142-146 W1

A prime self contained, medical building 1 2 The Location THE BUILDING Page 05 Page 08 3 4 Schedule Of Areas Specification Page 11 Page 18 5 6 Professional Team Further Information Page 22 Page 23

142-146 HARLEY STREET Marylebone W1 03 Tufnell Park Hampstead

Gospel Oak Hampstead Heath

Kentish Town

Belsize Park

Finchley Road

Chalk Farm

Swiss Cottage

Camden Road

Camden Town PRIMROSE HILL

St John’s Wood Mornington Crescent

King’s Cross REGENT’S PARK St Pancras International (Eurostar)

Lord’s Euston Cricket Ground

Euston Square

Great Portland Street Warren Street Regent’s Park

Marylebone Warwick Avenue Baker Street

142-146 Goodge Street HARLEY STREET Edgware Road The L1ocation

1 0 m inu te walk 142-146 Harley Street is located (Heathrow Express Tottenham /Crossrail) Court Road at the heart of the Harley Street Medical Area 1 (Crossrail) 0 m inu te Oxford Circus walk

Bond Street (Crossrail ) Marble Arch Lancaster Gate The Harley Street Medical Area is a world class centre of medical excellence located in the

Leicester Square heart of central London and is home to over 5,000 practitioners’, small clinics and full scale

2 0 m inu hospitals, covering over 200 medical specialists. It boasts the largest concentration of medical te w alk Piccadilly Circus • providers anywhere in the world who offer outstanding patient care through pioneering Charing Cross HYDE PARK treatments and cutting edge medicine within state of the art facilities.

The Harley Street Medical Area sits within one of the world’s most prosperous and well connected cities. It is within reach of several international airports, the St Pancras Eurostar

3 0 m in terminal, numerous mainline stations, Crossrail system and the vast public transport network. ute wa lk There are very few places in the UK, or indeed the world that are quite so accessible to GREEN PARK patients and staff. ST JAMES PARK Hyde Park Corner 4 0 m inu • te w St. James’s Park Royal Albert Hall alk • The Houses of Parliment

Victoria (Gatwick Express) harleystreetmedicalarea.com @HarleyStMedArea #HSMA Harley Street Medical Area 5 0 m inu te w 04 alk 05 South Kensington

Gloucester Road Sloane Square

6 0 m inu te w al k

Vauxhall

BATTERSEA PARK P REGENT’S PARK ARK SQUARE

P EAST ARK SQUARE

LE ER CIRC OUT AD

BRUN WEST PARK SQUARE WEST MARYLEBONE RO SWICK PLA

YO EAST

RK GA AD YORK TERRACE ARYLEBONE RO TE CE M Regent’s Park BOL

WEST SOLVER STR

YORK TERRACE PARK CRESCENT HARLEY STREET

PA RK C EET Ù RE Baker Street SCENT AD

ARYLEBONE RO D M EVONSHIRE PLA

G

REAT PORTLAND STR NO EET

LU

TTINGHAM

XBOROUGH EVONSHIRE STR G D H REAT TITCHFIELD STR ALLAM STR

CE

P EET BOL ORTLAND PLA

PLACE

EVONSHIRE STR SOLVER STR STREET D EET

EET

B

EAUMONT STR

EET EET EET HARLEY STREET CE

STREET U NOTTINGHAM DEVONSHIRE STRPPER WIMPOLE STR EET MOUTH STR WEY

EET H EET ALLAM STR MOUTH STR WEY P ORTLAND PLA

STREET EET PADDINGTON EET

EET

MARYLEBONE HIGH STREET WI CE MOUTH STR G WEY MPOLE STR REAT PORTLAND STR EET

PADDINGTON HARLEY STREET WEST STREET EW CAVENDISH STR GARDENS N MORELAND STR EET MOXON STREET M ARYLEBONE S EET

AY NEW CAVENDISH STR EET EET BROOK S ESS STR DUCH EET M ANCHESTER STR TREET EET TREET M HARLEY STREET ESS STR ANSFIELD STRDUCH EET

NEW CAVENDISH STR

EET WI

EET MPOLE STR

BLANDFORD STR EET EET CH The building is set within a fantastic location, Marylebone, which provides a dynamic, EEN ANNE STR ANDOS STR EET QU MARYLEBON refreshing and well connected area to work and reside in. Marylebone Village offers a full E L EET B A EET NE AKER STR EET range of amenities, from being a renowned retail destination with fashionable boutiques GEORGE STR QUEEN ANNE STR and specialist food and wine retailers to catering for your everyday needs with a Waitrose EET

TH WI EET ORGE STR GE MPOLE STR AYER ST HARLEY STREET supermarket, farmers market, post office and an array of restaurants, cafes and hotels. Marylebone is also surrounded by green space with Paddington Street Gardens situated WE REET M EET ARYLEBONE LA LBECK STR EET CE BENTINCK STR just off and Regent’s Park (one of the eight Royal Parks in London) CAVENDISH PLA EET positioned just at the top of Harley Street, providing 395 acres of parkland to explore, enjoy INDE STR M H EET MANCHESTER ANDEVILLE PL SQUARE NE CAVENDISH and unwind in. SQUARE GARDENS R EET EGENT STR EET ITZHARDINGE STR F WIGMORE STR EET ACE

WE MARGARET STR LBECK STR B M EET AKER STR ARYLEBONE LAN

EET H OLLES STR

WIGMORE STR EET

EET PORTMAN CE E SQUARE EET EET HENRIETTA PLA GMORE STR WI DUK Oxford Circus

VE E STR RE STREE Marylebone Village R EET EGENT STR

T EET facebook.com/marylebone-village OXFORD STR ORCH @MaryleboneVllge w: marylebonevillage.com ARD STR EET N HdWE EW BOND STREE boundary N EET D Bond Street 06 AVIES STR 07 EET OXFORD STR T HANOVER SQUARE EET

DUK

ÙMarble Arch E STR

EET 2 THE BUILDING

142-146 Harley Street is currently undergoing a substantial refurbishment by The Howard ■ Fully integrated vertical lifting platform ■ Intruder alarm system de Walden Estate to provide a self-contained D1 Medical building of 15,655 sq ft at main entrance (DDA access) (1,454 sq m) across lower ground to 4th floor. The property consists of three buildings; 142, ■ Occupational density: 1 person per 10m² 144 and 146 Harley Street and includes the mews buildings at the rear on Park Crescent ■ 1 x New trolley lift (serving all floors ■ New integral UKPS substation with Mews West, which will provide staff facilities, ancillary space and bike storage. to main building except 1st floor of 500kVA transformer 142 & 144 Harley Street) The buildings are being sympathetically refurbished to provide a single property while ■ TREND BEMS (Building Energy simultaneously embracing the modern amenities required to facilitate a medical occupier. A ■ 1 x New 6 person passenger lift (serving Management System) new integrated vertical lifting platform is to be installed to enable disabled access as well as LG, ground, 3rd Floor and half landings the installation of a new trolley lift and a new 6 person passenger lift. A new substation with on 1st & 2nd floor) ■ 6 x WCs (3x GRD, 1x 2nd, 1x 3rd, 1x 4th) 500kVA transformer, VRV heating/cooling system, LED lighting, video entry door system and ■ LED lighting ■ 3 x ACC. WCs (LG, GRD, 4th) fibre optic are a few examples of the provisions that will be available in the building. ■ 2 Pipe VRV heat/cooling system The interconnectivity of all three buildings allows for a fantastic opportunity for a medical ■ 18 No. secure cycle spaces provider to occupy a prestigious and substantial Grade II listed building that lies within the ■ Cat 6 voice/data cabling ■ Staff facilities; 2 x female showers, centre of the Harley Street Medical Area. ■ New incoming fibre optic telecom service 2 x male showers, changing facilities, cableways (for future tenant provision) 3 x WCs, kitchenette, office accommodation Interesting Fact: Lionel Logue, who was King George VI speech therapist and who helped him overcome his stammer, practiced from 146 Harley Street from 1926 to 1952. The building has been honoured with a green plaque by ■ Video entry control system ■ Cleaners store (3rd & 4th floor) Westminster Council as a lasting tribute to Lionel’s work and outstanding commitment to his profession.

08 09 3 Schedule of Areas

Sq Ft Sq M

Fourth Floor 1,587 147

Third Floor 2,088 194

Second Floor 2,084 194

First Floor 3,224 299

Ground Floor 2,595 241

Lower Ground Floor 4,077 379

Total 15,655 1,454

note: all areas are approximate and will be verified on completion in accordance with rics Code of Measuring Practice.

10 11 BASEMENT Ground

4,077 Sq Ft / 379 Sq M 2,595 Sq Ft / 241 Sq M Pa Pa r r k k

C

C rescent rescent STREET STREET Y Y M M e RLE e w RLE w s West HA s West HA

note: all areas are approximate and will be verified on completion in accordance with rics Code of Measuring Practice. note: all areas are approximate and will be verified on completion in accordance with rics Code of Measuring Practice.

Medical Core Lift Plant Capped off water, drainage & electricity for hand basins Medical Core Lift Plant Capped off water, drainage & electricity for hand basins

142-146 142-146 HARLEY STREET HARLEY STREET 12 Marylebone W1 Marylebone W1 13 First Second

3,224 Sq Ft / 299 Sq M 2,084 Sq Ft / 194 Sq M Pa Pa r k r

k C

rescent C rescent STREET STREET Y M Y e M RLE w e RLE s West w HA s West HA

note: all areas are approximate and will be verified on completion in accordance with rics Code of Measuring Practice. note: all areas are approximate and will be verified on completion in accordance with rics Code of Measuring Practice.

Medical Core Lift Plant Capped off water, drainage & electricity for hand basins Medical Core Lift Plant Capped off water, drainage & electricity for hand basins

142-146 142-146 HARLEY STREET HARLEY STREET 14 Marylebone W1 Marylebone W1 15 Third Fourth

2,088 Sq Ft / 194 Sq M 1,587 Sq Ft / 147 Sq M Pa r k

C rescent STREET Y M e RLE w s West HA

note: all areas are approximate and will be verified on completion in accordance with rics Code of Measuring Practice. note: all areas are approximate and will be verified on completion in accordance with rics Code of Measuring Practice.

Medical Core Lift Plant Capped off water, drainage & electricity for hand basins Medical Core Lift Plant Capped off water, drainage & electricity for hand basins

142-146 142-146 HARLEY STREET HARLEY STREET 16 Marylebone W1 Marylebone W1 17

Structure Emergency lighting in accordance with BS5266. Low level wall mounted lights in front lightwell for maintenance Building Structure access. Wall mounted lights in the courtyard lightwells for New underpinning to rear of the property where basement slab maintenance access only. Concealed low level lighting to perimeter is lowered. Existing structural brick walls retained with new lintels of removable planters to allow staff access to courtyards. Lights where required. Steel structure for new floors and new lift shaft with above entrance doors to first floor plant enclosures for maintenance non-loadbearing blockwork in-between. access only. Roof Telecoms Main buildings and mews: existing timber structure retained with Category 6 voice/data wiring to offices (perimeter wall mounted additional steel and timber supports. New steel structure to main outlets and floor boxes) roof where plant wells are created. New incoming fibre optic telecom service cableways (ducts only for Flat roof; courtyards and link buildings: new steel structure with future tenants’ service provision) timber joists in-between. Lift overruns: timber joists. Electrical Services Staircase NEW integral UKPS substation with 500kVA (700A) transformer, Basement: stone stair on steel supports. 4 three phase electricity supply. Ground to second floor: stone cantilevered stairs. Specification Third to fourth floor and mews: timber stairs. Separate secondary 100A three phase electricity supply for Trolley Lift.

Removable planters Air Conditioning & Environmental Control 0 0 0 0 Located in the roofs of basement diagnostics space, planters can Internal design conditions 23 C+/-2 C (summer), 21 C+/-2 C (winter) be lifted up by a crane (built-in lifting hooks on planters) to provide 2 Pipe VRV heat/cooling system is provided to all main rooms on delivery access for large equipment. ground to fourth floor and first floor mews. The system is designed to accommodate an occupancy of 1 person Services per 10m² in addition to equipment/lighting cooling loads of 25W/m². Accommodation Occupancy 1 person per 10m². Local electric low surface temperature heaters in corridors and WCs Density Lifts adjacent to external envelope. Basement and circulation areas are Ceiling Heights Lower Ground 2300 mm Finished Floor Level to ceiling 1 x (21 person/1600kg) Trolley/Stretcher lift operating at 1.0m/s heated only. 2650-2700 mm Finished Floor Level to soffit serving all floors of the main buildings except first floor of 142 & 144 Basement, WCs, showers, change rooms and two internal rooms on Harley Street. Ground 3770-3840 mm Finished Floor Level to existing ceiling (main buildings) third floor have mechanical ventilation with heat recovery and fresh 2100-2200 mm Finished Floor Level to suspended ceiling (link buildings) Trolley/stretcher lift, HTM 08-02 & 05-03e compliant: for carrying air delivered at 6 air changes per hour. Other rooms are naturally 2300-2500 mm Finished Floor Level to suspended ceiling (mews) a patient on a trolley (dimensions: 800 mm by 2375 mm), on a ventilated with openable windows. stretcher or an empty extended standard hospital bed, together with Shell space is not ventilated with services capped off for future the necessary staff and equipment. Floor Loadings First Floor 3790-3950 mm Finished Floor Level to existing ceiling (main buildings) provision. 2100 mm Finished Floor Level to suspended ceiling (mews) 1 x (6 person/450kg) motor room-less passenger lift operating at Cooling to comms room (external condensers within roof plant well. 3410 mm Max height of sloping ceiling (mews) 1.0m/s providing access to lower ground, ground, 3rd floor and half landings for 1st & 2nd floor. Control System Second Floor 2980-3110 mm Finished Floor Level to existing ceiling The building will have a TREND BEMS (Building Energy Passenger lift, HTM 08-02 & 05-03e compliant: a lift primarily used Management System). Third Floor 2250-2350 mm Finished Floor Level to existing ceiling to carry general passenger traffic, including standing passengers and 2100 mm Finished Floor Level to suspended ceiling passengers using mobility aids such as wheelchairs. Security Fourth Floor 2050-2850 mm Finished Floor Level to suspended ceiling Intruder alarm system. Lighting 1500-3200 mm Finished Floor Level to sloping Video entry control system to the main entrance doors, linked to a LED lighting installed throughout the building except the plant and received station at reception. Offices at or below ground level 3.0 + 1.2 kN/m² shell space. Office other than above 2.5 + 1.2 Nk / m²

Existing floors adequate for pervious use (consulting oomsr & residential). Site survey may be required for significantly increased loads. 142-146 HARLEY STREET 18 Marylebone W1 19 WCs timber single glazed windows (both sash and casement). Thermal Basement doors: Painted solid core timber flush doors. Mews timber stairs: broadloom carpet to full stair outline. Timber A total of 12 WCs are provided, including 3 disabled WCs. performance of external walls is retained as existing. Vision panels to circulation doors in basement. railings painted. Disabled accessible unisex toilets are provided to lower ground, ground Roof Generally, architraves, linings and stops made of solid timber and Lifts and fourth floor.S tandard unisex toilets are distributed as follows, one to Main buildings and mews: Existing slate roof covering is replaced matching existing. Door heights vary per floor. Fire rating upgrade to Back painted glass panelling to walls and full height mirror strips. Ceiling each of second, third and fourth floors with three to ground with new to match the existing. Thermal performance is improved by retained doors where required with intumescent paint. with incorporated lights to perimeter. Black brushed stainless steel floor of main building and a further three to ground floor installing insulation in-between rafters and insulated plasterboard to Glazed screens: entrance doors and control panels. Timber architraves to lift lobby side. of mews building. underside of rafter. Clear, double glazed acoustic panel partition system with silicone Porcelain tiled floor in passenger lift and vinyl floor in trolley/stretcher Staff Facilities Flat roof (Link buildings): Kemper System liquid applied waterproofing joints. lift. Separate staff facilities provided on ground and first floor, access (Kemperol 2K-PUR) installed on ply board. Ironmongery: Vaults & plant rooms via the mews. Two female showers and two male showers both Flat roof (Courtyards): ABG Geosynthetics drained roof system with Solid brass ironmongery with matt black nickel finish, of contemporary Painted concrete flooring and walls. Fire lining to soffit in plant rooms with changing facilities and access to a shared WC on ground floor. pebbles. design suitable for historic buildings. Brushed stainless steel and painted soffit in the vaults. Waterproofing render applied to vaults Kitchenette and office accommodation on 1st floor. Plant: ironmongery to basement, accessible WCs and the mews. Concealed prior to painting. Cycle storage Plant space split between roof plant wells, first floor plant enclosures, closers to front of house doors. Brushed stainless steel grab rails Shell space 18 secure cycle racks provided at ground level, access via the mews. ground floor of the mews and the vaults. and drop-down rails in accessible WCs and accessible change room. (Lower ground) Concealed hinges to all joinery doors. Cleaners Store Vibrations Painted walls and fire lining to ceiling. No floor finish. Special polished brass ironmongery to ground floor front doors. Dedicated facilities provided at third and fourth floor. External condensers located in purpose built plant enclosures at first EPC Rating floor and roof plant wells utilising appropriate anti-vibration mounts. Disabled Access Floors: To be confirmed upon completion of the building. Ground and first floor rooms: solid timber parquet flooring. Hidden step vertical lifting platform providing step free access from Insulation Values Second to fourth floor ooms:r Engineered timber planks. pavement to ground floor operating at 0.15m/s located at the main New elements meet Building Regulations requirements, existing Circulation areas, first to fourth floor:B roadloom carpet. building entrance. elements retain ‘as existing’ values. No level access at the mews. Circulation areas in ground floor of the main buildings: marble tile. Lower ground areas: sheet vinyl flooring. Internal Walls Lower ground areas with lowered slab: raised metal flooring. Envelope Fabric WCs, and ground floor circulation area in the mews: Porcelain tiles. General Retained existing walls and partitions: Plaster patch-repaired, lining Admin areas in the mews: Broadloom carpet. Building to be fully compliant with Building Regulations including Part paper applied prior to painting. Ceilings: L2B ‘Conservation of fuel and power in existing building other than New partitions: Insulated metal stud with double layer of plasterboard. Existing plaster ceilings repaired and painted with surface mounted dwellings’ with dispensations for Listed Buildings where applicable. Acoustic rating RW = 58dB. pendent lighting. New suspended plasterboard ceilings painted with Courtyards Lift shaft wall: Blockwork and fire lined. recessed downlights. Modular suspended tile ceiling Ecophon Access Removable planters have bench seat to perimeter and indirect lighting. C in basement and fourth floor circulation areas. Insulated plasterboard Waterproofing render to basement walls. Surface finish is pebbles with square stone pavers creating staff to sloping ceilings in the top floors and plasterboard bulkheads with pathway between the mews and the main buildings. coffer details to conceal lighting.

Steps to Harley Street Finishes Stairs Stone tiles replaced with new Portland stone. Steps at Walls Main stone stairs: stone repaired, sealed and border painted white. 146 Harley Street house a sesame lift. Existing walls lined with paper and painted, new walls painted over Carpet runner and satin nickel stair rods. Metal balusters painted dry-lining. All WCs and staff change facilities have fully tiled walls. white. Timber handrail varnished natural mahogany. External Walls Upper floors timber satin: broadloom carpet to full stair outline. Timber Elevations retained as existing: London stock brick walls and timber Doors railings painted. Glazed skylights above. single glazed sash windows. Only mews elevations to Park Crescent Painted solid timber panelled doors. Retained existing or new to Lower ground stairs: stone exposed and supported on exposed steel Mews West are altered from original, although they retain the match. structure with feature lighting behind. Existing metal railings painted. character of London stock brick, timber panelled garage doors and

142-146 142-146 HARLEY STREET HARLEY STREET 20 Marylebone W1 Marylebone W1 21 5 The Professional Team Further6 Information

Structural Engineer: Lift Consultant: Quantity Surveyor: Lift Supplier: Claire Kennedy Fairhurst VerticA Consulting Ltd. Nexus Project Services Ltd. Sesame ACCESS t: +44 (0)20 7290 0901 135 Park Street 2A Maple Court, Ash Lane 44 Howard Road Unit 1, Cumberland Works m: +44 (0)7970 034 238 London Collingtree, Northampton Coulsdon, Surrey Wintersell Business Park [email protected] SE1 9EA NN4 0NB CR5 2EA Surrey T: +44 (0) 20 7828 8205 T: +44 (0) 1604 858 850 T: +44 (0) 20 8407 2856 KT14 7LF Emma Fayers fairhurst.co.uk E: [email protected] E: [email protected] T: +44 (0)1784 440088 t: +44 (0)20 7291 6062 sesameaccess.com m: +44 (0)7703 728 434 Mechanical & Electrical Developer: Project Manager: [email protected] Engineer: The Daniel Beard Lift Supplier: hdwe.co.uk Chris Evans Consulting 23 Queen Anne Street The Howard de Walden Estate Elan Lifts Ltd. Sarah Walsh 27-33 Brighton Road London 23 Queen Anne Street 8 Mulberry Court [email protected] t: +44 (0)20 7290 0975 Redhill, Surrey W1G 9DL London Bourne Industrial Park m: +44 (0)7747 488 780 RH1 6PP T: +44 (0) 20 7580 3163 W1G 9DL Bourne Road, Crayford. [email protected] T: +44 (0) 20 8916 2284 hdwe.co.uk T: +44 (0) 20 7580 3163 DA1 4BZ 020 7290 0970 hdwe.co.uk T: +44 (0) 1322 559402 Architect: Main Contractor: E: [email protected] Sonnemann Toon Forcia Ltd Planning Consultant: 142-146harleystreet.co.uk Architects LLP Unit 4, Abbeville Mews Andrea Merrington Quality House 88 Clapham Park Road The Howard de Walden Estate MISREPRESENTATION ACT Howard de Walden Management Limited and DK Ahp for themselves and as agents for Howard de Walden Estates 6-9 Quality Court Clapham 23 Queen Anne Street Limited give notice that the particulars as set out are intended as general outline only for the guidance of intending purchasers/lessees and neither London London London Howard de Walden Management Limited nor DK Ahp on whose behalf the particulars are provided, accept any responsibility for any inaccuracies the particulars may contain. Any intending purchaser/lessee should not rely on them as statements or representations of fact but should satisfy WC2A 1HP SW4 7BX W1G 9DL themselves by inspection or otherwise as to their correctness. All floor areas and other measurements are approximate. These particulars do not T: +44 (0) 20 7580 8881 T: +44 (0) 20 7627 1791 T: +44 (0) 20 7580 3163 form, or form any part of, any offer or contract. Neither Howard de Walden Management Limited nor DK Ahp nor any of their employees have E: [email protected] E: [email protected] hdwe.co.uk any authority, either orally or in writing, to make or give any representation or warranties in relation to the property. Unless otherwise stated all prices and rents quoted are exclusive. st-arch.co.uk forcia.co.uk Designed and produced by MJ Associates • www.mj-associates.co.uk • 020 8449 6265 22 142-146harleystreet.co.uk