Sagardighi Thermal Power Project PO : Manigram, PS

Total Page:16

File Type:pdf, Size:1020Kb

Sagardighi Thermal Power Project PO : Manigram, PS WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED ( A Government of West Bengal Enterprise ) Sagardighi Thermal Power Project PO : Manigram, P.S.: Sagardighi, Dist : Murshidabad (West Bengal) PIN – 742237 Phone No : (03483)237085 , Fax: 237002 NIT No.: WBPDCL/Tend-Adv/CC/14-15/68/SgTPP Date: 05.08.2014 Ref. No. SgTPP/PUR/B&A/14-15/6246 Date : 18.04.14 Sagardighi Thermal Power Project invites 4 (four) Part sealed tenders from experienced Indian manufacturer for manufacturing, supply & delivery of coal mill grinding element indigenously to reputed thermal power plant having minimum capacity of 210 MW units. Suppliers having sound experience and financial capability for supply & delivery of the above, as per terms and conditions detailed in tender document, may contact Sr. Manager (S&P),SgTPP for tender documents which will be issued against deposition of Rs. 2000/- towards the cost of tender document in cash at SgTPP Cash Section from 11.08.14 to 22.08.14 between 10 A.M. to 02.30 P.M. except Saturdays, Sundays & Holidays. Tender papers will not be issued against DD /Money Order/ Cheque and by post. Last date of submission of tender : 12.09.2014 at 2.30 P.M. Opening of tender: 12.09.2014 at 3.00 P.M. ( part I & II) Job Description : Manufacturing , supply and delivery of grinding rollers and table liners sets of coal mill ZGM 123N for 300 MW China make Boiler at Sagardighi Thermal Power Project Estimated Value: Rs 2.478 crore Items and Quantity :- Mentioned in the tender documents. Earnest money : Rs. 2.478 lakh Cost of tender paper : Rs.2000.00 (Non refundable) Qualifying Requirement : Direct experience in satisfactory manufacturing, supply & delivery of coal mill grinding elements in last three years to thermal power plants having 210MW or above units. Required order value is single order of Rs. 1.98 crore / two orders of Rs. 1.24 crore each / three orders of Rs. 0.99 crore each. Documents to prove successful experience in manufacturing supply & delivery of coal mill grinding elements indigenously are to be submitted. Documents include purchase orders as mentioned with price schedule of supply, successful completion certificate and satisfactory performance certificate of materials. Documents should clearly indicate the name, reference of PO numbers, value & quantity, schedule date of completion, actual date of completion. Repeat orders of any reputed ( As per discretion of WBPDCL authority) power plant would also be considered as satisfactory performance certificate of materials of previous order. Documents of Valid factory license no. , VAT/CST Registration certificate & PAN are to be submitted. Cancellation of Tender: Tender may be cancelled at any stage without assigning any reason whatsoever. (Swapan Kumar Bandyopadhyay) General Manager Sg.T.P.P./W.B.P.D.C.L. .
Recommended publications
  • Final Population (Villages and Towns), Murshidabad, West Bengal
    CENSUS 1971 WEST BENGAL FINAL POPULATION (VILLAGES AND TOWNS) MURSHIDABAD DISTRICT DIRECTORATE OF CENSUS OPERATIONS WEST BENGAL PREFACE The final population totals of 1971 down -to the village level will be presented, along with other demographic data, in the District Census Handbooks. It will be some more months before we can publish the Handbooks for all the districts of the State. At the request of the Government of West Bengal, we are therefore bringing out this special publication in the hope that it will meet, at least partly, the immediate needs of administrators, planners and scholars. 10th February, 1975 Bhaskar Ghose Director of Census Operations West Bengal CONTENTS PAGE MURSHIDABAD DISTRICT Jangipur Subdivision 1 P .. S. Farrakka 3 2 P. S. Shamsherganj 4 3 P. S. Suti 5-6 4 P. S. Raghunathganj 7-8' 5. P. S. Sagardighi 9-1Q. Lalbagh Subdivision 6 P. S. Lalgola II 7 P. S. Bhagwangola 12-13 8 P. S. Raninagar 14--15 9 P. S. Murshidabad 16-17 10 P. S. Jiaganj 18 11 P. S. N abagram 19-20' Kandi Subdivision 12 P. S. Khargram 21-22 13 P. S. Burwan 23-24- 14 P. S. Kandi 25-26 15 P. S. Bharatpur 27-28 Sadar Subdivision 16 P. S. Beldanga 29-3(} 17 P. S. Berhampur 31-33 18 P. S. Hariharpara 34 19 P. S. Nawada 35 20 P. S. Domkal 36 21 P. S. Jalangi 37 3 J.L. Name of Village/ Total Scheduled Scheduled J.L. Name of Village/ Total Scheduled Scheduled No. Town/Ward Population Castes Tribes No.
    [Show full text]
  • Sagardighi Thermal Power Project
    Sagardighi Thermal Power Project The West Bengal Power Development Corporation Limited Sagardighi Thermal Power Project P.O.: Manigram, P.S.: Sagardighi, District: Murshidabad, West Bengal PIN: 742237 Notice Inviting Tender (NIT) NIT NO.: WBPDCL/SGTPP/NIT/E1248/18-19 Sub: Procurement of 120 MT Ferric Chloride (IS - 711) for Sagardighi Thermal Power Project, WBPDCL _________________________________________ (Vendor’s Signature with official seal) Page 1 Sagardighi Thermal Power Project The West Bengal Power Development Corporation Limited Notice Inviting Tender (NIT) NITNO.: WBPDCL/SGTPP/NIT/E1248/18-19 Sub: Procurement of 120 MT Ferric Chloride (IS - 711) for Sagardighi Thermal Power Project, WBPDCL Tender is hereby invited by the General Manager, SgTPP, WBPDCL for Procurement of 120 MT Ferric Chloride (IS - 711) for Sagardighi Thermal Power Project, WBPDCL as mentioned in the list given below, through electronic tendering (e-tendering) from eligible and resourceful manufacturers’ having sufficient credential and financial capability for execution of supply of similar nature. 1. GeneralGuidancefore-tendering : Interested bidders are requested to log on to the website https://wbtenders.gov.in to participate in the bid. 2. Registration ofBidders : Bidders who are willing to take part in the process of e-tendering are required to obtain Digital Signature Certificate(DSC)from any authorized Certifying Authority (CA) under CCA, Govt. Of India (viz.nCodeSolutions, Safescrypt, e-mudhra, TCS,MTNL,IDRBT ) or as mentioned in e-tendering portal of GOWB https://wbtenders.gov.in.DSC is given as a USB e-Token. After obtaining the Class II/III Digital Signature Certificate(DSC)from the approved CA, they are required to register the Digital Signature Certificates through the registration system available in the website.
    [Show full text]
  • Malda Division
    MALDA DIVISION 0 MALDA DIVISION 1 DISCLAIMER The information provided in this document is for the purpose of general guidance. Although all efforts have been made to ensure that it is authentic and accurate, however, in case of any conflict, the GR & SR /Accident Manual and other Codes would override. 2 3 4 CONTENTS Chapter Subject Matter Page No. Maps – Malda Division System Map 3 Rail & Road Map 4 1. ASSISTANCE FROM DEFENCE ORGANISATION IN CASE OF 6 RAILWAY DISASTER Assistance for Helicopter from Defence during Major Railway Disaters. 7 National Disaster Response Force (NDRF) 8-11 2. Important Numbers of Head Quarter & all Divisions of ER 13 Telephone numbers of Way side station of Malda division Telephone Numbers of Services HQs and Corresponding Railway Zonal/Divisional HQ. 3. CUG Numbers of Malda Division CUG Numbers of DRM, Accounts, Commercial CUG Numbers of Engineering & Electrical Department CUG Numbers of Mechanical department CUG Numbers of Medical department CUG Numbers of Operating, Personnel & RRB department CUG Numbers of S & T department CUG Numbers of Safety, Security & Stores department Phone Numbers of Medical/SBG & JMP Civil officers and Police offices 4. Station-wise information regarding disaster-management plan of Malda Division MLDT-BDAG L/C section DGLE-MPLR section BHW-SLJ ( Incl. TPH-RJL) section SBG-SBO section BGP-RPUR ( Incl. BGP-MDLE) section JMP-DNRE section Station-wise information regarding disaster-management plan of Malda Division 5 MLDT-BDAG L/C section DGLE-MPLR section BHW-SLJ ( Incl. TPH-RJL) section SBG-SBO section BGP-RPUR ( Incl. BGP-MDLE) section JMP-DNRE section 5 Chapter-1 ASSISTANCE FROM DEFENCE ORGANISATION IN CASE OF RAILWAY DISASTER.
    [Show full text]
  • Special Camp on Issuance of Caste Certificate for SC/ST/OBC from July
    Special Camp on issuance of Caste Certificate for SC/ST/OBC from July 2019 to September 2019 District Name Sub-Division Block Name of Venue Date Time Murshidabad Farakka Beniagram G.P Office 24-07-2019 Murshidabad Farakka Immannagr G.P Office 30-07-2019 Murshidabad Farakka Bewa - II G.P Office 06-08-2019 Murshidabad Farakka Bewa-I G.P Office 07-08-2019 Murshidabad Farakka Nayansukh G.P Office 20-08-2019 Murshidabad Samserganj Dogachi Napara GP 11-07-2019 Murshidabad Samserganj Paratap Ganj GP 18-07-2019 Murshidabad Samserganj Nimtita GP 23-07-2019 Murshidabad Samserganj Chachanda GP 30-07-2019 Murshidabad Samserganj BDO Office Samsherganj 08-08-2019 Murshidabad Raghunathganj-I Jamuar GP 15-07-2019 Murshidabad Raghunathganj-I Jarur GP 16-07-2019 Murshidabad Raghunathganj-I Mirzapur GP 30-07-2019 Murshidabad Raghunathganj-I Raninagar GP 01-08-2019 Murshidabad Raghunathganj-I Kanupur GP 05-08-2019 Murshidabad Raghunathganj-I Dafarpur GP 08-08-2019 Murshidabad Raghunathganj-II Barashimul GP 01-08-2019 Murshidabad Raghunathganj-II Laxmijola GP 06-08-2019 Murshidabad Raghunathganj-II Giria GP 07-08-2019 Murshidabad Raghunathganj-II Sekhalipur GP 08-08-2019 Murshidabad Raghunathganj-II Teghari GP 13-08-2019 Murshidabad Sagardighi Barala GP 16-07-2019 Murshidabad Sagardighi Gobardanga GP 25-07-2019 Murshidabad Sagardighi Patkeldanga GP 06-08-2019 Murshidabad Sagardighi Manigram GP 16-08-2019 Murshidabad Suti-I Banasbati GP 23-07-2019 Murshidabad Suti-I Ahiran GP 26-07-2019 Murshidabad Suti-I Bahutuli GP 30-07-2019 Murshidabad Suti-I Sadikpur
    [Show full text]
  • Alphabetical List of Villages, Town and Village Directory and Primary Census Abstract
    CENSUS 1971 SERIES 22 WEST BENGAL PART X-A & B DISTRICT CENSUS HANDBOOK MURSHIDABAD ALPHABETICAL LIST OF VILLAGES, TOWN AND VILLAGE DIRECTORY AND PRIMARY CENSUS ABSTRACT . Compiled by DIRECTORATE OF CENSUS OPERATIONS WEST BENGAL DISTRICT MURSHtDABAD N IS INDEX INnRNATIOMA~ 1IOUfC)A1fI' STATE eOuNQAA( DISTRICT IOIJNO,UIY SUBOIVISION i!IOUNDAI!t POlICf STATION IIOUHOo\Av DISTRICT HEADQUARTER ® SUBDIVISION HUDQlJARTlRS @ PO~ICE STATION HEAOQlJAIlTERS NATIONAL HIGHWAYS 5.H, - STATE HIGHWAYS '* ROADS (METALLED) AAILWAYS (8ROAO Q,aiIW RIVERS - <: G :r: o , o \ o \ iloIlO UPON SU~V(Y 0' _ ~,., WII'M Jl£AMISSIOll or THE $UIIVUOA GtHl~~ or IIIIIA . nc eXTEANAL BOUNDARY OF INDIA ON THE MAl' AGAEES WITN TME MCOIID COPY CERTlfl£D .. Til( SUAVE' 01 INOlA Moli! on the Cotler page : !' Bazar Duari It or the Palace of the Thousand Gates at Murshidabad : This r",mous palace of the Nawabs of Murshidabad was built by Nawab Hum_yun Jha, a descendant of Mirzafar in 1837, It has a rare collection of curios and China and a rich gallery of paintings by European and Indian masters. An armoury containing old arms and armour of the 17th and 18th Centuries is also located in the palace. [By courtesy : Director of 1ourism, Government of West Bengal] Price: (Inland) Rs. 10.00 Pais. = (Foreign) £ 1.17 or 3 $ 60 cents. PUBUSHED BY THE CONTROLLElt, GOVERNMENT PRINTING, WEST BENGAL AND PRINTED BY NELYS PRINTING (PVT.) LTD. 2, BARRETtO LANE, CAICUTTA-700069. 1977 PREFACE The 1971 Series of District Census Handbooks of which this represents one volume, are being presented in a new form. The Handbooks have been divided into three sections.
    [Show full text]
  • The List of Legal Services Clinic at Police Station/ Front Office/ Jails/ Observation Homes/ JJB/ Child Welfare Centres/ Other Legal Services Clinics
    The list of Legal Services Clinic at Police Station/ Front office/ Jails/ Observation Homes/ JJB/ Child Welfare Centres/ Other Legal Services Clinics S. No. Name of the SLSA/ Name of the women PLV Presently working in Legal Services Contact Number DLSA/ TLSC Clinic at Police Station/ Front office/ Jails/ Observation Homes/ JJB/ Child Welfare Centres/ Other Legal Services Clinics. 1. Andhra Pradesh DLSA, Smt.N.Saraswathi Legal Services Clinic at Govt. General 9985484118 Ananthapuramu Hospital, Ananthapuramu Kum.G.Rajeswari Legal Services Clinic at Sathya Sai Old 9441465550 Age home, Ananthapuramu Kum. Vadde Gowari Legal Services Clinic at Ammaodi Old 8520843384 age home, Ananthapuramu Kum.K.Lakshmi Legal Services Clinic at Vasavi Old age 9059666247 home Kum. S.Sailavathi Legal Services Clinic at Marthadu 9985859635 village, Garladinne Mandal MLSC, Dhamavaram Kum. Kotla Salamma Legal Services Clinic at Ramgiri MRO 7702732433 office, Ramgiri PS MLSC,Gooty Smt.B.Aruna Front office 8096159278 MLSC, Hindupur Smt. M.Naga Jyothi Legal Services Clinic at Police Station 9849721460 Kum.B.Sanneramma Village Legal Services Clinic at MRO 7330915325 office, Parigi Kum.S.Beebijan Village Legal Services Clinic at MRO 7799636235 office, Hindupur Kum.B.Susella Village Legal Services Clinic at MRO 7036013195 office, Lepakshi Kum.S.Kalavathi Village Legal Services Clinic at MRO 9440617153 office, Govt. Hospital, Hindupur Kum.M.Obulamma Sub-Jail, Hindupur 8897419845 Smt.K.Padmavathi Village Legal Services Clinic at MRO 9948925666 office, Chilamathur MLSC, Kadiri
    [Show full text]
  • Parts of Murshidabad District (9 Blocks), Farakka, Samserganj, Suti II, Suti I, Raghunathganj I, Sagardighi, Nabagram, Khargram and Kandi
    कᴂद्रीय भूमि जल बो셍ड जल संसाधन, नदी विकास और गंगा संरक्षण विभाग, जल शक्ति मंत्रालय भारत सरकार Central Ground Water Board Department of Water Resources, River Development and Ganga Rejuvenation, Ministry of Jal Shakti Government of India AQUIFER MAPPING AND MANAGEMENT OF GROUND WATER RESOURCES Parts of Murshidabad District (9 Blocks), Farakka, Samserganj, Suti II, Suti I, Raghunathganj I, Sagardighi, Nabagram, Khargram and Kandi पूिी क्षेत्र, कोलकाता Eastern Region, Kolkata GOVERNMENT OF INDIA MINISTRY OF JAL SHAKTI Dept. of Water Resources, River Development &Ganga Rejuvenation Report on Aquifer Mapping Studies in districts (pts.) of Murshidabad West Bengal (AAP 2017-2018) By: S. Brahma, Scientist ‘D’ Central Ground Water Board Eastern Region, Kolkata November 2020 CONTENTS Particulars Page No (s). Part I: Aquifer Mapping Studies Chapter-1: INTRODUCTION 1 to 9 1.1 Objective 1 1.2 Scope of Study 1 to 2 1.3 Approach and Methodology 2 1.4 Location, Extent and Accessibility of the study area 2 to 3 1.5 Administrative divisions and Population 4 to 5 1.6 Land use and Irrigation 6 to 8 1.7 Urban areas, Industries and Mining activities 9 Chapter-2: CLIMATE 9 to 10 2.1 Rainfall 9 2.2 Temperature 9 to 10 Chapter-3: PHYSIOGRAPHY 10 to 16 3.1 Geomorphology 10 to 13 3.2 Drainage 13 to 14 3.3 Soil Characteristics 15 to 16 Chapter-4: GEOLOGY 16 to 17 4.1 General geology 16 to 17 Chapter-5: SUBSURFACE AQUIFER DISPOSITION 18 to 30 Chapter-6: HYDROGEOLOGY 30 to 51 6.1 Water bearing Formation & Aquifer Groups 30 to 32 6.2 Aquifer wise groundwater regime, depth to water level, etc.
    [Show full text]
  • Minuter for 3Rd SLSSC 2020-21.Pdf
    Public Health Engineering Directorate,Govt. of West Bengal Head Quarter,Office of the Chief Engineer Head Quarter.,New Secretariat Building,7th.Floor, 1.K.S. Roy Road, 700001 Particulars related to clearance of different scheme Source Clearance Meeting No : 3rd (2020-2021) Date: 25/09/2020 Time: 2:30 PM Source Clearance Run Date : 09/10/2020 1:51:16PM Sl. #Name of Schemes District Recommendation No. of Villages Census Yr Design Yr Design Particulars of Proposed Source Test Result of Water Report Preparing division Block/ of the No. of Habs Census Pop Design Pop Water Sample of Executing Division Location Committee No. of Towns Dmd reference source Scheme Type No. of Wards Total (Kld) IMIS Scheme Type No. of HC SC No of SSP ST PASCHIM 1. Gopinathpur Piped Water Supply CY 2011DY 2050 485.00 Type : Ground Water pH -7.66 MEDINIPUR Scheme.(TSM/005703) Rural Pingla #TW :2 TDS - Planning and Design Division IV Yeild :18.65 m3/hr Fe - 0.78ppm Midnapore Division Vill 7 Tot 5055 DP 7540 Size :250mm X 150mm dia 200.00m As - BDL PWSS Hab 11 SC 406 Housing Pipe :250.00mm dia 48.00m F - BDL PWSS HC 1,142 ST 990 Well Pipe :150.00mm dia 117.00m Cl - SSP 7 Strainer : 150.00mm dia 30.00m NO3 - Urban Blank Pipe :150.00mm dia 5.00m Location : Big dia T/W TW 0 Tot 0 DP 0 of Dhaneswarpur WD 0 SC 0 PWSS at a distance of HC 0 ST 0 10 km (approx) from the SSP 0 command area.
    [Show full text]
  • Analysing the Anti CAA Violence in West Bengal
    December 2020 Dr. Syama Prasad Mookerjee Research Foundation Analysing the Anti CAA Violence in West Bengal Dr Mohit Ray Shri Sujit Sikdar Published by DR SYAMA PRASAD MOOKERJEE RESEARCH FOUNDATION & REFUGEE CELL, BJP WEST BENGAL Analysing the Anti CAA Violence in West Bengal (Analysis of the anti-CAA Violence in West Bengal between 13th - 15th December, 2019 in the light of the Newspaper Reports) Dr Mohit Ray Shri Sujit Sikdar (Translated from original Bengali by Ms Ahana Chaudhuri) Background The Citizenship Amendment Bill (henceforth CAB) was passed in the Lok Sabha on 10th December 2019. On the very next day, i.e. 11th December 2019, the Bill was passed in the Rajya Sabha. On 12th December, the President of India signed the Bill; and the Citizenship Amendment Act (CAA) came into force. The law was brought into existence through completely democratic and constitutional means. It is absolutely normal for political parties in the opposition to hold different views when a particular law is enacted in a democracy. Even protests against the law at various levels can be lodged as a democratic way of dissent. However, the violence that took place between 13th and 15th December 2019, in West Bengal in the name of protest, and those who perpetrated atrocities, reminded many of the days preceding the formation of Pakistan in 1946. Newspaper accounts and analyses of those terrible days are recorded in this booklet so that in the days to come, the people of West Bengal do not forget those three days when the state had virtually turned into a mini-Pakistan.
    [Show full text]
  • Proposed 1 X 500 MW Coal Based Sagardighi Phase III Extension Unit – 5 at Sagardighi Thermal Power Station (Sgtpp) in Murshidabad District, West Bengal
    Brief Summary of the Project 1. Name of the project: Proposed 1 x 500 MW Coal Based Sagardighi Phase III Extension Unit – 5 at Sagardighi Thermal Power Station (SgTPP) in Murshidabad District, West Bengal. 2. Existing Capacity / Area etc: Existing capacity of Phase – I is 600 MW (2x300MW) presently under operation. In Phase-II , necessary clearances received for 2×500 MW sub-critical units are under construction/commissioning stage. Land area required for the proposed expansion was already acquired during land acquisition for Phase-I. 3. Location: The proposed unit will be located in the premises of the existing SgTPP in Murshidabad District, West Bengal. SgTPP site is located at Manigram Village, 13 km north of Sagardighi town by the side of the SMGR (Sagardighi-Manigram- Gankar-Raghunathganj) Road at a distance 20 km from National Highway-34 in Murshidabad District, West Bengal. it is around 240 km from Kolkata. The approximate latitude and longitude of the project site are as follows: AREA LATITUDE LONGITUDE 24° 22’ 20’’N 88° 05’ 30’’E 24° 22’ 38’’N 88° 06’ 11’’E Plant Site 24° 21’ 47’’N 88° 07’ 04’’E 24° 21’ 19’’N 88° 06’ 05’’E 24° 22’ 06’’N 88° 05’ 05’’E 24° 23’ 08’’N 88° 05’ 25’’E Ash Pond 24° 22’ 38’’N 88° 06’ 05’’E 24° 22’ 20’’N 88° 05’ 28’’E 4. Nearest railway station / airport along with distance in kms: The nearest rail station is Manigram adjacent to the site on Bandel-Barhawara branch line. Sagardighi Railway Station (6.5 km) on Sainthia – Azimgunj line of Eastern Railway is another railway station.
    [Show full text]
  • (Rawdon Street) Kolkata-700 017 Ph.No.2280-5805; FAX:2280-7373
    WEST BENGAL STATE ELECTION COMMISSION 18, Saroniji Naidu Sarani (Rawdon Street) Kolkata-700 017 Ph.No.2280-5805; FAX:2280-7373 No.1810-SEC/1D-132/2012 Kolkata, the 3rd December, 2012 O R D E R In exercise of the power conferred by sections 16 and 17 of the West Bengal Panchayat Elections Act, 2003(West Bengal Act XXI of 2003), read with rules 26 and 27 of the West Bengal Panchayat Elections Rules, 2006, West Bengal State Election Commission, hereby publish the draft Order for delimitation of Murshidabad Zilla Parishad constituencies and reservation of seats thereto. The Block(s) have been specified in column (1) of the Schedule below (hereinafter referred to as the said Schedule), the number of members to be elected to the Zilla Parishad specified in the corresponding entries in column (2), to divide the area of the Block into constituencies specified in the corresponding entries in column (3), to determine the constituency or constituencies reserved for Scheduled Tribes (ST), Scheduled Castes (SC) or the Backward Classes (BC) specified in the corresponding entries in column (4) and the constituency or constituencies reserved for women specified in the corresponding entries in column (5) of the said schedule. The draft will be taken up for consideration by the State Election Commissioner after fifteen days from this day and any objection or suggestion with respect thereto, which may be received by the Commission within the said period, shall be duly considered. THE SCHEDULE Murshidabad Zilla Parishad Murshidabad District Name of Block Number of Number, Name and area of Constitue- Constituen- member to the Constituency ncies cies be elected reserved for reserved to the Zilla ST/SC/ BC for women Parishad persons (1) (2) (3) (4) (5) Farakka 3 Farakka/ ZP-1 BC Women Bewa-I, Bewa-II and Beniagram grams Farakka/ ZP-2 BC Bahadurpur, Imamnagar and Nayansukh grams.
    [Show full text]
  • The West Bengal Power Development Corporation Limited
    THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED DETAILED PROJECT REPORT FOR 1 x 660 MW PHASE-III EXTENSION UNIT # 5 SAGARIGHI THERMAL POWER STATION AT SAGARDIGHI, DIST.: MURSHIDABAD, WEST BENGAL MAY, 2016 CONSULTANT DEVELOPMENT CONSULTANTS PRIVATE LIMITED BLOCK DG-4, SECTOR-II, SALT LAKE CITY, KOLKATA – 700 091, INDIA Detailed Project Report 1 X 660 MW Phase-III Extension Unit#5, Sagardighi, West Bengal DETAILED PROJECT REPORT FOR SAGARDIGHI THERMAL POWER STATION 1 x 660 MW PHASE-III EXTENSION UNIT # 5 SAGARDIGHI, WEST BENGAL I N D E X SECTION – 1 : PROJECT BACK GROUND AND EXECUTIVE SUMMARY 1.1 Foreword 1.2 Executive Summary 1.3 Project At a Glance SECTION – 2 : JUSTIFICATION OF THE PROJECT 2.1 Introduction 2.2 All-India Power Scenario 2.3 Power Scenario of Eastern Region 2.4 Power Scenario in West Bengal 2.5 Justification of the Project 2.6 Unit Size Selection Index - 1 - Development Consultants Pvt. Ltd. (PCA.CD-006.16A03-DPR2_INDEX.DOC) Detailed Project Report 1 X 660 MW Phase-III Extension Unit#5, Sagardighi, West Bengal SECTION – 3 : BASIC REQUIREMENTS 3.1 Introduction 3.2 Land – Requirement & Availability for Phase-III Unit 3.3 Water – Requirement & Availability 3.4 Fuel Requirement 3.5 Ash Disposal 3.6 Power Evacuation 3.7 Infrastructural Facilities SECTION – 4 : SITE FEATURES 4.1 Introduction 4.2 Features of the Identified Site 4.3 Meteorological Details SECTION – 5 : POWER GENERATING EQUIPMENT 5.1 Introduction 5.2 Selection of Technology 5.3 Thermodynamic Cycle 5.4 Steam Generating Unit 5.5 Turbine Generator Unit Index - 2 - Development Consultants Pvt.
    [Show full text]