KERALA STATE ELECTRICITY BOARD LIMITED (Lncorporated Under the Companies Act, 1956) Ksebs,F'&D^Tnn Reg
Total Page:16
File Type:pdf, Size:1020Kb
KERALA STATE ELECTRICITY BOARD LIMITED (lncorporated under the Companies Act, 1956) KSEBs,f'&d^tnn Reg. Office: Wwthi Bhavanam, Pattom, Thiruvananthapuram - 695 004 Cl N:U40100K120L!SGCO27 424 Website: wwwkseb.in gdyuthi Bhavanam, Pattom, Thiruvananthapuram - 695 004, Kerala /5@ Phone: +97 477 22U6885, Fax: +97 477 2444738 [email protected] ABSTRACT Construction of 110kV Substation , Vengara as LILO (8km) of Kizhissery - Malappuram 110kV line and installing 2x12.5MVA LLO/LLkV Transformers underTransmission Circle, Malappuram- Administrative sanction accorded - orders issued. Corporate Office(SBU-T) B.O.(FTD)No.877 /2OL9/D(T&SO)/T3I110kV Vengara/20L9-20 dated, Thiruvananthapuram 29.1.1..2019 Ref : 1. Note No.D(T&SO\/PSE/NP/2OL9-2O /52 dated L9.06.2OL9 of the Executive Engineer; Power System Engineering. 2. Letter No. CEITRN lE3l]-tOkV S/s Vengara /2OI9-2O/595 dated 20.07.2079 of the Chief Engineer (Transmission North ). 3. Minutes of the DPR Approval Committee Meeting held on 24.L0.2019 . 4. Note No.D(f,,SO&S)/T3/ 110kV Vengara/20I9-20/ 78 dated 20 .LL.20L9 (Agenda No.iULLltsl The Chief Engineer (Transmission North) forwarded a proposal as per paper read 2 nd above for the construction of 110kV Substation, Vengara as LILO (8km) of Kizhissery - Malappuram 110kV line and installing 2x12.5MVA LLO/LLkV Transformers at an estimate amount of Rs.24.00 crore . The project is expected to facilitate the industrial and commercial development of Vengara and Oorakam grama panchayaths and nearby areas and to meet future demand, improve the quality and reliability of supply to about 3.5 Lakh people. The location for the Substation is proposed at Kilinakkode near Vengara which lies in between 110kV Substation Malappuram, 110kV Substation, Edarikode, 110 kV Substation Kizhissery, 33kV Substation, Kooriyad and 33kV Substation Othukkungal. lt is proposed to provide 2No. 12.5MVA, 110/11kV Transformers, 2No. 110kV feeder bays and 5 No. 11kV feeders. The incoming supply to substation is from the existing Kizhissery - Malappuram 110kV feeder 1 ( 1KlMLl ) with LILO arrangement for a length of 8 km. The location of this LILO ing point is near Myladi. Almost all line route proposed is passing through hilly terrain and lightly populated. Geographically the proposed area is located in the farthest end of all the substations mentioned above. All the l1kV feeders to the proposed area from these substations are almost overloaded or nearing full load. The growth of Load in Vengara town and surrounding area are expected to increase rapidly in the coming years due to commercial establishments and residential loads. Apart from that, lot of industrial units related to crushers and related to lnkel industrial projects are coming up in Oorakam village . This area is now fed by eight 11kV feeders viz. Pookkottur and Spinning mill feeder(from110kV Substation, Malappuram) ; Achanambalam and Pakkadappuraya feeder ( from 33kV Substation, Kooriyad ); AR Nagar and Kondotty feeder ( from 110 kV substation, Kizhissery ) Vengara feeder ( from 11OkV Substation, Edarikode ) and Mattathur feeder ( from 33kV Substation, Othukkungal ). Since all the above feeders are almost overloaded or nearing full load, interruption due to routine maintenance and feeder far-rlts will affect a large number of consumers for long time. Also at present 4.2 MVA new demand requests around Oorakam area are kept pending due to non availability of power. To tide over the crisis, the proposed substation is essential. Further, due to space constraints, no more outgoing 11 kV feeders can be arranged from the nearest substation viz. 110 kV substation, Edarikode. Moreover this substation is already loaded up to 90% of its installed capacity. This proposal will reduce the load of 1lOkV Substation, Edarikode to a certain extent. Further, the proposals of 11OkV Substation, Panakkad, 33kV Substation , Naduvakkad and 33kV Substation, Cherakkad need not be taken forward, if the above substation materialises. Load Flow Study shows that the construction of LLO/IIkV Substation at Vengara has a saving potential of 0.202 MW The study conducted with the present and future load indicates that the proposed project is beneficial by way of energy savings consequent to reduced losses and loading, improved voltage profile, better system availability, improved transmission reliability, providing secure supply and meeting the Government of India mandate for providing24 x7 power supply in a secure manner . The proposal was placed before the DPR Committee held on 24.10.2019 . After deliberations the Committee approved the proposal . The matter was placed before the FullTime Directors on 2O.IL2OI9 vide AgendaNo. 6I/LI/I9 for a decision. Having considered the above, the FullTime Directors in the meeting held on2O.I7.20I9 Resolved to accord Administrative Sanction for the Construction of 110kV Substation , Vengara as LILO (8km) of Kizhissery - Malappuram 110kV line and installing 2x12.5MVA 110/11kV Transformers at an estimate amount Rs.24.0 crore under Transmission Circle, Malappuram. Orders are issued accordingly. Sanctioned estimate is attached as Annexure. By Order of the Full Time Directors, sd/- Lekha G. Company Secretary (ln- Charge) To : The Chief Engineer (Transmission North) Copy to: The Deputy Chief Engineer, Transmission Circle, Malappuram The Deputy Chief Engineer(lT) The Financial Adviser/ The Chief Internal Auditor. The RCAO/ RAO. The TA to cMD/ D(T,SO,S, CP&REES)/ D(D, |T&HRM)/ D(G-c)/ D(G-E& SCM) The PA to Director (Finance)/CA to Company Secretary Fa i r Copy Su perinten dent/Library /Stock File. Forwarded / By Order utive Engineer An nexu re to B.O.(FTD) No.877 nOLg I D(T &SO)/T3l110kY Yen9ar a | 2019-20 dated, ThiruvananthaPuram 29.LL.2OL9 KERALA STATE ELECTRICITY BOARD LIMITED Abstractof Estimate Name of work: Construction of 110kV Substation, Vengara as LILO( 8km ) oI Kizhissery - Malappuram 110kV line and installing 2x12.5MVA Transformers under Transmission Circle, Malappuram Amount in Sl.No Description Crore Construction of 11OkV Substation, Vengara by installing 1 13.80 2xI 2 . 5NfI/ ATran s form ers Construction of 8km 110KV DC line from Kizhissery - 10.20 2 Malappuram 110kV line to the proposed Vengara llOkV substation with LILO arrangements. Total 24.00 (Rupees Twenty Four crore onlY) sd/- Director ( Transmission , System Op..4ton4 luftty) KERALA STATE ELECTRICITY BOARD LIMITED Name of work: Construction of I 10kV Substation,Yengara by LILOing Kizhissery - Malappuram 110kV line( 8km ) and installing 2xl2.5MYA Trans formers under Transmi ssion Circle, Malappuram Project A:Construction of l10kV Substation, Vengara by installing 2xl2.5MVA Transformers ESTIMATE Rate SI. Amount EquipmenVWork Quantity (Rs No. (Rs Lakh Lakh ) Part I I Land 150 cent 2.00 300.00 Part II - Civil Works I site Levelline No. 40 40.00 a L Compound wall No. 26 26.00 3 Control room No. 65 65.00 4 Metal spreading No. 1l 11.00 5 Earth mat No. 10 10.00 6 Power and control cable drainage No. 75 75.00 a 7 Control room electrification No. J 3.00 8 Fire Hydrant system No. 25 25.04 9 controlwiring No. J 3.00 10 Yard fencing No. 8.5 8.50 ll Road No. 32 32.00 12 opcn well No. J 3.00 1aIJ Foundation ofYard structures & equipments No 60.00 60.00 Sub Total Part II 361.50 Part III - Equipment I l lOkV Bus Isolator 1200,4. with structure 7 Nos. 2.25 15.7 5 llOkV CB with structure 4 Nos. s.18 20.72 J I I OkV NCT of ratio 300-l 50-75/lA 2 Nos. 0.23 0.46 + I 2.5lvtvA, I I 0/l 1 kV transformer 2 Nos. 80.51 161.02 a 5 C&R panel for l2.5MVATransformer z Nos. 5.27 10.54 6 32mm MS Rod 10 MT 0.53 5.30 I Control Cable 2.5mmt X 7 core 0.7 km 1.89 r.32 8 (8km) I km 1.730 1.73 9 Control Cable 2.5mm2 X 4 core 0.5 km 1.19 0.60 l0 Control cable 2.5mm2 X 19 core 1.3 km 4.33 5.63 1l Control cable 2.5mm'X 12 core 1.5 km 2.85 4.28 t2 Control cable 2.5mm2 X2 core 0.5 km 0.78 0.39 13 Conlrol cable 4mm'X 12 core km 4.27 4.27 l4 tlkV I X 500mm2 XLPE UG cable 1 km 6.06 6.06 l5 GI Yard structures as per BOM 20 MT 0.81 16.20 Page 1 l6 ACSR Kundah conductor 0.5 km 2.00 1.00 2.35 t7 Auxililiarv transformer I 60kVA, I lkY I 433V I No. 2.35 l8 l lkv NcT400/1A 2 No. 0.27 0.54 1.13 t3.s6 19 I l0kVPT with structure t2 Nos. 0.006 0 6r 20 Disc lnsulator 12OKN 96 Nos. 2l llkv 8004AB Switch 6 Nos. 0.24 144 5.27 10.54 22 I 1OkV Feeder control & RelaY Panel 2 Nos. gang operated Line ZJ I lOkV,E00Atriple pole double break 2 Nos. 2.52 5.04 Isolator with structure t2 Nos. 1.65 19.80 24 I 1 OkV CT 600-3 00-1 50/l- 1- I -1A with structure 0.37 4.44 25 11OkV LAwith structure l2 Nos. 42.97 42.97 26 llkv l0 panel set(Indoor) I No. 9.t3 13.70 27 I lkv3 X300mm2 XLPE UG cable t.s0 km 0.02 0.54 28 I lkV station class LA 27 Nos. 29 for I lkV XLPE cable I Cable termination kit(outdoor) 12 Nos. 0.025 0.30 X 500mm2 30 l XLPE 3 Cable termination kit(outdoor) for lkV cable 10 Nos.