Aberdeen Cross City Transport ConnecOns Engagement InformaOn Pack Overview Your Feedback

Total Page:16

File Type:pdf, Size:1020Kb

Aberdeen Cross City Transport Connec�Ons Engagement Informa�On Pack Overview Your Feedback Aberdeen Cross City Transport Connecons Engagement Informaon Pack Overview Your Feedback This document provides an overview of the Aberdeen (e sought your views on the inial phase of the study in ovember 201.. Cross City Transport Connecons Study. The study is At this stage a range of public transport and acve travel opons had been being undertaken on behalf of Aberdeen City Council, developed and a high level inial appraisal of the opons undertaken. Aberdeenshire Council and estrans, by Peter Bre" Associates (now part of Stantec). The study has progressed further and we are now seeking your views on the *nal set of opons which are in the process of being appraised in The overall purpose of the study is to: detail. Examine transport connecons between new areas of development on the periphery of Aberdeen, and To ensure the transport connecons have been developed appropriately, in areas of Aberdeenshire close to the Aberdeen City we would like to hear your views and feedback on the work undertaken boundary with the aim of providing viable, for the study and whether or not you agree or disagree with the opons. aracve and direct linkages, as an alternave to To capture your feedback we invite you to: the private car. An image showing the development sites is provided ♦ Review the material within this pack within this pack. ♦ Record your views through a short on0line 1uesonnaire available here: h"ps:22consultaon.aberdeencity.gov.uk2planning2aberdeen0 (hile the study is focussing on developing transport cross0city0transport0connecons connecons between new areas of development, many of the connecons developed provide (e recommend you have this engagement pack close at hand for reference improved accessibility to e)isng communies within when compleng the survey. Aberdeen and Aberdeenshire and we are therefore seeking input from e)isng communies who may The survey will be open unl Wednesday 1st October 2018. bene*t. If you have any further 1uesons or comments, a dedicated email address is available: crosscitytransport%peterbre&.com Study (ackground The study considers the provision of appropriate public transport and acve travel (walking and cycling) connecons: ♦ Between planned residenal and employment developments ♦ Between planned residenal areas and key employment centres ♦ Between the di3erent modes of sustainable transport at key interchange points The study considers a future posion , when the development sites are built out. The sites are predominantly green,eld sites which are yet to be developed, or are only starng to be developed. This study is about opportunity , and the chance to migate against the potenal transport impacts associated with the developments. Sco-sh Transport Appraisal .uidance The study is being undertaken in line with the Sco-sh Transport Appraisal .uidance (STA4) and has covered the Pre0Appraisal , Part 1 Appraisal and Part 2 Appraisal stages. STA4 provides a mechanism by which potenal opons to address evidence0based transport problems or opportunies are iden*ed and appraised in a consistent manner and is evidence0led, not soluon0led, proporonal and robust. The Pre0Appraisal stage covers the iden*caon of transport problems and opportunies, ob5ecve se6ng, opon generaon and si7ing and subse1uent recommendaon of opons for appraisal at Part 1. Part 1 Appraisal covers a high level appraisal of the opons progressing from Pre0Appraisal against a range of criteria with *nal recommendaons for opons worthy of further detailed appraisal at STA4 Part 2. Part 2 Appraisal covers a detailed appraisal of the opons progressing from the Part 1 Appraisal stage against a range of criteria with *nal recommendaons for opons worthy of being considered further. 8urther details on STA4 can be found at: h&p122www.transport.gov.scot2stag Transport Problems 3 Opportunies Problems The iden*caon of Problems and Opportunies within the If no provision is made for sustainable transport access then transport and land0use system forms the starng point for any future problems may include: STA4 study. ♦ A heavy reliance on the private car with associated The study is considering a future posion in 20 0 when all the addional road congeson, environmental impacts development sites are potenally built out. It is therefore (increased emissions, noise and vibraon) and an important to consider the future transport network and idenfy increased safety risk for all road users future problems and opportunies. ♦ Community severance A key part of the Pre0Appraisal work was a series of baselining acvies which included review of: ♦ Reduced access to employment, services, and retail and leisure facilies ♦ Overarching policy ♦ The e)isng transport network Opportunies ♦ The current accessibility of the development sites The key opportunity for the study is to migate against the ♦ E)isng travel pa"erns above iden ed future problems by providing appropriate sustainable transport connecons. The study also provides an ♦ Commi"ed and planned future transport schemes opportunity to: ♦ Current and historical economic trends ♦ Capitalise on the Aberdeen City Centre Masterplan which ♦ :ey environmental designaons and constraints. envisages a high level of public transport priority in the city centre ♦ Recognise key infrastructure and land which needs to be safeguarded ♦ Recognise key infrastructure which developers could integrate into their proposals. Transport Planning Ob4ecves Opon 5evelopment Process Based on the iden*ed key problems and opportunies, Opon development followed a number of key steps: and overarching policy conte)t, eight Transport Planning Ob5ecves (TPOs) have been set for the study. ♦ Step 11 Review of e6isng public transport and acve travel network in the study area ♦ Step 21 Review of the potenal future public transport and acve travel network in the study area ♦ Step 1 Establishment of key interchange points and key e6isng and future employment areas to ensure: ◊ Connecvity between e)isng radial routes and new orbital routes ◊ 4ood integraon between public transport and acve travel routes ◊ 4ood access to employment opportunies ♦ Step 71 Establishment of the key constraints ♦ Step 81 The generaon of opons , undertaken separately for public transport and acve travel due to the di3erent nature of travel Engagement with key stakeholders was undertaken during Step 5 and included engagement with the council(s), bus operators, local economic and business groups and local acve travel organisaons. A number of opons were =si7ed out’ through stakeholder discussions. :ey Constraints Public Transport Opons :ey constraints iden*ed that were crical in the opon Public transport opons were developed considering: development process included: ♦ Adapng e6isng bus services i.e. increasing current service ♦ The route of the River 5on acng as an east0west barrier fre1uency and2or e)tending e)isng bus routes with limited e)isng river crossings. ♦ New bus routes ulising e6isng infrastructure ♦ The route of the River 5ee acng as a north0south ♦ New routes (bus 2 tram 2 light rail) ulising new infrastructure barrier with limited e)isng river crossings. In total 22 public transport routes were taken forward for appraisal ♦ The geography of the development sites making a single at STA4 Part 1. Of these, A were subse1uently recommended for strategic route linking all sites di?cult without being detailed appraisal at STA4 Part 2. A further =circular loop’ opon was highly circuitous. also included at this stage. ♦ The rural nature of many of the sites south of 5yce All opons taken forward relate to new bus services. It is assumed re1uiring new infrastructure to provide connecons. that all services operate with a 30 minute bus fre1uency. ♦ The implementaon of the Aberdeen Western Each opon is considered in the following slides where the key Peripheral Route (AWPR ), making it challenging to advantages and disadvantages of each opon are presented. ote provide public transport 5ourney mes that can compete that the route of each opon through the development sites is with the private car. purely inducve and ♦ The lack of footway and2or cycleway along the AWPR; would be sub5ect to discussion with each ♦ Compeon between bus and rail travel modes , relevant developer. parcularly between Chapelton of Elsick and Dyce. ♦ 5i=culty in providing acve travel links suitable for commuter funcons in the rural areas di3ering uses, surfacing re1uirements and lighng. Public Transport Opons Opon A1 New orbital service linking (lackdog, 5yce Rail Staon, :irkhill Industrial Estate, Craibstone Park 3 Ride, :ingswells Park 3 Ride and Westhill with: ♦ ew bridge over the River Don. ew public transport 2 The route follows AC0 (Ellon Road), The Parkway, Scotstown Road, Desmond acve travel only bridge over River Don Drive, new route through development at 4randhome and over the River Don, Stoneywood Road and Dyce Drive, Scla6e Park, :epplehills Road, 8airley Road and the ACEE to (esthill. Advantages 5isadvantages ♦ Connects the large planned residenal areas at 4randhome and ♦ Fnlikely to be a"racve for longer trips between Blackdog and Dyce, ewhills directly with the employment opportunies at Bridge of Don, :ingswells and (esthill due to the distance and routeing via Dyce Murcar, :irkhill Industrial Estate, Dyce, :ingswells and (esthill Railway Staon ♦ Connects directly with Dyce Railway Staon ♦ Dourney me by private car on A(PR sll signi*cantly 1uicker for longer 5ourneys (e.g. between Blackdog Dyce, :ingswells and (esthill) ♦ Serves e)isng communies in Bridge of Don, Middleton Park, Bucksburn and
Recommended publications
  • Portlethen Moss - Wikipedia, the Free Encyclopedia Page 1 of 4
    Portlethen Moss - Wikipedia, the free encyclopedia Page 1 of 4 Portlethen Moss NFrom, 2°8′50.68 Wikipedia,″W (http://kvaleberg.com/extensions/mapsources the free encyclopedia /index.php?params=57_3_27.04_N_2_8_50.68_W_region:GB) The Portlethen Moss is an acidic bog nature reserve in the coastal Grampian region in Aberdeenshire, Scotland. Like other mosses, this wetland area supports a variety of plant and animal species, even though it has been subject to certain development and agricultural degradation pressures. For example, the Great Crested Newt was found here prior to the expansion of the town of Portlethen. Many acid loving vegetative species are found in Portlethen Moss, and the habitat is monitored by the Scottish Wildlife Trust. True heather, a common plant on the The Portlethen Moss is the location of considerable prehistoric, Portlethen Moss Middle Ages and seventeenth century history, largely due to a ridge through the bog which was the route of early travellers. By at least the Middle Ages this route was more formally constructed with raised stonework and called the Causey Mounth. Without this roadway, travel through the Portlethen Moss and several nearby bogs would have been impossible between Aberdeen and coastal points to the south. Contents 1 History 2 Conservation status 3 Topography and meteorology 4 Evolution of Portlethen Moss 5 Vegetation 6 Relation to other mosses 7 References 8 See also History Prehistoric man inhabited the Portlethen Moss area as evidenced by well preserved Iron Age stone circles and other excavated artefacts nearby [1]. Obviously only the outcrops and ridge areas would have been habitable, but the desirability of primitive habitation would have been enhanced by proximity to the sea and natural defensive protection of the moss to impede intruders.
    [Show full text]
  • A6.2 - Consultation Responses
    Aberdeen Western Peripheral Route Environmental Statement Appendices 2007 Part A: The Scheme Appendix A6.2 - Consultation Responses Table 1 – Summary of Consultation Responses The table below provides a summary of the responses received from statutory, non-statutory and Community Council consultees as a result of consultation undertaken throughout the EIA process for the AWPR. The information included in this table relates to the Northern Leg, Southern Leg and Fastlink sections of the currently preferred route only; comments relating to the superceded route options have been omitted as they are no longer relevant. It should also be noted that the table below includes only the formal responses to the consultation letters. Correspondence with consultees throughout the environmental assessment is not included in the table below. Consultee Subject Consultation Responses Aberdeen Bat Group EIA - Stage 2 and 3, • Informed that it was possible to provide information about potential bat habitats along the corridor, but not bat roosts as these would change over time. Murtle Route • Provided 1km square grid references of bat roosts recorded within the AWPR boundary. EIA – Stage 3, Results of bat survey carried out at Kingcausie Estate: Southern Leg and • Daubentons, Common pip and Soprano pips recorded. Fastlink • Landowner at Netherley (NO844937) informed he has Great Crested Newts in his garden pond. • There are a number of roosts around Kirkton of Maryculter – there was a big roost in the new Manse a few years ago –do not know if it is still there. • Peterculter – there are a large number of roosts in Peterculter, especially in the Local Authority houses, which includes Johnstone Gardens, and also in the Millside flats.
    [Show full text]
  • NKRCC Minutes 14122020
    Email: [email protected] MINUTES – Subject to approval For the virtual meeting held on Monday 14th December, at 7.30pm, via Zoom. Community Councillors in attendance Elected Councillors in attendance Henry Irvine-Fortescue (HIF) Chair Cllr Ian Mollison Rod Farquhar (RF) Cllr Colin Pike Mandi Dorward (MD) Graham Norrie (GN) Bob McKinney (BM) Susan Astell (SA) Avril Tulloch (AT) 2 Members of the public in attendance Welcome and Introductions HIF welcomed all to the virtual public meeting of the NKRCC. 1 Police Scotland • PC Marc Camus read through the November report, which is available to view on our website. Of the 59 Antisocial Crimes reported, 29 related to youth annoyance (fireworks or large groups) and intelligence gained has identified ringleaders resulting in reporting to the youth justice team. Many of the other 30 anti-social crimes reported were in relation to COVID-19 breaches – Parties are the worst scenario for the spreading of the virus. Of the 8 Assaults reported, 5 have been detected and the team are following positive leads • for the others • Questions were raised of the security of Ardoe House Hotel – PC Camus advised a skeleton staff were housed in the hotel, but will make further enquires and report back. • Random Drink/Drug Driving tests continue, although no seasonal campaign has been advertised, as do winter vehicle checks. • A list of emergency numbers for over the festive period can also be found on the Police Report. • Police Scotland can be contacted on 101 for non emergencies or by email [email protected] 2 Apologies Apologies were received from Cllr Alison Evison 3 Previous Minutes • HIF reviewed items from the previous minutes and the majority of items outstanding are covered within matters outstanding.
    [Show full text]
  • Minutes of the Ordinary Meeting Held on Monday 20Th February 2012 at 7.30Pm at the Corbie Hall, Maryculter, Aberdeenshire
    Secretary: Bob McKinney, Lakhipara, South Cookney, Stonehaven, AB39 3RX, Tel: 01569 730706 email: [email protected] Visit our Website - www.nkrcc.org.uk Minutes of the ordinary meeting held on Monday 20th February 2012 at 7.30pm at the Corbie Hall, Maryculter, Aberdeenshire. Present: Representing: Robin Baxter (Chairman) Banchory-Devenick Robert Keeler (Vice Chairman) Cookney/Netherley Rob Winmill Cookney/Netherley Hazel Witte Maryculter Avril Tulloch Maryculter Graeme Eglintine Banchory-Devenick Cllr Carl Nelson Aberdeenshire Council Cllr Ian Mollison Aberdeenshire Council Eight members of the public 1 Apologies: Bob McKinney (Secretary), Susan Astell, Cllr Paul Melling. 2 Police Report and Presentations: Police Report Constable Norman Thompson advised that there was little to report for the period 16 January up to 19 February 2012. There have been a number of calls made to the Police during this period the majority of them being non- criminal. Whilst this is encouraging news, we must remain vigilant to ensure our communities remain a safe place to live and work. Kees Witte advised that before Christmas a road sign at the Millbank Crossroads on the B979 Netherley road, just north of Parkhead Farm had been knocked down and since then there had been a few incidents. This was echoed by another MOP. He queried who reports such matters and was advised that that the Council would be notified by Police or any other person. Stuart MacFarlane, Roads Manager agreed to look into the matter. Constable Thompson pointed out that the responsibility to drive with care lay with individual drivers. Presentation Stuart MacFarlane, Roads Manager for Kincardine, Mearns and Marr then gave a short presentation about his role.
    [Show full text]
  • Dictionary of Deeside Date Due Digitized by the Internet Archive
    UNIVERSITY OF GUELPH LIBRARY 3 lift fl 010753m T VJ UNIV SOCSCI DA 8825. M C5B Coutts, James, 1B52- Dictionary of Deeside Date due Digitized by the Internet Archive in 2013 http://archive.org/details/dictionaryofdeescout — IH Aberdeen University Press Book Printers •> •:• •:• •:• liaoi and Commercial Printers Stereo- and Electrotypers •:• Typefounders •:• •:• •:• •:• Have the largest assortment—over 400 Tons of the finest type in Scotland, in various langu- ages—Bengali, German, Greek, Hebrew, Russian, etc. ; also Music, in Old and New Notation and Gregorian. They have the finest Machinery of any Printer in the United Kingdom—without exception. This unique position places them in the front rank of British Printers. All Documents of a Private and Confidential nature have the personal care of the Comptroller. Having an extensive connection with the lead- ing Publishers, they are in a position to arrange for the publication of works of any kind. ESTIMATES FREE. & Telegrams: "PICA, ABERDEEN "• PREMIER CODE USED. CppvL-ij- hi JoLtl B artliolomew 3c Co „E imT Dictionary of Deeside A GUIDE TO THE CITY OF ABERDEEN AND THE VILLAGES, HAMLETS, DISTRICTS, CASTLES, MANSIONS AND SCENERY OF DEESIDE, WITH NOTES ON ANTIQUITIES, HISTORICAL AND LITERARY ASSOCIATIONS, ETC. BY l \ '/ JAMES COUTTS, M.A. WITH PLAN OF CITY, MAP OF COUNTRY AND TEN ILLUSTRATIONS " The Dee is a beautiful river —Byron ABERDEEN THE UNIVERSITY PRESS 1899 1 lUl^f PREFACE. The spirit that prompted the question— " Are not Abana and Pharphar, rivers of Damascus, better " than all the waters of Israel ? —still survives. Sir Walter Scott has commented on the " reverence which . the Scotch usually pay to their dis- tinguished rivers.
    [Show full text]
  • Mounth” Passes Over the Grampians
    Scottish Geographical Magazine ISSN: 0036-9225 (Print) (Online) Journal homepage: http://www.tandfonline.com/loi/rsgj19 The “Mounth” passes over the Grampians G. M. Fraser To cite this article: G. M. Fraser (1920) The “Mounth” passes over the Grampians, Scottish Geographical Magazine, 36:2, 116-122, DOI: 10.1080/00369222008734309 To link to this article: http://dx.doi.org/10.1080/00369222008734309 Published online: 27 Feb 2008. Submit your article to this journal Article views: 8 View related articles Full Terms & Conditions of access and use can be found at http://www.tandfonline.com/action/journalInformation?journalCode=rsgj20 Download by: [New York University] Date: 24 June 2016, At: 12:47 116 , . SCOTTISH GEOGRAPHICAL MAGAZINK. wide, along Gips River. , The most picturesque district is Temple Bayr with Temple Mount and Temple Eange guarding the northern and the Colorado Hills the southern side. The characteristic form of the hills is flat-topped, with gentle slopes for the topmost 200 to 300 ft., then a rocky face of some 500 to 800 ft., and the remainder scree (Icelandic skritha = an accumulation of loose stones). These screes obscure the solid rock round the base of the hills. In all cases the ascent is diffi- cult, and on this map the Pyramid, De Geer Range, and Mount Jean are the only summits that can be reached with comparative ease. A series of soundings taken in Klaas Billen Bay and a large-scale survey of Bjona Haven, together with soundings taken in Storfjordr have been handed to the Hydrographic Department of the Admiralty for use on the next edition of the Spitsbergen chart.
    [Show full text]
  • Portlethen Community Action Plan 2019
    Cruden Bay Community Action Plan May 2018 1 Location Community Action Plan 2 Introduction Community Action Plan This is the Community Action Plan All the ideas in this booklet came for the community of Portlethen. from the community. The table at the This Action Plan was created from back shows those ideas which can be various surveys and public meetings, taken forward by the community on held between 2017 and 2019. its own, those which require help These were to establish what the from an external partner and those people of Portlethen wanted in which can only be taken forward by order to improve their area in one or more external agencies, which Portlethen from the air 2008 some way, be it in a material way, can provide moral, technical and by improvement to services, or to possibly financial support. provide directions towards a change. Various inputs were It is recommended that this Action gained from different age groups Plan should have a maximum lifespan and community groups. This was of 3 years. Some projects may be managed by both the Portlethen completed quickly whist others may & District Community Council and take much longer but all should be Aberdeenshire Council. This reviewed regularly to ensure that they project for a Community Action are still relevant. Plan 2019 is being co-ordinated by the Kincardineshire Development It is important that this plan is seen Partnership. by all interested parties, both within the local community and other This information has now been partners who may be able to assist used to guide the community and with the implementation of any the Community Planning Partners actions set out in the table.
    [Show full text]
  • Mounth, Post and Templar
    Mounth, Post 5 and Templar North Kincardine has a network of interesting routes both very old down the mounth and making use of staging posts, stores and and new. Just a few metres away from the A90, the Aberdeen trading points. Aberdeen was one of the earliest cities to have Western Peripheral Route and the railway line, you step back its own postal service. The blue uniforms with silver town crests in time to stories of highway men, ghosts, knights, kings and WEREÖÙRSTÖRECORDEDÖINÖÖ4HEÖÙRSTÖMAILÖCOACHÖRANÖBETWEENÖ the church. Take time to look more closely at the landscape Aberdeen and Edinburgh along the Causey Mounth in 1787. and see signs of earlier communities – cairns, hut circles, stone Connecting the Causey Mounth to the South Deeside Road CIRCLES ÖÙELDÖSYSTEMSÖANDÖMOREÖRECENTLYÖTOÖkIMPROVEMENTSlÖINÖLANDÖ is an interesting route crossing the inner countryside of North management and features such as Bridge of Dee and Boswell’s Kincardine which was the route of the Knights Templar running Monument. The changing priorities and status of land owners between Cammachmore and Templars, near Maryculter. This has shaped this area as it passed through the hands of the THÖCENTURYÖRELIGIOUSÖORDERÖOFÖÙGHTINGÖKNIGHTS ÖPROTECTEDÖPILGRIMSÖ people, kinships, clans, kings, queens, church, estate owners, travelling to the Holy Land. communities and individuals. To get the full effect of how your predecessors discovered the landscape, these routes are better The South Deeside Road follows the meandering of the Dee appreciated on foot, by bicycle or on horseback. which takes you past the impressive and distinctive architecture of Ardoe House Hotel, Blairs College and Maryculter House Hotel. The several large mosses in North Kincardine are treacherous, Exploring these sites touches on stories of the Knights Templar, MEANINGÖTHATÖDIRECTÖROUTESÖWEREÖDIFÙCULTÖTOÖENGINEERÖ4HEÖ2OMANSÖ the power of Royalty, the Church and industrialisation of the moved north from Raedykes camp towards Normandykes, near North East.
    [Show full text]
  • Chapelton Post Charrette Paper
    we were asked if we could provide a of urban sprawl. We want to design This paper is an body of water that was at least 250m a community where residents will be opportunity for us to long to enable kayaking as such a able to walk to work, to school and facility is lacking in the area. We have to the shops with the inevitable social communicate the outcome managed to plan for this by the linking interaction that pedestrian activity brings. of the Charrette we held of two of the new ponds. Another Combining this place-making approach interesting idea that was raised with good house designs means we in September last year. concerned the difficulty we all have believe we will be able to create a most in receiving deliveries during the day. desirable living space in Aberdeenshire Under the guidance of world-renowned In response, one of the architects made and something of which all contributors planner Andrés Duany and his team the provision for a delivery cupboard in will be proud. purpose was to gather information from some of his house designs and this interested parties with a view to creating could be adopted more widely. The details of this masterplan will be a masterplan for our proposed new shown in an exhibition at Cookney Hall community. We are not attempting Following the Charrette, the architects on Wednesday the 30th March, from to present a fait accompli in terms of have continued to work on house 2pm to 9pm, and on Thursday 31st design. What has happened so far is designs and we now have over 40 March, from 10am to 8pm.
    [Show full text]
  • Resources the 'Not Preferred' Recommendation Is Also Consistent with the Policies on Protecting Resources (Ch 10)
    MIR956 Aberdeenshire C:OLJNCIL Doing things digitally is our preference. Tick the box If you are !!.2.thappy to receive correspondence via email: D Tick the box if you would like to subscribe to the Aberdeenshire LOP eNewsletter: l✓I Fair processing notice Please tick to confirm your agreement to the following statements: By submitting a response to the consultation, I agree that Aberdeenshire Council can use the information provided in this form, including my personal data, as part of the review of the Aberdeenshire Local Development Plan. This will include consultation on the Main Issues Report (including any subsequent Proposed Plan). I also agree that following the end of the consultation, i.e. after 8 April 2019, my name and respondent identification number (provided to you by Aberdeenshire Council on receipt of your submission) can be published alongsider a copy of my completed response on the Main Issues Report website (contact details and information that is deemed commercially sensitive will not be made available to the public). The data controller for this information is Aberdeenshire Council. The data on the form will be used to inform a public debate of the issues and choices presented in the Main Issues Report of the Aberdeenshire Local Development Plan 2021. It will inform the content of the Proposed Aberdeenshire Local Development Plan. Aberdeenshire Council will only keep your personal data for as long as is needed. Aberdeenshire Council will retain your response and personal data for a retention period of 5 years from the date upon which it was collected. After 5 years Aberdeenshire Council will review whether it is necessary to continue to retain your information for a longer period.
    [Show full text]
  • Cammachmore Community Action Plan Map Community Action Plan
    Cammachmore Community Action Plan Map Community Action Plan Map of Cammachmore obtained from Google maps 2 Introduction Community Action Plan In March 2012 Newtonhill, Muchalls & Cammachmore Community Council, funded by the Kincardine & Mearns Local Community Planning Group, carried out a community consultation by delivering questionnaires to every property in the area. The outcomes from the completed questionnaires and comments given to members of the Community Council have been used to develop this prioritised Action Plan to help the community to focus on and develop future goals. For the purposes of this report we have taken West Cammachmore to include all the properties in the village and to the west, including Chapelton. The Community Council have worked with North Kincardine Rural Community Council in the preparation of this action plan. The Community Council will use this Community Action Plan to inform decision making and to promote the views and wishes of the communities of Cammachmore and Chapelton. History There is evidence of settlements here from before 1650. The natural harbour at Newtonhill provided a sheltered landing place for fishermen from Cammachmore and Skateraw. A pier was built around 1880 for use by fishing and cargo vessels (coal & lime), but the harbour proved unsuitable for steam driven vessels. In the late 1880’s the Laird improved the cottages to encourage the fishermen to stay, but despite this, many fishermen relocated to Stonehaven and Aberdeen. The pier fell into disrepair and was blown up in 1980. The 1901 census tells us that about one third of the cottages were vacant. West Cammachmore stands on what was the main drovers’ road, the Causey Mounth, from the south near Gillybrands Farm (formerly Jeally Bran’s Inn in the mid 18th century).
    [Show full text]
  • Issue 121 Arbuthnott
    Issue 121 Arbuthnott 1. List of Respondents None. 2. Issues No issues were raised in respect of Arbuthnott. 3. Actions The Draft Proposed Local Development Plan A number of changes were proposed in the Draft Proposed Local Development Plan on the basis of early consultation with stakeholders. These are captured in the recommendations below. 4. Recommendations 1. Amend the Vision in the Settlement Statement noting that the lack of small-scale housing is an issue for the local community. 5. Committee Decisions 1. Kincardine and Mearns Area Committee agreed the above recommendation at their special meeting on 20 and 21 August 2019. 2. At their meeting of 3 October 2019, Infrastructure Services Committee considered the views of Kincardine and Mearns Area Committee and no further recommendations were identified. 3. At the meeting of Aberdeenshire Council on 5 March 2020, Members agreed that the content of the Proposed Aberdeenshire Local Development Plan 2020 provides the settled view of the Council on the Plan they wish to see adopted in 2021. Issue 122 Auchenblae 1. List of Respondents MIR Ref Respondents 506 Scottish Natural Heritage 805 SEPA 914 Murray Architects on behalf of KIC (Holdings) Ltd 2. Issues Flood Risk SEPA has noted that text under ‘Flood Risk’ needs to be updated to reflect sites being removed from the Plan, and to state that Flood Risk Assessments (FRA) will be required for the settlement (805). Services and Infrastructure SEPA has noted there is no reference to waste water drainage in the Draft Proposed Local Development Plan (LDP) for Auchenblae. The settlement is on part of the sewer network served by Laurencekirk Waste Water Treatment Works (WWTW).
    [Show full text]