. system for EWS/LIG housing or exempt approval below certain built up area /plot area. States/UTs shall legislate or amend existing rent laws on the lines of the Model 5. 2018-19 Tenancy Act circulated by the First Party. States/UTs shall provide additional Floor Area Ratio (FAR)/Floor Space Index (FSI)/ 6. Transferable Development Rights (TDR) and relax density norms, for slum Completed redevelopment and low cost housing.

We Think Better PART B – PREPARATION OF DETAILED PROJECT REPORT

We Think Better DISASTER VULNERABLE AREAS IN HARYANA

We Think Better SEISMIC & FLOOD PREVENTIVE INTERVENTIONS:

CORNER ANCHORAGE DETAILS

LINTEL BAND OTHER RCC DETAILS

SILL BAND

PLINTH BAND RCC FOOTING

We Think Better AFFORDABLE HOUSING POLICY

Identify vacant land

Subsidy Eligibility: 35% of the houses in the project to be reserved for EWS category Single project must have at least 250 DU’s

Additional Incentives: CLU free, EDC free, application fees free, FAR – 2.25 Beneficiary contribution – nil State contribution - nil

We Think Better BENEFICIARY LED CONSTRUCTION

Beneficiary owns a plot of land Beneficiary has a kutcha house New DU Carpet area and wishes to construct a new ceiling for house subsidy=30 sqm

Minimum carpet area eligible for enhancement subsidy = 9 sqm

Beneficiary owns a small housing Beneficiary has an old house and unit and wishes to expand his wishes to enhance his current dwelling unit size dwelling unit

We Think Better PROJECT PROPOSAL BRIEF

CHECKLIST STATUS (Y/N)

Layout plan (as per NBC norms) Attached Yes

SLAC/SLSMC approval/Minutes submitted SLAC approved and SLSMC is under process

Land title status (encumbrance free) Yes Its mandatory as per eligibilty criteria

Beneficiary list (BLC) submitted Yes

No. of Beneficiaries with Aadhar ID 24221

No. of Beneficiaries with other Unique ID NA Wherever the projects are proposed either infrastructure is available or is proposed in the Status of physical & social infrastructure project.

Implementation plan/Completion period 2 Year from the work commencement date

Beneficiary consent sought Yes

We Think Better PROGRESS OF PMAY (U)

INDICATORS CURRENT STATUS (NO.) Number of Towns/Cities for which HFAPoA & DPR is taken up 28 Demand Survey Completed 28 Total Demand 42,804 Whether HFAPoA Submitted Yes Whether AIP Submitted Yes Whether HFAPoA & AIP entered in MIS yes, Under progress Yes, 9 in SLTC and 22 nos in CLTC and SLTC/CLTC staffs approved vs. placed balance are in process Presently 73.40 cr and revised demand proposed for Rs 200 cr and for yr 2018- State Budgetary Provision for PMAY (U) in 2017-18 19 Budget provision of Rs 1500 cr

We Think Better INTERFACE WITH MIS

INDICATORS CURRENT STATUS (NO.)

Survey entry made (%) 10275

Projects approved 28

Projects entered (7 B/C/D) 28

DUs approved under BLC 10275

Beneficiaries attached 10275

We Think Better TOTAL STATE AND CENTRAL SHARE

Verticals ISSR AHP BLC (New) BLC (E) Remarks .No. of Projects 0 28 28 28 - .No. of DUs 0 13946 8418 1857 - .Project Cost 0 134997.3 32577.66 4531.08 -

.Central Share 20919 12627 2785.5 - 0 .State Share 13946 8418 0 - 0 .ULB Share 0 0 0 0 - .Beneficiary Share 100132 11532.66 1745.58 - 0 Verticals Per Unit Central Share State Share ULB Share Benf. Share Completion (Rs. Lakhs) Cost Time

.ISSR 0 0 0 0 0 0.0 .AHP 9.68 1.50 1.00 0.00 7.18 24 month .BLC (E) 2.44 1.50 0.00 0.00 0.96 12 month

.BLC(N) 3.87 1.50 1.00 0.00 1.37 12 month

We Think Better

YEAR WISE INVESTMENT REQUIREMENT 1 - STEP 6: Assessment of Investment Requirement: (DPR) Year-wise targets under different components (Format V under Annexure 5 of “Pradhan Mantri Awas Yojana – Housing for

STEP STEP All (Urban), 2015”) 2 - Number of Beneficiaries and Central Assistance Required (Rs. in Lakh) Total 2015-16 2016-17 2017-18 2018-19 2019-20 2021-21 2021-22

STEP STEP Interventions N Amo Amou Amoun Amou Amo No No No No Amount No Amount No No Amount

3 o unt nt t nt unt - Redevelopment Slums

through Private STEP STEP

Participation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4

- Subsidy for Slums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 beneficiary- Non-

STEP STEP led/improvement of Slums

existing house 1542 2313 6165 9247.5 2568 3852 10275 15412.5 5 - Credit linked subsidy Slums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 to individual Non-

STEP STEP beneficiaries Slums 0 0 0 0 0 0 0 0

Affordable Housing Slums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 - in partnership (AHP) Non-

Slums 2092 3138 8368 12552 3486 5229 0 0 13946 20919 STEP STEP

TOTAL 7

- 0 0 0 0 3634 5451 14533 21799.5 6054 9081 0 0 0 0 24221 36331.5

STEP STEP

8

- STEP STEP

2 We Think Better SUMMARY SHEET FOR ANNUAL IMPLEMENTATION PLAN (AIP) - DPR

Target for Year*(YEAR Achievement for Years*(YEAR Target for Year**(AIP Remaining Targets as per Admissible Components PRECEDING TO AIP YEAR) PRECEDING TO AIP YEAR) YEAR) HFAPoA A. Beneficiary-led Construction New Houses 1263 1263 Enhancement 279 279 Sub Total(A) 1542 1542 B. In-Situ slum Rehabilitation with Participation of Private Sector Number of Slums 0 0 Number of Households (B) 0 0 C. Affordable Housing in Partnership (EWS Category) 2092 2092 D. Credit Linked Subsidy D-1 EWS Households New Houses 0 0 Enhancement 0 0 SUB TOTAL D-1 0 0 D-2 LIG Households New Houses Enhancement SUB TOTAL D-2 0 0 Sub Total (D)=D-1+D-2 0 0 E. Total (A+B+C+D) 3634 3634

We Think Better Progress of BSUP / IHSDP/ RAY

Status of different EWS Housing scheme of Urban Local Bodies Department

No. of In Scheme Target Completed Allotted Occupied Projects progress

B.S.U.P. 02 2896 2896 - 351 351

I.H.S.D.P. 23 10327 9980 347 9980 9980

R.A.Y. 04 3226 725 2024 725 725

Total: 29 16449 13601 2371 11056 11056

We Think Better हवस्तार िेर्ु मानदण्ड

कुल क्षेत्रफल (वर्त वर्तमान संरचना वर्तमान क्षेत्रफल (वर्त मीटर) वृद्धि वृद्धि क्षेत्रफल

कमरा + शौचालय (डब्लू.सी.) + बाथ셂म 13.03 कमरा + रसोई 16.97 30

कमरा + बाथ셂म + शौचालय कमरा + रसोई 15.97 14.03 30 (डब्लू.सी.) कमरा + शौचालय (डब्लू.सी.) 13.26 कमरा + रसोई + बाथ셂म 16.74 30

कमरा+ रसोई + बाथ셂म + शौचालय 12.02 कमरा + टॉयलेट 17.98 30 (डब्लू.सी.) कमरा + रसोई + बाथ셂म + कमरा 10.09 19.91 30 टॉयलेट

कमरा + रसोई + शौचालय (डब्लू.सी.) 14.964 कमरा + बाथ셂म 15.306 30

न्यूनर्म कार्पेट क्षेत्रफल मानदण्ड

घर के हिस्से न्यूनर्म कार्पेट क्षेत्रफल (वर्त मीटर)

कमरा/बैठक कक्ष 9 शौचालय (डब्लू.सी.) 0.9 बाथ셂म 1.2 टॉयलेट 1.8 रसोई 2.4

We Think Better हवस्तार िेर्ु मानदण्ड fo|ek कुल हनहमतर् कमरा-1 कमरा-2 िाथ셂म टॉयलेट रसोई र्पात्रर्ा u क्षेत्रफल सुहिधा

21 वर्गमीटर से अधिक द्धथथहर्-1 21 वर्गमीटर से कम

21 वर्गमीटर से द्धथथहर्-2 अधिक 21 वर्गमीटर से द्धथथहर्-3 अधिक

21 वर्गमीटर से द्धथथहर्-4 अधिक न्यूनर्म कार्पेट क्षेत्रफल मानदण्ड

घर के हिस्से न्यूनर्म कार्पेट क्षेत्रफल (वर्त मीटर) कमरा/बैठक कक्ष 9 पाश्चात्य शैली शौचालय (डब्लू.सी.) 0.9 बाथ셂म 1.2 टॉयलेट 1.8 रसोई 2.4

We Think Better हवस्तार िेर्ु मानदण्ड

कमरा, रसोई, टॉयलेट, बाथ셂म

1 - घर की संरचना क्षेत्रफल (वर्ग मीटर)

कमरा 12 स्थथधि रसोई 2.4 बाथ셂म 3.6 टॉयलेट 3.2

कुल क्षेत्रफल (वर्त मीटर) 21.2

2

- स्थथधि

कमरा-1, कमरा-2, रसोई, टॉयलेट

घर की संरचना क्षेत्रफल (वर्ग मीटर)

कमरा-1 9 कमरा-2 9 रसोई 2.4 टॉयलेट 1.8 कुल क्षेत्रफल (वर्त मीटर) 22.2

We Think Better हवस्तार िेर्ु मानदण्ड

कमरा-1, कमरा-2, रसोई, बाथ셂म

3 - घर की संरचना क्षेत्रफल (वर्ग मीटर)

कमरा-1 9 स्थथधि कमरा-2 9 रसोई 2.4 बाथ셂म 1.2 कुल क्षेत्रफल (वर्त मीटर) 21.6

स्थथधि-4

कमरा-1, कमरा-2, बाथ셂म, टॉयलेट

घर की संरचना क्षेत्रफल (वर्ग मीटर)

कमरा-1 9 कमरा-2 9 बाथ셂म 1.5 टॉयलेट 1.8 कुल क्षेत्रफल (वर्त मीटर) 21.3

We Think Better प्रस्ताहवर् हवस्तार िेर्ु मानदण्ड

ROOM + KITCHEN ROOM + KITCHEN + BATH + W.C ROOM + KITCHEN + BATH

13.03 SQ.M EXPANSION 13.26 SQ.M EXPANSION 10.09 SQ.M EXISTING EXISTING 16.74 SQ.M

16.97 SQ.M 19.91 SQ.M

EXISTING EXPANSION

TOTAL = 13.03 SQ.M + 16.97 SQ.M = 30 SQ.M TOTAL = 19.91 SQ.M + 10.09 SQ.M = 30 SQ.M TOTAL = 16.74 SQ.M + 13.26 SQ.M = 30 SQ.M

We Think Better प्रस्ताहवर् हवस्तार िेर्ु मानदण्ड

ROOM + BATH + W.C ROOM + BATH ROOM + TOILET

15.97. SQ.M 14.03 SQ.M EXPANSION EXPANSION 14.964 SQ.M 17.98 SQ.M EXISTING 15.036 SQ.M EXISTING 12.020 SQ.M EXISTING EXPANSION

TOTAL = 14.03 SQ.M + 15.97 SQ.M = 30 SQ.M TOTAL = 14.964 SQ.M + 15.036 SQ.M = 30 SQ.M TOTAL = 17.98 SQ.M + 12.020 SQ.M = 30 SQ.M

We Think Better प्रस्ताहवर् हवस्तार िेर्ु मानदण्ड

ROOM + BATH ROOM + TOILET

15.97. SQ.M 14.03 SQ.M EXPANSION EXPANSION 14.964 SQ.M 17.98 SQ.M EXISTING 15.036 SQ.M EXISTING 12.020 SQ.M EXISTING EXPANSION

TOTAL = 14.03 SQ.M + 15.97 SQ.M = 30 SQ.M TOTAL = 14.964 SQ.M + 15.036 SQ.M = 30 SQ.M TOTAL = 17.98 SQ.M + 12.020 SQ.M = 30 SQ.M

We Think Better प्रस्ताहवर् हवस्तार िेर्ु मानदण्ड

ROOM + BATH + W.C ROOM + BATH ROOM + TOILET

15.97. SQ.M 14.03 SQ.M EXPANSION EXPANSION 14.964 SQ.M 17.98 SQ.M EXISTING 15.036 SQ.M EXISTING 12.020 SQ.M EXISTING EXPANSION

TOTAL = 14.03 SQ.M + 15.97 SQ.M = 30 SQ.M TOTAL = 14.964 SQ.M + 15.036 SQ.M = 30 SQ.M TOTAL = 17.98 SQ.M + 12.020 SQ.M = 30 SQ.M

We Think Better We Think Better Thanks